A1 autostrada (Poland)

Last updated
A1-PL.svg
Autostrada A1
Autostrada Bursztynowa
NowaMapaA1.svg
Route information
Part of E75-PL.svg E 75
Length484.0 km (300.7 mi)
565.1 km (351 mi) planned
Major junctions
From S6-PL.svg S6 near Gdańsk
  S5-PL.svg S5 near Grudziądz (planned)

S10-PL.svg S10 near Toruń
A2-PL.svg A2 near Stryków
S8-PL.svg S8 near Tuszyn
S8-PL.svg S8 and S12-PL.svg S12 (planned) near Piotrków Trybunalski
S1-PL.svg S1 near Katowice International Airport in Pyrzowice
S11-PL.svg S11 near Tarnowskie Góry (planned)

Contents

A4-PL.svg A4 near Gliwice
To CZ traffic sign IS16a - D1.svg D1 border with Czech Republic
Location
Major cities Gdańsk, Grudziądz, Toruń, Łódź, Piotrków Trybunalski, Częstochowa, Gliwice
Highway system
National roads in Poland
A50-PL.svg A 50 A2-PL.svg A 2
A1 near Grudziadz, northern (Gdansk - Grudziadz) section. Autostrada A1 Swarozyn-Nowe Marzy.JPG
A1 near Grudziądz, northern (Gdańsk - Grudziądz) section.
2005 photo of partially completed bridge over the Vistula river in Torun-Czerniewice on the Torun bypass, with only one carriageway finished and pillars for the planned second one. The bridge was opened with dual carriageways in fall of 2011 and became part of A1. Torun-Czerniewice most.jpg
2005 photo of partially completed bridge over the Vistula river in Toruń-Czerniewice on the Torun bypass, with only one carriageway finished and pillars for the planned second one. The bridge was opened with dual carriageways in fall of 2011 and became part of A1.
Southern part of the Gliwice-Sosnica interchange of A1 motorway, A4 motorway, national road 44 and voivodeship road 902, the largest motorway junction in Europe, opened 2009-2010 Wezelsosnicafromthesky.JPG
Southern part of the Gliwice-Sośnica interchange of A1 motorway, A4 motorway, national road 44 and voivodeship road 902, the largest motorway junction in Europe, opened 2009-2010
800 meter bridge in Knurow near Gliwice Stawmoczuryfromthesky.jpg
800 meter bridge in Knurow near Gliwice
400 meter bridge in Mszana near Wodzislaw Slaski Most w Mszanie powiat wodzislawski 2015.jpg
400 meter bridge in Mszana near Wodzisław Śląski

The autostrada A1, officially named Amber Highway (pol. Autostrada Bursztynowa) in Poland is a north–south motorway, partly under construction, that runs through central Poland, from Gdańsk (on the Baltic Sea) through Łódź and the Upper Silesian Industry Area (to the west of Katowice) to the Polish-Czech border in Gorzyczki/Věřňovice, where it is connected with the Czech motorway D1. Except for its southernmost section, the motorway is a part of European route E75.

The total planned length is 565.1 km (351.1 mi). As of May 2020, 484 km (301 mi) are opened to traffic. The section from Gdańsk to Toruń is tolled, with fees being collected in toll booths across the motorway.

On the remaining 81 km (50 mi), an existing dual-carriageway national road 1 in under reconstruction to motorway standard (the bidirectional traffic being diverted onto a single carriageway for the time of reconstruction). The motorway is contracted to be fully completed by October 2022.

History of construction

The construction of the A1 motorway has been a highly politicized issue in Poland, as it is perceived to be an economically vital road that would connect the country's major ports on the Baltic coast with both central and southern Poland. One short fragment (17 km) was constructed in years 1978 – 1989, one of the first motorway stretches built under communist regime. Since 1989 various governments and political parties have supported an accelerated construction schedule for this motorway, without results.

After many delays, caused mainly by lack of funding, construction started in 2005. The main part of the motorway was constructed in years 2005 – 2014: about 395 km (70% of the route's length) have been built within this period. By July 2016 (when a delayed Łódź bypass section was finished), the route has been completed except for those sections where the old national road 1 had already been a dual carriageway, allowing for a significantly lower priority of constructing a motorway on this remaining stretch compared to construction of other highways.

