Hokuriku Shinkansen

Last updated

Hokuriku Shinkansen
Shinkansen-E.svg Shinkansen jrw.svg
SeriesE7-F19.jpg
A JR East E7 series train on the Hokuriku Shinkansen
Overview
Native name北陸新幹線
StatusOperational
Owner Img identity logo.png JRTT
Locale Tokyo; Saitama, Gunma, Nagano, Niigata, Toyama, Ishikawa, and Fukui Prefectures
Termini Takasaki
Kanazawa
Service
Type Shinkansen
Operator(s) JR logo (east).svg JR East (From Takasaki to Jōetsumyōkō)
JR logo (west).svg JR West (From Jōetsumyōkō to Kanazawa)
Depot(s)Nagano, Hakusan
Rolling stock E7 series, W7 series
History
Opened1 October 1997
Technical
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Minimum radius 4,000 m (13,000 ft)
Electrification 25 kV AC, 50/60 Hz, overhead catenary
Operating speed260 km/h (160 mph)
Route map
Hokuriku Shinkansen(English).jpg

The Hokuriku Shinkansen (北陸新幹線) is a high-speed Shinkansen railway line jointly operated by East Japan Railway Company (JR East) and West Japan Railway Company (JR West), connecting Tokyo with Kanazawa in the Hokuriku region of Japan. The first section, between Takasaki and Nagano in Nagano Prefecture, opened on 1 October 1997, originally called the Nagano Shinkansen (長野新幹線) (Takasaki is linked to Tokyo by the Jōetsu Shinkansen). The extension to Toyama in Toyama Prefecture and Kanazawa in Ishikawa Prefecture opened on 14 March 2015. [1] Construction of a further section onward to Fukui and Tsuruga in Fukui Prefecture commenced in 2012, with scheduled opening in fiscal 2022. The route of the final section to Shin-Osaka was decided on 20 December 2016 as the Osaka–Kyoto route, [2] with construction expected to begin in 2030 and take 15 years.

Contents

Train names and service patterns

Since March 2015, services on the line are split into four types, with train names as listed below. [3] Trains operate over the Joetsu and Tohoku Shinkansen tracks between Tokyo and Takasaki.

The original Nagano Shinkansen Asama services, introduced in 1997, replaced the conventional Shin'etsu Main Line limited express services, also named Asama, which previously took 2 hours 50 minutes from Tokyo (Ueno Station) to Nagano. Following the opening of the Shinkansen, part of the conventional line was abandoned between Yokokawa and Karuizawa. This section included the steeply-graded Usui Pass which required the use of bank engines on all trains.

