Line 24 | |
---|---|
24 | |
Overview | |
Status | Planned |
Locale | Yangpu, Pudong Shanghai |
Termini | |
Stations | 27 |
Website | www |
Service | |
Type | Rapid transit |
System | Shanghai Metro |
Operator(s) | Shanghai Metro Operation Co., Ltd. |
Technical | |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines (1500 volts) |
Line 24 will be a future subway line on the Shanghai Metro. The line was announced by the Municipal government in 2016. [1] [2] It will run in a north–south direction through Pudong and connect the Huangpu River bank in Yangpu District with the Shanghai Science and Technology Museum. [3] It will form a ring around the Middle Ring Road together with Line 20 and Line 22.
Shanghai metro line 24 service routes | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||
Routes | Station name | Connections | Distance | Location | Open- ing | |||||
M | English | Chinese | km | min | ||||||
Shanghai Baoshan Railway Station | 上海宝山站 | 19 Baojia (planned) | 0.0 | 0 | Baoshan | Fourth phase of Shanghai rail transit construction plan | ||||
Yanghang | 杨行 | 22 (planned) | ||||||||
Tiecheng Road | 铁城路 | |||||||||
South Jiangyang Road | 江杨南路 | 18 19 | ||||||||
Anda Road | 安达路 | |||||||||
Zhanghuabang | 张华浜 | 3 | ||||||||
Guofan Road | 国帆路 | 10 | Yangpu | |||||||
Zhayin Road | 闸殷路 | |||||||||
Yinxing Road | 殷行路 | |||||||||
Gongqing Forest Park | 共青森林公园 | 20 | ||||||||
Songhuajiang Road | 松花江路 | |||||||||
Kongjiang Road | 控江路 | |||||||||
Aiguo Road | 爱国路 | 12 | ||||||||
Tengyue Road | 腾越路 | 26 (planned) | ||||||||
Songpan Road | 松潘路 | |||||||||
Xiepu Road | 歇浦路 | 14 | Pudong | |||||||
Beiyangjing Road | 北洋泾路 | 6 | ||||||||
Fangdian Road | 芳甸路 | 9 | ||||||||
Yingchun Road | 迎春路 | 18 | ||||||||
Shanghai Science and Technology Museum | 上海科技馆 | 2 27 (planned) | ||||||||
Pujian Road | 浦建路 | |||||||||
Jinxiu Road | 锦绣路 | 7 | ||||||||
Xianan Road | 下南路 | 13 | ||||||||
Yanglian Road | 杨莲路 | 26 (planned) | ||||||||
Yanyu Road | 严御路 | 11 | ||||||||
Xiupu Road | 秀浦路 | |||||||||
Kangwu Road | 康梧路 | |||||||||
Shanghai is a direct-administered municipality and the most populous urban area in China. The city is located on the Chinese shoreline on the southern estuary of the Yangtze River, with the Huangpu River flowing through it. The population of the city proper is the third largest in the world, with around 24.87 million inhabitants in 2023, while the urban area is the most populous in China, with 29.87 million residents. As of 2022, the Greater Shanghai metropolitan area was estimated to produce a gross metropolitan product (nominal) of nearly 13 trillion RMB. Shanghai is one of the world's major centers for finance, business and economics, research, science and technology, manufacturing, transportation, tourism, and culture. The Port of Shanghai is the world's busiest container port.
The Shanghai Metro (Chinese: 上海地铁; pinyin: Shànghǎi Dìtiě; Shanghainese: Zaon6he5 Di6thiq7) is a rapid transit system in Shanghai, operating urban and suburban transit services to 14 of its 16 municipal districts and to the neighboring township of Huaqiao, in Kunshan, Jiangsu Province.
The Shenzhen Metro is the rapid transit system for the city of Shenzhen in Guangdong province, China. The Line 8 Extension – which opened on December 27, 2023 – put the network at 555.43 kilometres of trackage. It currently operates on 16 lines with 373 stations. Despite having only opened on December 28, 2004, the Shenzhen Metro is the 5th longest metro system in China and 6th longest in the world. By 2035, the network is planned to comprise 8 express and 24 non-express lines totaling 1,142 kilometres of trackage.
Kunshan is a county-level city in southeastern Jiangsu province with Shanghai bordering its eastern border and Suzhou on its western boundary. It is under the administration of the prefecture-level city of Suzhou.
Line 11 is a northwest–southeast line of the Shanghai Metro network. Since October 2013, Line 11 serves Kunshan city, making it is the second intercity metro in China after the Guangfo Metro and the first that crosses a provincial boundary. With a single-line mileage of 82.386 kilometres (51.192 mi), it is the second-longest single-line subway line in China, after Line 6 in Chongqing, which is 85.6 km (53.2 mi) long. The line is colored brown on system maps.
Line 14 of the Shanghai Metro is an east-west metro line opened on 30 December 2021. The line, consisting of 31 stations, starts from Fengbang town in Jiading District, and terminate in Jinqiao town in Pudong New Area via Zhenru, Jing'an Temple, Dashijie, and Lujiazui. Its total length is 39.1 kilometres (24.3 mi), and passengers are able to transfer to 13 existing and planned metro lines. Due to Line 14 cutting across some of the densest areas of Shanghai and being a relief line for line 2, high ridership is expected for the line. As such the line uses high capacity 8 car A size trains similar to lines 1 and 2. The line uses an automatic train control system jointly developed by Thales and Shanghai Electric. Line 14 is fully driverless. The line is colored olive on system maps.
