Kelana Jaya line

Last updated

Kelana Jaya Line
KLRT Line 5 icon.svg
Innovia Metro 200 MLR and 300 at KL Sentral.jpg
Bombardier Innovia ART 200 (left) and Innovia Metro 300 (right) at the KL Sentral LRT station
Overview
Native nameLRT Laluan Kelana Jaya
StatusOperational
Owner Prasarana Malaysia
Line number 5 (ruby)
Locale Klang Valley
Termini
Stations37 [1]
Website myrapid.com.my
Service
Type Medium-capacity rail system
System Rapid KL Logo.svg Rapid KL
Services GombakPutra Heights
Operator(s) Rapid Rail
Depot(s) Subang Depot
Rolling stock Bombardier Innovia ART 200 & Metro 300
266 carriages; 2-car & 4-car trainsets
Width: 2.65 m (8 ft 8 in) - narrow profile
Length: 67.1 m (220 ft) & 33.7 m (111 ft)
Daily ridership239,750 (Q3 2024) [2]
Ridership73.76 million (2023)
94.66 million (2019, highest) [3]
History
OpenedPhase 1: Kelana Jaya - Pasar Seni
1 September 1998;26 years ago (1998-09-01)
Phase 2: Pasar Seni - Gombak
1 June 1999;25 years ago (1999-06-01)
Last extension Kelana Jaya - Putra Heights
30 June 2016;8 years ago (2016-06-30)
Technical
Line length46.4 km (28.8 mi)
CharacterMostly elevated
Subsurface station(s): Sri Rampai
Underground station(s): Ampang Park - Masjid Jamek
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Electrification 750 V DC   third rail + linear induction motor
Operating speed80 km/h (50 mph)
Signalling Alcatel/Thales SelTrac CBTC
Route map

Contents

BSicon uYRDe.svg
yard
KJ1
BSicon uhBHFa.svg
Gombak BSicon PARKING.svg BSicon BUS2.svg
  ECR  
KJ2
BSicon uhBHF.svg
Taman Melati BSicon PARKING.svg
KJ3
BSicon uhBHF.svg
Wangsa Maju BSicon PARKING.svg
KJ4
BSicon lhSTRea.svg
BSicon uBHF.svg
Sri Rampai BSicon PARKING.svg
KJ5
BSicon uhBHF.svg
Setiawangsa BSicon PARKING.svg
13
KJ6
BSicon uhBHF.svg
Jelatek BSicon PARKING.svg
KJ7
BSicon uhBHF.svg
Dato' Keramat
KJ8
BSicon hPORTALf.svg
BSicon uhBHF.svg
Damai
KJ9
BSicon BLc2.svg
BSicon utBHF.svg
BSicon KBL3.svg
Ampang Park
PY16
BSicon utCONTgq.svg
BSicon utBHFq.svg
BSicon KBL1.svg
BSicon utKRZto.svg
BSicon BLc4.svg
BSicon utCONTfq.svg
BSicon WALKl.svg 12
KJ10
BSicon utBHF.svg
KLCC
KJ11
BSicon utBHF.svg
Kampung Baru
MR8
BSicon uhCONTgq.svg
BSicon BLc2.svg
BSicon utKRZh.svg
BSicon uhkBHF2+r.svg
BSicon BLc3.svg
BSicon KBL3.svg
BSicon uhkSTRc3.svg
Bukit Nanas
BSicon WALKl.svg 8
KJ12
BSicon utBHF.svg
BSicon KBL1.svg
BSicon hkSTR-c1.svg
BSicon BLc4.svg
BSicon uhkLLSTR+4.svg
Dang Wangi
AG7
SP7
BSicon HUBc2.svg
BSicon HUB3.svg
BSicon utINT.svg
Masjid Jamek
KJ13
BSicon uhCONTgq.svg
BSicon HUB1.svg
BSicon uhINTq.svg
BSicon kMSTR2+r.svg
BSicon uhkSTR2+r.svg
BSicon HUBc4.svg
BSicon utSTR.svg
BSicon uhkSTRc3.svg
3 4
BSicon CONTg.svg
BSicon hkSTR-c1.svg
BSicon uhtSTRe.svg
BSicon uhkLLSTR+4.svg
KG16
BSicon utkSTRc2.svg
BSicon STR.svg
BSicon utkSTR3+l.svg
BSicon HUBc2.svg
BSicon uhKRZt.svg
BSicon HUB3.svg
BSicon utINTq.svg
BSicon utCONTfq.svg
KJ14
BSicon utkSTR+1.svg
BSicon BLc2.svg
BSicon STR.svg
BSicon uhINT.svg
BSicon HUB1.svg
BSicon KBL3.svg
BSicon HUBc4.svg
Pasar Seni
9
BSicon utSTR.svg
BSicon INT.svg
BSicon KBL1.svg
BSicon BLc4.svg
BSicon uhSTR.svg
Kuala Lumpur BSicon LDER.svg
BSicon WALKl.svg 1 2
KG15
BSicon utBHF.svg
BSicon KBL2.svg
BSicon BLc3.svg
BSicon STR.svg
BSicon uhSTR.svg
BSicon uhLSTR.svg
Muzium Negara
BSicon MUSEUM.svg BSicon WALKl.svg 9
KJ15
BSicon BLc1.svg
BSicon utCONTf.svg
BSicon KBL4.svg
BSicon INT2.svg
BSicon XPLTaq.svg
BSicon XPLTq.svg
BSicon uhBHF.svg
BSicon STRc3.svg
BSicon BLaq.svg
BSicon KINTa.svg
BSicon XPLTeq.svg
BSicon uhKBHFe.svg
BSicon BLeq.svg
KL Sentral-redONE BSicon PARKING.svg BSicon LDER.svg
BSicon STRc1.svg
BSicon umhKRZ2+4.svg
BSicon CONTf.svg
BSicon STRc3.svg
BSicon WALKl.svg 1 2 10 6 7 8
KJ16
BSicon uhBHF.svg
BSicon STRc1.svg
BSicon STR+4.svg
Bank Rakyat-Bangsar
BSicon uhSTR.svg
BSicon ABZgl.svg
BSicon CONTfq.svg
KJ17
BSicon uhBHF.svg
BSicon BLaq.svg
BSicon BHF.svg
BSicon BLeq.svg
Abdullah Hukum
BSicon WALKl.svg 2
KJ18
BSicon uhBHF.svg
BSicon LSTR.svg
Kerinchi
KJ19
BSicon uhBHF.svg
Universiti
13
KJ20
BSicon uhBHF.svg
Taman Jaya BSicon PARKING.svg
KJ21
BSicon uhBHF.svg
Asia Jaya BSicon PARKING.svg
KJ22
BSicon uhBHF.svg
Taman Paramount BSicon PARKING.svg
KJ23
BSicon uhBHF.svg
Taman Bahagia BSicon PARKING.svg
KJ24
BSicon uhBHF.svg
Kelana Jaya BSicon PARKING.svg
BSicon uhSTRc2.svg
BSicon uhABZg3.svg
BSicon uexhCONTgq.svg
BSicon MSTRq.svg
BSicon uexhSTRq.svg
BSicon uhSTR+1.svg
BSicon kMSTR2+r.svg
BSicon uexhkSTR2+r.svg
BSicon uhSTR+hc4.svg
BSicon uexhkSTRc3.svg
BSicon lhSTRea.svg
BSicon uDST.svg
BSicon hkSTR-c1.svg
BSicon uhSTR.svg
BSicon uexhkLLSTR+4.svg
Subang Depot
KJ25
BSicon uhSTR2.svg
BSicon MSTR.svg
BSicon uhBHF.svg
BSicon uhSTRc3.svg
Lembah Subang
BSicon uhSTRc1.svg
BSicon uhABZg+4.svg
KJ26
BSicon uexhSTRc2.svg
BSicon uhBHF.svg
BSicon uexhLSTR3.svg
Ara Damansara BSicon PARKING.svg
BSicon uexhSTRc2.svg
BSicon uehKRZ3+1hu.svg
BSicon uexhSTRc4.svg
KJ27
BSicon HUBaq.svg
BSicon uexhINT+1.svg
BSicon uexhSTRc4.svg
BSicon HUBeq.svg
BSicon uhINT.svg
CGC-Glenmarie BSicon PARKING.svg
11
BSicon uexhCONTf.svg
BSicon uhSTR.svg
BSicon LSTR.svg
KJ28
BSicon uhBHF.svg
BSicon BLaq.svg
BSicon kINT3.svg
BSicon BLeq.svg
Subang Jaya BSicon PARKING.svg BSicon BICYCLE.svg
BSicon WALKl.svg 2 10
BSicon CONTgq.svg
BSicon MSTR.svg
BSicon uhSTR.svg
BSicon kSTRr+1.svg
BSicon kSTRc4.svg
KJ29
BSicon uhBHF.svg
SS15
KJ30
BSicon uhBHF.svg
SS18
KJ31
SB7
BSicon HUBaq.svg
BSicon uhINT.svg
BSicon HUBeq.svg
BSicon uhKINTaq.svg
BSicon uhCONTfq.svg
USJ7
B1
KJ32
BSicon uhBHF.svg
Taipan
KJ33
BSicon uhBHF.svg
Wawasan
KJ34
BSicon uhBHF.svg
USJ21 BSicon PARKING.svg
KJ35
BSicon uhBHF.svg
Alam Megah BSicon PARKING.svg
KJ36
BSicon uhENDEa.svg
BSicon uhBHF.svg
Subang Alam BSicon PARKING.svg
BSicon uehKRWgl.svg
BSicon uehKRWg+r.svg
KJ37
SP31
BSicon uhINT.svg
BSicon HUBaq.svg
BSicon XPLTaq.svg
BSicon uhINT.svg
BSicon HUBeq.svg
BSicon XPLTeq.svg
Putra Heights BSicon PARKING.svg
4
BSicon uhSTR.svg
BSicon uhENDEe.svg
BSicon uhLSTR.svg
BSicon uh3STR2.svg
BSicon uh-3STRq.svg
BSicon uh3STR3.svg
BSicon hbv3STR~LLq.svg