Stations

Station nameJapaneseDistance from Takasaki (km)TransfersLocation
Tohoku Shinkansen
Tokyo 東京-108.6 Chiyoda Tokyo
Ueno 上野-105 Taitō
Ōmiya 大宮-77.3
Ōmiya-ku, Saitama Saitama
Joetsu Shinkansen
Ōmiya大宮Ōmiya-ku, SaitamaSaitama
Kumagaya 熊谷-40.7 Kumagaya
Honjō-Waseda 本庄早稲田-19.6 Honjō
Takasaki 高崎0.0 Takasaki Gunma
Hokuriku Shinkansen
Takasaki高崎TakasakiGunma
Annaka-Haruna 安中榛名18.5 Annaka
Karuizawa 軽井沢41.8 Shinano Railway Symbolmark.svg Shinano Railway Line Karuizawa, Kitasaku Nagano
Sakudaira 佐久平59.4 Koumi Line Saku
Ueda 上田84.2 Ueda
Nagano 長野117.4 Nagano
Iiyama 飯山147.3 Iiyama Line Iiyama
Jōetsumyōkō 上越妙高176.9 Echigo-TOKImeki logomark.svg ETR Myōkō Haneuma Line Jōetsu Niigata
Itoigawa 糸魚川213.9 Itoigawa
Kurobe-Unazukionsen 黒部宇奈月温泉253.1 Toyama Chihō Railway Main Line Kurobe Toyama
Toyama 富山286.9 Toyama
Shin-Takaoka 新高岡305.8 Jōhana Line Takaoka
Kanazawa 金沢345.4 Kanazawa Ishikawa
Under construction; scheduled to open in fiscal 2022
Komatsu 小松372.6 Hokuriku Main Line Komatsu Ishikawa
Kagaonsen 加賀温泉387.2 Hokuriku Main Line Kaga
Awaraonsen 芦原温泉403.4 Hokuriku Main Line Awara Fukui
Fukui 福井421.4 Fukui
Echizen-Takefu [4] 越前たけふ440.4  Echizen
Tsuruga 敦賀466.1 Tsuruga
Environmental impact assessment is underway. [5]
Higashi-Obama [Note 1] 東小浜 [Note 1] Obama Fukui
Kyōto 京都
Shimogyo-ku, Kyoto Kyoto
Matsuiyamate [Note 1] 松井山手 [Note 1] [6]
Kyōtanabe Kyoto
Shin-Ōsaka 新大阪 Kita-ku, Osaka Osaka
  1. 1 2 Although the official terminus of the Ryōmō Line is at Shin-Maebashi and that of the Agatsuma Line is at Shibukawa, trains on both lines run through to Takasaki.
  2. Although the official terminus of the Iiyama Line is at Toyono, trains on the line run through to Nagano.

Notes

  1. 1 2 3 4 This is a tentative name

As of 2012, the maximum line speed is 110 km/h (70 mph) between Tokyo and Omiya, 245 km/h (150 mph) between Omiya and Takasaki, and 260 km/h (160 mph) between Takasaki and Nagano. [7]

Rolling stock

With the start of Nagano Shinkansen services, trains were operated by a new fleet of JR East E2 series 8-car sets. A fleet of 17 new E7 series 12-car trainsets were phased in from March 2014, and these were augmented by a fleet of 10 JR West W7 series 12-car sets introduced from March 2015. The fleet of W7 series was purchased at a cost of ¥32.8 billion. [9] The remaining E2 series trainsets were withdrawn from Hokuriku Shinkansen services on 31 March 2017. [10]

In 2019, ten trains, eight from JR East with a book value of ¥11.8 billion and two from JR West, were damaged when a train yard in Nagano was flooded as the Chikuma River overflowed during typhoon Hagibis. [9] [11] As a result, JR West suffered a loss of ¥3 billion. [11]

Former rolling stock

The original E2 series 8-car "J" sets, primarily used on Tohoku Shinkansen services were also used on some Asama services until they were subsequently lengthened to 10 cars. One specially-modified 200 series set, numbered F80, was used on additional Asama services in February 1998 during the 1998 Winter Olympics held in Nagano. The train was modified to operate on both 25 kV AC 50 Hz and 60 Hz overhead power supplies, incorporated weight-saving measures to comply with the 16 tonne axle load restriction, and included additional control equipment to cope with the 30 gradient of the Nagano Shinkansen. [12] Its maximum speed was limited to 210 km/h (130 mph). [12] The last services operated using eight-car E2 series trainsets ran on 31 March 2017, from which date all Asama services were formed of E7 and W7 series trainsets. [13]

History

Nagano Shinkansen

The initial section between Takasaki and Nagano opened on 1 October 1997, in time for the 1998 Winter Olympics in Nagano.

