East Village, London

Last updated

East Village
Olympic Village, London, 16 April 2012 (1).jpg
Olympic and Paralympic Village, April 2012. To the rear is the temporary Basketball Arena
Greater London UK location map 2.svg
Red pog.svg
East Village
Location within Greater London
OS grid reference TQ385845
  Charing Cross 6 mi (9.7 km)  WSW
London borough
Ceremonial county Greater London
Region
Country England
Sovereign state United Kingdom
Post town LONDON
Postcode district E20
Dialling code 020
Police Metropolitan
Fire London
Ambulance London
UK Parliament
London Assembly
List of places
UK
England
London
51°32′51″N0°00′35″W / 51.547375°N 0.009656°W / 51.547375; -0.009656

East Village is a housing development in Stratford, East London that was designed and constructed as the Olympic Village of the 2012 Summer Olympics and has been converted for use as a new residential district, complete with independent shops, bars and restaurants. The area was formerly contaminated waste land and industrial buildings to the north of Stratford town centre.

Contents

History

Planning and construction

Olympic Village during construction, September 2010 London 2012 MMB 02.jpg
Olympic Village during construction, September 2010
Aerial overview of the Olympic Park south towards the River Thames, during construction in April 2011. With the Olympic Stadium in the centre of picture, the Olympic Village is at the bottom, centre Olympic village during construction (London Stratford, June 2011).jpg
Aerial overview of the Olympic Park south towards the River Thames, during construction in April 2011. With the Olympic Stadium in the centre of picture, the Olympic Village is at the bottom, centre

As part of the regeneration programme within the bid for the 2012 Summer Olympics, the Olympic Village design to house the athletes was based on reusing the buildings after the games as a new residential district for Stratford. The basis for the residential plan was taken from the SCDC regeneration plan for the area as a consequence of the creation of the London-Paris high speed link. The spoil from the tunnel which went underground at Stratford created the platform on which Westfield Shopping Centre and the Olympic Village was created. Through a competitive bidding process, the then Labour British government chose a proposal by Lend Lease which covered financing and construction of both the Olympic Village and part of the London Olympics Media Centre. This would both provide accommodation for 22,500 athletes and team officials, 16,000 as Olympic and 6,500 as Paralympic built to Life Time Home standards to support the Paralympic residents and future residents with impairments or other physical challenges:afterwards provide a mix of low cost and private residential housing, within a community that would comprise offices, shops, schools and a health centre.

Cilantro Engineering were appointed to work as part of a collaborative team to deliver Design and Build MEP Installations for the main contractor, Lend Lease. [1]

Lend Lease engaged a team of: architects Fletcher Priest; structural engineers Arup; and urban planning/landscape architecture firm West 8 and Vogt Landscape. They were briefed to design a village-garden type district to fit in with the wider urban park vision of the Olympic Park legacy, emulating the classical Victorian architecture layout of Maida Vale and other parts of Victorian west London. [2] On a 27 hectares (67 acres) site, [3] the plan provided for 14 residential plots, each made up of 5 to 7 blocks, built around communal squares and courtyards, with water features accentuating the closeness of the River Lea. [2] Each of the 69 blocks is of between 8 and 12 storeys high, nominally laid out: [2] Street level of mostly three-storey townhouses, with front doors on street level to create an "active frontage". [2] These are supplemented by a mix of single to three-storey shops and offices. [2] Floor 3 and above in the centre of the complex are communal raised gardens, which hide carparks beneath. [2] At and above this level are a mix of low cost and private residential apartments, ranging from studio to five bedroom. Each apartment provides generous floor spacing, and each includes its own balcony that is big enough for a table and chairs. [2]

The whole Olympic Park site was proposed to be secured under a Compulsory Purchase Order (CPO) by the London Development Agency. In late 2005, a row broke out between then Mayor of London Ken Livingstone and Newham Council/Westfield Group over the use of the legal instrument. The site for the Olympic Village was to be located next to the £4Bn development of Stratford City, but access difficulties meant that the Olympic Park CPO extended onto the site for Stratford City. In November 2005, an agreement was made whereby the CPO over the Westfield site was removed, subject to agreed access provisions to the Olympic Village. [4]

