Northcliffe branch railway

Last updated

Northcliffe branch
OIC pemberton karri forest SW with railway.jpg
The line through karri forests south of Pemberton
Overview
Owner Public Transport Authority
Arc Infrastructure
Pemberton Tramway Company
Termini
Service
Type Heavy rail
Operator(s) Pemberton Tramway Company
Aurizon
History
Opened12 March 1891 (Bunbury-Boyanup)
then in stages until
27 November 1933 (Pemberton-Northcliffe)
Technical
Line length205 km (127 mi)
Track gauge 1,067 mm (3 ft 6 in)
Route map

Contents

km
BSicon CONTg@Gq.svg
BSicon STR+l.svg
BSicon YRDq.svg
BSicon CONTf@Fq.svg
BSicon STR+r.svg
0
Picton Yard
BSicon STRl.svg
BSicon ABZ+lr.svg
BSicon STRr.svg
BSicon KBSTxe.svg
3
Picton East
BSicon exBHF.svg
008.4
Dardanup
BSicon exABZgnl.svg
BSicon exnCONTfq.svg
Millars Tramway
(Wellington)
BSicon exHST.svg
012.7
Crooked Brook
BSicon WCONTgq.svg
BSicon exhKRZWae.svg
BSicon WCONTgeq.svg
BSicon BUILDINGr.svg
BSicon exSPLa.svg
South West Rail
and Heritage Centre
BSicon exvBHF.svg
17.9
Boyanup
BSicon exCONTgq.svg
BSicon exvSTRr-SHI1r.svg
BSicon exHST.svg
22.2
Gwindinup
BSicon exHST.svg
27.0
Argyle
BSicon exBHF.svg
33.6
Donnybrook
BSicon exABZgl.svg
BSicon exCONTfq.svg
BSicon exHST.svg
43.4
Brookhampton
BSicon exHST.svg
48.0
Newlands
BSicon exPSLl.svg
051.9
Kirup
BSicon exABZg+nl.svg
BSicon exnCONTfq.svg
Millars Tramway
(Kirup / East Kirup)
BSicon exABZgnl.svg
BSicon exnCONTfq.svg
BSicon exHST.svg
060.2
Mullalyup
BSicon WCONTgq.svg
BSicon exhKRZWae.svg
BSicon WCONTgeq.svg
Balingup Brook
BSicon exBHF.svg
66.7
Balingup
BSicon exPSLl.svg
078.0
Greenbushes
BSicon exnCONTgq.svg
BSicon exABZgnl.svg
BSicon exABZgnr.svg
BSicon exnCONTfq.svg
BSicon exHST.svg
87.4
Catterick
BSicon exHST.svg
94.3
Hester
BSicon exBHF.svg
102.2
Bridgetown
BSicon WCONTgq.svg
BSicon exhKRZWae.svg
BSicon WCONTgeq.svg
BSicon exHST.svg
109.9
Glenlynn
BSicon exPSLr.svg
116.1
Yornup
BSicon exnCONTgq.svg
BSicon exABZgnr.svg
Bunning Brothers Tramway
(Donnelly River)
BSicon exBST.svg
121
Yornup Ballast Siding
BSicon exHST.svg
124.4
Wilgarup
BSicon exHST.svg
127.4
Alco
BSicon exnCONTgq.svg
BSicon exABZgnr.svg
BSicon exABZg+nl.svg
BSicon exnCONTfq.svg
Millars Tramway (Palgarup)
BSicon exHST.svg
131.4
Palgarup
BSicon exBHF.svg
138.1
Manjimup
BSicon exnCONTgq.svg
BSicon exABZgnr.svg
BSicon exABZgnl.svg
BSicon exnCONTfq.svg
Bunning Brothers Tramway
(Nyamup / Tone River)
BSicon exBHF.svg
143.2
Jardee
BSicon exnCONTgq.svg
BSicon exABZgnl.svg
BSicon exABZgnr.svg
BSicon exnCONTfq.svg
BSicon exHST.svg
.0149
Lambert
BSicon exSPLa.svg
BSicon exvHST.svg
149
Lambert
BSicon exENDEaq.svg
BSicon exvSTRr-SHI1r.svg
Diamond Mill
BSicon GRZq.svg
BSicon exSTR.svg
BSicon exPSLl.svg
149.1
Lyall
BSicon exHST.svg
156.1
Diamond Tree
BSicon exPSLl.svg
159.5
Eastbrook
BSicon exHST.svg
162.9
Collins
BSicon exHST.svg
165.7
Barronhurst
BSicon WCONTfa.svg
BSicon KBHFxa.svg
BSicon lDAMPF.svg
169.8
Pemberton
BSicon KBHFxa.svg
BSicon lDAMPF.svg
169.8
Pemberton
BSicon exnCONTgq.svg
BSicon WCONTfa.svg
BSicon eABZgnr.svg
BSicon WABZg+l.svg
BSicon hKRZWae.svg
BSicon WCONTgeq.svg
172.8
Eastbrook Bridge
BSicon WASSERl.svg
BSicon hKRZWae.svg
BSicon vWASSER+r-.svg
174.0
Bob's Bridge
BSicon WASSER+l.svg
BSicon hKRZWae.svg
BSicon vWASSERr-.svg
174.2
Lefroy Bridge
BSicon WFALLf.svg
BSicon KHSTxe.svg
174.3
The Cascades
BSicon WASSERl.svg
BSicon exhKRZWae.svg
BSicon WASSER+r.svg
174.4
Cascade Bridge
BSicon WASSER+l.svg
BSicon exhKRZWae.svg
BSicon WASSERr.svg
176.4
Redgum Bridge
BSicon WASSER.svg
BSicon exHST.svg
178.1
Brockman
BSicon WABZg+l.svg
BSicon exhKRZWae.svg
BSicon WCONTgeq.svg
179.4
Warren River Bridge
BSicon WCONTf.svg
BSicon exHST.svg
179.5
Warren Bridge
BSicon exHST.svg
187.9
Yeagarup
BSicon WCONTgq.svg
BSicon exhKRZWae.svg
BSicon WCONTgeq.svg
196.1
Dombakup Bridge
BSicon exHST.svg
199.1
Dombakup
BSicon exHST.svg
202.8
Terry
BSicon exABZgnl.svg
BSicon exnCONTfq.svg
State Saw Mills (Shannon)
BSicon exKBHFe.svg
205.4
Northcliffe
BSicon exnCONTf.svg