Interchange stations

BSicon INT.svg
BSicon HUBaq.svg
BSicon uINT.svg
BSicon HUBeq.svg
BSicon uINT.svg
integrated paid area
single fare trip
BSicon BHF.svg
BSicon BLaq.svg
BSicon uBHF.svg
BSicon BLq.svg
BSicon uBHF.svg
BSicon BLeq.svg
non-integrated paid area
multiple fare trips
BSicon INT.svg
BSicon XPLTaq.svg
BSicon uINT.svg
BSicon HUBaq.svg
BSicon XPLTq.svg
BSicon uKINTe.svg
BSicon HUBeq.svg
BSicon XPLTeq.svg
interchange within same building
or cross-platform interchange
BSicon kSTR2.svg
BSicon uSTRl.svg
BSicon uSTRq.svg
BSicon kSTRc1.svg
BSicon kSTRl+4.svg
BSicon STRq.svg

The LRT Kelana Jaya Line is a medium-capacity light rapid transit (LRT) line and the first fully automated and driverless rail system in the Klang Valley, Malaysia. It forms part of the Klang Valley Integrated Transit System in and around Kuala Lumpur, Malaysia. Servicing 37 stations, the line has 46.4 km (28.8 mi) of grade-separated tracks running mostly on underground and elevated guideways. Formerly known as the PUTRA-LRT, it is operated as part of the Rapid KL system by Rapid Rail, a subsidiary of Prasarana Malaysia. The line is named after its former terminus, the Kelana Jaya station. The line is numbered 5 and coloured ruby on official transit maps.

History

With the incorporation of Projek Usahasama Transit Ringan Automatik Sdn Bhd (PUTRA-LRT), construction began on 15 February 1994, about the same time as construction of the Ampang Line. [ citation needed ] The tunnels were constructed by Hazama Corporation and Hyundai Engineering & Construction. [4] Operations commenced on Section 1 from Subang Depot to Pasar Seni on September 1, 1998. Section 2 from Pasar Seni to Terminal PUTRA (now known as Gombak), which includes Malaysia's first underground railway, commenced operations on June 1, 1998. [5]

Due to financial difficulties, PUTRA-LRT was wound up by the Kuala Lumpur High Court in April 26, 2002. By September 1, 2002, PUTRA-LRT came under management of Syarikat Prasarana Negara (also known as Prasarana Malaysia) and renamed "Putraline" under the first phase of the restructuring of Kuala Lumpur's public transport system.[ citation needed ] Prasarana also takes over STAR-LRT and is renamed "Starline". Operational aspects of the two lines are transferred to the new government-owned Rapid KL in November 2004 under the second phase of the restructuring process. [ citation needed ] Ownership of their assets remains with Prasarana.[ citation needed ]

In July 2005, the line was rebranded as Kelana Jaya Line, with all station signage changed by 2006.

Extensions

On 29 August 2006, Malaysian Deputy Prime Minister Dato Seri Najib Tun Razak announced that the western end would be extended to the suburbs of Subang Jaya (USJ and Putra Heights) to the south-west of Kuala Lumpur. The extension would be part of a RM10 billion plan to expand Kuala Lumpur's public transport network.

The expansion plan would also see the LRT Sri Petaling Line extended to the suburbs of Puchong and the south-west of Kuala Lumpur. The plan also involved the construction of an entirely new line, tentatively called the Kota Damansara–Cheras line, running from Kota Damansara in the western portion of the city, to Cheras in the southeast of Kuala Lumpur.