Line 15 of the Shanghai Metro is a north-south metro line in the city of Shanghai that opened on 23 January 2021. The line begins at Gucun Park in Baoshan District at its northern end, and terminates at Zizhu Hi-tech Park in Minhang District at its southern end, via Shanghai West Railway Station and Shanghai South Railway Station. It will be 42.3 kilometres (26.3 mi) in length and have 30 stations. The line is one of Shanghai Metro's new batch of high capacity fully automated and driverless lines along with Lines 14 and 18. The line is colored ivory on system maps.
Line 18 is a north–south Shanghai Metro line running from South Changjiang Road station in the city's Baoshan District to Hangtou station in Pudong, with a length of 36.13 km (22.45 mi). The line was originally scheduled to open by the end of 2020. However, officials announced that only the initial segment of eight stations in Pudong started test runs in September 2020. The 14.5 km (9.0 mi) southern section opened for passenger operations on December 26, 2020. The remainder of the line was opened on 30 December 2021. The line is 36.5 km (22.7 mi) long with 26 stations. The line is one of Shanghai Metro's new batch of high capacity fully automated and driverless lines along with Lines 14 and 15. The line is colored earth yellow on system maps.
Line 16 is a rapid transit line serving the south-eastern suburban areas of Shanghai. The line was formerly known as the Lingang line. It was originally designated as Line 21 and was planned as the south part of line 11. The line runs entirely in Pudong New Area, starting from Longyang Road, via Shanghai Wild Animal Park, Huinan Town, ending at Dishui Lake in Nanhui New City. The line is 59 km (37 mi) long and has 13 stations of which three are underground and the rest elevated. Construction begun in early 2009, and the line opened on 29 December 2013. The second phase was completed at the end of 2014.
Line 21 will be a future subway line on the Shanghai Metro. It will run in a north–south direction through Pudong, connecting Gaohang in Waigaoqiao to the Disney Resort. The first phase will be about 28 km (17 mi) long with 10 stations. Stations will have passing loops to allow for express and local stopping patterns.
Line 22 is a future subway line on the Shanghai Metro. It will be located in south-west Shanghai near Dachang in Baoshan District and Taopu in Putuo District. The line was announced by the Municipal government in 2016.
Line 20 will be a future subway line on the Shanghai Metro. It will run in an east–west direction in northern Shanghai, connecting Shanghai West railway station in Jiading District to Gongqing Forest Park in Yangpu District, with a possible future extension to Zhouhai Road in northern Pudong. It will be about 20 km (12 mi) long with 10 stations. The line was announced by the Municipal government in 2016.
Line 23 is an under construction Shanghai Metro line that would run from Shanghai Indoor Stadium in Xuhui District to Minhang Development Zone in Minhang District. Its It is planned to be 29 kilometres (18 mi) in length, and is planned to have 22 stations. The line was announced by the Shanghai municipal government in 2016. It will adopt unmanned driving (GoA4).
Line 19 is an under construction subway line on the Shanghai Metro. Its termini are planned to be Baoshan Railway Station and Hongjian Road. It is planned to be 46.2 km (28.7 mi) in length, with 34 stations. The line hopes to ease car congestion along Pudong South Road, as well as reduce crowding on the southern part of line 8, and the northern sections of lines 1 and 3.
Shanghai University of Finance and Economics, formerly named Zhengli Road, is a metro station as part of Line 18 of the Shanghai Metro. Located at the intersection of Zhengli Road and Wuchuan Road in Yangpu District, Shanghai, the station opened with the rest of phase one of Line 18 on December 30, 2021. It is located near the main campus of the Shanghai University of Finance and Economics. During the planning stage of Line 18, the station was also known as Wuchuan Road.
Jinqiu Road is a metro station on the Line 15 of the Shanghai Metro. Located at the intersection of Qilianshan Road and Jinqiu Road in Putuo District, Shanghai, the station was scheduled to open with the rest of Line 15 by the end of 2020. However, the station eventually opened on 23 January 2021 following a one-month postponement. It is located in between Gucun Park station to the north and Fengxiang Road station to the south.
The Hangzhou–Haining Intercity Rail, also known as the Hanghai line, is a commuter rail line connected to, but operated independently of the Hangzhou Metro that connects the cities Hangzhou and Haining in Zhejiang, China. The total length is 46.38 km (28.819 mi) and has 12 stations, including 4 underground stations and 8 elevated stations and 2 stations with passing loops for express services. The line began construction in late 2016 and opened on 28 June 2021.
Line 26 is a future subway line on the Shanghai Metro. The line was announced by the Municipal government in 2016.
Lianggang Express Line is a commuter rail line currently under planning on the Shanghai Suburban Railway, and will be run by Shentong Metro Group. The Lianggang Express Line is an express suburban railway between the Lingang New Area and Pudong Hub, Hongqiao Hub and Shanghai's main urban area. The plan published public review between April 29th to May 28th by the Shanghai Transportation Commission. The special plan (draft) was for the selection of the Lianggang Express Line.
Line 32 of the Shenzhen Metro is a line under construction, which will run entirely in Dapeng New District from Xichong at the terminus of Line 8 to Kuichong East for approximately 9.5 kilometers. Construction began on 8 May 2024.