Between May 2012 and March 2014, station platforms on the Nagano Shinkansen had their platform roofs extended to handle the E7 series 12-car trains which entered service in March 2014 ahead of the March 2015 opening of the extension beyond Nagano. [14] The Hokuriku Shinkansen extension from Nagano to Kanazawa opened in March 2015. [14] The 113-km extension from Kanazawa to Tsuruga was approved for construction in June 2012. [15]

From the start of the revised timetable on 15 March 2014, E7 series trainsets were introduced on Asama services. [8] Initially used on seven return services daily, this number was increased to eleven return services daily from 19 April 2014. [8]

Naming

The line's legal name has always been Hokuriku Shinkansen. However, just before the opening of the Nagano section, JR East has decided that using this name in passenger service is to be avoided. From March 22, 1997 until the extension of the Hokuriku Shinkansen to Kanazawa, the primary route for Hokuriku customers (from the Tokyo area) is to use the Joetsu Shinkansen to Echigo-Yuzawa Station, then transfer to Hakutaka via the Hokuetsu Express, rendering using the Takasaki–Nagano section of the Hokuriku Shinkansen meaningless for them. Therefore, JR East sought other names. [16]

On the other hand, local governments in Hokuriku, fearing construction west of Nagano may be halted, petitioned that the name "Hokuriku" should remain in use for operational purposes. [17]

JR East announced the following solution at July 25, 1997: [18]

Soon, "Nagano-bound Shinkansen" fell out of use, and timetables by various publishers use "Nagano Shinkansen" only. [19] Construction to Kanazawa was officially decided, thereby reducing the opposition to the name.

Extension beyond Nagano

Construction of the Hokuriku Shinkansen extension near Kanazawa Station in March 2008 The Viaduct of Hokuriku Shinkansen-1.JPG
Construction of the Hokuriku Shinkansen extension near Kanazawa Station in March 2008

Construction of the extension from Nagano to Kanazawa was completed on 24 May 2014. [20] When services commenced in March 2015, the travel time from Tokyo to Toyama was reduced to about 2 hours, with Kanazawa an additional 30 minutes away. [20] Final permission to start construction to Fukui was granted in December 2011, with modification works to Fukui Station already in progress for several years in anticipation of the extension. [21] The extension to Tsuruga was approved for construction on 30 June 2012, [22] and is scheduled to open in fiscal 2022. [23] Beyond Jōetsumyōkō Station, the line is operated by West Japan Railway Company (JR West) instead of East Japan Railway Company (JR East). [24]

Naming issue rises again

Many people speculated about and discussed what the line's operational name should be after Nagano–Kanazawa section is completed.

Nagano economic associations argued a sudden change in name will confuse customers, propose "Nagano–Hokuriku Shinkansen" to be used. [25] In contrast government officials and economic associations in Hokuriku region defended the legal name, including statements such as "a just result should come after 3 prefectures striving for 40 years". [26] [27] [28]

Section west of Jōetsumyōkō belongs to JR West, which did not state an opinion and used "Hokuriku Shinkansen" only. [29]

On October 2, 2013, JR East announced formal line name will be Hokuriku Shinkansen (consistent with National Shinkansen Railway Development Act) and depicted as Hokuriku Shinkansen (via Nagano), resolving the naming issue.

Test-running

Test-running on the JR East section of the line between Nagano and Kurobe-Unazukionsen commenced on 1 December 2013, initially at low speeds using the "East i" test train. [30] From 6 December, test-running commenced using 10-car E2 series trainsets, with running speeds gradually increased to the full line speed of 260 km/h (160 mph). [30] Test-running continued until the end of March 2014. [30] Test-running on the entire line between Nagano and Kanazawa (Hakusan Depot) started on 1 August 2014, using the "East i" test train. [31] Test-running using W7 series trains commenced on 5 August 2014, initially at low speed, on the JR West section between Kanazawa and Jōetsumyōkō. [32]

Future plans

Construction of the Hokuriku Shinkansen near Fukui Station in August 2007 Fukui-C-3082.jpg
Construction of the Hokuriku Shinkansen near Fukui Station in August 2007

The route of the final section from Tsuruga to Ōsaka was finalized on 20 December 2016 as the 'Obama–Kyoto' route. [2] The following four options were under consideration, [23] with a fifth unofficial option suggested by a local politician. [33]