The Northcliffe branch, also known as the Northcliffe section or Picton to Northcliffe line, is the railway route between Picton and Northcliffe in Western Australia.

History

The line was the first one in the Bunbury area, officially opening as the Western Australian Government Railways (WAGR) Bunbury-Boyanup Railway on 12 March 1891. [1] [2] E.V.H. Keane had commenced construction in 1887 and the line was largely complete by late 1888, but financial difficulties delayed the opening for several years. [1]

Construction continued, with the official opening of the Byfield & Risely-constructed Boyanup-Donnybrook section on 16 November 1893. [2] A few months prior, the South Western Railway opened between Pinjarra and Bunbury, absorbing the Bunbury-Picton section of the Boyanup line. [1] A year later, on 21 November 1894, the first section of the Flinders Bay branch opened between Boyanup and Busselton, coinciding with a reconfiguration of Boyanup Station to a transfer-friendly island platform arrangement. [2] [1]

The Donnybrook to Bridgetown section of the line was constructed by W.N. Hedges and officially opened on 1 November 1898. [2] Bridgetown remained the terminus for a number of years, however the first section of the Donnybrook-Katanning railway, to Noggerup, was built by the Public Works Department and opened on 26 March 1908. [2] The Northcliffe line was next extended to Jardee (originally called Jarnadup), with the Public Works Department-built section opening on 14 June 1911. [3] [2]

