Northern line

Last updated

Northern line
Northern line flag box.svg
Why London Underground is nicknamed The Tube.jpg
1995 Stock emerging from the tunnel north of Hendon Central station
Overview
Stations52
Colour on map Black
Website tfl.gov.uk
Service
Type Rapid transit
System London Underground
Depot(s)
    • Golders Green
    • Morden
  • Stabling Sidings:
    • Highgate
    • Edgware
    • High Barnet [1]
Rolling stock 1995 Stock
Ridership339.704 million passenger journeys (2019) [2]
History
Opened
  • 18 December 1890;133 years ago (1890-12-18) (as City and South London Railway)
  • 28 August 1937;86 years ago (1937-08-28) (renamed to Northern line)
Last extension20 September 2021;2 years ago (2021-09-20)
Technical
Line length58 km (36 mi)
CharacterDeep-tube
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Electrification Fourth rail,  630 V DC
Operating speed45 mph (72 km/h) [3]
Signalling CBTC (SelTrac)
London Underground
Bakerloo
Central
Circle
District
Hammersmith & City
Jubilee
Metropolitan
Northern
Piccadilly
Victoria
Waterloo & City
London Overground
Liberty
Lioness
Mildmay
Suffragette
Weaver
Windrush
Other TfL Modes
DLR
Elizabeth line
London Trams

The Northern line is a London Underground line that runs from North London to South London. It is printed in black on the Tube map. The Northern line is unique on the Underground network in having two different routes through central London, two southern branches and two northern branches. Despite its name, it does not serve the northernmost stations on the Underground, though it does serve the southernmost station at Morden, the terminus of one of the two southern branches.

Contents

The line's northern termini, all in the London Borough of Barnet, are at Edgware and High Barnet; Mill Hill East is the terminus of a single-station branch line off the High Barnet branch. The two main northern branches run south to join at Camden Town where two routes, one via Charing Cross in the West End and the other via Bank in the City, continue and then join at Kennington in Southwark. At Kennington the line again divides into two branches, one to each of the southern termini – at Morden, in the borough of Merton, and at Battersea Power Station in Wandsworth.

For most of its length the Northern line is a deep tube line. [nb 1] The portion between Stockwell and Borough opened in 1890 and is the oldest section of deep-level tube line on the network. About 294 million passenger journeys were recorded in 2016/17 on the Northern line, making it the busiest on the Underground. [4] It has 18 of the system's 31 stations south of the River Thames. There are 52 stations in total on the line, of which 38 have platforms below ground.

The line has a complicated history. Its longtime structure of two main northern branches, two central branches, and southern unification, reflects its genesis as three separate railways which were combined in the 1920s and 1930s. An extension in the 1920s used a route originally planned by a fourth company. Abandoned plans from the 1920s to extend the line further southwards, and then northwards in the 1930s, would have incorporated parts of the routes of two further companies. From the 1930s to the 1970s, the tracks of a seventh company were also managed as a branch of the Northern line. [nb 2] An extension of the Charing Cross branch from Kennington to Battersea opened on 20 September 2021, giving the line a second southern branch. There are also proposals to split the line into separate lines following the opening of the new link to Battersea.

History

Formation

City & South London Railway train, 1890 Electric railway train.jpg
City & South London Railway train, 1890

The core of the Northern line evolved from two railway companies: the City & South London Railway (C&SLR) and the Charing Cross, Euston & Hampstead Railway (CCE&HR).

The C&SLR was London's first electric hauled deep-level tube railway. It was built under the supervision of James Henry Greathead, who had been responsible (with Peter W. Barlow) for the Tower Subway. [5] It was the first of the Underground's lines to be constructed by boring deep below the surface and the first to be operated by electric traction. [6] The railway opened in November 1890 from Stockwell to a now-disused station at King William Street. [7] This was inconveniently placed and unable to cope with the company's traffic so in 1900 a new route to Moorgate via Bank was opened. [8] By 1907, the C&SLR had been further extended at both ends to run from Clapham Common to Euston. [9]

Formation of the Northern line (Northern Heights and Battersea extensions not shown) Formation of the Northern Line small.png
Formation of the Northern line (Northern Heights and Battersea extensions not shown)

The CCE&HR (commonly known as the "Hampstead Tube") was opened in 1907 and ran from Charing Cross (known for many years as Strand) via Euston and a junction at Camden Town to Golders Green and Highgate (now known as Archway). [10] [11] It was extended south by one stop to Embankment in 1914 to form an interchange with the Bakerloo and District lines. [11] [12] In 1913, the Underground Electric Railways Company of London (UERL), owner of the CCE&HR, took over the C&SLR although they remained separate companies. [13]

