Nilambe Dam

Last updated
Nilambe Dam
Sri Lanka relief location map.jpg
Red pog.svg
Location of Nilambe Dam in Sri Lanka
Country Sri Lanka
Location Nilambe, Central Province
Coordinates 07°11′18″N80°37′52″E / 7.18833°N 80.63111°E / 7.18833; 80.63111 Coordinates: 07°11′18″N80°37′52″E / 7.18833°N 80.63111°E / 7.18833; 80.63111
Purpose Power
StatusOperational
Operator(s)Mahaweli Authority
Dam and spillways
Type of dam Gravity dam
Impounds Nilambe River
Length70 m (230 ft)
Reservoir
CreatesNilambe Reservoir
Maximum length250 m (820 ft)
Maximum width240 m (790 ft)
Nilambe Power Station
Coordinates 07°11′48″N80°36′44″E / 7.19667°N 80.61222°E / 7.19667; 80.61222
Operator(s) CEB
Commission dateJuly 1988
Type Conventional
Turbines 2 × 1.6 MW
Installed capacity 3.2 MW

The Nilambe Dam is a small hydroelectric dam build across the Nilambe River, measuring approximately 70 m (230 ft) in length. Water from the Nilambe Dam is transferred to the 3.2-megawatt Nilambe Power Station through a penstock measuring approximately 2.8 km (1.7 mi). The power station consists of two 1.6 MW generating units, which were commissioned in July 1988. [1] [2]

See also

Related Research Articles

Samanala Dam Dam in Balangoda

The Samanala Dam is a dam primarily used for hydroelectric power generation in Sri Lanka. Commissioned in 1992, the Samanalawewa Project is the third-largest hydroelectric scheme in the country, producing 405 GWh of energy annually. It was built with financial support from Japan and the United Kingdom. It is notable for a large leak on its right bank. Power production continues as planned despite the leakage, and the water from the leak now provides two thirds of the water issued by the reservoir for agriculture in downstream areas.

Ceylon Electricity Board

The Ceylon Electricity Board - CEB, is the largest electricity company in Sri Lanka. With a market share of nearly 100%, it controls all major functions of electricity generation, transmission, distribution and retailing in Sri Lanka. It is one of the only two on-grid electricity companies in the country; the other being Lanka Electricity Company (LECO). The company earned approximately Rs 204.7 billion in 2014, with a total of nearly 5.42 million consumer accounts. It is a government owned and controlled utility of Sri Lanka that takes care of the general energy facilities of the island. The Ministry of Power and Energy is the responsible ministry above the CEB. Ceylon Electricity Board (CEB), established by an CEB Act No. 17 of 1969, is under legal obligation to develop and maintain an efficient, coordinated and economical system of Electricity supply in accordance with any Licenses issue

Electricity sector in Sri Lanka

The electricity sector in Sri Lanka has a national grid which is primarily powered by hydro power and thermal heat, with sources such as photovoltaics and wind power in early stages of deployment. Although potential sites are being identified, other power sources such as geothermal, nuclear, solar thermal and wave power are not used in the power generation process for the national grid.

Mampuri Wind Farms

The Mampuri Wind Farms are a set of three wind farms located near the Lakvijaya Power Station, on the Kalpitiya peninsula, in Mampuri, Puttalam District, Sri Lanka. The wind farms, referred to as Mampuri-I, Mampuri-II, and Mampuri-III, was built successively, and consists of eighteen Suzlon wind turbines ranging from 1.25 MW to 2.10 MW. Mampuri-I was commissioned on 22 March 2010, and was the first wind farm in the country to reach the 10 MW installed capacity threshold. As the government only allows projects up to 10 MW, the three wind farms are registered under three different company names, namely Senok Wind Power, Senok Wind Energy, and Senok Wind Resource.

Broadlands Dam Dam in Kitulgala

The Broadlands Dam is a 35 MW run-of-the-river hydroelectric complex currently under construction in Kitulgala, Sri Lanka. The project is expected to be completed in 2020, and will consist of two dams, and a power station further downstream.

Rantembe Dam Dam in Rantembe, Central Province

The Rantembe Dam is a 52-megawatt hydroelectric gravity dam at Rantembe, in the Central Province of Sri Lanka. Construction of the dam began in January 1987, and was completed in April 1990 as scheduled. The dam was constructed by the German 'Joint Venture Randenigala'; a different German joint venture has built the Randenigala Dam, further upstream.

Bowatenna Dam Dam in Bowatenna

The Bowatenna Dam is a 100 ft (30 m) high gravity dam at Bowatenna, in the Naula, Central Province of Sri Lanka. The dam was built in June 1981, and is used primarily for irrigation. A 40 MW power station is also constructed 5,800 ft (1,800 m) downstream, for hydroelectric power generation.

