Bangabandhu Railway Bridge

Last updated

Bangabandhu Railway Bridge

যমুনা রেল সেতু
Bangabandhu Railway Bridge.jpg
Bangabandhu Railway Bridge during construction
Coordinates 24°24′09″N89°46′05″E / 24.4026°N 89.7681°E / 24.4026; 89.7681
CarriesDual-Gauge Rail-line
Crosses Jamuna River
Locale Sirajganj, & Tangail Bangladesh
Official nameBangabandhu Railway Bridge
Other name(s)Jamuna Railway Bridge
Owner Bangladesh Railway
Characteristics
Total length4.8 kilometres (3 mi)
Location
Bangabandhu Railway Bridge

Bangabandhu Railway Bridge also known as Jamuna Railway Bridge is an under-construction dual-gauge, double-track railway bridge on Jamuna River. This bridge connects Sirajganj with Tangail by railway network. [1] After construction this bridge will be the longest solo railway bridge in Bangladesh. The 90% of this railway bridge is located the area of Tangail District. So the bridge is mainly located in Tangail. As of October 2020, 44 trains per day pass through the existing Bangabandhu Bridge. As the bridge does not allow trains to run at full speed with the speed limit set to 20 km/h and being a single-track railway takes longer to cross the bridge, trains are prone to schedule disruptions. Also, heavy goods trains cannot run on the bridge due to weight restrictions. At the Bangabandhu Railway Bridge, the average time to reach the destination of the trains running between the capital Dhaka and the northern and western regions of the country will be reduced by 2 hours. Besides, the facility of transporting goods by rail from neighboring countries will increase. Apart from this, this bridge will also be useful for easy transportation of passengers and goods on internal routes. Apart from this, the bridge is an important link between SAARC, BIMSTEC, SASEC, and other regional and sub-regional railway routes and trans-Asian railway network. When the bridge is built, the railway tracks of the Bangabandhu Bridge will be removed. [2]

Contents

Project details

First, on 6 December 2016, the Executive Committee of the National Economic Council (ECNEC) approved the construction project of the bridge. [3] For this, the Bangladesh government undertook the project at a cost of Tk 9,734 crore, of which Japan's development cooperation organization Japan International Cooperation Agency (JICA) will provide Tk 7,724 crore. The project is scheduled to be implemented by December 2023.

However, in the next revised project, the deadline has been extended by two years to December 2025. At the same time, the project cost has been increased from Tk 9,734 crore to Tk 16,781 crore. JICA will provide loan assistance of 72% of the construction cost. Bangladesh Railway will implement the project. This project has been carried out by the Obayashi-Toa-JFE (OTJ) Joint Venture and IHI-SMCC Joint Venture for the eastern and western parts, respectively. Additionally, the project involves constructing a 7.6 km double-line railway approach embankment, 30.73 km of dual-gauge track, 16 viaducts, and renovating the Bangabandhu Bridge East and West stations and yards. After completion, the bridge will increase the number of trains that can pass between the capital and the northwest by 88, significantly improving rail connectivity in the region. This bridge can accommodate broad-gauge trains traveling at 120 km/h and meter-gauge trains moving at 100 km/h.

Progress

The construction of the bridge has been fully completed in November 2024. A test run was initiated on 26 November, being completed the following day. It is slated to commence commercial operations in January 2025. [4] [5]

See also

Related Research Articles

<span class="mw-page-title-main">Transport in Bangladesh</span>

Transport in Bangladesh is dominated by roadways, accounting for the majority of both passenger and cargo traffic due to substantial development efforts since independence. Eight major national highways connect the capital, Dhaka, with divisional and district headquarters, port cities, and international routes. Despite this, vehicle usage per capita remains low, with non-motorised modes prevailing. However, Bangladesh's roads are unsafe, having one of the highest road accident fatality rates. They also suffer from high congestion, as well as severe air and noise pollution.

The Trans-Asian Railway(TAR) is a project to create an integrated freight railway network across Europe and Asia. The project is of the United Nations Economic and Social Commission for Asia and the Pacific (UNESCAP).