The section from Częstochowa to Pyrzowice is being constructed in years 2016 – 2020. The remaining section from Tuszyn to Częstochowa is being constructed in years 2019 – 2022, which also includes an upgrade of the 17 km long pre-1989 stretch.

Gdańsk to Stryków

This section was built in stages between 2005 and 2014. First, a 25 km (16 mi) section was opened on 22 December 2007, near Gdańsk, extending the S6 bypass expressway, and a remaining 65 km (40 mi) opened on 17 October 2008. The 62 km extension of the motorway to Toruń opened on 14 October 2011. In November 2012 a 75 km (47 mi) long section from Kowal to Łódź Północ interchange in Stryków was opened, followed by 45 km (28 mi) extension from Toruń to Włocławek in December 2013. Missing Włocławek-Kowal section was completed in April 2014.

Stryków to Pyrzowice

The oldest section of this segment, a 17.5 km (11 mi) stretch as the Piotrków Trybunalski bypass, was built between 1978 and 1989. This was one of the very few stretches of motorway built in Poland under the Communist regime. In addition, the section from Częstochowa to Piotrków Trybunalski was built in the 1970s as a dual carriageway road on a motorway alignment. However, it lacks motorway interchanges, and instead has standard intersections with no grade separation, regulated by traffic lights.

On 22 January 2009 a contract was signed for the construction of the 180 km (110 mi) section from Stryków (junction with motorway A2) to Pyrzowice. [2] Under the terms of the contract, the segment from Stryków to Częstochowa (123 km (76 mi)) was to be finished by May 2012, while the remaining segment from Częstochowa to Pyrzowice (57 km (35 mi)) was to be finished by January 2014 (60 months after the signing of the contract). The motorway was to be built within a Private-Public Partnership framework by company Autostrada Południe. The contract included the rebuilding of an already existing stretch of A1 motorway (opened in 1989) as well as the upgrade of the existing dual-carriageway road between Piotrków Trybunalski and Częstochowa. On 23 January 2010 the contract was cancelled as the company was not able to secure financing. [3] It carried out the design project of the motorway however, which according to the Polish government was to make it possible for construction to begin in 2010 by new contractors, and be finished by 2012. However, the design project turned out to be full of flaws and needed to be redone. [4]

The section from Łódź Północ interchange to Tuszyn interchange was opened in 2016. The section from Pyrzowice to Częstochowa began construction in 2016, and was finished in 2020. Reconstruction of the remaining dual-carriageway stretch from Częstochowa to Piotrków Trybunalski began in 2019, with completion of 3 sections contracted for 2021 and 2 sections: for 2022.

Pyrzowice to border with Czech Republic

At the southern end of the motorway, construction of a 15.5 km (9.6 mi) section from Gliwice-Sośnica to Bełk, part of the southernmost section from the junction with the A4 motorway at Sośnica district of Gliwice to the Czech border, began on 26 March 2007 and was completed in December 2009. The remainder of the 48 km (30 mi) long section from A4 to the border was opened in different stages from 2009 till 2014. Construction of the 43 km (27 mi) section from Gliwice-Sośnica north to Pyrzowice began in 2009 and was fully completed by June 2012.

On 15 December 2009 the Polish government announced the cancelling of the contract for building the Świerklany - Gorzyczki (Czech border) section, citing the unacceptably slow pace of construction by Alpine Bau GmbH . [5] The government solicited new bids for this section in April 2010 [5] and the bid was won by the same company that lost the original contract, and construction resumed in October 2010. [6] The original plan was for the road to be ready in the Summer of 2010, [5] and according to the new contract it was to be ready in April 2012, in time for Euro 2012 championships. Alpine Bau GmbH abandoned their second effort to finish this section in May 2013. [7] It was finally opened in May 2014.

