Agra Metro

Last updated

Agra Metro
UPMRC.svg
UPMRC logo
Overview
Owner Uttar Pradesh Metro Rail Corporation
Area served Agra
Locale Agra, Uttar Pradesh
Transit type Rapid transit
Number of lines2
Line number
  • Yellow Line
  • Blue Line
Number of stations27 (Phase 1)
6 (priority corridor)
Website www.lmrcl.com
Operation
Began operationMarch 6, 2024;38 days ago (2024-03-06)
CharacterElevated & Underground
Train length3 Coaches
Technical
System length29.65 km (Phase-1)
7.0 km (priority corridor) [1]
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Electrification 750 V DC third rail
Average speed34.0 km/h (21.1 mph) [2] [3]
Top speed90 km/h (56 mph)
System map

AgraMetraRouteMap.jpg

Agra Metro is a rapid transit network in Agra, the fourth largest city in the Indian state of Uttar Pradesh. The Detailed Project Report (DPR) was submitted in 2014 and cleared by the Uttar Pradesh cabinet in 2015. However, due to the formation of a new government and a new Metro Rail Policy, a revised feasibility report was created with the government finally approving it on the 6 March 2024. The Agra Metro is set to consist of two metro lines, with a total length of 29.65 kilometres (18.42 mi).

Contents

Once completed it will be the 2nd fastest urban transit system in Uttar Pradesh after Meerut Metro and Delhi Meerut RRTS.

Agra Metro & Taj Mahal Agra Metro.png
Agra Metro & Taj Mahal

History

As of July 2016, DPR has been prepared by RITES and submitted to the state government. [4]

On 28 February 2019, Union Cabinet approved the metro project in Agra worth 8379.62 crore. [5] [6]

6 March 2024: Prime Minister Narendra Modi inaugurated the first stretch of Agra Metro Project.

Project highlights

The cost of construction is estimated at 350 crore per km. The cost will be evaluated based on the June 2015 price index.

Agra Metro Rail Project will have 2 corridors that will pass through the heart of the city and will connect prominent tourist places including Taj Mahal, Agra Fort, and Sikandra as well as ISBT, Raja Ki Mandi railway station, Medical College, Agra Cantonment railway station, Collectorate, Sanjay Place, and surrounding densely populated residential areas.

Highlights of these corridors include:

  1. The length of Sikandra to Taj East Gate corridor 14.00 km, which is partly elevated and partly underground and comprises 13 stations (6-Elevated and 7-Underground).
  2. The length of Agra Cantt to Kalindi Vihar corridor is 15.40 km comprising 14 stations all elevated.
  3. The estimated cost of the project is 8,379.62 crore and the project will be completed in five years.

About 20 lakh population of the city is expected to be benefitted by Agra Metro Rail Project directly and indirectly at the time of commencement of commercial operations.

The proposed corridors will be having Multimodal Integration with Railway Stations & BRTS Stations and will have a feeder network of Bus, Intermediate Public Transport (IPT), and Non-Motorized Transport (NMT). The Project will have non-fare box revenue from rental & advertisement as well as Value Capture Financing (VCF) through the mechanism of Transit-Oriented Development (TOD) and Transfer of Development Rights (TDR).

The Agra Metro became operational on 6 March 2024. [7]

Route network

Phase 1

In Phase 1, 14 metro stations will be built on the Yellow Line (Line 1) from Sikandra to Taj East Gate and 15 metro stations will be built on the Blue Line (Line 2) from Agra Cantt to Kalindi Vihar. [8]

Line NameTerminalsLengthStations
Yellow Line SikandaraTaj East Gate14.27 km13
Blue Line Agra CanttKalindi Vihar15.40 km15
Total29.67 km28

Current Phases

Phase 1
Line NameTerminalsLengthStationsOpening Date
Yellow Line SikandraMankameshwar Mandir9.07 km7Under construction
MankameshwarTaj East Gate6 km [9] 66 March 2024
Blue Line Agra CanttKalindi Vihar15.40 km15Planned
Total29.67 km28

Current network

Agra Metro
Line NameFirst OperationalLast ExtensionStationLengthTerminalRolling StockTrack GaugeElectrification
Yellow Line 6 March 2024N/A65.2 kmMankameshwar MandirTaj East Gate Alstom MOVIA 1,435 mm (4 ft 8+12 in)750 V DC third rail

Rolling stock

In 2020, Bombardier Transportation won the contract to supply the rolling stock and the signalling system, and the project received conditional clearance from the Supreme Court. [10] [11] However the contract was cancelled and Alstom was chosen to supply the rolling stock for the Yellow line. The rolling stock resembles those that run on the Kanpur Metro. On 6 March 2023, the first set of coaches arrived at the Taj Station of the Yellow line from Alstom's manufacturing facility at Savli in Gujarat.