  1. Maibara Route (米原ルート): This involved building a full standard shinkansen track to Maibara Station. It was one third of the length of the Obama Route, and provided good access to both Kyoto and Nagoya. It would have resulted in longer travel time to Osaka than the other options, and trains would have had to use the existing, already near-capacity Tokaido Shinkansen tracks between Maibara and Shin-Osaka.
  2. Kosei Route (湖西ルート): This involved no new track construction; instead, this proposal would have upgraded the Kosei Line to Kyōto, either by regauging or dual-gauging the line to support Mini-Shinkansen, or alternatively utilising Gauge Change Train (GCT) operations. This was the cheapest option, but meant train speeds would likely be limited to a maximum of 160 km/h (100 mph) and hence travel times would have been longer than the other options.
  3. Obama Route (小浜ルート): First proposed in 1973, [23] this route involved building a full standard shinkansen track via Obama and Kameoka. It was the shortest route to Osaka, but also the most expensive (approximately 1 trillion yen), and would have bypassed Kyōto.
  4. Obama–Kyoto Route (小浜・京都ルート): This, the now selected route, was first made public in August 2015, and involves following the proposed Obama Route west as far as Obama and then building shinkansen track southward to link with the Tokaido Shinkansen at Kyōto. Including Kyoto on the route is seen as important to increase tourism. [23]
  5. Maizuru Route (舞鶴ルート): Kyoto politician, Shoji Nishida's proposal from Tsuruga, via Obama, to Maizuru then south-east to Kyoto, eastern Osaka and Kansai Airport. [33] This option was uncosted but would have been the most expensive due to the scale of the proposal. Its case was to provide development to the Maizuru region as per the Japanese national government's policy, with the Maizuru Maritime Self-Defence Force Base and several nuclear power stations put forward as reasonable traffic generators. The option to extend the line south of Kyoto to a new Osaka station (located to the south east of Osaka) and onwards to Kansai International Airport was seen as a means to avoid the congestion of the Tokaido line. It may have served as an alternative route or terminus to Shin-Osaka station for Tokaido line trains, reducing Tokaido line congestion.

A government committee deliberating the proposals decided in April 2016 to narrow the proposed route to three alignments between Tsuruga and Kyōto and two alignments between Kyoto and Shin-Ōsaka (a northern route through Minoh and a southern route through the Kansai Science City). On 6 March 2017 the government committee announced the chosen route from Kyoto to Shin-Osaka is to be via Kyotanabe, with a station at Matsuiyamate on the Katamachi Line. [34] [35] There had previously been discussion of routing the line to Tennōji, a major terminal in southeast Osaka, which would allow an extension of the line to Kansai Airport. [36] [37]

Interim plans

In an attempt to extend the benefits of the Hokuriku Shinkansen to stations west of Tsuruga before the section to Shin-Osaka is completed, JR West was working in partnership with Talgo on the development of a Gauge Change Train (GCT), which was proposed to be capable of operating under both the 25 kV AC electrification used on the Shinkansen and the 1.5 kV DC system employed on conventional lines. The six-car train was due to start trials on the Hokuriku Shinkansen and the 1067 mm-gauge Hokuriku and Kosei lines in 2017. As part of the project JR West had begun trials with a purpose-built 180 m-long gauge-changer at Tsuruga. [38] However, as a result of the abandonment of the proposed use of a GCT on the West Kyushu Shinkansen to Nagasaki by JR Kyushu, in August 2018 JR West announced that the proposed GCT between Tsuruga and Osaka had been abandoned. [39]

Conventional lines running parallel to the Hokuriku Shinkansen

With the opening of the initial Nagano Shinkansen section in October 1997, the section of the conventional (narrow gauge) Shinetsu Main Line running along approximately the same route between Karuizawa and Shinonoi was transferred from the control of JR East to a newly established third-sector railway operating company, Shinano Railway, becoming the Shinano Railway Line.