As of August 2008, Syarikat Prasarana Negara was reportedly running land and engineering studies for the proposed extension. [6]

In September 2009, Syarikat Prasarana Negara began displaying the alignment of the proposed extensions over a 3-month period for feedback. The Kelana Jaya extension would have 13 new stations over 17 km (11 mi) from Kelana Jaya to Putra Heights. Construction was expected to commence in early 2010. [7] [8] [9] [10]

In November 2010, Prasarana announced that it had awarded RM1.7 billion for first phase of the project. The winners included Trans Resource Corp Bhd for the Kelana Jaya Line extension. UEM Builders Bhd and Intria Bina Sdn Bhd were appointed as subcontractors for the fabrication and supply of segmental box girder jobs for the Kelana Jaya Line. [11]

Construction works on the Kelana Jaya Line and the Sri Petaling Line extension project were targeted to accelerate at the end of March 2011, with commencement of structural works, subject to approval from state government and local authorities. [12]

In 2014, completion of the extension was targeted for 2016. [13] On 14 April 2016, Prasarana Malaysia confirmed in a media release that the Kelana line extension would be fully operating on 30 June 2016. [14]

The extension begun operation on June 30, 2016, with 13 new stations added to the line beyond the Kelana Jaya terminus, the new terminus is now at Putra Heights, where the line meets with the LRT Sri Petaling Line. [7]

Line information

Kelana Jaya line
Location of Kelana Jaya LRT line
Underground LRT tunnel of the line with visible emergency sidewalk Kelana Jaya LRT underground tunnel (211031).jpg
Underground LRT tunnel of the line with visible emergency sidewalk

The line runs from Putra Heights through Kelana Jaya to Gombak, serving the Subang Jaya and Petaling Jaya regions to the south; southwest and central Kuala Lumpur, and the Kuala Lumpur City Centre; and low-density residential areas further north.[ citation needed ] At 46.4 km (28.8 mi) in length, it is one of the longest fully automated driverless metro lines in the world.[ citation needed ]

The stations are given in a north–south direction, consists primarily of elevated stops and a handful of underground and at-grade stations. Of the 37 stations, 31 are elevated, Sri Rampai lies at ground level, and five stops (Masjid Jamek, Dang Wangi, Kampung Baru, KLCC, and Ampang Park) are underground.

The stations, like those of the Ampang and Sri Petaling Lines, are styled in several types of architectural designs. Elevated stations, in most parts, were constructed in four major styles with distinctive roof designs for specific portions of the line. KL Sentral station, added later, features a design more consistent with the Stesen Sentral station building. Underground stations, however, tend to feature unique concourse layout and vestibules, and feature floor-to-ceiling platform screen doors to prevent platform-to-track intrusions. 22 stations (including two terminal stations and the five subway stations) use a single island platform, while 15 others use two side platforms. Stations with island platforms allow easy interchange between north-bound and south-bound trains without requiring one to walk down or up to the concourse level. The island platform at Putra Heights terminal station is shared with the Sri Petaling Line trains bound for Sentul Timur, allowing cross-platform line interchange at the station.

The stations were built to support disabled passengers, with elevators and wheelchair lifts alongside escalators and stairways between the levels. The stations have platform gaps smaller than 5 cm (2.0 in) to allow easy access for the disabled and wheelchair users. They are able to achieve this with:

The stations on the Kelana Jaya Line are the earliest rapid transit stations in the Klang Valley designed to provide a degree of accessibility for handicapped users.[ citation needed ] In contrast, handicapped-friendly facilities for the Ampang and Sri Petaling Lines were installed beginning in 2012.[ citation needed ]

The stations have closed-circuit security cameras for security purposes.[ citation needed ]

List of stations

CodeNameImagePlatform typePositionParking baysInterchange/notesOpening
 KJ1  Gombak KJ1 Gombak LRT Exterior 20231216 110147.jpg Terminus (Island)ElevatedMSPR: 1,441

Northern terminus. Formerly known as Terminal PUTRA.

Parking is provided by a multi-storey park-and-ride, the only one on the Kelana Jaya Line, and is accessible only using TnG cards.

Proposed interchange with   ECR   East Coast Rail Link

1 June 1999;
25 years ago
 KJ2  Taman Melati KJ2 Taman Melati LRT Exterior 20231216 105835.jpg Side Parking by DBKL
 KJ3  Wangsa Maju Wangsa Maju MRT Station structure (211031).jpg Island
 KJ4  Sri Rampai Sri Rampai LRT Station.jpg SideSubsurfaceNot availableExit to Wangsa Walk Mall.
24 December 2010;
13 years ago
 KJ5  Setiawangsa KJ5 Setiawangsa LRT Exterior 20231216 105005.jpg IslandElevated125Proposed interchange with  CC14  MRT Circle Line.
1 June 1999;
25 years ago
 KJ6  Jelatek KJ6 Jelatek LRT Platform 1 20231216 104358.jpg Side292Exit to Datum Jelatek Shopping Centre.
 KJ7  Dato' Keramat Dato' Keramat LRT Station platform (211210).jpg Not available
 KJ8  Damai Damai LRT Station platform (220527).jpg Island
 KJ9  Ampang Park Ampang Park LRT Station platform (230319) 03.jpg UndergroundConnecting station, without paid-area integration, with  PY20  MRT Putrajaya Line.

Exit to The Intermark Mall and The Linc KL.

 KJ10  KLCC KLCC LRT Station platform 3 (211031).jpg By Suria KLCC and Avenue K managementPedestrian access to  MR6  Bukit Bintang and  MR7  Raja Chulan for the KL Monorail, and  KG18A  Pavilion Kuala Lumpur-Bukit Bintang for the MRT Kajang line via a pedestrian walkway connecting the Kuala Lumpur Convention Centre and Pavilion Kuala Lumpur.

14 mins walk to  KJ11  Kampung Baru via Saloma Bridge (behind Jalan Ampang Muslim Cemetery) which is accessible at Jalan Saloma (the road is beside Menara Public Bank).

Exit to Suria KLCC, Avenue K Shopping Mall and Kuala Lumpur Convention Centre.

 KJ11  Kampung Baru Kampung Baru LRT Station platform (211210) alt.jpg Not available14 mins walk to  KJ10  KLCC via Saloma Bridge.
 KJ12  Dang Wangi Southbound platform of Dang Wangi LRT Station November 2017.jpg Connecting station, without paid-area integration, to  MR8  Bukit Nanas for KL Monorail.
 KJ13  Masjid Jamek Masjid Jamek LRT Station KJ Platform 2 (211030).jpg Interchange station to  AG7  SP7  LRT Ampang and Sri Petaling Lines.

Exit to Dataran Merdeka.

 KJ14  Pasar Seni KJ14 Pasar Seni LRT Platform 1 20231216 095015.jpg Elevated

Interchange station to  KG16  MRT Kajang Line.

Connecting station, without paid-area integration, to  KA02  Kuala Lumpur for KTM Batu Caves-Pulau Sebang Line, KTM Tanjung Malim-Port Klang Line and KTM ETS via a pedestrian bridge across the Klang River.

Bus hub to Puchong, Subang Airport, Petaling Jaya, Shah Alam and Subang Jaya.

