Civil Court metro station

Last updated

Civil Court
Pune Metro station
WIP of Civil Court metro station campus, Pune.jpg
Civil Court metro station under construction
General information
Location Shivajinagar, Pune, Maharashtra 411001
Coordinates 18°31′37″N73°51′29″E / 18.52689°N 73.85802°E / 18.52689; 73.85802
Owned by Maharashtra Metro Rail Corporation Limited (MAHA-METRO)
Operated by Pune Metro
Line(s) Purple Line Aqua Line
Platforms Side platform
Platform-1 → Ramwadi
Platform-2 → Vanaz
Island platform
Platform-3 → Train Terminates Here
Platform-4 → PCMC Bhavan
Tracks4
Construction
Structure typeUnderground, Elevated, Double track
Platform levels4
AccessibleYes Wheelchair symbol.svg
Other information
Station codeCVC
History
Opened1 August 2023;7 months ago (2023-08-01)
Electrified 25 kV 50 Hz AC overhead catenary
Services
Preceding station Pune Metro Following station
PMC Bhavan
towards Vanaz
Aqua Line Mangalwar Peth
towards Ramwadi
Shivaji Nagar
towards PCMC Bhavan
Purple Line Terminus
Future service
Shivaji Nagar
towards PCMC Bhavan
Purple Line Budhwar Peth
towards Swargate
Location
Civil Court metro station

Civil Court is the underground southern terminal metro station on the North-South corridor of the Purple Line and an elevated metro station on the East-West corridor of the Aqua Line of Pune Metro in Pune, India. The station was opened on 1 August 2023 as an extension of Pune Metro Phase I. [1] Currently, the Purple Line is operational between PCMC and Civil Court, whereas, the Aqua Line operates between Vanaz and Ramwadi. [2] This station will also serve as an future interchange for Aqua Line and Line 3 of Pune Metro. [3] It is one of the deepest metro stations in India at the depth of 33m (108 ft.). The roof design of the station allows the sunlight to directly reach the underground platforms. [4]

Contents

Station layout

Aqua Line - Station Layout

Civil Court track layout
BSicon vCONTgfa.svg
BSicon cBS.svg
BSicon vSTR.svg
BSicon cBS.svg
P2
BSicon cBS.svg
BSicon vSTR.svg
BSicon cBS.svg
P1
BSicon cBS.svg
BSicon vSTR.svg
BSicon cBS.svg
BSicon vCONTgfe.svg
Station with two tracks and two side platforms
GStreet levelExit/Entrance
L1MezzanineFare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Wheelchair symbol.svg
Platform 1
Eastbound
Towards → Ramwadi next station is Mangalwar Peth
Platform 2
Westbound
Towards ← Vanaz next station is PMC Bhavan
Side platform | Doors will open on the left Wheelchair symbol.svg
L3

Purple Line - Station Layout

Civil Court track layout
BSicon HSTg.svg
BSicon HSTf.svg
BSicon STR+BSl.svg
BSicon STR+BSr.svg
P4
BSicon STR+BSl.svg
BSicon STR+BSr.svg
P3
BSicon STR+BSl.svg
BSicon STR+BSr.svg
to Train Terminates Here
BSicon HSTg.svg
BSicon HSTf.svg
Station with two tracks and one Island platform
GStreet levelExit/ Entrance
MMezzanineFare control, station agent, Ticket/token, shops
PPlatform 3
Southbound
Towards → Train Terminates Here
Island platform | Doors will open on the right Wheelchair symbol.svg
Platform 4
Westbound
Towards ← PCMC Bhavan next station is Shivaji Nagar

Entry/Exit

See also

Related Research Articles

<span class="mw-page-title-main">Pune Metro</span> Rapid transit in Pune

Pune Metro is a mass rapid transit system serving the city of Pune, India. The system comprises 3 lines with a combined length of 54.14 km (33.64 mi), of which 24.12 km (14.99 mi) on two lines are operational as of August 2023.The extended metro line from Ruby Hall Clinic to Ramwadi, including the Bund Garden, Kalyani Nagar and Ramwadi metro stations, covering a distance of 6 km, was inaugrated on 6 March 2024. The 16.59 km (10.31 mi) Purple Line from PCMC Bhavan to Swargate runs on an elevated viaduct between PCMC Bhavan to Range Hills, from where it goes underground. The Aqua Line runs from Vanaz to Ramwadi covering a distance of 14.66 km (9.11 mi) on an elevated viaduct. The 23.33 km (14.50 mi) elevated Line 3 will run from the Rajiv Gandhi Infotech Park in Hinjawadi via Balewadi to Civil Court. All three lines will align at the Civil Court interchange station.