With the opening of the Hokuriku Shinkansen extension north of Nagano on 14 March 2015, the conventional lines running along approximately the same route were transferred from the control of their respective JR owning companies to newly established third-sector railway operating companies funded primarily by the prefectural and municipal governments through which the lines pass. A total of 252.2 km (156.7 mi) of route between Nagano and Kanazawa was transferred to four separate operating companies, including 75.0 km (46.6 mi) of the Shinetsu Main Line between Nagano and Naoetsu, and 177.2 km (110.1 mi) of the Hokuriku Main Line between Naoetsu and Kanazawa. [40] Details of the four third-sector operating companies and their respective lines are as shown below. [40]

SectionLength (km)Former line nameFormer operating companyDate transferredNew line nameOperating company
KaruizawaShinonoi 65.1 Shinetsu Main Line JR East 1 October 1997 Shinano Railway Line Shinano Railway
NaganoMyōkō-Kōgen 37.314 March 2015 Shinano Railway Kita-Shinano Line
Myōkō-KōgenNaoetsu 37.7 Myōkō Haneuma Line Echigo Tokimeki Railway
NaoetsuIchiburi 59.3 Hokuriku Main Line JR West Nihonkai Hisui Line
IchiburiKurikara 100.1 Ainokaze Toyama Railway Line Ainokaze Toyama Railway
KurikaraKanazawa 17.8 IR Ishikawa Railway Line IR Ishikawa Railway

Related Research Articles

Shinkansen Japanese high-speed rail system

The Shinkansen, colloquially known in English as the bullet train, is a network of high-speed railway lines in Japan. Initially, it was built to connect distant Japanese regions with Tokyo, the capital, to aid economic growth and development. Beyond long-distance travel, some sections around the largest metropolitan areas are used as a commuter rail network. It is operated by five Japan Railways Group companies.

<i>Asama</i> (train)

The Asama (あさま) is a high-speed Shinkansen train service operated by East Japan Railway Company on the Hokuriku Shinkansen in Japan. The shinkansen service was introduced in October 1997, but the name was first used for a semi-express service operated by Japanese National Railways (JNR) in 1961. "Asama" is the name of an active volcano near Karuizawa, on the boundary between Gunma and Nagano Prefecture.

Thunderbird (train)

The Thunderbird is a limited express train service operated by the West Japan Railway Company between Osaka and Kanazawa or Wakuraonsen in Japan, using portions of the Tokaido Main Line, Kosei Line, Hokuriku Main Line, IR Ishikawa Railway Line, and Nanao Line.

Kanazawa Station Railway station in Kanazawa, Ishikawa Prefecture, Japan

Kanazawa Station is a major railway station in Kanazawa, Ishikawa, Japan, operated by West Japan Railway Company, the private railway operator Hokuriku Railroad, and the third-sector operator IR Ishikawa Railway.

Toyama Station Railway station in Toyama, Toyama Prefecture, Japan

Toyama Station is a railway station in Toyama, Toyama Prefecture, Japan, operated by West Japan Railway Company. It is the largest and busiest railway terminal in Toyama.

Hokuetsu

The Hokuetsu (北越) was a limited express train service in Japan formerly operated by Japanese National Railways (JNR) and later by East Japan Railway Company between Kanazawa and Niigata from 1970 until March 2015.

Kita-Nagano Station Railway station in Nagano, Nagano Prefecture, Japan

Kita-Nagano Station is a railway station on the Shinano Railway Kita-Shinano Line in Nakagoe, in the city of Nagano, Japan, operated by the third-sector railway operating company Shinano Railway. It is also a freight terminal for the Japan Freight Railway Company.

Iiyama Station Railway station in Iiyama, Nagano Prefecture, Japan

Iiyama Station is a railway station on the Iiyama Line in the city of Iiyama, Nagano Prefecture, Japan, operated by East Japan Railway Company. Since 14 March 2015, it is also a stop on the high-speed Hokuriku Shinkansen line from Tokyo to Kanazawa.

Itoigawa Station Railway station in Itoigawa, Niigata Prefecture, Japan

Itoigawa Station is a railway station in Itoigawa, Niigata, Japan, operated by West Japan Railway Company and the third-sector railway operator Echigo Tokimeki Railway. It is also a freight terminal for the Japan Freight Railway Company.