Status updates

See also

Related Research Articles

<span class="mw-page-title-main">Noida International Airport</span> Upcoming international airport to serve Noida and Greater Noida in Uttar Pradesh, India

Noida International Airport, also known as Jewar Airport, is an upcoming international airport being constructed near Jewar in Gautam Buddha Nagar District, Uttar Pradesh in India, which will serve the National Capital Region (NCR). The airport is situated in the new planned YEIDA city.

Ganga Expressway is an under-construction, 594 km (369 mi) long, 6-lane wide greenfield expressway in the state of Uttar Pradesh, India. It is being constructed in two phases. Phase-1 will connect Bijauli village on NH-334 in Meerut district with Judapur Dandu village on NH-19 in Prayagraj district, while Phase-2 will see the extension of both sides of the expressway: from Prayagraj to Ballia and from Meerut to Haridwar. It is being implemented by the Uttar Pradesh Expressways Industrial Development Authority (UPEIDA) on the Design-Build-Finance-Operate-Transfer (DBFOT) Model.

<span class="mw-page-title-main">Expressways of India</span> List of Expressways in India

Expressways are the highest class of roads in India. In July 2023, the total length of expressways in India was 5,579 km (3,467 mi), with 8,366 km (5,198 mi) under construction. These are controlled-access highways where entrance and exits are controlled by the use of cloverleaf or trumpet or grade separated interchanges that are incorporated into the design of the expressway and designed for maximum speed of 120 km/h, whereas National highways are flyover access or tolled, where entrance and exit is through the side of the flyover, at each intersection of highway with road, flyovers are provided to bypass the city/town/village traffic and these highways are designed for speed of 100 km/h. Some roads are not access-controlled expressways but are still named expressways, such as the Biju Expressway, these are actually state highways that are not declared by the central government as an Expressway, hence not an Expressway or National Highway.

<span class="mw-page-title-main">Lucknow Metro</span> Rapid transit system in Lucknow, Uttar Pradesh, India

The Lucknow Metro is a mass rapid transit (MRT) system in Lucknow, Uttar Pradesh, India. The metro is owned and operated by the Uttar Pradesh Metro Rail Corporation (UPMRC). The frequency of the metro's services is around 5 - 7 minutes.

<span class="mw-page-title-main">Kanpur Metro</span> Metro service in the city of Kanpur in India

The Kanpur Metro is a mass rapid transit (MRT) system in Kanpur, Uttar Pradesh, India. The metro is owned and operated by the Uttar Pradesh Metro Rail Corporation (UPMRC).This is the second smallest Metro system in India by the system length after Agra Metro. This metro system is the fastest constructed metro system in the world, partially opening within 2 years of construction starting in 2019.

<span class="mw-page-title-main">Urban rail transit in India</span> Overview of the urban rail transit system in India

Urban rail transit in India plays an important role in intracity transportation in the major cities which are highly populated. It consists of rapid transit, suburban rail, monorail, and tram systems.

<span class="mw-page-title-main">Bhoj Metro</span> Rapid transit system serving Bhopal, India

The Bhoj Metro is an under construction rapid transit system intended to serve the city of Bhopal, India, the capital of the Indian state of Madhya Pradesh. The total system consists of 6 corridors covering a distance of 104.87 kilometres (65.16 mi). The first phase of the Bhopal Metro project consists of 28 km (17.40 mi) of line 2 & 5 being under construction. This project will cost 80 billion (US$1.0 billion) approximately. There will be three types of run – on road, on bridges, and underground in some locations.