<span class="mw-page-title-main">Bangabandhu Bridge</span> Bridge in Bangladesh

Jamuna Multi-purpose Bridge, also known as Bangabandhu Bridge, is a bridge opened in Bangladesh in June 1998. It connects Bhuapur on the Jamuna River's east bank to Sirajganj on its west bank. 90% of this bridge in under Tangail district and 10% under Sirajganj district. So it's mainly located in Tangail District.It was the 11th longest bridge in the world when constructed in 1998 and at present is the 6th longest bridge in South Asia. The Jamuna River, which it spans, is one of the three major rivers of Bangladesh, and is fifth largest in the world in discharge volume.

Tangail is a city of Tangail District in central Bangladesh. A significant city in Bangladesh, Tangail lies on the bank of the Louhajang River, 83 kilometres (52 mi) northwest of Dhaka, the nation's capital. It is the 25th most populous city in Bangladesh.

<span class="mw-page-title-main">Bangladesh Railway</span> State owned rail transport agency of Bangladesh

Bangladesh Railway is the state-owned rail transport agency of Bangladesh. It operates and maintains all railways in the country, and is overseen by the Directorate General of Bangladesh Railway. The Bangladesh Railway is governed by the Ministry of Railways and the Bangladesh Railway Authority with a reporting mark known as "BR".

<span class="mw-page-title-main">Kamalapur railway station</span> Railway station in Dhaka, Bangladesh

Kamalapur Railway Station, officially Dhaka Railway Station, is the central railway station in Kamalapur, Dhaka, capital of Bangladesh. It is the largest station and the busiest infrastructure for transportation in the country that acts as a gateway of the country's capital. It was opened on 1 May 1968.

<span class="mw-page-title-main">Padma Bridge</span> Longest bridge in Bangladesh

The Padma Multipurpose Bridge, commonly known as the Padma Bridge, is a two-level road-rail bridge across the Padma River, the main distributary of the Ganges in Bangladesh.

<span class="mw-page-title-main">Dhaka Metro Rail</span> Mass rapid transit system in Dhaka, Bangladesh

The Dhaka Metro Rail, or simply the Dhaka Metro, is a mass rapid transit system serving Dhaka, the capital and largest city of Bangladesh. It is operated by the Dhaka Mass Transit Company Limited (DMTCL). Together with the under construction Dhaka BRT, proposed Dhaka Subway and Dhaka suburban circular rail, it is expected to reduce traffic congestion in the city. The metro rail network has five planned lines which are the MRT Line 6, the only operational line, MRT Line 1 and MRT line 5, which are under construction, and MRT Line 2 and MRT Line 4, which are in the planning stages. It is part of the Strategic Transport Plan outlined by the Dhaka Transport Coordination Authority (DTCA).

<span class="mw-page-title-main">Narayanganj–Bahadurabad Ghat line</span> Railway line in Bangladesh

The Narayanganj–Bahadurabad Ghat line is a railway line connecting Narayanganj and Bahadurabad Ghat in Bangladesh. There are branch lines to Jagannathganj Ghat and Netrakona-Mohanganj. This track is under the jurisdiction of Bangladesh Railway.

<span class="mw-page-title-main">Chilahati railway station</span> Railway station in Bangladesh

Chilahati is a border railway station in Bangladesh, situated in Nilphamari District, in Rangpur Division. It is an active railway transit point on the Bangladesh-India border.

The Santahar–Kaunia line is a dual-gauge railway line connecting Santahar and Kaunia in Bangladesh, under the jurisdiction of Bangladesh Railway. From 1878 to 2010 it was a single line of metre gauge 1,000 mm. Between 2010 and 2013, Bangladesh Railway converted the track to also include a 1,676 mm line, with help of Indian Railways.

Biral is a border railway station in Bangladesh, situated in Dinajpur District, in Rangpur Division. It is a defunct railway transit point on the Bangladesh-India border and is an India-Bangladesh land border checkpoint.