Sections of the motorway

Motorway sectionLengthConstructedNote
Gdańsk - Grudziądz 90 km20052008opened October 17, 2008; toll motorway
Grudziądz - Toruń 62 km20082011opened October 14, 2011; toll motorway
Toruń - Kowal 64 km20102014Construction interrupted in September 2012, as companies involved have been ejected from the contract. [8] [9] (the ejected companies have sued the Polish authorities). New contractors have been selected in April 2013 and the road opened to traffic in December 2013 (45 km) and April 2014 (19 km). [10] [11]
Kowal - Stryków/Łódź 75 km20102012opened November 13, 2012
Stryków/Łódź - Tuszyn 37.3 km20122016 Design-build contract signed in December 2010, completion originally planned in 32 months, [12] then delayed to June 2014, [13] then later plans had it completed in Summer of 2015. [14] However, the contractor abandoned the contract in January 2014. [15] New contractors have been appointed fall 2014. [16] Opened July 2016.
Tuszyn - Piotrków Trybunalski 16 km19781989;
20192021
Reconstruction of an existing motorway fragment constructed in the 1980s. Widening to 3 lanes per direction. Reconstruction intended to be finished in late 2021.

Currently without motorway features (narrowed to one lane per direction, at-grade intersections, traffic lights, etc.) for the time of reconstruction.

Piotrków Trybunalski - Częstochowa 65 km20192022Reconstruction of an existing dual-carriageway road constructed in the 1970s (with some motorway features) into a motorway. Widening to 3 lanes per direction.

Eastern carriageway of the old road closed, traffic diverted to western carriageway (one lane northbound, one / two lanes southbound depending on the fragment). First reconstructed carriageway is intended for opening in 2021 and since then two continuous lanes in each direction will be provided to ease the traffic congestion. Second carriageway is to be completed by the end of 2022.

Częstochowa bypass20,3 km2015-2019opened 23 December 2019, construction works continue [17] .
Contract signed in October 2015. In April 2019, Salini Impregilo was ejected from the contract for extensive delays. In August 2019, completion of the section was awarded to Budimex, Strabag and Bud-Pol. The section is open to traffic since 23 December 2019, while the construction works continued till June 2020.
Blachownia -"Częstochowa Południe"4,7 km2015-2019opened 23 December 2019 [18]
"Częstochowa Południe" - Woźniki 16,7 km2016-2019opened 2 August 2019
Woźniki - Pyrzowice 15,2 km2015-2019opened 2 August 2019
Pyrzowice - "Zabrze Północ”31 km2009–2012opened 1 June 2012 [19]
"Zabrze Północ” - Maciejów 8,1 km2009–2011opened December 2011, [20] 3 lanes per direction
Maciejów - "Gliwice Sośnica"6 km2009–2011opened September 2011, [21] 3 lanes per direction
"Gliwice Sośnica" - Bełk 15,5 km2007–2009opened December 2009, 3 lanes per direction
Bełk - Świerklany 14,1 km2008-2011Bełk - Rowień opened in December 2010, 3 lanes per direction
Rowień - Świerklany opened in April 2011 (delayed because of floods)
Świerklany - Mszana 7,3 km20072014Construction interrupted in late 2009 due to contract dispute, [5] then resumed [6] in October 2010. Was to open in July 2012, [22] but a problem with one of the bridges then moved the planned opening until August, 2013. [23] In May, 2013 the contractor abandoned the project, citing disagreement with Polish government agencies. [24] A new contractor to finish the bridge was selected in June 2013, and the road fully opened to traffic on May 23, 2014.
Mszana - Gorzyczki (Czech border)11,1 km20072012Construction interrupted in late 2009 due to contract dispute, [5] then resumed [6] in October 2010. Opened (to light vehicles only) in November 2012, and to all vehicles on May 23, 2014 after completion of adjacent section. [25]

Route description

Number of exit(facility)Exit(facility) nameMileage from terminusNotes(facilities available if opposite the MOP(rest area))
(1) Rusocin S6-PL.svg DK91-PL.svg DW226-PL.svg E75-PL.svg 0 km
Toll booth 1 Gdańsk 1 km (0.62 mi)
(1)MOP Kleszczewko 5.2 km (3.23 mi)parking only
(2) Stanisławie DW224-PL.svg 16 km (9.94 mi)
(3) Swarożyn DK22-PL.svg 24.4 km (15.16 mi)
(4) Pelplin DW229-PL.svg 35.9 km (22.31 mi)
(2)MOP Olsze 41 km (25.48 mi)petrol station, restaurant present as well as parking
(5) Kopytkowo DW231-PL.svg 57.9 km (35.98 mi)
64.7 km (40.20 mi)Border: kujawsko-pomorskie and pomorskie voiv
(3)MOP Gajewo68.3 km (42.44 mi)(southbound)

