Ming Tombs Reservoir | |
---|---|
![]() Ming Tombs Reservoir and the dam | |
Official name | Ming Tombs Reservoir |
Location | Changping, Beijing, China |
Coordinates | 40°25′03″N116°26′58″E / 40.41750°N 116.44944°E |
Construction began | 1958-1 |
Opening date | 1958-4 |
Demolition date | N/A |
Owner(s) | PRC |
Dam and spillways | |
Height | 29 m (95 ft) |
Length | 627 m (2,057 ft) [1] |
Width (base) | 179 m (587 ft) |
Reservoir | |
Total capacity | 60,000,000 m3 (49,000 acre⋅ft) [1] |
The Ming Tombs Reservoir or the Shisanling Reservoir (十三陵水库) is a dam in Changping District of northern Beijing, China. Named for the Ming tombs nearby, it is the lower reservoir of the Shisanling Pumped Storage Power Station. The earth-fill embankment dam is 29 metres (95 ft) high and 627 metres (2,057 ft) long. The dam creates a reservoir that can store 59,000,000 cubic metres (2.083565337×109 cu ft) of water and contains a controlled chute spillway. [2]
The Ming Tombs Reservoir was built in only four months by hundreds of thousands of workers who labored around the clock. [3] : 159
In 2008, the reservoir was one of the nine temporary venues of the Beijing Olympics. It was used for the Triathlon events at the 2008 Summer Olympics, during which it was known as the Triathlon Venue (simplified Chinese :铁人三项赛场; traditional Chinese :鐵人三項賽場; pinyin :Tiěrén Sānxiàng Sàichǎng).
During its construction, the project attracted writers and artists from nearby Beijing. [3] : 159 The Ming Tombs Reservoir's development was represented in photography, music, literature and film. [3] : 159
French photographer Henri Cartier-Bresson also documented the construction in color photography. [3] : 159
The Banqiao Reservoir Dam is a dam on the River Ru (汝河), a tributary of the Hong River in Zhumadian City, Henan province, China. The Banqiao dam and Shimantan Reservoir Dam are among 62 dams in Zhumadian that failed catastrophically in 1975 during Typhoon Nina. The dam was subsequently rebuilt.
Changping District, formerly Changping County (昌平县), is a district situated in the suburbs of north and northwest Beijing. Changping has a population of 2,269,487 as of November 2020, making it the most populous suburban district of Beijing.
The Guangdong Pumped Storage Power Station or Guangzhou Pumped Storage Power Station is a pumped-storage hydroelectric power station near Guangzhou, Guangdong Province, China. Power is generated by utilizing eight turbines, each with a 300 megawatts (400,000 hp) capacity, totalling the installed capacity to 2,400 megawatts (3,200,000 hp). The generated power is sold to CLP customers in Hong Kong. The power station was constructed in two stages, the first four turbines were completed in 1994 and the second four in 2000.
The Triathlon competitions at the 2008 Summer Olympics, in Beijing, were held on Monday, August 18 (women) and Tuesday, August 19 (men), on the Triathlon Venue at the Ming Tomb Reservoir in Shisanling.
The women's triathlon was part of the triathlon at the 2008 Summer Olympics programme. It was the third appearance of the event, which was established in 2000. The competition was held on Monday, August 18, 2008 at the Triathlon Venue at the Ming Tomb Reservoir in Shisanling. Fifty-five triathletes from thirty nations competed.
The men's triathlon was part of the Triathlon at the 2008 Summer Olympics programme. It was the event's third appearance, established in 2000. The competition was held on Tuesday, August 19, 2008 at the Triathlon Venue at the Ming Tomb Reservoir in Shisanling. Fifty-five triathletes from 31 nations competed.
The Siah Bisheh Pumped Storage Power Plant, also spelled Siyāhbisheh and Siah Bishe, is located in the Alborz Mountain range near the village of Siah Bisheh and 48 km (30 mi) south of Chalus in Mazandaran Province, Iran. The power plant uses the pumped-storage hydroelectric method to generate electricity during periods of high energy demand, making it a peaking power plant, intended to fulfill peak electricity demand in Tehran 60 km (37 mi) to the south. When complete it will have an installed generating capacity of 1,040 megawatts (1,390,000 hp) and a pumping capacity of 940 megawatts (1,260,000 hp). Planning for the project began in the 1970s and construction began in 1985. It was delayed from 1992 until 2001 and the first generator went online in May 2013. The remaining generators were commissioned by 1 September 2015. The power plant is the first pumped-storage type in Iran and will also use the country's first concrete-face rock-fill dam – two of them.
The Huizhou Pumped Storage Power Station is a pumped storage hydroelectric power station near Huizhou in Guangdong province, China. It contains 8 pump-generators that total a 2,448 megawatts (3,283,000 hp) installed capacity. Initial units went online between 2007 and 2008, and the power station was complete on June 15, 2011.
The Tianhuangping Pumped Storage Power Station is a pumped-storage power station in Tianhuangping, Anji County of Huzhou, Zhejiang Province, China. The power station has an installed capacity of 1,836 megawatts (2,462,000 hp) utilizing 6 reversible Francis turbines. Construction began in 1993 and the power station was completed in 2004.