In light of the 2008 financial crisis, Lend Lease found difficulties in raising funds on the commercial markets for the construction of the village, the single largest project in the 2012 Summer Olympics scheme. [5] The government via the Olympic Delivery Authority (ODA) hence agreed to underwrite a greater part of the required sum, and a scale-back of the project scale by 25%, on the proviso that athletes competing in non-London based events would be housed locally to their competition, that three of the plots would be deferred until the post-Games period, plots 5,6 & 8. This did not solve the challenge of providing Games time bed numbers. A Games design plan was created which introduced temporary walls within the legacy design so create more bed spaces: thus a 2-bed space, single bedroom apartment became 4; a four-bed apartment, 2 bedrooms became 6 and six bed apartment became 8 mainly by dividing the open plan lounge, dining and kitchen areas. Everything was retrofitted back to the original concept after the Games. Only the town houses over three levels were not subject to this Games time modification but still increased bed spaces from legacy 6 to 8 by use of the separate lounge. [6] [7] Following the athletes' experiences in Beijing 2008, and in particular through comments concerning athletes' welfare by International Olympic Committee President Jacques Rogge, this compromise was to be reconsidered whilst pressure built for the finance deal to be resolved. [8]

Up until this point, the proposed site had been a mix of former industrial buildings and contaminated waste land. The proposed site for the village provided two living camp sites for Irish Travellers, one on Clays Lane, Newham, and a second on Waterden Crescent, Hackney. The final part of the Olympic CPO covering the village site, secured in December 2006, was unsuccessfully challenged by the travellers in the High Court in May 2007. [9] Towards the end of demolition/site clearance, on 12 November 2007 a fire broke out in an old industrial warehouse on Waterden Road, Hackney Wick, on the western edge of the proposed Olympic village site. With flames of 50 feet (15 m) in height engulfing the building and sending clouds of acrid black smoke over the city centre, it took 75 firefighters from the London Fire Brigade to bring the fire under control. [10]

Olympic and Paralympic village

View looking towards the Olympic and Paralympic Village, April 2012. In the foreground is the London Velopark, followed by the Basketball Arena and then the Village. To the top right is the London Aquatics Centre, to the right of which (out of shot) is the Olympic Stadium. Olympic Park, London, 16 April 2012 (7).jpg
View looking towards the Olympic and Paralympic Village, April 2012. In the foreground is the London Velopark, followed by the Basketball Arena and then the Village. To the top right is the London Aquatics Centre, to the right of which (out of shot) is the Olympic Stadium.
View towards Stratford City/Olympic Village, June 2011. In the centre is Stratford International station. To its immediate left is Stratford City, to its immediate right the under construction Olympic Village. To the rear are various buildings of the Olympic Park, raging from (far left) the Olympic Stadium, to (far right) the London Olympics Media Centre Stratford City, 14 June 2011.jpg
View towards Stratford City/Olympic Village, June 2011. In the centre is Stratford International station. To its immediate left is Stratford City, to its immediate right the under construction Olympic Village. To the rear are various buildings of the Olympic Park, raging from (far left) the Olympic Stadium, to (far right) the London Olympics Media Centre

During the summer of 2012, the first use for the blocks was as the Olympic Village for the 2012 Summer Olympics. Taking the original design, the architects added temporary partitioning to create "hotel" style apartments catering for: [2] 3,300 apartments: each to have a TV, internet access, and a private courtyard; and 17,320 beds (this is around 17,000 for athletes ~ 10903 (total number of them) [11] and rest for officials during the Games): [12] providing each athlete with 16 square metres (170 sq ft) floor space. In addition, the developers added two temporary buildings: a 17,000 square metres (180,000 sq ft) food hall, which was open 24 hours a day, capable of catering for 5,500 athletes at a time; and an entertainment hall of 10,000 square metres (110,000 sq ft), providing Video games for the athletes use and a communal rest space, plus a non-alcoholic bar. The village also included a plaza, where athletes were able to meet with friends and family during the games. [2]

There is a full list of the buildings and the athletes that stayed in them during the 2012 Olympics, [13] and plaques in all East Village building foyers mark which countries stayed there. For example, the British team stayed in Calla House, Kotata House and Tayberry House; Greece in Hopground House; Spain in Carina House; Ukraine in Emperor House; Japan in Applegate House; Armenia, Peru and Slovenia in Calico House; Belgium, Cape Verde and Kyrgyzstan in Frye House; Costa Rica and Yemen in Galena House; and the Netherlands in Heinieken House.

After the Games

After the conclusion of the games, the Olympic housing was adapted to create a new residential quarter to be known as East Village. [2] The new construction created 2,818 new homes, including 1,379 affordable homes and houses, for sale and rent. The wider community is planned with wide vistas filled with gardens, parks and communal areas, within which are to be housed a school, a health clinic and shops. [2] Having sold the affordable homes to Triathlon Homes in 2009 for £268 million, [14] [15] a competitive tender was issued in 2008 for ODA's interests in the remaining 1,439 private homes, along with six adjacent future development plots with the potential for a further 2,000 new homes, and long-term management of East Village.