Integration

During the early 1920s a series of works were carried out which involved connecting the C&SLR and CCE&HR tunnels to enable an integrated service to be operated. The first of these new tunnels, between the C&SLR's Euston station and the CCE&HR's station at Camden Town, had originally been planned in 1912 but was delayed by the First World War. [14] [15] Construction began in 1922 and this first tunnel opened in 1924. [11] [15] The second connection linking the CCE&HR's Embankment and C&SLR's Kennington stations opened in 1926. [11] [15] It provided a new intermediate station at Waterloo to connect to the main line station there and the Bakerloo line. The smaller diameter tunnels of the C&SLR were also enlarged to match the standard diameter of the CCE&HR and other deep tube lines. [16]

Extensions

In conjunction with the works to integrate the two lines, two major extensions were undertaken: northwards to Edgware in Middlesex (now in the London Borough of Barnet) and southwards to Morden in Surrey (then in the Merton and Morden Urban District, but now in the London Borough of Merton).

Edgware Extension

The Edgware extension used plans dating back to 1901 for the Edgware and Hampstead Railway (E&HR) [17] which the UERL's subsidiary, the London Electric Railway, had taken over in 1912. [18] It extended the CCE&HR line from its terminus at Golders Green to Edgware in two stages: to Hendon Central in 1923 and to Edgware in 1924. [11] [19] The line crossed open countryside and ran mostly on viaduct from Golders Green to Brent and then on the surface, apart from a short tunnel north of Hendon Central. [19] Five new stations were built to pavilion-style designs by Stanley Heaps, head of the Underground's Architects Office, stimulating the rapid northward expansion of suburban developments in the following years. [20]

Morden Extension

The engineering of the Morden extension of the C&SLR from Clapham Common to Morden was more demanding; it runs in tunnels to a point just north of Morden station which was constructed in a cutting. The line then goes under the wide station forecourt and public road outside the station to the depot. The extension was initially planned to continue to Sutton [21] over part of the route for the unbuilt Wimbledon and Sutton Railway (in which the UERL held a stake) but agreements were made with Southern Railway to end the extension at Morden. Southern Railway built the surface line from Wimbledon to Sutton in the 1930s via South Merton and St. Helier. [nb 3] The tube extension itself opened in 1926 with seven new stations all designed by Charles Holden in a modern style. Originally Stanley Heaps was to design the stations, but after seeing the designs Frank Pick (Assistant Joint Manager of the UERL) decided that Holden should take over the project. [22]

With the exception of Morden and Clapham South, where more land was available, the new stations were built on confined corner sites at main road junctions in areas that had been already developed. Holden made good use of this limited space and designed striking buildings. The street-level structures are of white Portland Stone with tall double-height ticket halls, with the London Underground roundel made up in coloured glass panels in large glazed screens. The stone columns framing the glass screens are surmounted by a capital formed as a three-dimensional version of the roundel. The large expanses of glass above the entrances ensure that the ticket halls are bright and lit from within at night, creating a welcoming feel. [23] The first and last new stations on the extension, Clapham South and Morden, include a parade of shops and were designed with structures capable of being built above (like many of the earlier central London stations). Clapham South was extended upwards soon after its construction with a block of apartments; Morden was extended upwards in the 1960s with a block of offices. All the stations on the extension, except Morden itself, are Grade II listed buildings.

Great Northern & City Railway

After the UERL and the Metropolitan Railway became part of the new unified London Passenger Transport Board in 1933, the MR's subsidiary the Great Northern & City Railway became part of the Underground as the Northern City Line. It ran underground from Moorgate to Finsbury Park. In preparation for the Northern Heights Plan it was operated as part of the Northern line, although it was never connected to the rest of the line.