70 km (43.50 mi)(northbound)

parking only
(6) Warlubie DW214-PL.svg Indirect (in 1 km range): DK91-PL.svg DW238-PL.svg DW391-PL.svg 73.2 km (45.48 mi)
(7) Nowe Marzy DK5-PL.svg DK91-PL.svg Contract signed for(works haven't started): S5-PL.svg 89 km (55.30 mi)
Bridge over Vistula middle at 94.3 km (58.60 mi)
(8) Grudziądz DK95-PL.svg (indirect access to DK55-PL.svg )96.1 km (59.71 mi)
(4)MOP Malankowo 105.6 km (65.62 mi)petrol station and restaurant
(9) Lisewo DW548-PL.svg 111.8 km (69.47 mi)
(5)MOP Nowy Dwór128.4 km (79.78 mi)parking only
(10) Turzno DK96-PL.svg (indirect access to DK15-PL.svg DW646-PL.svg )134.3 km (83.45 mi)
(11)Toruń Wschód DK10-PL.svg DK80-PL.svg (indirect access to DW552-PL.svg )140.4 km (87.24 mi)
(6)MOP Nowa Wieś143.3 km (89.04 mi)Parking only
Toll booth Toruń 143.7 km (89.29 mi)
Bridge over Vistula(Most Im. Armii Krajowej)149.1 km (92.65 mi)
(12)Czerniewice S10-PL.svg 151 km (93.83 mi)End of toll road
(7)MOP Otłoczyn Zachód159 km (98.80 mi)Petrol station and restaurant
(13) Ciechocinek DK91-PL.svg (indirect access) DW266-PL.svg 163.6 km (101.66 mi)
(8)MOP Kałęczynek Zachód177 km (109.98 mi)parking only
(14)Brzezie DW252-PL.svg DW268-PL.svg (indirect access)186.5 km (115.89 mi)
(15) Włocławek DK62-PL.svg 195.1 km (121.23 mi)
(9)MOP Ludwinowo Wschód201.8 km (125.39 mi)parking only
(16) Kowal DK91-PL.svg 215 km (133.59 mi)
(10)MOP Lubień Północ218.7 km (135.89 mi)petrol station
229.5 km (142.60 mi)Triple border point: kujawsko-pomorskie, łódzkie and mazowieckie (going on the border of the two latter voivoderships to 235.9 km (146.58 mi), when fully starts going in łódzkie)
(11)MOP Strzelce236.9 km (147.20 mi)Eastbound only, parking only
(17) Kutno Północ DK60-PL.svg 243.4 km (151.24 mi)
(18) Kutno Południe DK92-PL.svg 252.6 km (156.96 mi)
(19) Piątek DW703-PL.svg 271 km (168.39 mi)
(12)MOP Głowno 278.1 km (172.80 mi)
(20) Łódź Północ A2-PL.svg E30-PL.svg 292.2 km (181.56 mi)
(13)MOP Skoszewy 298.2 km (185.29 mi)
(21) Brzeziny DK72-PL.svg 303.9 km (188.83 mi)
(22)Łódź Wschód DW713-PL.svg 309.9 km (192.56 mi)
(14)MOP Wiśniowa Góra314.9 km (195.67 mi)
(23)Łódź Górna DW714-PL.svg 318.0 km (197.60 mi)
(24)Łódź Południe S8-PL.svg E67-PL.svg 322.3 km (200.27 mi)
(25)Tuszyn DK12-PL.svg DK91-PL.svg 332.8 km (206.79 mi)Exit from eastern carriageway only toward Łódź.
(26) Piotrków Trybunalski Zachód S8-PL.svg E67-PL.svg 346.1 km (215.06 mi)Entrance into southern direction (Gorzyczki) only, upgrade ongoing
(27)Piotrków Trybunalski Południe DK74-PL.svg 348.9 km (216.80 mi)Terminus, upgrade ongoing
(28) Kamieńsk DW484-PL.svg Under construction
(29) Radomsko DK42-PL.svg
Entrance to Silesian voivodership
(30) Mykanów Under construction
(31)Częstochowa Północ (Rząsawa) (indirect access to DK91-PL.svg )0 km
(32)Częstochowa Jasna Góra (Lgota) DK43-PL.svg 10.0 km (6.21 mi)
(33)Częstochowa Blachownia DK46-PL.svg 18.3 km (11.37 mi)
(34) Częstochowa Południe DW908-PL.svg 23.0 km (14.29 mi)
(15)MOP Starcza29.4 km (18.27 mi)
(35) Woźniki DW789-PL.svg 39.9 km (24.79 mi)
(16)MOP Woźniki42.6 km (26.47 mi)
(36) Pyrzowice S1-PL.svg 56.5 km (35.11 mi)
(37) Piekary Śląskie DW911-PL.svg 70.6 km (43.87 mi)
(38) Bytom DK11-PL.svg 73.1 km (45.42 mi)
(39) Zabrze Północ DK78-PL.svg DK94-PL.svg 83.1 km (51.64 mi)
(40)Zabrze Zachód DK78-PL.svg 88.4 km (54.93 mi)
(41) Gliwice Wschód DK88-PL.svg 92.6 km (57.54 mi)
(42)Gliwice Sośnica(I) DW902-PL.svg 96.7 km (60.09 mi)
(43)Gliwice Sośnica(II) DK44-PL.svg 97.9 km (60.83 mi)
(44)Gliwice Sośnica(III) A4-PL.svg E40-PL.svg 99.0 km (61.52 mi)
(45) Knurów DW921-PL.svg 103.5 km (64.31 mi)
(17)MOP Knurów106.8 km (66.36 mi)Parking only
(46) Dębieńsko 110.7 km (68.79 mi)
(47) Rybnik DW925-PL.svg 114.5 km (71.15 mi)
(48)MOP Rowień Zachód121.5 km (75.50 mi)Petrol station and restaurant
(49) Żory DW935-PL.svg 121.9 km (75.75 mi)
(50) Świerklany DW932-PL.svg 128.9 km (80.09 mi)
(51) Mszana DW933-PL.svg 136.2 km (84.63 mi)
(18)MOP Mszana139.2 km (86.49 mi)Restaurant, hotel, petrol station and shower
(52) Gorzyce (indirect access to DK78-PL.svg )145.4 km (90.35 mi)Last interchange before border to Czech Republic
Border Gorzyce-Bohumín Flag of Poland (WFB 2004).gif Flag of the Czech Republic.svg 147.5 km (91.65 mi)Entrance to CZ traffic sign IS16a - D1.svg (Czech motorway);to Ostrava, Olomouc, Brno, Bratislava and Prague