<span class="mw-page-title-main">Indore Metro</span> Rapid transit system in Indore, India

The Indore Metro is a rapid transit system which is under construction for the city of Indore, in the state of Madhya Pradesh, India. The total system consists of 11 corridors (lines) covering a distance of 124 kilometres (77 mi). This project will cost approximately 12,000 crore (US$1.5 billion). The cost per km will be 182 crores and total cost is 15,000 crores. The metro system will be elevated, underground and on ground. The Indore Metro project has been subject to serious contestation due to the inappropriate shifting of Seismic zone-II to Seismic zone-IV category which has led to increase in budgetary cost for the entire project.

<span class="mw-page-title-main">Patna Metro</span> Rapid transit system in Bihar, India

Patna Metro (Patna MRTS) is a rapid transit system being constructed in the city of Patna, India. Construction will be completed over five phases, and the transit system would be owned and operated by the state-run Patna Metro Rail Corporation. In the first phase, five stations of Patna Metro will be operational by March 2025. Patna MRTS, constructed under a public-private partnership model, is estimated to cost 133,657.7 million (US$1.7 billion). This cost excludes land acquisition cost, which will be paid for by the Bihar government. The first phase (consisting of the east–west and north–south corridors) will include both a 15.36 km (9.54 mi) elevated track and a 16.30 km (10.13 mi) underground track.

<span class="mw-page-title-main">Nagpur Metro</span> Rapid transit system in Nagpur, India

Nagpur Metro is a rapid transit system for the city of Nagpur, Maharashtra, India. Phase I of the metro project cost was estimated to cost 8,650 crore but the final project cost incurred was 9,279 crore (US$1.2 billion). In February 2014, the Government of Maharashtra gave approval for the Metro project, while the Government of India's Ministry of Urban Development had given "In Principle" approval for the project. On 20 August 2014, Union Cabinet gave approval for the development of the project, and the Prime Minister laid the foundation stone on 21 August. Construction began on 31 May 2015, with trial run beginning on 30 September 2017.

The Surat Metro is an under-construction rapid transit rail system for Surat in the Surat Metropolitan Region, Gujarat state of India. Two corridors with a combined length of 40.35 kilometers are under construction since 18 January 2021. The project is expected to be completed by December 2027 at an estimated cost of 12,020.32 crore (US$1.5 billion).

<span class="mw-page-title-main">Uttar Pradesh Metro Rail Corporation</span> Company that operates the Lucknow Metro in Uttar Pradesh, India

The Uttar Pradesh Metro Rail Corporation(UPMRC) is a joint venture company that operates the Lucknow Metro, Agra Metro and Kanpur Metro.The Varanasi Metro, Prayagraj Metro, Gorakhpur Metro, and Bareilly Metro are proposed by UPMRC. The company's headquarters is at Vipin Khand, Gomti Nagar Lucknow

<span class="mw-page-title-main">Purvanchal Expressway</span> Indian expressway connecting Lucknow and Ghazipur

Purvanchal Expressway is a 340.8 km long, 6-lane wide access-controlled expressway in the state of Uttar Pradesh, India. The expressway connects Chand Saray village near Gosainganj in Lucknow district with Haydaria village on NH-31 in Ghazipur district. It is developed by the Uttar Pradesh Expressways Industrial Development Authority (UPEIDA). The Purvanchal Expressway has a 3.2 km long airstrip at Akhalkiri Karwat village near Kurebhar in Sultanpur district for emergency landing of aircraft. The construction work was started by the UPEIDA on 10 October 2018 and was inaugurated and opened to the public on 16 November 2021.

The Meerut Metro is an under-construction rapid transit system, which will serve the city of Meerut, Uttar Pradesh, India. It is being built in two phases, out of which the first phase with the first line will cover 23.6 km (14.7 mi) with 13 stations, from Modipuram to Meerut South. It will have nine elevated, three underground stations, one at-grade station as the depot station at Modipuram, and four stations integrated with the Delhi–Meerut RRTS on a single corridor, making the metro the first such rapid transit system in India to be merged directly with a regional railway system. The second phase will include a second line covering 15 km (9.3 mi) from Shradhapuri Phase-II to Jagrati Vihar, with 12 stations, out of which seven will elevated and five will be underground, thereby taking the overall length to 38.6 km (24.0 mi). The metro will also be the fastest metro of India, at an operational speed of 120 km/h (75 mph).