1 September 1998;
26 years ago
 KJ15  KL Sentral–redONE KL Sentral LRT Station platform (211110).jpg SideParking By KL Sentral

Connectingstation, without paid area integration, to:

16 April 2001;
23 years ago
 KJ16  Bank Rakyat–Bangsar Bangsar LRT Station (211211).jpg Not available
1 September 1998;
26 years ago
 KJ17  Abdullah Hukum Abdullah Hukum LRT Station outview (220709) 02.jpg

Connecting station, without paid-area integration, to  KD01  KTM Tanjung Malim-Port Klang Line.

Link-bridge access to  KB01  Mid Valley for the KTM Batu Caves-Pulau Sebang Line via KL Eco City, The Gardens Mall & Mid Valley Megamall.

 KJ18  Kerinchi
 KJ19  Universiti Universiti LRT Station (211027).jpg IslandRapid KL Bus T789 to Universiti Malaya and T788 to  KB01  Mid Valley on the KTM Batu Caves-Pulau Sebang Line.

Proposed connecting station with  CC31  MRT Circle Line.

Exit to KL Gateway Mall.

 KJ20  Taman Jaya Taman Jaya LRT Station structure (211110).jpg SideExit to The Amcorp Mall.
 KJ21  Asia Jaya Asia Jaya LRT station.jpg IslandParking by MBPJ
 KJ22  Taman Paramount Taman Paramount LRT Station platform (220708).jpg Side68
 KJ23  Taman Bahagia Taman Bahagia SS2 LRT station Petaling Jaya - Nov 2018.jpg Parking by MPSJ
 KJ24  Kelana Jaya Kelana Jaya LRT Station (KJ24) Exterior (220730) 1.jpg Island482

Bus hub to  KT3  PY41  Putrajaya Sentral (506), Subang Jaya (783), Sunway Pyramid (783) and Bandar Utama (506/802).

 KJ25  Lembah Subang KJ Line Lembah Subang Overall View 6.jpg SideNot availableThe station is located on top of the existing Lembah Subang depot reception track ramp.
Feeder Bus T807 to  KG07  Surian for the MRT Kajang Line.
30 June 2015;
9 years ago
 KJ26  Ara Damansara KJ Line Ara Damansara Platform 1.jpg Island817Exit to Evolve Concept Mall.
 KJ27  CGC–Glenmarie Glenmarie Station - Mapillary (xITJSNqIR3OtUHTJkEUmFG).jpg 569Future interchange with  SA07  LRT Shah Alam Line.
 KJ28  Subang Jaya Subang Jaya LRT Station platform level (211104) 07.jpg Parking by KTMB

Connecting station, without paid-area integration, to  KD09  KS02  KTM Tanjung Malim-Port Klang Line and KTM KL Sentral-Terminal Skypark Line.

 KJ29  SS15 SS 15 LRT Station platform level (211104) 04.jpg Not availableExit to SS15 Courtyard.
 KJ30  SS18 KJ Line SS18 Overall View 3.jpg
 KJ31  USJ7 USJ7 LRT Station platform 5 (211104).jpg Interchange station with  SB7  BRT Sunway Line.

Exit to Da Men Mall and The Summit USJ.

 KJ32  Taipan KJ Line Taipan LRT Station 1.jpg Side
 KJ33  Wawasan Wawasan LRT Station.jpg Exit to The 19 USJ City Mall.
 KJ34  USJ21 USJ 21 LRT Station platform level (211104) 06.jpg 694
 KJ35  Alam Megah Alam Megah LRT Station platform level (211104) 06.jpg Island196
 KJ36  Subang Alam Subang Alam LRT Station platform level (211104) 05.jpg 115
 KJ37  Putra Heights Putra Heights LRT Terminal.jpg Terminus (Island & Side)452Southern terminus of both the LRT Kelana Jaya Line and LRT Sri Petaling Line.

Cross-platform interchange with  SP31  LRT Sri Petaling Line.

Rolling stock

2-car 1998 Innovia ART 200 (1998-2023)

An unrefurbished 2-car Bombardier Innovia ART 200 Bombardier Innovia Metro 200 set 32 at KL Sentral.jpg
An unrefurbished 2-car Bombardier Innovia ART 200

The rolling stock, was in used since the opening of the line in 1998 until 2023, consisted of 35 Innovia ART 200 trains [7] [15] with related equipment and services supplied by the Bombardier Group and train electronics company Quester Tangent. They consisted of two-electric multiple units, which served as either a driving car or trailer car depending on the direction of travel. They were equipped with Linear Induction Motor (LIM) propulsion technology which allowed for operation on tighter curves, with less noise and greatly reduced wheel and track wear. The plating in between the running rails was used for accelerating and decelerating the train; additionally, the reaction plate was semi-magnetised, which pulls the train along and helps it slow down.

The ART was completely automated and operates without drivers, stopping at stations for a limited amount of time. Nevertheless, manual override control panels were provided at each end of the trains for use in an event of an emergency. The technology was essentially identical to that of the Vancouver SkyTrain, which operates in very similar environments.

The foldable seat to make space for wheelchairs and strollers inside Innovia ART 200 The foldable seat inside Innovia Metro 200.jpg
The foldable seat to make space for wheelchairs and strollers inside Innovia ART 200

The interior of the ART, like its Ampang and Sri Petaling Lines' counterparts, consists of plastic seating aligned sideways towards the sides of the train, with one foldable seats for passengers at the end of the cars for wheelchair, and spacing in the middle for standing occupants. Since its launch in 1998, the ART rolling stock has remained relatively unchanged; only more holding straps have been added and the labeling has been modified from Putra-LRT to Rapid KL. Some of the rolling stock has the majority of the seats removed for added passenger capacity during rush hours.

With the fleet being aged, a tender was released by Prasarana in 2023 for the disposal of 4 2-car trains. [16]

On 23 May 2023, two-car train Number 32 was sent to Megalift, which handled logistics for the train's relocation. [17] [18] Train 32 was repurposed as a prop for disaster management training. It will form part of the simulation site at Pulau Meranti for the Malaysian Search & Rescue Team (SMART) to train on. [19]

On November 2023, all unrefurbished 2-car trains had been fully withdrawn from service.

