Belkaya Dam

Last updated
Belkaya Dam
Location Turkey
Coordinates 37°19′04″N29°44′42″E / 37.31774°N 29.74504°E / 37.31774; 29.74504

Belkaya Dam is a dam in Burdur Province, Turkey. It was built between 1993 and 2003.

See also


Related Research Articles

<span class="mw-page-title-main">Euphrates</span> River in Turkey, Iraq, and Syria

The Euphrates is the longest and one of the most historically important rivers of Western Asia. Together with the Tigris, it is one of the two defining rivers of Mesopotamia. Originating in Turkey, the Euphrates flows through Syria and Iraq to join the Tigris in the Shatt al-Arab in Iraq, which empties into the Persian Gulf.

The Atatürk Dam, originally the Karababa Dam, is the third largest dam in the world and it is a zoned rock-fill dam with a central core on the Euphrates River on the border of Adıyaman Province and Şanlıurfa Province in the Southeastern Anatolia Region of Turkey. Built both to generate electricity and to irrigate the plains in the region, it was renamed in honour of Mustafa Kemal Atatürk (1881–1938), the founder of the Turkish Republic. The construction began in 1983 and was completed in 1990. The dam and the hydroelectric power plant, which went into service after the upfilling of the reservoir was completed in 1992, are operated by the State Hydraulic Works (DSİ). The reservoir created behind the dam, called Atatürk Reservoir, is the third largest in Turkey.

<span class="mw-page-title-main">Ilısu Dam</span> Dam in Mardin Province, Turkey

The Ilısu Dam is a concrete-face rock-fill dam on the Tigris near the village of Ilısu and along the border of Mardin and Şırnak Provinces in Turkey. It is one of the 22 dams of the Southeastern Anatolia Project and its purpose is hydroelectric power production, flood control and water storage. When operational, the dam will support a 1,200 MW power station and will form a 10.4 billion m3 reservoir. Construction of the dam began in 2006 and was originally expected to be completed by 2016. As part of the project, the much smaller Cizre Dam is to be constructed downstream for irrigation and power. The dam has drawn international controversy, because it will flood portions of ancient Hasankeyf and necessitate the relocation of people living in the region. Because of this, the dam lost international funding in 2008. Most historical structures in Hasankeyf were moved to the new Hasankeyf prior to the filling of the dam. The dam began to fill its reservoir in late July 2019. Due to rainfall, the dam has achieved water levels up to 100m above the river bed and stored 5 billion cubic meters of water. The water level had reached an elevation of 498.2m on 1 April 2020.

<span class="mw-page-title-main">Oymapinar Dam</span> Dam in Antalya Province, Turkey

Oymapinar Dam is an arch dam built on the Manavgat river in Turkey in 1984. It is an arch dam in design, 185 m in height, built to generate hydroelectric power.

The Cizre Dam is a dam being constructed on the Tigris River north of Cizre, Turkey. The Cizre Dam is to be built in conjunction and downstream of the Ilisu Dam. The Cizre Dam is also one of the planned dams of Turkey's Southeastern Anatolia Project (GAP). The purpose of the Cizre Dam is irrigation, hydro-power and to control the tailwaters of the Ilisu Dam.

Alpaslan-1 Dam is a dam and hydroelectric power station in Muş Province, Turkey. The foundation stone for the dam was laid in 1994 and construction on the dam superstructure began in 1998. The dam began to impound its reservoir in 2008 and the first of four 40 MW generators was operational in 2009. The second was commissioned in 2012.

<span class="mw-page-title-main">Deriner Dam</span> Dam in Artvin Province, Turkey

Deriner Dam is a concrete double-curved arch dam on the Çoruh River 5 km (3.1 mi) east of Artvin in Artvin Province, Turkey. The main purpose of the dam is hydroelectric power production and additionally flood control. Construction on the dam began in 1998, the reservoir began to fill in February 2012 and the power station was completed by February 2013. It will have a 670 MW power house and is the tallest dam in Turkey. The dam is being implemented by Turkey's State Hydraulic Works and constructed by a consortium of Turkish, Russian and Swiss companies.

The Torul Dam is a concrete-face rock-fill dam on the Harşit River located 10 km (6 mi) northwest of Torul in Gümüşhane Province, Turkey. The development was backed by the Turkish State Hydraulic Works. Construction on the dam began in 1998 and was completed in 2007. The dam's hydroelectric power plant was commissioned in 2008. Water is diverted through a tunnel and penstock on the river's north side where it reaches the power plant located about 4 km (2 mi) downstream. It has an installed capacity of 121.5 MW.