Naming

The resulting line became known as the Morden–Edgware line, although a number of alternative names were also mooted in the fashion of the contraction of Baker Street & Waterloo Railway to "Bakerloo", such as "Edgmor", "Mordenware", "Medgeway" and "Edgmorden". [24] With Egyptology very much in fashion after the discovery of the tomb of Tutankhamun in 1922, there was also a proposal to call the line the Tootancamden Line as it passed through both Tooting and Camden. [25] It was eventually named the Northern line from 28 August 1937, [26] reflecting the planned addition of the Northern Heights lines. [27]

Northern Heights plan

Line map of the abandoned Northern Heights plan Northern Heights diagram.png
Line map of the abandoned Northern Heights plan
Sign displaying the route of the Northern Heights extension Northern Line Northern Heights Extension sign.jpg
Sign displaying the route of the Northern Heights extension

In June 1935 the LPTB announced the New Works Programme, an ambitious plan to expand the Underground network which included the integration of a complex of existing London and North Eastern Railway (LNER) lines north of Highgate through the Northern Heights. These lines, built in the 1860s and 1870s by the Edgware, Highgate and London Railway (EH&LR) and its successors, ran from Finsbury Park to Edgware via Highgate, with branches to Alexandra Palace and High Barnet. The line taken over would be extended beyond Edgware to Brockley Hill, Elstree South and Bushey Heath with a new depot at Aldenham. The extension's route was that planned for the unbuilt Watford and Edgware Railway (W&ER), using rights obtained from the earlier purchase of the W&ER (which had long intended an extension of the EH&LR Edgware route towards Watford). This also provided the potential for further extension in the future; Bushey's town planners reserved space in Bushey village for a future station and Bushey Heath station's design was revised several times to ensure this option would remain available in the future.

The project involved electrification of the surface lines (operated by steam trains at the time), the doubling of the original single-line section between Finchley Central and the proposed junction with the Edgware branch of the Northern line, and the construction of three new linking sections of track: a connection between Northern City Line and Finsbury Park station on the surface; an extension from Archway to the LNER line near East Finchley via new deep-level platforms below Highgate station; and a short diversion from just before the LNER's Edgware station to the Underground's station of the same name.

Intended service levels

The peak-hour service pattern was to be 21 trains an hour each way on the High Barnet branch north of Camden Town, 14 of them via the Charing Cross branch and seven via the Bank branch. 14 would have continued on beyond Finchley Central, seven each on the High Barnet and Edgware branches. An additional seven trains an hour would have served the High Barnet branch but continued via Highgate High-Level and Finsbury Park to Moorgate, a slightly shorter route to the City. It does not seem to have been intended to run through trains to the ex-Northern City branch from Edgware via Finchley Central. Seven trains an hour would have served the Alexandra Palace branch, to/from Moorgate via Highgate High-Level. In addition to the 14 through trains described the ex-Northern City branch would have had 14 four-car shuttle trains an hour.

Progress of works

Work began in the late 1930s and was in progress on all fronts by the outbreak of the Second World War. The tunnelling northwards from the original Highgate station (now Archway) had been completed, and the service to the rebuilt surface station at East Finchley started on 3 July 1939 but without the opening of the intermediate (new) Highgate Station at the site of the LNER's station of the same name. Further progress was disrupted by the start of the war; however enough development had been made to complete the electrification of the High Barnet branch onwards from East Finchley (over which tube services started on 14 April 1940) and the new deep-level Highgate station opened on 19 January 1941. The single track LNER line to Edgware was electrified as far as Mill Hill East, including the Dollis Brook Viaduct, opening as a tube service on 18 May 1941 to serve the barracks there thus forming the Northern line as it is today. The new depot at Aldenham had already been built and was used to build Halifax bombers. Work on the other elements of the plan was suspended late in 1939.

Work on the extension from Edgware to Bushey Heath including work on a viaduct and a tunnel started in June 1939, but was stopped after war broke out. [28] After the war, the area beyond Edgware was made part of the Metropolitan Green Belt, largely preventing the anticipated residential development in the area, and the potential demand for services from Bushey Heath thus vanished. Passenger numbers also dropped on the then-BR's Mill Hill and Alexandra Palace branches, so it was useless to electrify them. Available funds were directed towards completing the eastern extension of the Central line instead, and the Northern Heights plan was dropped on 9 February 1954. Aldenham depot was converted into an overhaul facility for buses.

The implemented service from High Barnet branch gave good access both to the West End and the City. This appears to have undermined traffic on the Alexandra Palace branch, still run with steam haulage to Kings Cross via Finsbury Park, as Highgate (low-level) was but a short bus ride away and car traffic was much lighter than it would become later. Consequently, the line from Finsbury Park to Muswell Hill and Alexandra Palace via the surface platforms at Highgate was closed altogether to passenger traffic in 1954.[ citation needed ] This contrasts with the decision to electrify the Epping-Ongar branch of the Central line, another remnant of the New Works programme, run as a tube-train shuttle from 1957. A local pressure group, the Muswell Hill Metro Group, campaigns to reopen this route as a light-rail service.[ citation needed ] So far there is no sign of movement on this issue: the route, now the Parkland Walk, is highly valued by walkers and cyclists, and suggestions in the 1990s that it could, in part, become a road were met with fierce opposition.[ citation needed ] Another pressure group has proposed using the track bed further north, as part of the North and West London Light Railway.[ citation needed ] The connection between Drayton Park and the surface platforms at Finsbury Park was opened in 1976, when the Northern City Line became part of British Rail.