The Jamtoil–Joydebpur Line is a dual gauge railway line connecting Joydebpur and Jamtoil, Sirajganj District in Bangladesh. This track is under the jurisdiction of Bangladesh Railway.

Karnaphuli Tunnel, also known as Bangabandhu Sheikh Mujibur Rahman Tunnel, is an underwater expressway tunnel in the port city of Chittagong, Bangladesh under the Karnaphuli River. The length of the entire route is 9.39 kilometres (5.83 mi), with the tunnel making up 3.32 kilometres (2.06 mi) of the length. The tunnel diameter is 10.80 metres (35.4 ft). It is expected, over 17,000 vehicles will be able to use this tunnel daily. The cost of the project is estimated at US$1.1B, of which around half is financed by the Exim Bank of China. The Karnaphuli Tunnel is the first underwater road tunnel in South Asia. It is expected to improve the Dhaka–Chittagong–Cox's Bazar highway network. A Chinese company, China Communications Construction Company, was selected to construct it. The tunnel segments were produced in Zhenjiang, China.

Bhanga Junction Railway Station is a junction station of Bangladesh. It is a junction which is being built in Bhanga. It will connect Dhaka with Jessore, Rajbari and Port of Payra through Padma Bridge. Its construction is likely to be end in June 2023.

<span class="mw-page-title-main">Dhaka–Jessore line</span> Railway line in Bangladesh

Dhaka–Jessore line is a 172 km long under construction broad gauge railway. It is being constructed under the Ministry of Railways, Government of Bangladesh. The line will connect the capital of Bangladesh to Jessore via Dhaka District, Narayanganj District, Munshiganj District, Shariatpur District, Madaripur District, Faridpur District, Gopalganj District, Bangladesh, and Narail District. It is a project related to Padma Bridge.

<span class="mw-page-title-main">MRT Line 6</span> Mass rapid transit line of Dhaka Metro

The MRT Line 6 is a rapid transit line of the Dhaka Metro Rail. Despite its number, it is Bangladesh's first rapid transit line and has been in service since 2022. The line is entirely elevated and currently has 16 stations operational in service between Uttara North and Motijheel.

The Bhanga–Kuakata line is a planned railway line in Bangladesh to connect Bhanga with the beach city of Kuakata in Patuakhali. It is planned to build by 2030. It will also connect Barisal Division to the rest of Bangladesh.

<span class="mw-page-title-main">Northern Route (MRT Line 5)</span> Branch of the MRT Line 5 of Dhaka Metro

The Northern Route is one of the branches of the approved MRT Line 5 of Dhaka Metro Rail; the other one being the Southern Route. The construction of the Northern Route started in 4 November 2023 and is scheduled to commence operation by 2028.

References

  1. Topu, Ahmed Humayun Kabir (18 July 2022). "Bangabandhu Sheikh Mujib Railway Bridge: The next milestone in connectivity". The Daily Star. Archived from the original on 30 April 2024. Retrieved 16 October 2024.
  2. "যমুনায় দ্বিতীয় রেল সেতুর কাজ শুরু নভেম্বরে, ব্যয় বাড়লো দ্বিগুণ" [The second bridge on the Jamuna River]. Bangla Tribune (in Bengali). 19 October 2020. Archived from the original on 25 November 2020. Retrieved 16 October 2024.
  3. প্রতিবেদক, নিজস্ব (7 December 2016). "বঙ্গবন্ধু সেতুর পাশে রেলসেতু হবে" [The bridge will make beside Bangabandhu Bridge]. Prothomalo (in Bengali). Archived from the original on 23 October 2023. Retrieved 16 October 2024.
  4. "Trail train to run across Bangabandhu Railway Bridge Tuesday". Dhaka Tribune. 25 November 2024. Retrieved 29 November 2024.
  5. "Test run over new Jamuna Rail Bridge completed". Bangladesh Sangbad Sangstha . 27 November 2024. Retrieved 29 November 2024.