4-car 2009 Innovia ART 200

4-car Bombardier Innovia ART 200 Bombardier Innovia Metro 200 set 56.jpg
4-car Bombardier Innovia ART 200

On 13 October 2006, Syarikat Prasarana Negara signed an agreement with Bombardier HARTASUMA Consortium for the purchase of 88 Innovia ART 200 cars (22 train sets of 4-cars), with an option for another 13, for RM1.2 billion. [20] The 22 train sets, initially targeted to be delivered from August 2008 onwards, would have four cars each, boosting the carrying capacity of the fleet by 1,500 people. On 7 October 2007, Syarikat Prasarana Negara exercised its option to purchase an additional 52 Innovia ART 200 cars (13 train sets of 4-cars) for 71 million. The first trains were expected to enter revenue service in 2010. [21]

Although the trains were expected to arrive in August 2008, the manufacturer delayed the delivery to November 2008. [ citation needed ] Rapid Rail said that the trains will only be usable by September 2009 after having sufficient rolling stocks, power line upgrades, and safety testing. [22] Transport Minister Datuk Seri Ong Tee Keat said in Parliament that the new trains would begin operations by December 2009. [23] However, in July 2009, Prime Minister Najib Tun Razak announced that the four-car trains will only be fully operational by the end of 2012. [24]

On 30 December 2009, 3 of the 35 new four-car trains entered commercial service. [25] In addition to increased capacity up to 950 passengers per trip, new features included seat belts for wheelchair-bound travelers, door alarm lights for hearing impaired, and more handles for standing commuters. [26]

2-coach Mid-Life Refurbishment

Bombardier Innovia ART 200 MLR set Refurbished Bombardier Innovia Metro 200 set 09 at KL Sentral.jpg
Bombardier Innovia ART 200 MLR set

In June 2012, several 2-car Innovia ART 200 trains underwent major refurbishment work done by from Hartasuma Consortium. [27] Known as Mid-Life Refurbishments (MLR), these refurbishments include an updated livery, changes of the LED headlights and interior lights, and interior refurbishments such as newer seat design and the installation of additional infotainment systems. Facilities were also added, such as openable windows during emergencies. The first MLR set, TR08, entered service on 15 October 2014. [28]

Interior of the refurbished set Interior of the married train Bombardier.jpg
Interior of the refurbished set
A 'married train' of the Innovia ART 200 MLR set 87 Bombardier Innovia Metro 200 MLR set 87 at KL Sentral.jpg
A 'married train' of the Innovia ART 200 MLR set 87

In 2017, another MLR project included two 2-car sets permanently coupled to form a 4-car set, known as the 'married train'. Interiors were similar to the previous MLR sets with added TV panels at each end of the sets, dynamic route map displays and walkable through gangways between the two sets. The first coupled train, TR87 (previously TR22 and TR27), entered service on 29 December 2017, with the remaining undergoing delivery in stages. [29]

Since the delivery of the new KLAV27 trains, the remaining 2-car trains that are not refurbished will be replaced by the new trains. [30] As of now, only 20 2-car trains are refurbished (including married trains).

KLAV Innovia Metro 300

Bombardier Innovia Metro 300, known as KLAV Bombardier Innovia Metro 300 set 73.jpg
Bombardier Innovia Metro 300, known as KLAV

Under the Kuala Lumpur Additional Vehicle programme, the first new generation Bombardier Innovia Metro 300 started service on 29 December 2016. [31] Each driverless train features a new design for the end caps, a curved sidewall structure, and a larger, more spacious interior. All trains come in a four-car configuration with each car accommodating up to 220 passengers. Low energy consumption is achieved through a combination of lightweight aluminium car shells and a LIM propulsion system. Furthermore, the vehicle's regenerative braking enables the reuse of energy released during braking. The aisles and walk-through gangways are also wider when compared with the previous fleet. In addition, the trainsets are equipped with 16 cameras on board, infotainment LCD screens, dynamic route maps, better air-conditioning and bigger windows. With the new trains, the line could increase its capacity by 20 to 30 percent. [32] [33] [34] [35]

An additional 27 new trainsets are being delivered. As of August 2020, three have arrived with two of them under installation. They were delivered for the first time by air using an Antonov An-124, one of the largest cargo planes in existence. The rest of the fleet are to be delivered by ship. [36] Since 27 June 2021, two trainsets labelled Sets 92 and 93 were spotted to be in service on the line. [note 1] [37] As of 14 September 2023, three trains in addition to the eight introduced previously are in operation. [note 2] [39]

4-coach Mid-Life Refurbishment

Due to recent developments in numerous breakdowns involving the 4-coach ART 200 fleet, [40] [41] [42] it was revealed by Rapid KL that mid-life refurbishment is to be done on the 34 trains. [note 3] According to former Transport Minister Wee Ka Siong, faulty or dated equipments included tachometers, electronic units and antennas. The most serious contributor to faults were from tachometers, accounting up to 47%. This refurbishment was expected to cost RM 800 million in May 2022. [45]

Fleet details

The Kelana Jaya Line fleet consists of the following models:

Innovia SeriesGenerationNumber builtFormationManufacturersNotes
INNOVIA ART 200 414 Series (unrefurbished)35 trainsets2-cars Bombardier Transportation In operation since 1998, until retirement in 2023.
414 Series (refurbished)10 trainsetsIn operation since 2014.
5 trainsets4-carsIn operation since 2017.
818 Series35 trainsetsIn operation since the end of 2009 [25] To be refurbished starting 2024. [46] [44]
INNOVIA Metro 300 KLAV1414 trainsetsIn operation since the end of 2016.
KLAV2727 trainsetsIn operation since 2021. Replaced unrefurbished 414 series trains.

The old RM10 banknote of the 1996 series featured an image of the 2-car Bombardier Innovia ART 200 Kelana Jaya Line train.

Accidents and incidents

On 24 July 2006, failure of the back-up computer caused the line to stop functioning during the evening rush hour. Passengers were trapped in trains and some forced opened doors in order to get out.

On 6 October 2006, a "technical problem" caused a train to stall between Dato Keramat and Damai at 7am, causing a shut-down of the Masjid JamekGombak LRT Station stretch. Normal service was restored by 5pm that day. [ citation needed ]

On 12 December 2006, an accident occurred during peak hours as a train was approaching Pasar Seni LRT station. The train stopped abruptly as if it hit something. No casualties occur.[ citation needed ]

On 4 March 2018, a high-voltage power line broke and fell on the roof of the Kelana Jaya station, causing the roof to be blown off. Trains on both routes passed through the station while it was closed for repairs. The Kelana Jaya station reopened a few days later.

On 2 May 2022, a train braked suddenly in the tunnel between Dang Wangi and Kampung Baru while travelling towards Gombak at around 11:20 p.m. The train eventually continued towards KLCC, with passengers being asked to disembark. No injuries were reported. [47]

In November 2022, a series of service disruptions caused by faulty automatic train control (ATC) device(s) forced trains to move slower and stop longer than usual, especially between Kelana Jaya and KLCC stations.