1990s refurbishment and upgrade

Close-up of a High Barnet-bound Northern line 1995 stock cab Northern line cab.JPG
Close-up of a High Barnet-bound Northern line 1995 stock cab

In the 1980s, a southern extension of the line to Peckham was proposed, as part of a review of potential extensions of Underground lines. The proposal was not proceeded with. [29]

By the early 1990s, the line had deteriorated due to years of under-investment and the use of old rolling stock, most of which dated back to the early 1960s. [30] The line gained the nickname "Misery Line" due to its perceived unreliability. [31] [32] In 1995, a comprehensive refurbishment of the line began – including track replacement, power upgrades, station modernisation (such as Mornington Crescent) and the replacement of older rolling stock with new 1995 Stock thanks to a public–private partnership deal with Alstom. [33] [34]

Recent developments

Throughout the 2000s no plans were considered for extending the Northern line, as the PPP to upgrade the Underground did not include provision for line extensions within the PPP contracts. [35] [36] The Northern line was originally scheduled to switch to automatic train operation in 2012, using the same SelTrac S40 system [37] as used since 2009 on the Jubilee line and for a number of years on the Docklands Light Railway. [38] Originally the work was to follow on from the Jubilee line so as to benefit from the experience of installing it there, but that project was not completed until spring 2011. Work on the Northern line was contracted to be completed before the 2012 Olympics. It was then undertaken in-house, and TfL predicted the upgrade would be complete by the end of 2014. [39] The first section of the line (West Finchley to High Barnet) was transferred to the new signalling system on 26 February 2013 [40] and the line became fully automated on 1 June 2014 with the Chalk Farm to Edgware via Golders Green section being the last part of the line to switch to ATO. [41] [42]

In January 2018 Transport for London announced that it would double the period during which it runs peak evening services in the central London section to tackle overcrowding. There would now be 24 trains an hour on both central London branches and the northern branches, as well as 30 trains an hour on the Kennington to Morden section between 5pm and 7pm. [4]

24-hour weekend service

Since the mid-autumn of 2016 [43] a 24-hour "Night Tube" service has run on Friday and Saturday nights from Edgware and High Barnet to Morden via the Charing Cross branch; service is suspended on the Bank branch during these times. [44] Trains run every 8 minutes between Morden and Camden Town and every 15/16 minutes between Camden Town and Edgware/High Barnet. Labour disputes delayed the planned start date of September 2015. [45]

Battersea extension

In September 2021 the Northern line was extended to serve the redevelopment of Battersea Power Station. Partially funded by private developers, the £1.2bn [46] project extended the Charing Cross branch of the line for 3.2 km (2.0 mi) from Kennington to Battersea Power Station, with an intermediate stop at Nine Elms. [47] [48] Approved by Wandsworth Council in 2010 [49] and Transport for London in 2014, [47] the construction of the line began in 2015. Tunnelling for the project was completed in 2017, [46] and the extension opened on 20 September 2021. [50] [51] Provision has been made for a future extension to Clapham Junction railway station. [52]

Services

Peak

As of September 2021, morning peak southbound services are: [53]

This service pattern provides 20 tph between Finchley Central and High Barnet, 4 tph between Finchley Central and Mill Hill East, 7 tph between Kennington and Battersea Power Station and 22 tph everywhere else on the line except between Kennington and Morden, between Camden Town and Finchley Central and on the Edgware branch where there will be 24 tph.

Off-peak

As of November 2022, off-peak services are the similar to peak services, minus the four hourly trains that run from Morden to the northern branches via Charing Cross: [53]

This service pattern provides 16 tph between Finchley Central and High Barnet, 4 tph between Finchley Central and Mill Hill East, 10 tph between Kennington and Battersea Power Station and 20 tph everywhere else on the line.