The State Saw Mills were created in 1913 by the Scaddan Government to support the State Government's desire to supply sleepers for the Trans-Australian Railway project. [4] [5] In order to service this sleeper supply contract, the State Saw Mills opened two mills south of Jardee, in Big Brook (now called Pemberton). [5] [3] The line from Jardee to Pemberton was constructed by the Public Works Department and opened as a State Saw Mills tramway on 20 January 1914. [5] [4] [2] [3]

The Group Settlement Scheme greatly impacted the development of the region, with the first settlers arriving near Manjimup in 1921. [3] After lobbying from settlers, the line from Jarnadup to Pemberton was upgraded with heavier rails and station buildings constructed, with ownership transferring to WAGR line on 11 October 1926. [6] [3] While pre-construction and surveys of the line to serve the settlers further south in Northcliffe commenced in 1924, significant works did not commence until 1929. [2] [6] The Public Works Department built the line at significant cost to navigate the terrain, making it the most expensive railway per mile in the state when it officially opened on 27 November 1933. [6] The final train to Pemberton operated in December 1986, after which time the line was leased and used as a tramway by the Pemberton Tramway Company. [6]

Beyond Northcliffe

When the line from Jardee was taken over by the WAGR and extended to Northcliffe it was considered as part of a longer line connecting to the Nornalup branch to provide a southern route to Albany. [6] [7] The initial intent was to continue construction of the line beyond Northcliffe to Westcliffe, with surveys undertaken for this section. [6] [7] However, as the costs of the Northcliffe section soared, the decision was made to terminate the line there in 1933. [6]

While the WAGR never built the line to Westcliffe, the Kauri Timber Company did use 11km of the surveyed alignment for its timber tramway from Northcliffe. This included a notable 600 feet (180 m) long, 30 feet (9.1 m) high timber bridge over Palm Creek. [7]

Royal train derailment

The Northcliffe branch is notable for being the site of a Royal train derailment. During the then Prince of Wales' (Edward VIII) visit to the region in 1920 he travelled by special train, which derailed near Wilgarup while travelling from Manjimup to Bridgetown. Photos of the incident indicate that his carriage rolled, ending on its side. No significant injuries were noted. [3]

Alignment

As operated by the WAGR, the line was 127 miles 49  chains (127.61 miles, 205.37 km) from Picton to Northcliffe. [8] Most of the line remains in place, although disused, with few changes since it was last operated. [9] However, a section through Manjimup has been lifted as part of its Town Centre Revitalisation project, although the rail reserve remains theoretically available for future rail uses. [10]

Like all railways outside of Perth, the line is not electrified and is predominantly single-track, with passing loops at various locations. The section from Picton to Lambert is controlled by the Arc Infrastructure, with the remainder of the line to Northcliffe controlled by the Pemberton Tramway Company, under arrangement with the Public Transport Authority. [11] [9] [12]

Heading south from Picton, the line traverses predominantly agricultural land to Boyanup, where the South West Rail and Heritage Centre sits adjacent to the Shire of Capel's heritage-registered Boyanup Railway Precinct. [13] From here, the line climbs through the Preston River Valley to Donnybrook and traverses a mix of agricultural and forested land south to Manjimup. Heading to Pemberton, the line passes the Diamond Tree and increasingly forested areas. The section from Pemberton to Northcliffe through dense karri forests and over several bridges is on the State Register of Heritage Places and considered the most scenic part of the line. [14] [15] [6]

Bridges

The line crosses a few notable bridges, with the curved 127-metre-long (417 ft), 10-metre-high (33 ft) Warren River Bridge being listed on the State Register of Heritage Places. [6] [16] Other notable bridges include:

In particular, the section from Pemberton to Northcliffe features seven bridges, six of which are within 10 kilometres (6.2 mi) south of Pemberton. Of those, three are within a 500-metre (1,600 ft) stretch of the line. [14] The final bridge, over Dombakup Brook is a completely wooden trestle bridge, of which no examples are known to be still in use. [17]

Branches

While the Bunbury–Picton section of the South Western Railway was part of the original line to Boyanup, it is now considered part of the mainline, with the Northcliffe branch connecting to it at Picton. [1] The first junction en route is at Boyanup, where the Flinders Bay branch diverges to the west, providing access to the Nannup branch at Wonnerup. Further south at Donnybrook, the Donnybrook–Katanning branch provided a connection to the east.