<span class="mw-page-title-main">Varanasi Metro</span> Light rail transit system

The Varanasi Metro is a light rail transit system proposed for the city of Varanasi, Uttar Pradesh, India. The proposed system consists of 2 corridors that span from BHEL to Banaras Hindu University (19.35 km) and Benia Bagh to Sarnath (9.885 km). The feasibility study of the project was done by RITES and was completed in June 2015.

<span class="mw-page-title-main">Delhi–Meerut Regional Rapid Transit System</span> Under-construction and partially operational regional transit system in India

The Delhi–Meerut Regional Rapid Transit System, also known as Delhi–Meerut RRTS, Delhi–Ghaziabad–Meerut RRTS and coloquially Rapid Rail, is an under-construction and partially operational 82.15 km (51.05 mi)-long semi high-speed rail and regional transit corridor that will connect the National Capital Region (NCR) cities of Delhi, Ghaziabad and Meerut. It is the first of the four rapid rail corridors planned under the first phase of the RapidX project managed by the National Capital Region Transport Corporation (NCRTC). Designed to allow a maximum speed of 180 km/h (110 mph), the distance between Delhi and Meerut will be covered in less than 60 minutes. The project is being executed at a cost of 30,274 crore (US$3.8 billion). It will start from Jangpura as the starting station, run through Sarai Kale Khan, the terminal for the three planned corridors, both in Delhi, and end in Modipuram in Meerut. It will have 16 stations and two depots at Duhai and Modipuram.

The Prayagraj Metrolite, formerly Allahabad Metro, is a proposed light rail system for the city of Prayagraj (Allahabad), Uttar Pradesh, India. The proposed system will consist of two lines, an east–west line from Manauri to Trivenipuram, and a north–south line from Shantipuram in Jalalapur to Karchana. Both lines will be about 20 kilometres (12 mi) long. There will be a total of 39 stations, 20 on the east–west line and 19 on the north–south line. The project is expected to cost 8000 crore.

<span class="mw-page-title-main">Railway in Haryana</span> Train service in the northern Indian state

The rail network in the state of Haryana in India, is covered by five rail divisions under three rail zones: North Western Railway zone, Northern Railway zone and North Central Railway zone.

The Lucknow–Kanpur Expressway or National Expressway 6 (NE-6), is an under construction 63 km long, 6-lane wide(expandable to 8) access controlled expressway in India's Uttar Pradesh. The expressway will connect Lucknow and Kanpur and will run parallel to NH-27 which connects Kanpur and Lucknow with a distance of about 85 km (53 mi) between existing and proposed parallel roads. The expressway will start from its junction with NH-27 near Shaheed Path in South Lucknow connecting Bani, Kantha, Amarsas and terminating at its junction with NH No. 27 near Kanpur.

Metrolite is a light rail (LRT) urban transit system being planned in India for cities with lower ridership projection and as a feeder system for the existing metro systems. It will cater to lower passenger capacity at a reduced cost than a metro line. It will have dedicated tracks, separated from the road.