Night

Since 2016, the Northern line has operated Night Tube services on Friday and Saturday nights between the Edgware and High Barnet termini and Morden, via the Charing Cross branch only. Trains run every 15 minutes on each of the northern branches, combining to give eight trains per hour between Camden Town and Morden. There is no Night Tube service on the Mill Hill East, Bank, or Battersea branches. [43]

Map

Geographical path of the Northern line Northern Line with Battersea.svg
Geographical path of the Northern line

Stations

Northern line
Bushey Heath
BSicon uexKBHFa.svg
BSicon uexdKSTR2.svg
BSicon uexcSTRc3.svg
BSicon uexlv-DST.svg
BSicon uexdSTR+c12.svg
BSicon uexSTR3+4.svg
Elstree South
BSicon uexdHST.svg
BSicon uexdSTR+1.svg
BSicon uexSTRc4.svg
Brockley Hill
BSicon uexdHST.svg
Edgware
BSicon uKACCa.svg
BSicon uexSTR.svg
Edgware (LNER)
BSicon exKBHFa.svg
BSicon uvSHI2gl-.svg
1867–1939
BSicon POINTERf@gq.svg
BSicon exdSTR2.svg
BSicon uxv-ABZg3.svg
BSicon exUWu3.svg
BSicon uKDSTe.svg
Edgware depot
BSicon exUWu1.svg
BSicon uvSTR+1-.svg
BSicon uexv-STR.svg
BSicon exv-STR+4.svg
BSicon POINTERg@lfq.svg
proposed but
unbuilt connection
Burnt Oak
BSicon udHST.svg
BSicon exdHST.svg
Mill Hill (The Hale)
BSicon udSTR.svg
BSicon ldENDE@G.svg
BSicon udHSTACC.svg
Mill Hill East
BSicon udSTR.svg
BSicon uSTR.svg
BSicon uKACCa.svg
BSicon udYRDe.svg
High Barnet
Colindale
BSicon uHST.svg
BSicon uhSTRae.svg
BSicon udBS2c1.svg
BSicon uSHI1+l.svg
BSicon uBS2+r.svg
BSicon udSTR.svg
BSicon udSTR.svg
BSicon udHSTACC.svg
Totteridge & Whetstone
BSicon udSTR.svg
BSicon udSTR.svg
BSicon uSTRc2.svg
BSicon ldHSTACC.svg
BSicon udSTR3.svg
Woodside Park
Burroughs tunnel
BSicon utSTRa@g.svg
BSicon udSTR+c2.svg
BSicon uHSTACC3+1.svg
BSicon ucdSTRc4.svg
West Finchley
Hendon Central
BSicon utHSTACCe@g.svg
BSicon uv-ABZg+1.svg
BSicon lACC.svg
BSicon uSTRc4.svg
Finchley Central
BSicon udSTR.svg
BSicon udHST.svg
East Finchley
BSicon udSTR.svg
BSicon udSTR.svg
BSicon exdKHSTa.svg
Alexandra Palace
Brent Cross
BSicon udHST.svg
BSicon udSTR.svg
BSicon exdHST.svg
Muswell Hill
BSicon udSTR.svg
BSicon uvSHI2gl-.svg
BSicon exv-HST.svg
Cranley Gardens
BSicon udSTR.svg
BSicon utdSTRa.svg
BSicon udSTR.svg
BSicon POINTERg@fq.svg
BSicon excSTRc2.svg
BSicon exdSTR3.svg
1873–1954
Golders Green
BSicon udHSTACC.svg
BSicon utdSTR.svg
BSicon udENDE@F.svg
BSicon uldDST.svg
BSicon exvSTR+1-.svg
BSicon exdSTRc4.svg
Highgate depot
Golders Green depot
BSicon uvSTR-KDSTa.svg
BSicon utSTR.svg
BSicon extSTRa.svg
Highgate north tunnel
BSicon PORTALf.svg
BSicon uSHI2g+l.svg
BSicon udBS2c4.svg
BSicon exlvHST.svg
BSicon utdHST.svg
BSicon extSTRea.svg
Highgate
not
completed
North End
BSicon uetdHST.svg
BSicon utdHST.svg
BSicon extvSTR2e-.svg
BSicon exdSTRc3.svg
Archway
BSicon utdSTR.svg
BSicon utdHST.svg
BSicon exSTRc1.svg
BSicon exdSTR+4.svg
Tufnell Park
Hampstead
BSicon utdHST.svg
BSicon utUWBl.svg