<span class="mw-page-title-main">Esplanade metro station</span> Kolkata Metros Blue, Green & Purple Line interchange station

Esplanade is an underground interchange metro station on the North-South corridor of the Blue Line and on the East-West corridor of the Green Line of Kolkata Metro in Kolkata, West Bengal, India. This station, which is the biggest in kolkata, is located in the Esplanade neighbourhood of Kolkata, at the northern end of Chowringhee Road/Jawaharlal Nehru Road near New Market and the Oberoi Grand hotel. It opened in 1984 as part of what is now Kolkata Metro Line 1. The station is re-designed to be the largest station of the metro and will function as the interchange station between Line 1, Line 2 and Line 3. The Line-2 complex, built below the Line-1 complex was completed and inaugurated on 6 March 2024. The Line-2 complex is designed with world class amenities and murals that depict the culture, tradition, sports, monuments, important structures, etc in them.

<span class="mw-page-title-main">Howrah metro station</span> Metro station in West Bengal, India

Howrah metro station is a metro station of Kolkata Metro Line 2 in Howrah, India. Built underneath Howrah railway station's new complex, the metro station allows interchanging with other zones of Indian Railways as part of the Howrah station transport hub. It is the deepest metro station in India. To the east, the station connects to Mahakaran station in Kolkata through India's biggest under-river metro tunnel beneath the Hooghly river; whilst to the west the adjacent station is Howrah Maidan.

<span class="mw-page-title-main">Aqua Line (Pune Metro)</span> Rapid transit railway line of Pune Metro

Aqua Line of the Pune Metro is the second line of the city's mass transit network. It will run from Ramwadi to Vanaz via Mangalwar Peth and Deccan Gymkhana. The section from Vanaz to Garware College was inaugurated on 6 March 2022 by Prime Minister Narendra Modi. The section from Garware College to Ruby Hall Clinic was inaugurated on 1 August 2023, while the remaining stretch upto Ramwadi was opened on 6 March 2024.

<span class="mw-page-title-main">Vanaz metro station</span> Pune Metros Aqua Line terminal metro station

Vanaz is the elevated western terminal metro station on the East-West corridor of the Aqua Line of Pune Metro in Pune, India. The station was opened on 6 March 2022 as an inauguration of Pune Metro. From March 2022 to August 2023, the Aqua Line was operational between Vanaz and Garware College. The extended section between Garware College to Ruby Hall Clinic was inaugurated on 1 August 2023. So the metro operated from Vanaz to Ruby Hall Clinic. Later the remaining stretch was completed and the line operates till Ramwadi from 6 March 2024.

<span class="mw-page-title-main">Anand Nagar (Pune) metro station</span> Pune Metros Aqua Line metro station

Anand Nagar is an elevated metro station on the East-West corridor of the Aqua Line of Pune Metro in Pune, India. The station was opened on 6 March 2022 as an inauguration of Pune Metro and was the first to be completed. From March 2022 to August 2023, the Aqua Line was operational between Vanaz and Garware College. The extended section between Garware College to Ruby Hall Clinic was inaugurated on 1 August 2023. So the metro operated from Vanaz to Ruby Hall Clinic. Later the remaining stretch was completed and the line operates till Ramwadi from 6 March 2024.

<span class="mw-page-title-main">Ideal Colony metro station</span> Pune Metros Aqua Line metro station

Ideal Colony is an elevated metro station on the East-West corridor of the Aqua Line of Pune Metro in Pune, India. The station was opened on 6 March 2022 as an inauguration of Pune Metro and was the first to be completed. From March 2022 to August 2023, the Aqua Line was operational between Vanaz and Garware College. The extended section between Garware College to Ruby Hall Clinic was inaugurated on 1 August 2023. So the metro operated from Vanaz to Ruby Hall Clinic. Later the remaining stretch was completed and the line operates till Ramwadi from 6 March 2024.

<span class="mw-page-title-main">Nal Stop metro station</span> Pune Metros Aqua Line metro station

Nal Stop is an elevated metro station on the East-West corridor of the Aqua Line of Pune Metro in Pune, India. The station was opened on 6 March 2022 as an inauguration of Pune Metro and was the first to be completed. From March 2022 to August 2023, the Aqua Line was operational between Vanaz and Garware College. The extended section between Garware College to Ruby Hall Clinic was inaugurated on 1 August 2023. So the metro operated from Vanaz to Ruby Hall Clinic. Later the remaining stretch was completed and the line operates till Ramwadi from 6 March 2024.

<span class="mw-page-title-main">Garware College metro station</span> Pune Metros Aqua Line metro station

Garware College is an elevated metro station on the East-West corridor of the Aqua Line of Pune Metro in Pune, India. The station was opened on 6 March 2022 as an inauguration of Pune Metro and was the first to be completed. From March 2022 to August 2023, the Aqua Line was operational between Vanaz and Garware College. The extended section between Garware College to Ruby Hall Clinic was inaugurated on 1 August 2023. So the metro operated from Vanaz to Ruby Hall Clinic. Later the remaining stretch was completed and the line operates till Ramwadi from 6 March 2024.