Tomari Station (Toyama) Railway station in Asahi, Toyama Prefecture, Japan

Tomari Station is a railway station on the Ainokaze Toyama Railway Line in Asahi, Toyama, Japan, operated by the third-sector railway operator Ainokaze Toyama Railway.

Arimagawa Station

Arimagawa Station is a railway station on the Echigo Tokimeki Railway Nihonkai Hisui Line in the city of Jōetsu, Niigata, Japan, operated by the third-sector railway operator Echigo Tokimeki Railway.

Kurobe-Unazukionsen Station

Kurobe-Unazukionsen Station is a railway station on the high-speed Hokuriku Shinkansen line in Kurobe, Toyama, Japan, operated by West Japan Railway Company. It opened on 14 March 2015. Shin-Kurobe Station on the Toyama Chihō Railway Main Line is connected to the station by a walkway.

Shin-Takaoka Station Railway station in Takaoka, Toyama Prefecture, Japan

Shin-Takaoka Station is an interchange railway station on the high-speed Hokuriku Shinkansen line and Jōhana Line in Takaoka, Toyama, Japan, operated by West Japan Railway Company. It opened on 14 March 2015, coinciding with the opening of the Hokuriku Shinkansen extension from Nagano to Kanazawa.

Kita-Arai Station Railway station in Myōkō, Niigata Prefecture, Japan

Kita-Arai Station is a railway station on the Myōkō Haneuma Line in the city of Myōkō, Niigata, Japan, operated by the third-sector operator Echigo Tokimeki Railway.

<i>Hakutaka</i>

The Hakutaka (はくたか) is a high-speed shinkansen train service jointly operated by East Japan Railway Company and West Japan Railway Company between Tokyo and Kanazawa on the Hokuriku Shinkansen line in Japan. The shinkansen service was introduced on 14 March 2015, but the name was first used for a limited express service operated by Japanese National Railways (JNR) from 1965 until 1982, and later by JR West and Hokuetsu Express between 1997 and March 2015.

E7 and W7 Series Shinkansen Japanese high-speed train type

The E7 series (E7系) and W7 series Shinkansen are Japanese high-speed train types operated by East Japan Railway Company and West Japan Railway Company (JR-West), respectively. They were jointly developed.

Jōetsumyōkō Station Railway station in Jōetsu, Niigata Prefecture, Japan

Jōetsumyōkō Station is an interchange railway station in Jōetsu, Niigata, Japan, operated by East Japan Railway Company, West Japan Railway Company and the third-sector railway operator Echigo Tokimeki Railway. It opened in March 2015.

IR Ishikawa Railway

The IR Ishikawa Railway is a Japanese third-sector railway company established in 2012 to operate passenger railway services on the section of the JR West Hokuriku Main Line within Ishikawa Prefecture. The main line was separated from the JR West network on 14 March 2015, coinciding with the opening of the Hokuriku Shinkansen extension from Nagano to Kanazawa. The company was founded on 28 August 2012 and has its headquarters in Kanazawa, Ishikawa.

The Noto Kagaribi (能登かがり火) is a limited express train service operated by West Japan Railway Company between Kanazawa and Wakura-Onsen in Ishikawa Prefecture, Japan, via the IR Ishikawa Railway Line and Nanao Line since 14 March 2015.

The Dinostar is a limited express train service operated by the West Japan Railway Company between Fukui and Kanazawa in Japan via the Hokuriku Main Line since 14 March 2015.