BSicon exdSTR.svg
BSicon utdSTR.svg
BSicon utINT.svg
BSicon exdSTR.svg
Kentish Town ThameslinkSymbol.svg
Belsize Park
BSicon utHST.svg
BSicon utUWBl.svg
BSicon POINTERg@fq.svg
BSicon exSTR.svg
1867–1954
BSicon utdSTR.svg
BSicon uetdHST.svg
BSicon exdSTR.svg
South Kentish Town
1907–24
Chalk Farm
BSicon utdHST.svg
BSicon utdSTR.svg
BSicon exdHST.svg
Crouch End
BSicon utdSTR.svg
BSicon utdSTR.svg
BSicon exdHST.svg
Stroud Green
BSicon utvSHI2l-.svg
BSicon utSTR.svg
BSicon KINTACCxa.svg
Finsbury Park National Rail logo.svg Piccadilly line roundel (no text).svg Victoria line roundel (no text).svg
Camden Town
BSicon utXBHF-L.svg
BSicon utdSTR2.svg
BSicon utdSTRc23.svg
BSicon utXBHF-R.svg
BSicon utdSTR3.svg
BSicon POINTERg@fq.svg
BSicon STR.svg
Gnome-searchtool.svg
BSicon utcdSTRc2.svg
BSicon utdSTRc1.svg
BSicon utSTR3+1.svg
BSicon utdSTR3.svg
BSicon utSTR2+4.svg
BSicon utdSTRc4.svg
BSicon utdSTR2.svg
BSicon utcdSTRc3.svg
BSicon tINTa@f.svg
Drayton Park National Rail logo.svg
Mornington Crescent
BSicon utdSTR+1.svg
BSicon utcdSTRc4.svg
BSicon utcdSTRc1.svg
BSicon uldHST.svg
BSicon utdSTR+4.svg
BSicon tINT.svg
Highbury and Islington National Rail logo.svg Victoria line roundel (no text).svg Overground roundel (no text).svg
National Rail logo.svg Victoria line roundel (no text).svg Overground roundel (no text).svg Euston
BSicon utSTR+lo-STRl.svg
BSicon ut-STR2+r.svg
BSicon lvINTq.svg
BSicon utSTRq-.svg
BSicon utSTRc3.svg
BSicon utSTRr-.svg
BSicon tINT.svg
Essex Road National Rail logo.svg
Victoria line roundel (no text).svg Warren Street
BSicon utBHF.svg
BSicon utSTRc1.svg
BSicon utINTACC+4.svg
BSicon tSTR.svg
King's Cross
St Pancras
Circle line roundel (no text).svg H&c line roundel (no text).svg Metropolitan line roundel (no text).svg Piccadilly line roundel (no text).svg Victoria line roundel (no text).svg
National Rail logo.svg Eurostar icon RDT (2023).svg
Goodge Street
BSicon utHST.svg
BSicon utHST.svg
BSicon tSTR.svg
Angel
BSicon utSTR.svg
BSicon tBS2c2.svg
BSicon uetHST.svg
BSicon tBS2r.svg
City Road
1901–22
Central line roundel (no text).svg Elizabeth line roundel (no text).svg
Tottenham
Court Road
BSicon utACC.svg
BSicon lvINT.svg
BSicon umtvSTR.svg
Old Street National Rail logo.svg
BSicon utdSTR.svg
BSicon tv-ENDEe.svg
BSicon lvINT.svg
BSicon uxmtvSTR.svg
Moorgate National Rail logo.svg Circle line roundel (no text).svg H&c line roundel (no text).svg Metropolitan line roundel (no text).svg Elizabeth line roundel (no text).svg
Piccadilly line roundel (no text).svg Leicester Square
BSicon utBHF.svg
BSicon utUWBl.svg
BSicon extKBHFe.svg
Lothbury
authorised
but not built
BSicon utSTR.svg
BSicon utINTACC.svg
Bank Central line roundel (no text).svg W&c line roundel (no text).svg DLR no-text roundel.svg ( Monument Circle line roundel (no text).svg District line roundel (no text).svg )
National Rail logo.svg Bakerloo line roundel (no text).svg Charing Cross