See also

Related Research Articles

Łódź Voivodeship Voivodeship of Poland

Łódź Voivodeship is a province-voivodeship in central Poland. It was created on 1 January 1999 out of the former Łódź Voivodeship (1975–1999) and the Sieradz, Piotrków Trybunalski and Skierniewice Voivodeships and part of Płock Voivodeship, pursuant to the Polish local government reforms adopted in 1998. The province is named after its capital and largest city, Łódź, pronounced.

Highways in Poland Wikipedia list article

Highways in Poland are public roads designed to carry large amounts of traffic.

Katowice Airport

Katowice Airport is an international airport, located in Pyrzowice, 30 km (19 mi) north of Katowice, Poland. The airport has the 4th-biggest annual passenger flow in Poland. Katowice Airport is the biggest Polish airport in terms of leisure traffic. It is also the second biggest airport in the country in terms of cargo traffic. It operates a variety of charter, regular and cargo flights. Long-haul flights are operated from Katowice to Cancún in Mexico, Malé in Maldives and to Puerto Plata as well as Punta Cana in Dominican Republic by LOT's Boeing 787s Dreamliner. The airport has the tallest Air Traffic Control Tower and the second longest runway in Poland. Katowice Airport is the Poland's only airport with more than one passenger terminal and the airport with the biggest number of based airlines. The Katowice Airport serves the most industrialised region in Poland, one of the most urbanised areas of Europe. 13 million inhabitants are estimated to live within 100 km of Katowice Airport. This is a larger catchment area than many airports in Europe.