On 5 November 2022, a fault occurred between KLCC and Ampang Park stations. RapidKL resolved the problem by updating the software of the faulty ATC device, and train service resumed as usual on 6 November 2022. The problem resurfaced again between KLCC and Kelana Jaya stations on the evening of 7 November 2022. Stations between Damai and Lembah Subang were closed at night to resolve the ATC stability issues. [48] However, the same problem recurred on the evening of 8 November 2022, leading to a 4-day suspension. [49] Prasarana carried out the repairs, including finding the root cause of the problem. [50] After the subsequent stability tests under the supervision of technical experts from Thales Group and Land Public Transport Agency, the Ampang Park-Kelana Jaya stretch re-opens on 14 November 2022, two days earlier than expected. [51]

2021 underground collision

On 24 May 2021, at 8:45 pm MYT, train number 81 and 40 collided with each other between the KLCC and Kampung Baru LRT stations. Both trains were traveling in opposite directions on the same track and collided head-on. One of the trains was under maintenance and was being driven manually on the wrong track, while the other was automatically driven from KLCC. The cab ends which collided were carriages 181 and 240. A total of 213 people were on board the automated train. Preliminary reports indicated that no fewer than 166 people were injured, 47 of which were serious; [52] no deaths were reported, but 64 people requiring hospitalization, with 6 in critical condition. The case is under investigation as of 25 May 2021. This is the only and most severe incident involving a collision between two trains to occur along the Kelana Jaya line since it first opened in 1999. [53]

Ridership

In 2002, the line carried its 150 millionth passenger, with an average of passengers daily. [54] Today, it carries over 250,000 passengers per day [2] and over 350,000 per day during national events. [55]

Kelana Jaya Line Ridership [56] [57]
YearRidershipRemarks
202469,755,136As of Oct 2024
202373,763,592
202255,015,765
202125,123,614 Total lockdown
202045,307,182 COVID-19 pandemic
201994,657,974Highest on record
201887,216,597
201783,585,412
201679,002,829
201582,144,674
201481,971,322
201378,702,931
201271,574,675
201168,398,561
201058,037,633
200955,580,190
200858,168,337
200756,965,258
200656,747,136
200560,290,467
200457,729,971
200350,254,365
200254,423,246
200152,478,951
200044,542,496
199917,252,259

Notes and references

Notes

  1. There was no explicit mention of when these trains were officially serving passengers, so the closest date cited in public news sites was mentioned.
  2. Although news outlets quoted 3 trains to be in service on 14 September 2023, observations, however were different where the first train number 33 debuted on 17 August 2023. [38]
  3. Various published sources quoted differing numbers from May 2022 to the present (in 2023), but the most recent source quoted 34. [43] [44] The only train to be excluded would be Train 40 due to the major collision in 2021.

Related Research Articles

<span class="mw-page-title-main">KL Monorail</span> Monorail in Malaysia.

The KL Monorail Line is the only operational monorail system in Malaysia. Operated as part of the Rapid KL system by Rapid Rail, a subsidiary of Prasarana Malaysia, it is one of the components of the Klang Valley Integrated Transit System. The line is numbered 8 and coloured light green on official transit maps.

<span class="mw-page-title-main">Rapid KL</span> Public transportation system in Malaysia

Rapid KL is a public transportation system owned by Prasarana Malaysia and operated by its subsidiaries Rapid Rail and Rapid Bus. The acronym stands for Rangkaian Pengangkutan Integrasi Deras Kuala Lumpur, which translates to Kuala Lumpur Rapid Integrated Transport Network in the Malay language. Rapid KL, with its 204.1 km (126.8 mi) of metro railway and 5.6 km (3.5 mi) of BRT carriageway, is part of the Klang Valley Integrated Transit System, operating throughout Kuala Lumpur and Selangor's satellite cities in the Klang Valley area.

Prasarana Malaysia Berhad (Prasarana) (English: Malaysian Infrastructure Limited) is a government-owned company which was set up by Ministry of Finance (Malaysia) as a corporate body established under the Minister of Finance (Incorporation) Act 1957 to own the assets of multi-modal public transport operator in Malaysia, under the government's move to restructure the city's public transport system. It is one of the largest public-transport companies in Malaysia other than Konsortium Transnasional Berhad. As a government-owned company since 1998, it operates stage bus and light metro services via several wholly owned subsidiaries.

<span class="mw-page-title-main">Masjid Jamek LRT station</span> LRT station in Kuala Lumpur, Malaysia

Masjid Jamek LRT station is a rapid transit station in Kuala Lumpur, Malaysia. It is the interchange station between two of Rapid KL's light rapid transit (LRT) systems, namely the LRT Ampang and Sri Petaling Lines and the LRT Kelana Jaya Line. The station is one of only two stations integrating the LRT lines, the other being Putra Heights station. The station is situated near and named after the Masjid Jamek in central Kuala Lumpur.

<span class="mw-page-title-main">KLCC LRT station</span> LRT station Kuala Lumpur, Malaysia

KLCC LRT station is an underground rapid transit station in Kuala Lumpur, Malaysia, served by the Kelana Jaya Line.

Transport in Greater Kuala Lumpur includes a road network, a railway network, airports, and other modes of public transport. Greater Kuala Lumpur is conterminous with the Klang Valley, an urban conglomeration consisting of the city of Kuala Lumpur, as well as surrounding towns and cities in the state of Selangor. The Klang Valley has the country's largest airport, the Kuala Lumpur International Airport (KLIA), as well as the country's largest intermodal transport hub and railway station, Kuala Lumpur Sentral.

Kampung Baru LRT station is an underground rapid transit station, named after and serving Kampung Baru, Kuala Lumpur, in Malaysia. The station is part of the Kelana Jaya Line. The station was opened on June 1, 1999, as part of the line's second and latest extension, which includes the addition of 12 stations, and an underground line that the Kampung Baru station is connected to. The Kampung Baru station is currently one of only five underground stations in the Kelana Jaya Line.

<span class="mw-page-title-main">Gombak LRT station</span> LRT station in Gombak, Selangor, Malaysia

Gombak LRT station is a light rapid transit (LRT) station in the Gombak District, Selangor, Malaysia. It is the northern terminus of the LRT Kelana Jaya Line.

Rapid Rail Sdn Bhd is the operator of the rapid transit (metro) system serving Kuala Lumpur and the Klang Valley area in Malaysia. A subsidiary of Prasarana Malaysia, it is the sole operator of five rapid transit lines which collectively form the Rapid KL rapid transit system. The system currently consists of three light rapid transit (LRT) lines, two mass rapid transit (MRT) lines and a monorail line, with another MRT and LRT line currently under construction.

<span class="mw-page-title-main">Kajang line</span> Railway line in the Klang Valley, Malaysia

The MRT Kajang Line, previously known as the MRT Sungai Buloh–Kajang Line, is a Mass Rapid Transit (MRT) line servicing the Klang Valley, Malaysia. It is the second fully automated and driverless rail system in the Klang Valley region after the LRT Kelana Jaya Line. Owned by MRT Corp and operated as part of the Rapid KL system by Rapid Rail, it forms part of the Klang Valley Integrated Transit System. The line is numbered 9 and coloured green on official transit maps.

<span class="mw-page-title-main">Ampang and Sri Petaling lines</span> Malaysian passenger railway lines

The LRT Ampang Line and the LRT Sri Petaling Line are medium-capacity light rapid transit (LRT) lines in the Klang Valley, Malaysia. The combined network comprises 45.1 kilometres (28.0 mi) of tracks with 36 stations and was the first railway in Malaysia to use standard-gauge track and semi-automated trains. The lines are operated as part of the Rapid KL system by Rapid Rail, a subsidiary of Prasarana Malaysia.

<span class="mw-page-title-main">Putra Heights LRT station</span>

Putra Heights is a Klang Valley Rapid Transit station in Putra Heights in the southern Subang Jaya. The station are the southern terminus for the Sri Petaling Line and Kelana Jaya Line. The station is located on the intersection of Persiaran Putra Indah and Persiaran Putra Perdana, next to E6 ELITE. Nearby places include Kampung Kuala Sungai Baru, Laman Putra, Putra Indah and Putra Point Commercial Centre.