Timber tramways

Several timber mills used to operate along the railway, each with their own access to the mainline. Many of these mills operated extensive timber tramways that fed significant quantities of timber to the railway. [18] The section from Jardee to Pemberton was originally built as a State Saw Mills tramway, before being transferred to the WAGR 12 years later, in 1926. [3] [4]

Operations

Passenger

The only passenger services on the line are operated by the Pemberton Tramway Company. This tourist service is currently limited to the section between Pemberton and The Cascades, operated by diesel trams. [15] Previously, the company operated passenger services along its entire section of the line, with steam-hauled trains Pemberton-Lyall and diesel trams Pemberton-Northcliffe. [12] [19]

Stations

With the line largely disused and the only passenger services operating from Pemberton, most railway stations have disappeared. However, several towns have preserved their stations, potentially re-purposing them for other uses:

Freight

There are currently no freight services on the line, with only the first 3 kilometres (1.9 mi) in use as part of Picton Yard. However, it has been proposed that the line be rehabilitated and reopened between Picton and Greenbushes to carry lithium ore from the Talison Lithium mine near the town. [23] It is hoped that the reopened line would support the carriage of other goods, such as mineral sands, agricultural produce and timber. [23] In 2020, a high-level feasibility study into reopening the line was completed by the state government, Talison Lithium, and Arc Infrastructure, and a second joint Government-industry feasibility study commenced 2023 and is expected to be complete by late 2024. [24] It was later clarified that a decision on reopening would be expected by mid-2025. [25]

In January 2024, Rail Heritage WA attempted to use the portion of the line between Piction and Boyanup to transfer a retired Australind carriage to their Boyanup museum, but were unable to after Arc Infrastructure determined the section was unsafe for transporting. [26]

Related Research Articles

<span class="mw-page-title-main">Manjimup, Western Australia</span> Town in Western Australia

Manjimup is a town in Western Australia, 307 kilometres (191 mi) south of the state capital, Perth. The town of Manjimup is a regional centre for the largest shire in the South West region of Western Australia. At the 2016 census, Manjimup had a population of 4,349.

<span class="mw-page-title-main">Western Australian Government Railways</span> Former government railway commission in Western Australia

Western Australian Government Railways (WAGR) was the state owned operator of railways in the state of Western Australia between October 1890 and June 2003. Owned by the state government, it was renamed a number of times to reflect extra responsibility for tram and ferry operations that it assumed and later relinquished. Westrail was the trading name of the WAGR from September 1975 until December 2000, when the WAGR's freight division and the Westrail brand were privatised. Its remaining passenger operations were transferred to the Public Transport Authority in July 2003.

<span class="mw-page-title-main">Flinders Bay branch railway</span> Former Busselton to Flinders Bay railway line

The Flinders Bay branch railway, also known as the Boyanup to Flinders Bay section ran between Boyanup and Flinders Bay, in South Western Western Australia. The section from Flinders Bay to Busselton has now been converted into a rail trail for bushwalkers and cyclists, called the Wadandi Trail.

<span class="mw-page-title-main">South Western Highway</span> Highway in Western Australia

South Western Highway is a highway in the South West region of Western Australia connecting Perth's southeast with Walpole. It is a part of the Highway 1 network for most of its length. It is about 406 kilometres (252 mi) long.

<span class="mw-page-title-main">Kirup, Western Australia</span> Town in Western Australia

Kirup, originally named Upper Capel, then Kirupp, is situated between Donnybrook and Balingup on the South Western Highway, 228 kilometres (142 mi) south of Perth, Western Australia in the upper reaches of the Capel River valley.

<span class="mw-page-title-main">South Western Railway, Western Australia</span> Main railway route between Perth and Bunbury in Western Australia

The South Western Railway, also known as the South West Main Line, is the main railway route between Perth and Bunbury in Western Australia.