<span class="mw-page-title-main">Köprü Dam</span> Dam in Kozan, Adana, Turkey

The Köprü Dam is a gravity dam on the Göksu, the main tributary of the Seyhan River about 25 km (16 mi) northwest of Kozan in Adana Province, Turkey. Its primary purpose is hydroelectric power generation. Construction began in 2009 and was complete in 2012. On 24 February 2012, the dam's diversion tunnel seal broke while the dam was impounding the river for the first time. This resulted in 97,000,000 m3 (78,639 acre⋅ft) of water flooding the downstream area of the dam. The accident and subsequent flood killed 10 workers. Downstream communities received proper warning and no one was killed.

<span class="mw-page-title-main">Alaköprü Dam</span> Dam in Anamur, Mersin Province

Alaköprü Dam is a concrete-face rock-fill dam on the Anamur (Dragon) Creek in Anamur district of Mersin Province, southern Turkey. The development is backed by the Turkish State Hydraulic Works (DSİ). The dam was primarily built as part of the Northern Cyprus Water Supply Project, to supply water for drinking and irrigation to Northern Cyprus.

The Çetin Dam hydropower dam, on the Botan River in Siirt Province, Turkey, with an installed capacity of 420 MW. It was completed in 2020.

The Artvin Dam an arch-gravity dam on the Çoruh River in Artvin Province, Turkey. Preliminary construction on the dam began in December 2010 and the river diversion tunnels were complete in July 2012 at which time construction on the dam foundation started. The purpose of the dam is hydroelectric power generation and its power station has an installed capacity of 340 MW when completed. The dam is part of the Çoruh Development Plan and its construction was supervised by Turkey's State Hydraulic Works. The dam began to impound its reservoir in October 2015 and the power station was commissioned beginning in January 2016.

The Yedigöze Dam, also known as Sani Bey Dam, is a concrete-face rock-fill dam on the Seyhan River bordering İmamoğlu and Aladağ districts in Adana Province, Turkey. The primary purpose of the dam is hydroelectric power generation and irrigation. The dam's power station has an installed capacity of 320 MW and the reservoir will help irrigate 75,000 ha. Construction began in 2007 and the river was diverted by 2008. In the same year construction on the actual dam began and the reservoir began to fill on 15 June 2010. By November 2010 the remaining construction work was complete and the generators were commissioned in 2011. Construction on the irrigation works is ongoing.

The Silopi Dam is a gravity dam on the Hezil River about 24 km (15 mi) northeast of Silopi in Şırnak Province, southeast Turkey. Under contract from Turkey's State Hydraulic Works, İLCİ Holding A.Ş began construction on the dam in 2008 and it was completed in November 2012.

The Şırnak Dam is a gravity dam on the Ortasu River about 25 km (16 mi) southeast of Şırnak town in Şırnak Province, southeast Turkey. Under contract from Turkey's State Hydraulic Works, AGE Inşaat began construction on the dam in 2008 and it was completed in 2012.

The Uludere Dam is a gravity dam under construction on the Ortasu River near İnceler in Uludere District of Şırnak Province, southeast Turkey. Under contract from Turkey's State Hydraulic Works, Hidrokon began construction on the dam in 2008 and a completion date has not been announced.

The Balli Dam is a gravity dam under construction on the Ortasu River in Uludere district of Şırnak Province, southeast Turkey. Under contract from Turkey's State Hydraulic Works, construction on the dam began in 2008 and a completion date has not been announced.

The Çetintepe Dam is a gravity dam under construction on the Ortasu River in Uludere district of Şırnak Province, southeast Turkey. Under contract from Turkey's State Hydraulic Works, Ozerka Insatt began construction on the dam in 2008 and a completion date has not been announced.

The Beyyurdu Dam is a gravity dam on the Bembo River in Beyyurdu, Şemdinli district of Hakkâri Province, southeast Turkey.

The Çocuktepe Dam is a gravity dam under construction on the Güzeldere River in Çukurca district of Hakkâri Province, southeast Turkey. Under contract from Turkey's State Hydraulic Works, İnelsan İnşaat began construction on the dam in 2008 and a completion date has not been announced. Construction on the Gölgeliyamaç Dam immediately upstream began in 2008 as well but was cancelled due to poor geology.