A2 motorway (Romania)

The A2 motorway, also known as The Motorway of the Sun, is a motorway in Romania which links Bucharest with Constanța, a city-port on the shore of the Black Sea, where it merges after an interchange into the A4 motorway. It is 206 km long, and has been operational on its entire length since November 2012.

European route E75 Road in trans-European E-road network

European route E 75 is part of the International E-road network, which is a series of main roads in Europe.

A4 autostrada (Poland)

The A4 autostrada in Poland is a 672 km (418 mi) long east–west motorway that runs through southern Poland, along the north side the Sudetes and Carpathian Mountains, from the Polish-German border at Zgorzelec-Görlitz, through Wrocław, Opole, Gliwice, Katowice, Kraków, Tarnów and Rzeszów, to the Polish-Ukrainian border at Korczowa-Krakovets. It is a part of European route E40.

A2 autostrada (Poland)

The autostrada A2 in Poland, officially named Autostrada Wolności, is a motorway which runs from the Polish-German border in Świecko/Frankfurt an der Oder, through Poznań and Łódź to Warsaw and, in the future, to the Polish-Belarusian border in Terespol/Brest. The motorway is a part of the European route E30 connecting Berlin and Moscow.

A18 autostrada (Poland)

Autostrada A18 is a short, planned motorway in southwestern Poland which is to run from the Polish/German border at Olszyna/Forst-Bademeusel to the Polish Autostrada A4. The highway is part of the European route E36 and the Pan-European corridor IIIA from Berlin to Wrocław.

A6 autostrada (Poland)

The autostrada A6 in Poland is a short motorway that starts at the Polish/German border at Kołbaskowo/Pomellen connecting to the German A11 autobahn. It forms a southern bypass of the Szczecin metropolitan area and terminates at Rzęśnica interchange to the east of the city, from where it continues in an expressway standard as S3 towards Świnoujście and S6 towards Gdańsk. Its length is 29.2 km (18.1 mi). The motorway is part of the European route E28.

Expressway S1 (Poland)

Expressway S1 or express road S1 is an expressway under construction in Poland with a planned length of 130 km (81 mi), which is located in the Silesian and Lesser Poland voivodeships. Upon completion, it will connect the A1 motorway near the Katowice International Airport in Pyrzowice with the A4 motorway and the border of Slovakia in Zwardoń, where it will connect to the D3 Motorway. A major part of the route is the Eastern beltway of Upper Silesian Industrial Region.

Expressway S2 (Poland)

Expressway S2 is a short highway in Poland, serving as the southern section of the Warsaw Express Ring Road. Conceptually forming one continuous route with motorway A2, it was initially planned as a part of it, however after local Warsaw residents objected to the plans of an inner-city motorway, the proposed road was downgraded to an expressway.

Expressway S3 (Poland)

Expressway S3 or express road S3 is a major road under development in Poland, which is planned to run from Świnoujście on the Baltic Sea through Szczecin, Gorzów Wielkopolski, Zielona Góra and Legnica, to the border with the Czech Republic, where it will connect to the planned D11 motorway. The total intended length is 480.7 km (298.7 mi), of which 367.8 km (228.5 mi) is open to traffic and 56.3 km (35.0 mi) is under construction.

Expressway S6 (Poland)

Expressway S6 is a major road in Poland which has been planned to run from the A6 autostrada in Szczecin, through Goleniów in West Pomerania to Gdańsk parallel to the Baltic coast, forming the main connection between Gdańsk and Szczecin.

Expressway S8 (Poland)

Expressway S8 or express road S8, officially named The Route of the Heroes of the Battle of Warsaw 1920 is a major road in Poland which connects Wrocław via Łódź and Warsaw to Białystok. The whole road is about 587 km (365 mi) long. Construction of the last fragment finished in October 2019.

Expressway S61 (Poland)

Expressway S61 or express road S61 is a major planned road in Poland which is going to run from the Polish-Lithuanian border near Budzisko to Ostrów Mazowiecka.

National road 91 (Poland)

Droga krajowa nr 91 is a route belonging to Polish national roads network. It runs from the seaport in Gdańsk to Częstochowa, and goes through Pomeranian, Kuyavian-Pomeranian, Łódź and Silesian Voivodeships.