<span class="mw-page-title-main">WAGR Y class</span> Australian diesel-electric locomotives

The Y class was a class of 18 diesel locomotives built by British Thomson-Houston and Clayton Equipment Company for the Western Australian Government Railways between 1953 and 1955. British Thomson-Houston supplied the electrical control equipment but the mechanical work, assembly and testing was carried out by Clayton Equipment Company at their premises in Hatton, Derbyshire. The locomotives carried separate builders plates for each company.

The Lower South West Football League is a country Australian rules football league incorporating teams from towns located within the South West and Great Southern regions of Western Australia.

<span class="mw-page-title-main">WAGR V class</span> Class of Australian 2-8-2 locomotives

The WAGR V class was the last class of steam locomotive to enter service with the Western Australian Government Railways (WAGR). The class was part of the post war regeneration plan for the WAGR, intended for the heavy coal traffic between the Collie coal fields and Perth.

<span class="mw-page-title-main">WAGR J class</span> Class of Australian 4-6-0 locomotives

The WAGR J class was a three-member class of 4-6-0 steam locomotives operated by the Western Australian Government Railways (WAGR) between 1892 and 1924 before seeing further use with the State Saw Mills until the early 1930s.

<span class="mw-page-title-main">Wilga, Western Australia</span> Town in Western Australia

Wilga is a small town located between Donnybrook and Boyup Brook in the South West region of Western Australia.

<span class="mw-page-title-main">Western Australian Government Railway lines and operations centres</span>

Western Australian Government Railways railway system during its peak operational time in the 1930s to 1950s was a large system of over 6,400 kilometres (4,000 mi) of railway line.

<span class="mw-page-title-main">WAGR G class</span> Class of steam locomotives operated by WAGR

The WAGR G class is a class of steam locomotives operated by the Western Australian Government Railways (WAGR) from 1889. The class's wheel arrangement varied; 48 were 2-6-0s and 24 were 4-6-0s.

The agricultural railways in Western Australia were a system of railway lines that were built after the Western Australian 1905 Royal Commission on Immigration, which stated the need for a policy that "all considerable areas of agricultural land must have a 15 mile rail service." The lines were designed and constructed by the Public Works Department, for the Western Australian Government Railways. The railways were identified in the early 1900s as specifically light with 40 lb rails, and required for the agricultural region. The Railway Advisory Board of Western Australia was the administrative body that considered the viability of the proposed lines.

<span class="mw-page-title-main">South West newspapers</span> Newspapers of the South West of Western Australia

This is a list of newspapers published in, or for, the South West region of Western Australia.

WAGR G class G233 <i>Leschenault Lady</i> Preserved Australian steam locomotive

WAGR G class G233 Leschenault Lady is a preserved 2-6-0 steam locomotive, built in 1898 by James Martin & Co of Gawler, South Australia, for the Western Australian Government Railways (WAGR). It is the second oldest Australian-built steam locomotive still in operational order after the Victorian Railways Y112.

<span class="mw-page-title-main">Manjimup–Mount Barker railway</span> Proposed railway line in Western Australia

The Manjimup–Mount Barker railway, was an authorised but never constructed railway line in the South West and Great Southern regions of Western Australia. The railway line was to connect Manjimup, located on the Northcliffe branch railway, with Mount Barker on the Great Southern Railway.

<span class="mw-page-title-main">Boyup Brook–Cranbrook railway</span> Proposed railway line in Western Australia

The Boyup Brook–Cranbrook railway was an authorised but never constructed railway line in the South West and Great Southern regions of Western Australia. The railway line was to connect Boyup Brook, located on the Donnybrook–Katanning railway, with Cranbrook on the Great Southern Railway.

Crowea is a rural locality of the Shire of Manjimup, located near Northcliffe, in the South West region of Western Australia. The South Western Highway forms the eastern border of the locality while the Warren River forms most of its northern border. Parts of the Greater Hawke National Park, in the west, and Greater Dordagup National Park, in the east, are located in Crowea while a small section of Jane National Park penetrates into the south of the locality.