<span class="mw-page-title-main">Deccan Gymkhana metro station</span> Pune Metros Aqua Line metro station

Deccan Gymkhana is an elevated metro station on the East-West corridor of the Aqua Line of Pune Metro in Pune, India. The station was opened on 1 August 2023 as an extension of Pune Metro Phase I. Aqua Line operates between Vanaz and Ramwadi.

<span class="mw-page-title-main">Chhatrapati Sambhaji Udyan metro station</span> Pune Metros Aqua Line metro station

Chhatrapati Sambhaji Udyan is an elevated metro station on the East-West corridor of the Aqua Line of Pune Metro in Pune, India. The station was opened on 1 August 2023 as an extension of Pune Metro Phase I. Aqua Line operates between Vanaz and Ruby Hall Clinic.

<span class="mw-page-title-main">PMC Bhavan metro station</span> Pune Metros Aqua Line metro station

PMC Bhavan is an elevated metro station on the East-West corridor of the Aqua Line of Pune Metro in Pune, India. The station was opened on 1 August 2023 as an extension of Pune Metro Phase I. Aqua Line operates between Vanaz and Ruby Hall Clinic.

Ramwadi is the elevated eastern terminal metro station on the East - West corridor of the Aqua Line of Pune Metro in Pune, India. It is connected to Rainbow Bus Rapid Transit System. The station was opened on 6 March 2024 as an extension of Pune Metro Phase I. Aqua Line operates between Vanaz and Ramwadi stations.

<span class="mw-page-title-main">Mangalwar Peth metro station</span> Pune Metros Aqua Line metro station

Mangalwar Peth is an elevated metro station on the East-West corridor of the Aqua Line of Pune Metro in Pune, India. The station was opened on 1 August 2023 as an extension of Pune Metro Phase I. Aqua Line operates between Vanaz and Ramwadi.

<span class="mw-page-title-main">Pune Railway Station metro station</span> Pune Metros Aqua Line metro station

Pune Railway Station is an important elevated metro station on the East-West corridor of the Aqua Line of Pune Metro in Pune, India, which holds the main Pune Junction railway station. The station was opened on 1 August 2023 as an extension of Pune Metro Phase I. Aqua Line operates between Vanaz and Ramwadi.

<span class="mw-page-title-main">Ruby Hall Clinic metro station</span> Pune Metros Aqua Line metro station

Ruby Hall Clinic is the elevated eastern terminal metro station on the East - West corridor of the Aqua Line of Pune Metro in Pune, India. The station was opened on 1 August 2023 as an extension of Pune Metro Phase I. Aqua Line operates between Vanaz and Ramwadi.

<span class="mw-page-title-main">Bund Garden metro station</span> Pune Metros Aqua Line metro station

Bund Garden is the elevated eastern terminal metro station on the East - West corridor of the Aqua Line of Pune Metro in Pune, India. The station was opened on 6 March 2024 as an extension of Pune Metro Phase I. Aqua Line operates between Vanaz and Ramwadi stations.

Yerwada is the elevated eastern terminal metro station on the East - West corridor of the Aqua Line of Pune Metro in Pune, India. It is connected to Rainbow Bus Rapid Transit System. The station was opened on 6 March 2024 as an extension of Pune Metro Phase I. Aqua Line operates between Vanaz and Ramwadi stations. Though this stretch was inaugurated on March 6, 2024, pending works have forced this station to be exempted for commercial operations for more than a month, unlike the other three stations opened in this stretch inaugurated along with this station.

Kalyani Nagar is the elevated eastern terminal metro station on the East - West corridor of the Aqua Line of Pune Metro in Pune, India. It is connected to Rainbow Bus Rapid Transit System. The station was opened on 6 March 2024 as an extension of Pune Metro Phase I. Aqua Line operates between Vanaz and Ramwadi stations.

<span class="mw-page-title-main">Shivaji Nagar metro station (Pune)</span> Pune Metros Purple Line metro station

Shivajinagar is an underground metro station on the North-South corridor of the Purple Line of Pune Metro in Pune, India. The station was opened on 1 August 2023 as an extension of Pune Metro Phase I. Currently Purple Line is operational between PCMC and Civil Court. This station will serve as an interchange for Line 3 of Pune Metro which will operate from Civil Court to Megapolis Circle.

References

  1. "PM to flag off metro trains marking inauguration of completed sections of Pune Metro". pib.gov.in. 30 July 2023. Retrieved 3 August 2023.
  2. "Comfortable, convenient & economic: Citizens on Metro launch till Ramwadi". The Times of India. 7 March 2024. ISSN   0971-8257 . Retrieved 7 March 2024.
  3. Gadkari, Siddharth (27 July 2023). "It's official, PM to open Pune Metro service on two sections on Aug 1". Hindustan Times . Retrieved 3 August 2023.
  4. "Civil Court interchange, where elevated & underground lines meet". The Times of India. 11 August 2023. ISSN   0971-8257 . Retrieved 12 August 2023.