The LRT Shah Alam Line, previously known as the LRT Bandar Utama–Klang Line, LRT Bandar Utama-Johan Setia Line or simply LRT Johan Setia Line, is a medium-capacity light rapid transit (LRT) line which will be serving the Shah Alam and Klang regions on the western side of the Klang Valley, Malaysia. It will be the third LRT line, and the fourth fully automated and driverless rail system in the Klang Valley region. The line will be operated as part of the Rapid KL system by Rapid Rail, a subsidiary of Prasarana Malaysia. It was announced by Prasarana Malaysia on 24 April 2013.

<span class="mw-page-title-main">Klang Valley Integrated Transit System</span> Rail transportation network in the Klang Valley

The Klang Valley Integrated Transit System is an integrated transport network that primarily serves the area of Klang Valley and Greater Kuala Lumpur. The system commenced operations in August 1995 with the introduction of commuter rail service on the existing rail between Kuala Lumpur and Rawang. The system have since expanded and currently consists of 11 fully operating rail lines in a radial formation; two commuter rail lines, six rapid transit lines, one bus rapid transit line and two airport rail links to the Kuala Lumpur International Airport's (KLIA) Terminal 1 and Terminal 2, and one temperarily suspended airport rail link to the Sultan Abdul Aziz Shah Airport. The system encompasses 528.4 kilometres (328.3 mi) of grade-separated railway with 197 operational stations.

<span class="mw-page-title-main">Puchong Prima LRT station</span>

Puchong Prima LRT station is a Light Rapid Transit station at Puchong Prima, a township in Puchong, Petaling District, Selangor, Malaysia. It is served by the LRT Sri Petaling Line, which is situated between the terminus of the line, Putra Heights station and Puchong Perdana station.

<span class="mw-page-title-main">Persiaran KLCC MRT station</span> Rapid transit station in Kuala Lumpur

Persiaran KLCC MRT station(Working name: KLCC East) is a mass rapid transit (MRT) station in the KLCC subdistrict in Kuala Lumpur, Malaysia. It is one of the stations on the MRT Putrajaya Line.

The Kelana Jaya line extension is an extension of one of the Klang Valley LRT lines completed in 2016. It is 17 km in length from Kelana Jaya to Putra Heights.

<span class="mw-page-title-main">Ampang and Sri Petaling lines extension</span>

The Ampang and Sri Petaling lines extension is an extension of the Sri Petaling line completed in 2016, extending 17.7 kilometres from Sri Petaling to Putra Heights, Malaysia.

<span class="mw-page-title-main">Ampang Park MRT station</span> MRT station in Kuala Lumpur, Malaysia

Ampang Park MRT station is a mass rapid transit (MRT) station in Kuala Lumpur that is served by RapidKL's MRT Putrajaya Line. The MRT station is situated on the former site of Ampang Park Shopping Centre as one of the three Putrajaya Line stations around the Kuala Lumpur City Centre (KLCC). It is also located opposite Intermark Mall along the busy stretch of Jalan Tun Razak.

<span class="mw-page-title-main">2021 Kelana Jaya LRT collision</span> Train collision in Malaysia

On 24 May 2021, at 20:33 local Malaysia time, a head-on collision occurred between a manually-driven empty train and an automated train carrying passengers, on the Kelana Jaya line between Kampung Baru and KLCC stations in Kuala Lumpur, Malaysia. The collision caused 213 injuries, including 166 minor injuries and 47 serious injuries.