References

  1. 北陸新幹線、来年3月14日開業 東京―金沢2時間半 [Hokuriku Shinkansen to open 14 March next year: Tokyo - Kanazawa in two and a half hours]. Tokyo Shimbun Web (in Japanese). Japan: Chunichi Shimbun. 27 August 2014. Archived from the original on 27 August 2014. Retrieved 27 August 2014.
  2. 1 2 "Hokuriku extension route agreed". Railway Gazette. London. 23 December 2016. Retrieved 23 March 2018.
  3. 北陸新幹線 長野~金沢間開業に伴う運行計画の概要について [Outline of service plans for opening of Hokuriku Shinkansen from Nagano to Kanazawa](PDF) (Press release) (in Japanese). Japan: JR East & JR West. 27 August 2014. Retrieved 27 August 2014.
  4. About a new station name
  5. "Document on Primary Environment Impact Consideration (May 2019)" (PDF) (in Japanese). Japan Railway Construction, Transport and Technology Agency.
  6. According to the materials (PDF) (in Japanese)<published by Japan Railway Construction, Transport and Technology Agency>, the station is going to be installed around Matsuiyamate Station.
  7. "300km/hのトップランナー" [300 km/h Top Runners]. Japan Railfan Magazine . Vol. 52 no. 612. Japan: Kōyūsha Co., Ltd. April 2012. p. 14.
  8. 1 2 3 3月15日ダイヤ改正と各地の話題[15 March timetable revision and topics from around the regions]. Tetsudō Daiya Jōhō Magazine (in Japanese). Vol. 43 no. 361. Japan: Kōtsū Shimbun. May 2014. p. 12.
  9. 1 2 "Ten Hokuriku Shinkansen Line trains worth ¥32.8 billion sustain damage after yard is flooded in Typhoon Hagibis". The Japan Times Online. 13 October 2019. Retrieved 7 November 2019.
  10. 北陸新幹線「E2系」今月引退…五輪輸送で活躍 [Hokuriku Shinkansen E2 series to be withdrawn this month - Played an active role in transportation during the Olympics]. Yomiuri Online (in Japanese). Japan: The Yomiuri Shimbun. 21 March 2017. Archived from the original on 21 March 2017. Retrieved 22 March 2017.
  11. 1 2 "All 10 typhoon-flooded shinkansen bullet trains to be scrapped". Kyodo News+. Retrieved 7 November 2019.
  12. 1 2 200系F80編成[200 series set F80]. Japan Railfan Magazine . Vol. 38 no. 444. Japan: Koyusha Co., Ltd. April 1998. p. 64.
  13. E2系N編成“あさま”の営業運転終了 [E2 series N set Asama services end]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 1 April 2017. Archived from the original on 1 April 2017. Retrieved 3 April 2017.
  14. 1 2 Ito, Tadayuki (3 May 2012). 新幹線ホーム屋根延長へ 長野県内各駅、金沢延伸に備え [Nagano Prefecture shinkansen station platforms to have roofs extended in preparation for extension to Kanazawa]. The Asahi Shimbun Digital (in Japanese). Japan: The Asahi Shimbun Company. Archived from the original on 12 May 2012. Retrieved 3 May 2012.
  15. Kyodo News, "Bullet-train extensions approved", The Japan Times , 30 June 2012, p. 2
  16. 「北陸新幹線・東京-長野 10月開業を発表 列車愛称『あさま』」『信濃毎日新聞』 [Hokuriku Shinkansen Tokyo-Nagano will open October]. Shinano Daily News, Apr 16 1997 (in Japanese).
  17. 「呼称は長野か北陸か新幹線揺れる―JR東日本『まだ長野まで』北陸自治体『名前は残して』」『日本経済新聞』1997年5月5日
  18. 「北陸新幹線ダイヤを発表 長野まで最速79分 しなの鉄道2割増」『信濃毎日新聞』1997年7月26日
  19. JTB時刻表 時刻表80年のあゆみ-第3回- - JTB Publishing るるぶ.com