The Shisanling Pumped Storage Power Station (十三陵抽水蓄能电厂) is a pumped-storage power station in Changping District of Beijing, China, near the Thirteen Tombs of the Ming Dynasty from where it got its name Shisanling, which means "thirteen tombs". The power station contains four reversible turbines for an installed capacity of 800 MW.
The Baishan Dam is an arch-gravity dam on the Second Songhua River near the town of Baishanzhen, Huadian, Jilin Province, China. The purpose of the dam is hydroelectric power generation and flood control. The dam supplies water to five turbine-generators in two different powerhouses for an installed capacity of 1,500 megawatts (2,000,000 hp) while it can also control a design 19,100 cubic metres per second (670,000 cu ft/s) flood. Additionally, it has a 300 megawatts (400,000 hp) pumped-storage hydroelectric generation capacity. It is named after Baekdu Mountain, near the city of Baishan.
The Shin-Takasegawa Pumped Storage Station (新高瀬川発電所) uses the Takase River to operate a pumped storage hydroelectric scheme about 12 kilometres (7.5 mi) west of Ōmachi in Nagano Prefecture, Japan. Part of the system is within Chūbu-Sangaku National Park.
The Hohhot Pumped Storage Power Station, also known by Huhehaote, is located 20 kilometres (12 mi) north of Hohhot in Inner Mongolia, China. It uses the pumped-storage hydroelectric method to generate electricity. The plant has an installed capacity of 1,224 megawatts (1,641,000 hp). Construction began in 2005 and the first generator was commissioned on 20 November 2014. The second generator was commissioned on 26 December 2014 and the final two were commissioned in June 2015.
The Jixi Pumped Storage Power Station is a pumped-storage hydroelectric power station currently under construction in Jixi County, Anhui Province, China. Studies were carried out in 2008 and construction began in December 2010. It is expected to last 6 years. As of April 2017 the dam is completed. First turbine was commissioned in December 2019, followed by second in May 2020 and third and fourth in August 2020. The last two units were commissioned in February 2021.
The Vianden Pumped Storage Plant is located just north of Vianden in Diekirch District, Luxembourg. The power plant uses the pumped-storage hydroelectric method to generate electricity and serves as a peaking power plant. Its lower reservoir is located on the Our River, bordering Germany, and the upper is elevated above on the nearby Saint Nicholas Mountain. Construction on the plant began in 1959 and the first pump-generators were commissioned in 1962. A tenth pump-generator was installed in 1976 bringing the plant's installed generating capacity to 1,096 megawatts (1,470,000 hp). The plant generates an average of 1,650 gigawatt-hours (5,900 TJ) annually but of course consumes even more. Generally the efficiency of this energy storage method is around 70–80%. The plant is owned by Société électrique de l'Our and RWE. Construction on an eleventh pump-generator began in 2010 and it is expected to be commissioned in 2013, which will bring the plant's installed capacity to 1,296 megawatts (1,738,000 hp).
The Tongbai Pumped Storage Power Station is a pumped-storage hydroelectric power station located 6 kilometres (3.7 mi) north of Tiantai city in Tiantai County of Zhejiang Province, China. Construction on the power station began in May 2000 and the first unit was commissioned in December 2005. The remaining three were operational by December 2006. The entire project cost US$904.10 million, of which US$320 million was provided by the World Bank. The power station operates by shifting water between an upper and lower reservoir to generate electricity. The lower reservoir was formed with the creation of the Tongbai Lower Dam on the Baizhang River. The Tongbai Upper Reservoir, which already existed before construction began, is in an adjacent valley above the east side of the lower reservoir on Tongbai Creek. During periods of low energy demand, such as at night, water is pumped from Tongbai Lower Reservoir up to the upper reservoir. When energy demand is high, the water is released back down to the lower reservoir but the pump turbines that pumped the water up now reverse mode and serve as generators to produce electricity. The process is repeated as necessary and the plant serves as a peaking power plant. The power station is operated by Shenergy Company.
The Yixing Pumped Storage Power Station is a pumped-storage hydroelectric power station located Yixing city of Jiangsu Province, China. Construction on the power station began in 2003 and the first unit was commissioned in 2007, the last in 2008. The entire project cost US$490 million, of which US$145 million was provided by the World Bank. The power station operates by shifting water between an upper and lower reservoir to generate electricity. The lower reservoir was formed with the existing Huiwu Dam at the foot of Mount Tongguan. The Yixing Upper Reservoir is located atop Mount Tongguan which peaks at 530 metres (1,740 ft) above sea level. During periods of low energy demand, such as at night, water is pumped from Huiwu Lower Reservoir up to the upper reservoir. When energy demand is high, the water is released back down to the lower reservoir but the pump turbines that pumped the water up now reverse mode and serve as generators to produce electricity. Water from the nearby Huangtong River can also be pumped into the lower reservoir to augment storage. The process is repeated as necessary and the plant serves as a peaking power plant. The power station is operated by East China Yixing Pumped Storage Co Ltd.
Ming Tombs station, is a station on the Changping Line of the Beijing Subway. It was opened on 26 December 2015.
Shisanling Town is a town located in the northern part of Changping District, Beijing, China. Situated at the immediate south of Taihang Mountain Range, Shisanling shares border with Jingzhuang Town and Dazhuangke Township in the north, Yanshou Town in the east, Cuicun and Nanshao Towns in the southeast, Chengbei and Chengnan Subdistricts in the south, and Nankou Town in the west. In 2020, census counted 34,085 residents living within the town.