BSicon utINT.svg
BSicon uextkSTRc2.svg
BSicon uetkKRZ3+ltu.svg
BSicon uextKBHFeq.svg
King William Street
1890–1900
BSicon uetABZg2.svg
BSicon uextSTRc3.svg
BSicon WSTRc2.svg
BSicon uextkSTR+1.svg
BSicon WASSER3+l.svg
BSicon utSTR.svg
BSicon WASSERq.svg
Bakerloo line roundel (no text).svg Circle line roundel (no text).svg District line roundel (no text).svg BSicon FERRY.svg Embankment
BSicon uextSTRc1.svg
BSicon utINT.svg
BSicon uextSTR2.svg
BSicon WASSER+1.svg
BSicon uextvSTR+4-.svg
BSicon uextSTRc3.svg
BSicon WSTRc4.svg
BSicon utINTACC.svg
London Bridge National Rail logo.svg Jubilee line roundel (no text).svg BSicon FERRY.svg
1914–25
Charing Cross
reversing loop
BSicon WASSERq.svg
BSicon uetABZgl.svg
BSicon WASSERr.svg
BSicon uextvSTRr-.svg
BSicon uetABZg+4.svg
National Rail logo.svg Bakerloo line roundel (no text).svg Jubilee line roundel (no text).svg W&c line roundel (no text).svg BSicon FERRY.svg Waterloo
BSicon utINT.svg
BSicon utHST.svg
Borough
BSicon utSTR2.svg
BSicon utSTRc3.svg
BSicon utUWBr.svg
BSicon utdSTRc1.svg
BSicon utSTR+4.svg
BSicon utINT.svg
Elephant & Castle National Rail logo.svg Bakerloo line roundel (no text).svg ThameslinkSymbol.svg
BSicon utXBHF-L.svg
BSicon utdABZg2.svg
BSicon utcSTRc3.svg
BSicon utXBHF-R.svg
Kennington
reversing loop
BSicon utSTR+l.svg
BSicon utABZgr.svg
BSicon lv-NULf.svg
BSicon utdSTRc1.svg
BSicon utv-ABZg+4.svg
BSicon utSTRc2.svg
BSicon utABZgl.svg
BSicon utABZ3r.svg
BSicon utHST.svg
Oval
BSicon lvNULg-.svg
BSicon utABZg+1.svg
BSicon utSTRc4.svg
BSicon uetABZg+l.svg
BSicon uexKDSTCCeq.svg
Stockwell depot
closed 1915
Nine Elms
BSicon utHSTACC.svg
BSicon utBHF.svg
Stockwell Victoria line roundel (no text).svg
Battersea Power Station
BSicon utKACCe.svg
BSicon exGRZa.svg
BSicon utHST.svg
Clapham North
reserved route
BSicon exGRZ.svg
BSicon utHST.svg
Clapham Common
Overground roundel (no text).svg National Rail logo.svg Clapham Junction
BSicon lINT.svg
BSicon exGRZe.svg
BSicon utHST.svg
Clapham South
BSicon utINT.svg
Balham National Rail logo.svg
BSicon utdHST.svg
Tooting Bec
BSicon utdHST.svg
Tooting Broadway
BSicon utdHST.svg
Colliers Wood
BSicon utdHST.svg
South Wimbledon
BSicon utACCe@g.svg
Morden
BSicon dCONTgq.svg
BSicon kSTR2+r.svg
BSicon kSTRc3.svg
BSicon uKDSTe.svg
BSicon uexSTR.svg
Morden depot
National Rail logo.svg Morden South
BSicon kHST+4.svg
BSicon POINTERg@lfq.svg
BSicon uexSTR.svg
proposed but
unbuilt connection
BSicon uexldHST.svg
BSicon dSTR.svg
South Morden
authorised
but not built
National Rail logo.svg Sutton Common
BSicon dHST.svg
BSicon uexldHST.svg
BSicon dSTR.svg
Cheam
authorised
but not built
National Rail logo.svg Sutton
BSicon KINTe.svg
Notice explaining about step-free access. This can be found inside every Northern line train. Step-free access notification (Northern line).png
Notice explaining about step-free access. This can be found inside every Northern line train.