  20. 1 2 Igata, Katsuhiro (25 May 2014). "Hokuriku Shinkansen line between Nagano, Kanazawa completed". ajw.asahi.com. Asahi Shimbun. Archived from the original on 28 May 2014. Retrieved 27 May 2014.
  21. Archived 5 January 2012 at the Wayback Machine
  22. 1 2 3 4 北陸新幹線延伸「小浜・京都ルート」も検討 JR西日本 [JR West also considering Obama-Kyoto route for Hokuriku Shinkansen extension]. Asahi Shimbun Digital (in Japanese). Japan: The Asahi Shimbun Company. 29 August 2015. Retrieved 29 August 2015.
  23. Kyodo News, "DPJ may OK three new bullet-train sections", The Japan Times, 17 December 2011, p. 1.
  24. "北陸新幹線:名称は「長野北陸新幹線」に 県商工会議所連合会らJRに要望/長野". 毎日新聞 . 毎日新聞社. 17 March 2009. Retrieved 17 March 2009.[ permanent dead link ]
  25. "新幹線あくまで「北陸」 知事 「3県で40年努力した」". Chunichi ShimbunTomaya ver. Chunichi Shimbun Company. 20 February 2013. Archived from the original on 22 February 2013. Retrieved 20 February 2013.
  26. "新幹線 堂々と「北陸に」 谷本知事「乗客が誤解する」". Hokuriku Chunichi Shimbun . Chunichi Shimbun Hokuriku branch. 21 February 2013. Retrieved 21 February 2013.[ permanent dead link ]
  27. "問答無用「北陸」で当然". 北陸中日新聞. 中日新聞北陸本社. 2 March 2013. Archived from the original on 5 March 2013. Retrieved 2 March 2013.
  28. "北陸新幹線用の新型車両について" (Press release). JR West. 4 September 2012. Retrieved 12 November 2014.
  29. 1 2 3 北陸新幹線、12月1日から走行試験 [Hokuriku Shinkansen test running to start from 1 December]. Webun (in Japanese). Japan: The Kitanippon Shimbun. 5 October 2013. Archived from the original on 8 October 2013. Retrieved 9 October 2013.
  30. E926形"East-i"が金沢(白山総合車両所)まで走行試験 [Class E926 "East i" test run to Kanazawa (Hakusan Depot)]. Tetsudo Hobidas (in Japanese). Japan: Neko Publishing. 4 August 2014. Retrieved 5 August 2014.
  31. 北陸新幹線金沢~上越妙高間でW7系による走行試験が始まる [Test-running using W7 series begins on Hokuriku Shinkansen between Kanazawa and Jōetsumyōkō]. Tetsudo Hobidas (in Japanese). Japan: Neko Publishing. 5 August 2014. Retrieved 5 August 2014.
  32. 1 2 Johnston, Eric (24 January 2016). "Politics heating up over Hokuriku Shinkansen Line's undecided last leg". Japan Times Online. Retrieved 23 March 2018.
  33. "Archived copy" お知らせ : 京都新聞. www.kyoto-np.co.jp. Kyoto News. Archived from the original on 7 March 2017. Retrieved 23 March 2018.CS1 maint: archived copy as title (link)
  34. 北陸新幹線“京田辺市ルート”最終調整へ|日テレNEWS24. news24.jp. Retrieved 23 March 2018.
  35. "終点は新大阪駅 与党検討委、北陸新幹線延伸で一本化". The Nikkei. 26 April 2016. Retrieved 28 April 2016.
  36. 北陸新幹線、「けいはんな」通る第3案 京都と大阪間、与党委. The Nikkei. 12 April 2016. Retrieved 13 April 2016.
  37. "Talks begin on Hokuriku Shinkansen extension". 7 August 2015.
  38. "北陸新幹線にフリーゲージ断念へ政府、与党とJR西日本" [Abandon free gauge on the Hokuriku Shinkansen Government, ruling party and JR West]. Fukui Shimbun (in Japanese). 25 August 2018. Archived from the original on 4 September 2019. Retrieved 17 February 2021.
  39. 1 2 Osano, Kagetoshi (March 2015).  北陸新幹線並行在来線各社の姿[Guide to companies operating conventional lines alongside the Hokuriku Shinkansen]. Tetsudō Daiya Jōhō Magazine (in Japanese). Vol. 44 no. 371. Japan: Kōtsū Shimbun. pp. 28–33.