The ODA received three bids: [16] a joint-venture between Jamie Ritblat's Delancey and Qatari Diar; Hutchison Whampoa; and Wellcome Trust, who bid to take over all the 2.5 square kilometres (0.97 sq mi) Olympic park. In August 2011, the ODA announced an agreement with Delancey/Qatari Diar, who paid £557 million for the East Village site, [3] representing an estimated £275 million loss to the ODA and hence the British taxpayer.[ citation needed ] Culture Secretary Jeremy Hunt commented that the ODA never expected to recoup building costs: "It was an entirely empty site, it didn't have any infrastructure, roads or parks. There was always going to be a public sector contribution to help put those in." [15]

Chobham Academy in April 2012 Chobham Academy, 16 April 2012.jpg
Chobham Academy in April 2012

Temporary partitions installed during the games are being removed to create a range of one to five-bed homes, ranging from apartments to townhouses. The hotel style designed rooms were converted to include kitchens. 1,439 private homes are let on a rental basis, instead of being sold, with the ownership remaining with Delancey/Qatari Diar and managed by Get Living London. This created the first UK private sector residential fund of over 1,000 homes to be owned and directly managed as an investment. [3] In addition, the developers created new parklands and additional transport links. A health centre [17] for residents of East Village and the surrounding areas has also been constructed. Independent retailers have been brought in to East Village, which is now a neighbourhood in its own right.

The developers also added Chobham Academy, a new education campus with 1,800 places for students aged 3–19. During the Olympics, the school building was used as the main base for organising and managing teams. Rebuilt after the games, it opened in September 2013 as Chobham Academy, home to an education campus, comprising nursery, primary and secondary schools; an adult learning facility; and a community arts complex. [18] In July 2015 Chobham Academy was rated 'Outstanding' by OFSTED. [19]

Transport

Olympic and Paralympic Village, April 2012. To the right is the Stratford International station. Olympic Village, London, 16 April 2012.jpg
Olympic and Paralympic Village, April 2012. To the right is the Stratford International station.

East Village is located at Stratford International station with fast services to central London (in 5–6 minutes) via High Speed One, on Southeastern trains, but not Eurostar, whose trains do not stop at Stratford International station. The Docklands Light Railway gives direct access to much of the east of London, and is one stop from Stratford station, which itself gives access to the Great Eastern Main Line (services operated by Greater Anglia and TfL Rail), c2c services (weekends only), the North London line (services operated by London Overground) and the London Underground Jubilee and Central lines.

London Bus routes 97, 108, 308 and 339 and night route N205 serve East Village. Also, route D8 stops nearby at Stratford International and routes 58, 69 and 158 stops nearby on Leyton High Road along with route 97.

Generally, walking distance from Big Ben is about 10 km (6 mi). [20] At the time of the Olympics Stratford and Stratford International Stations were located in Travelcard Zone 3 [21] During the Olympics, for every competition day there an all-zones free travel day card. [22] As of January 2016 Stratford station and Stratford International station have been moved to Zone 2/3. [23]

Sustainability

Residential accommodation was designed to achieve Code for Sustainable Homes Level 4 on 8 September 2012. [24]

Plot N25, car park for Stratford International Station achieved CEEQUAL Excellent on 8 September 2012. [25]

Permanent and temporary timber used was externally verified and audited and the project achieved Full Project FSC certification (2009: TT-PRO-002826) on 31 January 2012. [26]

In construction the project achieved three Gold awards from the Considerate Constructors Scheme in 2010, 2011 and 2012, project registration references: 32454,36861 and 46760. [27]

See also

Related Research Articles

<span class="mw-page-title-main">Stratford, London</span> Human settlement in England

Stratford is a town in East London, England, within the London Borough of Newham. Part of the Lower Lea Valley, Stratford is situated 6 miles (9.7 km) east-northeast of Charing Cross, and includes the localities of Maryland and East Village.

<span class="mw-page-title-main">University of East London</span> Public university in London, England

University of East London (UEL) is a public university located in the London Borough of Newham, London, England, based at three campuses in Stratford and Docklands, following the opening of University Square Stratford in September 2013. The University of East London began as the West Ham Technical Institute and it was officially opened in October 1898 after approval was given for the construction of the site by the West Ham Technical Instruction Act Committee in 1892 following the Technical Instruction Act of 1889. It gained university status in 1992. It was formerly known as College of East London.

<span class="mw-page-title-main">Chobham</span> Human settlement in England

Chobham is a village and civil parish in the Borough of Surrey Heath in Surrey, England.