References

  1. 1 2 3 4 5 Austin, Jeff (2010). "South west pioneers". The Westland (266): 5–30.
  2. 1 2 3 4 5 6 7 8 Gunzburg, Adrian; Austin, Jeff (2008). "12. Construction of the W.A. Government Railways network, 1879-1931". Rail through the Bush: Timber and Firewood Tramways and Railway Contractors of Western Australia. Perth: Rail Heritage WA. pp. 208–210. ISBN   978-0-9803922-2-7.
  3. 1 2 3 4 5 6 7 Evans MLA, Hon. H. D. The Manjimup-Northcliffe Railway Line.
  4. 1 2 3 Tilley, A.J. (1968). Timber Tramways of the Bridgetown-Pemberton Districts. Perth: Australian Railway Historical Society WA Division.
  5. 1 2 3 Gunzburg, Adrian; Austin, Jeff (2008). "4. State Saw Mills". Rail through the Bush: Timber and Firewood Tramways and Railway Contractors of Western Australia. Perth: Rail Heritage WA. pp. 111–121. ISBN   978-0-9803922-2-7.
  6. 1 2 3 4 5 6 7 8 9 "REGISTER OF HERITAGE PLACES –ASSESSMENT DOCUMENTATION (Pemberton-Northcliffe Railway)". State Heritage Office. Retrieved 26 August 2020.
  7. 1 2 3 Gunzburg, Adrian; Austin, Jeff (2008). "7. Kauri Timber Coy". Rail through the Bush: Timber and Firewood Tramways and Railway Contractors of Western Australia. Perth: Rail Heritage WA. pp. 139–144. ISBN   978-0-9803922-2-7.
  8. Western Australian Government Railways (1946). Time Table for passenger, mixed, and goods trains over all lines. Perth: Western Australian Government Railways.
  9. 1 2 Arc Infrastructure Network Map Arc Infrastructure
  10. "Manjimup Town Centre Revitalisation". Shire of Manjimup. Retrieved 26 August 2020.
  11. Public Transport Authority Network Map Public Transport Authority
  12. 1 2 "Company Details". Pemberton Tramway Company. Retrieved 25 August 2020.
  13. "Boyanup Railway Precinct". State Heritage Office. Retrieved 26 August 2020.
  14. 1 2 3 "Bridges". Pemberton Tramway Company. Retrieved 26 August 2020.
  15. 1 2 3 "Timetable & Fares". Pemberton Tramway Company. Retrieved 25 August 2020.
  16. "Warren River Railway Bridge, Picton to Northcliffe Railway". State Heritage Office. Retrieved 26 August 2020.
  17. "Dombakup Bridge". Pemberton Tramway Company. Retrieved 26 August 2020.
  18. Gunzburg, Adrian; Austin, Jeff (2008). Rails through the Bush: Timber and Firewood Tramways and Railway Contractors of Western Australia. Perth: Rail Heritage WA.
  19. "News 2005". Pemberton Tramway Company. Retrieved 25 August 2020.
  20. "The Donnybrook Visitor Centre". Donnybrook Regional Tourism Association. Retrieved 25 August 2020.
  21. "Greenbushes Railway Station". Heritage Council of WA. Retrieved 25 August 2020.
  22. "Railway Station". Bridgetown-Greenbushes Visitor Information. Retrieved 25 August 2020.
  23. 1 2 Draft South West Supply Chain Strategy Department of Transportation
  24. Punch, Don; Saffioti, Rita (14 July 2023). "Detailed feasibility study into recommissioning of Greenbushes to Bunbury Railway Line to begin". Media Statements. Government of Western Australia. Retrieved 31 August 2023.
  25. Smith, Sean (9 October 2024). "Call on reopening disused Greenbushes-Bunbury rail link revised to second quarter of mid-2025". The West Australian. Retrieved 27 November 2024.
  26. Lane, Oliver (4 January 2024). "Call goes out for community help to move Australind train carriage to museum". South Western Times. Retrieved 18 January 2024.

Further reading