Maskeliya Dam Dam in Maskeliya, Central Province

The Maskeliya Dam is a large gravity dam at Maskeliya, in the Central Province of Sri Lanka. Along with the Castlereigh Dam, the dams are the highest point and beginning of the Laxapana Hydropower Complex, involving a number of dams, penstocks, and hydroelectric power stations. The dam creates the Maskeliya Reservoir over the route of Maskeliya Oya, a major tributary of the Kelani River, which is the 4th longest in the country.

Castlereigh Dam Dam in Hatton, Central Province

The Castlereigh Dam is a gravity dam built across the Kehelgamu Oya, a major tributary to the Kelani River, approximately 3 km (1.9 mi) south-west of Hatton, in the Central Province of Sri Lanka.

Polgolla Barrage Dam in Polgolla, Central Province

The Polgolla Barrage, is a barrage built across the Mahaweli River at Polgolla, in the Central Province of Sri Lanka. The barrage is used to increase the volume of water, for transfer to the hydroelectric power station located 8 km (5 mi) north, via penstock.

Norton Dam Dam in Norton Bridge,Central Province

The Norton Dam is a gravity dam built across the Kehelgamu Oya, which is a major tributary to the Kelani River. The dam is built at Norton Bridge, in the Central Province of Sri Lanka.

Canyon Dam (Sri Lanka) Dam in Laxapana Falls,Central Province

The Canyon Dam is a large arch-gravity dam built across the Maskeliya Oya, 4.5 km (2.8 mi) upstream of the iconic Laxapana Falls, in the Central Province of Sri Lanka. The associated power station plays a major role in the national power grid, due to its significant output. The dam is surrounded by steel structures of the substation.

Kukule Ganga Dam

The Kukule Ganga Dam is a 110 m (360 ft) gravity dam built across the Kukule River in Kalawana, Sri Lanka. The run-of-river-type dam feeds an underground hydroelectric power station located approximately 5 kilometres (3.1 mi) away, via tunnel.

Udawalawe Dam Dam in Udawalawe

The Udawalawe Dam is a large irrigation dam in Udawalawe, in the Southern Province of Sri Lanka. The dam consists of an embankment section and a gravity section, combining the total dam length to approximately 3.9 km (2.4 mi). The dam is also used for hydroelectric power generation, powering three 2 MW units, commissioned in April 1969.

Gal Oya Dam Dam in Gal Oya National Park

The Gal Oya Dam is an embankment dam in the Uva Province of Sri Lanka. The dam creates one of the largest and most iconic reservoirs in the country, the Gal Oya Reservoir. Water from the reservoir is used primarily for irrigation in the Uva and Eastern provinces, in addition to powering a small hydroelectric power station. Construction of the dam and reservoir began in August 24, 1949, completing four years later in 1953.

Deduru Oya Dam Dam in Wariyapola

The Deduru Oya Dam is an embankment dam built across the Deduru River in Kurunegala District of Sri Lanka. Built in 2014, the primary purpose of the dam is to retain approximately a billion cubic metres of water for irrigation purposes, which would otherwise flow out to sea. Site studies of the dam began in 2006 and construction started in 2008. It was ceremonially completed in 2014, with the presence of the then President Mahinda Rajapaksa.

Thambapavani Wind Farm

The Thambapavani Wind Farm named after Thambapanni and Pavan meaning wing in Sinhalese. Also called Mannar Island Wind Farm or Mannar Wind Farm) is a 100-megawatt wind farm which was built on the southern coast of the Mannar Island, in Sri Lanka. The project would cost approximately US$200 million, 78% of which will be borne by the Asian Development Bank, while the remaining 22% will be borne by the developers, the Ceylon Electricity Board. Identification of land plots and ownership has already begun. It is currently regarded as the largest wind farm in Sri Lanka and it is also the first wind power plant to be owned by the Ceylon Electricity Board.

The 2019 Sri Lanka electricity crisis was a crisis which happened nearly a month from 18 March to 10 April 2019 faced by Sri Lanka caused by a severe drought that depleted water levels at hydroelectric plants. Sri Lanka experienced rolling blackouts for three to five hours per day except on Sundays in all parts of the island nation at different time schedules that started from 24 March 2019 to present. This is regarded as one of the worst blackouts confronted in Sri Lanka since 2016 and the longest ever blackout recorded in history of the country. However it was revealed that the main electricity providing institution Ceylon Electricity Board had restricted the power supply to almost all regions of the country without proper prior notice and implemented a time schedule unofficially from 24 March 2019. However the Ministry of Power and Renewable Energy revealed that it didn't grant and approve permission to CEB to impose power cuts.

References

  1. "Ministry of Power and Renewable Energy: Generation Plants". Ministry of Power and Renewable Energy. Retrieved 25 October 2015.
  2. "Ceylon Electricity Board: Generation Details". Ceylon Electricity Board. Archived from the original on 18 November 2015. Retrieved 25 October 2015.