References

  1. "Agra Metro - Information, Route Map, Fares, Tenders & Updates".
  2. "Agra Metro - Information, Route Map, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 6 March 2024.
  3. "Agra Metro: Information, Route Maps & Project Updates". Metro Rail News. 8 August 2023. Retrieved 6 March 2024.
  4. "मेट्रो का सपना कहीं सपना ही न रह जाए" [Metro project remains pending in Agra]. Agra City News. 16 February 2016. Archived from the original on 3 July 2017. Retrieved 9 October 2017.
  5. "Kanpur & Agra metro projects get cabinet nod". Business Standard India. Press Trust of India. 28 February 2019. Retrieved 28 February 2019.
  6. "Centre approves Agra, Kanpur metro rail projects". aninews.in. Retrieved 28 February 2019.
  7. "PM Modi to flag off Agra Metro priority corridor: Route, price, other details". Mint. 5 March 2024. Retrieved 5 March 2024.
  8. "Agra Metro – Information, Route Maps, Fares, Tenders & Updates". The Metro Rail Guy. Retrieved 19 December 2020.
  9. Rao, Lingamgunta Nirmitha (6 March 2024). "Now, reach Taj Mahal by Metro. PM to launch Agra 'priority corridor' today". Hindustan Times. Retrieved 6 March 2024.
  10. 1 2 "Agra Metro Project: अब आएगी रफ्तार, अगले सप्ताह से शुरू होगा मेट्रो के लिए ये काम". Dainik Jagran (in Hindi). 24 July 2020. Retrieved 16 August 2020.
  11. 1 2 IANS (24 July 2020). "Decks cleared for Agra Metro project, with conditions". www.daijiworld.com. Retrieved 16 August 2020.
  12. "Uttar Pradesh govt gets DPRs for Meerut, Agra". The Indian Express. 1 July 2016. Archived from the original on 6 February 2017. Retrieved 9 October 2017.
  13. "Centre rejects metro rail project report - Times of India". The Times of India. 16 September 2017. Archived from the original on 9 October 2017. Retrieved 9 October 2017.
  14. "UP to Start Metro Services in Agra, Kanpur and Meerut". 18 January 2018.
  15. "UP govt sent DPR to Union govt". 5 September 2018.
  16. Anurag Gupta (8 February 2019). "कानपुर-आगरा को जल्द मिलेगी मेट्रो की सौगात, 350 करोड़ रुपयों से पकड़ेगी रफ्तार". Dainik Jagaran (in Hindi). Retrieved 20 March 2019.
  17. "Adityanath thanks Modi for clearing Agra, Kanpur Metro projects". Outlook . Retrieved 20 March 2019.
  18. "कानपुर से पीएम मोदी ने किया आगरा मेट्रो का शिलान्यास, ताजनगरी में हुआ सीधा प्रसारण". Amar Ujala (in Hindi). 8 March 2019. Retrieved 20 March 2019.
  19. "तेजी सेे बढ़ रही आगरा की मेट्रो, स्टेशनों के लिए जमीन हस्तांतरण की तैयारी Agra News". Dainik Jagran (in Hindi). 22 August 2019. Retrieved 29 August 2019.
  20. "Work on Agra Metro yet to start; may miss deadline | Agra News - Times of India". The Times of India. 21 January 2020. Retrieved 29 January 2020.
  21. "TYPSA-Italferr JV Wins Kanpur & Agra Metro's General Consultancy". The Metro Rail Guy. 15 June 2020. Retrieved 15 June 2020.
  22. Rai, M. K. (23 October 2020). "Agra Metro Line-1's Construction Works Worth Rs 272 Crores Set for award to Sam India". Metro Rail News. Retrieved 30 October 2020.
  23. "दिसंबर से शुरू होगा आगरा मेट्रो का काम, 273 करोड़ की लागत से बनेंगे तीन प्रमुख स्टेशन". Amar Ujala (in Hindi). 21 October 2020. Retrieved 30 October 2020.
  24. "Narendra Modi: PM Narendra Modi inaugurates construction work | Agra News - Times of India". The Times of India. 7 December 2020. Retrieved 7 December 2020.
  25. "EIB to fund Agra metro rail project: UPMRC". Hindustan Times. 29 July 2021. Retrieved 28 September 2021.
  26. "Agra Metro Rail Project: आगरा मेट्रो के सभी स्टेशनों के यूनिक कोड को मिली मंजूरी, अब इन नामों से भी जाने जाएंगे ये स्टेशन". Dainik Jagran (in Hindi). Retrieved 28 September 2021.
  27. "EIB agrees to fund 480 million euros for Agra Metro Rail Project". Urban Transport News. Retrieved 28 September 2021.
  28. "Agra Metro Rail Project: जल्द आकार लेने लगेगा आगरा का ये मेट्रो स्टेशन, रखा गया पहला डबल टी गर्डर". Dainik Jagran (in Hindi). Retrieved 28 September 2021.
  29. "आगरा मेट्रो के काम ने पकड़ी रफ्तार: ताज पूर्वी के साथ अब बसई स्टेशन पर कार्य शुरू, दस महीने में 102 पिलर का निर्माण". Amar Ujala (in Hindi). Retrieved 28 September 2021.
  30. "Tender invited for electrification contract for Agra Metro Rail Project". Urban Transport News. Retrieved 23 October 2021.
  31. "आगरा में मेट्रो: तीसरे स्टेशन का काम दिसंबर अंत में होगा पूरा, निर्माण के दौरान ताजमहल की खूबसूरत तस्वीर आई सामने". Amar Ujala (in Hindi). Retrieved 6 December 2021.