An Olympic Village is a residential complex built or reassigned for the Olympic Games in or nearby the host city for the purpose of accommodating all of the delegations. Olympic Villages are usually located close to the Olympic Stadium within an Olympic Park.

<span class="mw-page-title-main">Lower Lea Valley</span> Southern end of the Lea Valley in Greater London

The Lower Lea Valley is the southern end of the Lea Valley which surrounds the River Lea in eastern Greater London. It is part of the Thames Gateway redevelopment area and was the location of the 2012 Summer Olympics.

<span class="mw-page-title-main">London bid for the 2012 Summer Olympics</span> Successful bid to host the Olympic Games

London 2012 was the successful bid to host the 2012 Summer Olympics, held in London with most events taking place in Stratford in the borough of Newham. The British Olympic Association had been working on the bid since 1997, and presented its report to government ministers in December 2000.

<span class="mw-page-title-main">2012 Summer Olympics</span> Multi-sport event in London, England

The 2012 Summer Olympics, officially the Games of the XXX Olympiad and also known as London 2012, were an international multi-sport event held from 27 July to 12 August 2012 in London, England, United Kingdom. The first event, the group stage in women's football, began on 25 July at the Millennium Stadium in Cardiff, Wales, followed by the opening ceremony on 27 July. There were 10,518 athletes from 206 National Olympic Committees (NOCs) who participated in the 2012 Olympics.

<span class="mw-page-title-main">Queen Elizabeth Olympic Park</span> Sporting complex in Greater London, England

Queen Elizabeth Olympic Park is a sporting complex and public park in Stratford, Hackney Wick, Leyton and Bow, in east London. It was purpose-built for the 2012 Summer Olympics and Paralympics, situated adjacent to the Stratford City development. It contains the Olympic stadium, now known as the London Stadium, and the Olympic swimming pool together with the athletes' Olympic Village and several other Olympic sporting venues and the London Olympics Media Centre. The park is overlooked by the ArcelorMittal Orbit, an observation tower and Britain's largest piece of public art.

The 2012 Summer Olympic development process began in 2005, following the successful London bid for the 2012 Summer Olympics, and ran until the games in 2012. While many of the plans were included in the bid portfolio, which gained the favour of the International Olympic Committee (IOC) over the four other bids on 6 July 2005, there were more details released and decisions made afterwards. The London Organising Committee of the Olympic Games and Paralympic Games (LOCOG) was created to oversee many of these developments, though such a large-scale event requires the co-operation of many other agencies. These organizations are sometimes integral parts of the London 2012 plans, while others are unrelated but can still have a great effect.

The 2012 Summer Olympics and Paralympics venues were mostly located in the host city of London, though some other events required facilities located elsewhere. Between the successful bid and the Olympics and Paralympics themselves, several details and venues changed.

<span class="mw-page-title-main">Lusail</span> City in Qatar

Lusail is the second-largest city in Qatar after Doha, and the economic capital of Qatar, located on the coast, in the southern part of the municipality of Al Daayen. Lusail lies about 23 kilometres (14 mi) north of the city centre of Doha, just north of the West Bay Lagoon, on over 38 square kilometres (15 sq mi) and will eventually have the infrastructure to accommodate 450,000 people. Of these 450,000 people, it is estimated that 250,000 or fewer will be residents, 190,000 will be office workers and 60,000 retail workers.

Temple Mills is a district located on the boundary of the London boroughs of Newham and Waltham Forest, with a small part also in Hackney in east London.

<span class="mw-page-title-main">Chelsea Barracks</span> Former British Army barracks in London

Chelsea Barracks was a British Army barracks located in the City of Westminster, London, between the districts of Belgravia, Chelsea and Pimlico on Chelsea Bridge Road. The barracks closed in the late 2000s, and the site is currently being redeveloped for residential use by Qatari Diar, a subsidiary of the Qatar Investment Authority (QIA).

<span class="mw-page-title-main">Basketball Arena (London)</span> Venue of the 2012 Summer Olympics

The Basketball Arena for the 2012 Summer Olympics and the 2012 Summer Paralympics was located in the Olympic Park in Stratford, London. The arena was designed to be fully recyclable, and was dismantled in January 2013, the seating was sold to Barnet owner Tony Kleanthous to be used in the construction of The Hive Stadium.

<span class="mw-page-title-main">Lifschutz Davidson Sandilands</span>

Lifschutz Davidson Sandilands is a practice of architects, urban designers and masterplanners established in 1986 and practising out of London.

<span class="mw-page-title-main">Stratford City</span> Human settlement in England

Stratford City is a mixed-use development project in Stratford, London, England, to the north of Stratford town centre. The main developers are the Westfield Group and Lendlease.