References

  1. "Kelana Jaya Line". RapidKL. Archived from the original on 11 May 2015. Retrieved 21 April 2015.
  2. 1 2 "Ridership". Rapid Rail Performance Update. RapidKL. 1 November 2024. Archived from the original on 11 November 2024. Retrieved 12 November 2024.
  3. "Public Transportation Dashboard". RapidKL. 18 January 2024. Retrieved 18 January 2024.
  4. "Light Railway Transit (LRT) of Kuala Lumpur, Tunnel Work". Archived from the original on 20 February 2017. Retrieved 9 May 2017.
  5. Meng Yew Choong (31 August 2015). "Klang Valley urban rail service turns 10". The Star Online. Archived from the original on 25 April 2017. Retrieved 8 May 2019.
  6. "Two extra LRT lines being studied". The Star. 21 August 2008. Archived from the original on 24 August 2008.
  7. 1 2 3 Thousands to Benefit from LRT Extension Archived 22 September 2009 at the Wayback Machine
  8. "New LRT Line Extensions on Display from Tomorrow". The Malaysian Insider. 14 September 2009. Archived from the original on 16 September 2009.
  9. "Public May Give Feedback on LRT Extension Project". The New Straits Times. 14 September 2009. Archived from the original on 22 September 2009. Retrieved 15 September 2009.
  10. "RM7bn LRT Extension". The Star. 15 September 2009. Archived from the original on 26 March 2012. Retrieved 30 May 2020.
  11. "Prasarana awards RM1.7bil jobs for LRT extension". The Star. 27 November 2010. Archived from the original on 12 June 2012. Retrieved 30 May 2020.
  12. "Construction Works for LRT Extension Project to Commence". Rapid KL. 11 March 2011. Archived from the original on 5 September 2012.
  13. "Information on the Kelana Jaya Line Extension | LRT Line Extension Project Website". Archived from the original on 2 July 2014. Retrieved 29 June 2014.
  14. "LRT Kelana Jaya Line Extension Opening As Scheduled On June 30". myRapid. 14 April 2016. Archived from the original on 19 April 2016.
  15. Railway Technology – Kuala Lumpur Driverless Metro System, Malaysia Archived 27 October 2008 at the Wayback Machine
  16. "DISPOSAL OF FOUR (4) SETS OF USED 2-CAR KELANA JAYA LINE TRAINS BASED ON 'AS IS WHERE IS' BASIS". Tenders. Prasarana. Archived from the original on 6 April 2023. Retrieved 16 October 2023.
  17. "Megalift Malaysia Sdn Bhd". Facebook. 30 May 2023. Retrieved 22 September 2023.
  18. VincentKoh LUMCFan (23 May 2023). "RIP Train 32: Observations on that fateful day on LRT Kelana Jaya Line". YouTube. Retrieved 22 September 2023.
  19. "JKR Daerah Sepang (Ministry of Works Sepang branch)". Facebook (in Malay). 30 May 2023. Retrieved 15 October 2023.
  20. "Prasarana Homepage – Prasarana in RM1.2b deal for 35 LRT trains". Prasarana. 20 March 2007. Archived from the original on 20 March 2007. Retrieved 6 February 2018.
  21. "Bombardier Consortium Receives a 71 Million Euro Order for 52 Additional Advanced Rapid Transit Cars in Kuala Lumpur, Malaysia". Bombardier. 7 October 2007. Archived from the original on 22 May 2023. Retrieved 22 May 2023.
  22. "New trains for Kelana Jaya line will only be usable by Sept 2009". New Straits Times. 4 September 2008. Archived from the original on 6 September 2008.
  23. Bernama (5 November 2009). "Ong: Six new LRT trains to run next month". The Edge. Archived from the original on 8 November 2009.
  24. "Targets set for the six Key Result Areas". The Star. 28 July 2009. Archived from the original on 31 July 2009.
  25. 1 2 "Four-star Ride on LRT with Longer Coaches". The Star. 31 December 2009. Archived from the original on 8 June 2011. Retrieved 21 October 2022.
  26. Nuradzimmah Daim (1 January 2010). "In for a better ride with new four-car coaches". New Straits Times.[ dead link ]
  27. "Refurbishment The Existing 35 Sets Of 2-Car Trains For Kelana Jaya Line - TDA Berhad". Archived from the original on 8 August 2021. Retrieved 8 August 2021.
  28. Latiff, Rozanna (17 October 2014). "Refurbished trains project vibrant image | New Straits Times". NST Online. Retrieved 8 August 2021.
  29. "Prasarana begins rolling out 'married' LRT train sets - Business News | The Star Online". 29 December 2017. Archived from the original on 29 December 2017. Retrieved 8 August 2021.
  30. "DISPOSAL OF FOUR (4) SETS OF USED 2-CAR KELANA JAYA LINE TRAINS BASED ON 'AS IS WHERE IS' BASIS". Tenders. Prasarana. Archived from the original on 6 April 2023. Retrieved 16 October 2023.
  31. "Bombardier's INNOVIA Metro 300 Enters Service in Kuala Lumpur". 29 December 2016. Archived from the original on 22 May 2023. Retrieved 22 May 2023.
  32. "Driverless INNOVIA Metro 300 fleet enters service in Kuala Lumpur". Eurotransportmagazine.com. 3 January 2017. Archived from the original on 28 June 2017. Retrieved 22 May 2017.
  33. "New improved trains brought in for LRT Kelana Jaya line - Community | The Star Online". Thestar.com.my. 16 May 2016. Archived from the original on 14 June 2017. Retrieved 22 May 2017.
  34. "New fleet to increase passenger capacity by 20% on Kelana Jaya line - Community | The Star Online". Thestar.com.my. 21 January 2016. Archived from the original on 3 January 2017. Retrieved 22 May 2017.
  35. "Bombardier consortium delivers first Innovia Metro 300 train for Kuala Lumpur light metro". Railway Technology. 18 January 2016. Archived from the original on 31 August 2017. Retrieved 22 May 2017.
  36. "Prasarana targets over 10pc passenger increase for LRT Kelana Jaya line, says chairman". Malay Mail. 25 August 2020. Retrieved 9 September 2020.
  37. "Two New State-of-the-art Trains Now Running of LRT Kelana Jaya Line". 27 June 2021. Archived from the original on 17 June 2022. Retrieved 17 June 2022.
  38. "TranSPOT - LRT KJL" . Retrieved 22 September 2023.
  39. "Loke: Kelana Jaya LRT Line Peak Hour Train Frequency to be at Three Minutes Next Year". News Straits Times. 14 September 2023. Retrieved 22 September 2023.
  40. "Technical Issues Cause Disruptions on LRT Kelana Jaya Line". The Star. 10 May 2022. Archived from the original on 22 May 2023. Retrieved 22 May 2023.
  41. "LRT Train Breaks Down at KL Sentral". The Star. 20 May 2022. Archived from the original on 22 May 2023. Retrieved 22 May 2023.
  42. "Pengguna Terjejas Akibat Masalah Teknikal Sebuah Tren di Stesen KL Sentral" (PDF) (Press release) (in Malay). RapidKL. 10 September 2022. Archived (PDF) from the original on 22 May 2023. Retrieved 22 May 2023.
  43. "CONSULTING ENGINEER SERVICES FOR THE MIDLIFE REFURBISHMENT, RECTIFICATION, OVERHAUL AND OTHER RELATED WORKS (MLR) OF EXISTING THIRTY-FOUR (34) SETS OF 4-CAR 818 TRAIN'S SERIES FOR KELANA JAYA LINE". Tenders. Prasarana. Archived from the original on 14 March 2022. Retrieved 15 October 2023.
  44. 1 2 "Mid-Life Refurbishment of 818 Trains – carry out refurbishment, overhaul and upgrading of 818 train’s sub-systems
    Involve 34 trains (818 trains)
    Programme Duration: January 2024 – January 2029
    Status : Tendering Stage" "Rapid Rail Performance Update - Reliability". 12 May 2023. Archived from the original on 22 May 2023. Retrieved 22 May 2023.
  45. "RM800m for 'Mid-life Refurbishment' of Kelana Jaya LRT Line, Says Transport Minister". Malay Mail. 25 May 2022. Archived from the original on 22 May 2023. Retrieved 22 May 2023.
  46. "CONSULTING ENGINEER SERVICES FOR THE MIDLIFE REFURBISHMENT, RECTIFICATION, OVERHAUL AND OTHER RELATED WORKS (MLR) OF EXISTING THIRTY-FOUR (34) SETS OF 4-CAR 818 TRAIN'S SERIES FOR KELANA JAYA LINE". Tenders. Prasarana. Archived from the original on 14 March 2022. Retrieved 15 October 2023.
  47. David, Adrian (3 May 2022). "Aidilfitri jolt for LRT passengers". New Straits Times. Retrieved 3 May 2022.
  48. Meng, Yew Choong (8 November 2022). "Kelana Jaya LRT line service back to normal". The Star (Malaysia) . Retrieved 8 November 2022.
  49. "Kelana Jaya LRT line suffers another disruption Nov 8 evening". The Star (Malaysia) . 8 November 2022. Retrieved 8 November 2022.
  50. "16 stations on Kelana Jaya line closed for a week". Free Malaysia Today . 9 November 2022. Retrieved 9 November 2022.
  51. "Dr Wee: Kelana Jaya LRT Line back in operation from 6am Nov 14". The Star (Malaysia) . 13 November 2022. Retrieved 14 November 2022.
  52. "LRT train mishap: 47 commuters seriously injured in accident on LRT Kelana Jaya line". The Star. Retrieved 24 May 2021.
  53. Chin, Emmanuel Santa Maria (24 May 2021). "Transport minister: 166 wounded including 47 seriously hurt in LRT train crash near KLCC | Malay Mail". www.malaymail.com. Retrieved 24 May 2021.
  54. Kelana Jaya line (formerly known as PUTRA line) Archived 14 December 2007 at the Wayback Machine
  55. "RapidKL Puts Marketing Retail Space on Fast Lane". 9 October 2007. Archived from the original on 16 March 2008. Retrieved 5 January 2008.
  56. "Public Transportation Dashboard". 18 January 2024. Retrieved 18 January 2024.
  57. "Statistic of Rail Transport". Ministry of Transport (Malaysia). Archived from the original on 9 January 2022. Retrieved 12 February 2022.