National road 1 (Poland)

National road 1 is a route in the Polish national road network. The highway connects the northern and southern regions of Poland, running from Gdańsk to Zwardoń at the Slovak border, traversing the Pomeranian, Kuyavian-Pomeranian, Łódź and Silesian voivodeships. It has four bridges over the Vistula river. Most of the national road 1 is a component of European highway E75.

Grodzisk Mazowiecki–Zawiercie railway

The Central Rail Line, which was completed on 23 December 1977, could have been the first high speed railway line in Europe. Designed for speeds of up to 250 km/h, the line goes from the city of Zawiercie in Zagłębie Dąbrowskie region of southern Poland, to Grodzisk Mazowiecki in the suburbs of Warsaw. Its length is 224 kilometers, and in the Polish rail system it is officially known as Rail Line Number 4. The line was originally built for rail freight transport, but it now carries InterCity and EuroCity long-distance passenger services, mostly from Wrocław and Opole, Częstochowa, Katowice, Kraków to Warsaw.

Łódź Ring Road

Łódź Ring Road is a common name to the complex of motorways and expressways in Poland, being built in order to decrease the traffic in the city of Łódź and neighbouring regions of Zgierz, Pabianice and Rzgów.

The 1982–83 Polish Cup was the 29th edition of the annual Polish football knockout tournament. It started on the 23 July 1982 and finished on 22 June 1983. The finalists were 2nd division Piast Gliwice and 3rd division Lechia Gdańsk, with Lechia Gdańsk winning the Polish Cup for the first time after winning the final 2–1.

References

  1. "Podpisano umowę na największy węzeł autostradowy w Europie :: Generalna Dyrekcja Dróg Krajowych i Autostrad - Serwis informacyjny". www.gddkia.gov.pl. Retrieved 2020-07-12.
  2. News on GDDKiA official web portal
  3. biznes.onet.pl article Jan. 23, 2009 Archived January 26, 2010, at the Wayback Machine
  4. Ostre hamowanie A1 w Pyrzowicach
  5. 1 2 3 4 5 biznes.onet.pl article, 15 December 2009 Archived 12 January 2010 at the Wayback Machine
  6. 1 2 3 Announcement on official www.gddkia.gov.pl
  7. constructionpoland.com article on abandonment, 20 May 2013
  8. "Minister: autostrada A1 do Łodzi dopiero za rok". Archived from the original on 2012-09-10. Retrieved 2012-09-07.
  9. Walsh, John (September 14, 2012). "Sisk to sue Poland over road project". Irish Examiner.
  10. Salini dokończy budowę A1. Umowy podpisane
  11. "Gazeta Wyborcza". Archived from the original on 2013-12-21. Retrieved 2013-12-21.
  12. Umowa na budowę odcinka autostrady A1 w kierunku Katowic
  13. "Archived copy". Archived from the original on 2012-10-24. Retrieved 2012-10-22.CS1 maint: archived copy as title (link)
  14. "Autostrada A1. Bez szans na oddanie w terminie". Archived from the original on 2013-10-11. Retrieved 2013-10-08.
  15. "Budowa autostrady A1. Kiedy dokończą obwodnicę Łodzi?". Archived from the original on 2014-01-29. Retrieved 2014-01-24.
  16. "Archived copy". Archived from the original on 2014-10-07. Retrieved 2014-10-03.CS1 maint: archived copy as title (link)
  17. "Autostrada A1 - obwodnica Częstochowy w końcu gotowa!". AutoŚwiat.pl. 2019-12-22. Retrieved 2019-12-22.
  18. "Autostradowy cud przed świętami. GDDKiA w poniedziałek otworzy A1 wokół Częstochowy". Forsal.pl. 2019-12-20. Retrieved 2019-12-20.
  19. "Przybyło nam kolejne 28 km autostrad". Bankier.pl. 2012-06-01. Retrieved 2012-11-07.
  20. GDDKiA official announcement
  21. Autostrada A1 otwarta z Maciejowa do Sośnicy!
  22. Autostrada A1. Nie zdążą przed Euro 2012 Archived April 9, 2012, at the Wayback Machine
  23. Naprawa mostu na autostradzie A1 wystraszyła inwestorów. Gmina załamana
  24. Alpine Bau nie dokończy mostu w Mszanie na autostradzie A1
  25. A1 do samej granicy? Wiemy kiedy będzie gotowa