<span class="mw-page-title-main">Chobham Academy</span> Academy school in Stratford, London, England

Chobham Academy is a mixed all-through school and sixth form which opened in September 2013. The school is located on Cheering Lane in the East Village of Stratford in the London Borough of Newham, England. It has 1,800 student places and has a specialism in performing arts and English.

<span class="mw-page-title-main">Here East</span> Media complex in the Olympic Park in London, England

Here East is a media complex located in the Olympic Park in East London, built specially for the 2012 London Olympics. It is located at the site of the former Hackney Wick Stadium close to the Riverbank Arena in Hackney Wick.

James Ritblat is a British businessman. Ritblat worked for British Land, the company acquired by his father Sir John Ritblat, until 1995 when he left to start his own business, Delancey, of which he is the chairman and chief executive. James Ritblat and wholly owned offshore subsidiaries of Delancy appear in the Panama Papers database. In 1998, billionaire George Soros 's Quantum Realty Fund was reported to have taken a controlling shareholding in Delancey through a deal with Ritblat. In 2010, the Crown Estate sold Royal Mint Court freehold to DV4 in an off-market sale and in 2011, Delancey, with the Qatari ruling family, bought the Olympic Village used in the London 2012 Olympic Games.

Delancey Real Estate Asset Management Limited is a British property development company that has wholly owned subsidiaries such as DV4 based in offshore jurisdictions. The billionaire George Soros invested in the company in 1998. The company appears in the Panama papers. In 2011, the Qatari ruling family bought the Olympic Village used in the London 2012 Olympic Games. The area has been renamed the East Village.

References

  1. "Lend Lease hands over delayed athletes' village plots to ODA". Building. 4 January 2012. Retrieved 28 October 2022.
  2. 1 2 3 4 5 6 7 8 9 10 11 Rowan Moore (8 January 2012). "Olympic Village – review". London: The Observer . Retrieved 27 July 2012.
  3. 1 2 3 "London Olympics Village Investor". e-architect.co.uk. 15 August 2011. Retrieved 27 July 2012.
  4. "Deal settles 2012 site land row". BBC News . 21 November 2005. Retrieved 27 July 2012.
  5. London 2012 Games village deal seen by year-end Reuters Accessed 8 October 2008
  6. D
  7. London 2012 Olympic village funding to be settled by end of 2008 following reduction in scale Associated Press Released 11 July 2008
  8. 2012 Games will be under budget BBC News Accessed 31 August 2008
  9. "Gypsies lose Olympic site battle". BBC News . 3 May 2007. Retrieved 27 July 2012.
  10. "Olympic Park fire under control". BBC News . 12 November 2007. Retrieved 27 July 2012.
  11. Rogers, Simon (27 July 2012). "World news,Olympic Games 2012 olympics olys". The Guardian. London.
  12. "London 2012 Venues - Top Stories Videos & Photos | Olympicorg". Archived from the original on 31 July 2012. Retrieved 27 July 2012.
  13. "Olympics/Paralympics, who stayed where?" (PDF). Retrieved 21 August 2015.
  14. "Olympic village handed more funds". BBC News . 13 May 2009. Retrieved 27 July 2012.
  15. 1 2 Julia Kollewe (12 August 2011). "Olympic Village snapped up by Qatari ruling family for £557m". The Guardian . London. Retrieved 27 July 2012.
  16. "Delancey, Qatari Diar sign Olympic village deal". Reuters. 15 August 2011. Retrieved 27 July 2012.
  17. "IIS Windows Server".
  18. "Olympic school gets the go ahead". BBC News . 3 April 2009. Retrieved 27 July 2012.
  19. "OFSTED Report - Chobham Academy".
  20. Google Maps
  21. London: The Olympic Park - TripAdvisor
  22. Tube, DLR and London Overground | Transport for London
  23. "Stratford stations to become part of Zone 2 London - ITV News" . Retrieved 21 August 2015.
  24. "Working to the Code on the Athletes' Village" (PDF). ODA. Archived from the original (PDF) on 15 August 2012. Retrieved 8 September 2012.
  25. "CEEQUAL Athletes' Village - N25 Car Park". CEEQUAL. Archived from the original on 17 June 2015. Retrieved 8 September 2012.
  26. "Project certificate details for Athletes Village". FSC. Archived from the original on 9 October 2011. Retrieved 8 September 2012.
  27. "Award entries for Athletes Village from Considerate Constructors Scheme Database". Considerate Constructors Scheme. Archived from the original on 17 June 2015. Retrieved 8 September 2012.

Cilantro Engineering