Open stations

High Barnet branch

StationImageOpenedBranchAdditional information
High Barnet Wheelchair symbol.svg High Barnet stn entrance.JPG 1 April 1872High Barnet branchTerminus. Northern line introduced 14 April 1940 map 1
Totteridge & Whetstone Totteridge & Whetstone stn building.JPG Northern line introduced 14 April 1940 map 2
Woodside Park Wheelchair symbol.svg Woodside Park stn building.JPG Northern line introduced 14 April 1940 map 3
West Finchley Wheelchair symbol.svg West Finchley stn entrance.JPG 1 March 1933Northern line introduced 14 April 1940 map 4
Mill Hill East Wheelchair symbol.svg Mill Hill East stn building.JPG 22 August 1867Mill Hill branchClosed 11 September 1939, reopened 18 May 1941 map 5
Finchley Central Wheelchair symbol.svg Finchley Central station.jpg High Barnet & Mill Hill branchesFirst Northern line train was 14 April 1940 map 6
East Finchley East Finchley stn building.JPG High Barnet branchFirst Northern line train was 3 July 1939 map 7
Highgate Highgate station entrance Priory.JPG 19 January 1941Disused surface station opened 22 August 1867 map 8
Archway Archway station side entrance.JPG 22 June 1907Originally named Highgate map 9
Tufnell Park Tufnell Park stn building.JPG map 10
Kentish Town ThameslinkSymbol.svg National Rail logo.svg Kentish Town stn building.JPG Mainline station opened 13 July 1868. Change for National Rail services. map 11

Edgware branch

StationImageOpenedAdditional information
Edgware Wheelchair symbol.svg Edgware station building.JPG 18 August 1924Terminus map 12
Burnt Oak Burnt Oak stn building.JPG 27 October 1924Opened with its current name, then renamed as "Burnt Oak (Watling)" approximately four years after its opening; was reverted to its original name in 1950. map 13
Colindale Colindale station entrance.JPG 18 August 1924Used as a terminus for some trains travelling north. map 14
Hendon Central Wheelchair symbol.svg Hendon Central stn entrance.JPG 19 November 1923 map 15
Brent Cross Brent Cross stn building.JPG Opened as "Brent"; renamed 20 July 1976. map 16
Golders Green Wheelchair symbol.svg Golders Green stn building.JPG 22 June 1907Originally a terminus; remains a terminus for some trains. map 17
Hampstead Hampstead station building.JPG Originally proposed to be named "Heath Street"; this name can still be seen on wall tilings on station platform walls. map 18
Belsize Park Belsize Park stn building.JPG One of eight London Underground stations that have deep-level air-raid shelters underneath them. The shelter was constructed in the Second World War to provide safe accommodation for service personnel. map 19
Chalk Farm Chalk Farm stn entrance.JPG map 20

Camden Town

StationImageOpenedBranchAdditional information
Camden Town Camden Town stn building2.JPG 22 June 1907Edgware, High Barnet, Charing Cross and Bank branches [lower-alpha 1] The junctions connecting the two northern branches of the Northern line to the two central branches are just south of Camden Town station. The station has a pair of platforms on each of the two northern branches, and southbound trains can depart toward either Charing Cross or Bank from either of the two southbound platforms without crossing over. map 21

Charing Cross branch

StationImageOpenedAdditional information
Mornington Crescent Mornington Crescent stn building.JPG 22 June 1907Was planned to be named "Seymour Street", but this was changed. It was closed on 23 October 1992 to replace the lifts and was reopened on 27 April 1998. map 22
Euston (Charing Cross branch) Overground roundel (no text).svg National Rail logo.svg Euston station facade.jpg Change for southbound Northern line service via Bank from platform 6, Victoria line, London Overground and National Rail services map 23
Warren Street Warren Street stn entrance.JPG Change for Victoria line map 24
Goodge Street Goodge Street stn entrance.JPG Opened as "Tottenham Court Road"; renamed 3 September 1908 map 25
Tottenham Court Road Wheelchair symbol.svg Elizabeth line roundel (no text).svg Tottenham Court Road stn main entrance under refurb Oct 09.JPG Change for Central line and Elizabeth line.
Leicester Square Leicester Square stn northwest entrance.JPG Piccadilly line opened 15 December 1906 map 27
Charing Cross National Rail logo.svg Charing Cross tube station 1.jpg Bakerloo line opened as Trafalgar Square 10 March 1906. Stations combined 1 May 1979. Change for Bakerloo line and National Rail services map 28
Embankment ( BSicon FERRY.svg Embankment Pier ) Embankment station.jpg 6 April 1914District Railway opened 30 May 1870. Northern line extension from Charing Cross opened 6 April 1914. Extension from Kennington opened 13 September 1926. Change for Bakerloo, Circle and District lines map 29
Waterloo National Rail logo.svg ( BSicon FERRY.svg Waterloo Pier, Festival Pier ) Waterloo tube stn entrance.JPG 13 September 1926Waterloo and City line opened 8 August 1898. Extension from Kennington opened 13 September 1926. Change for Bakerloo, Jubilee and Waterloo & City lines and National Rail services map 30

Bank branch

StationImageOpenedAdditional information
Euston (Bank branch) Overground roundel (no text).svg National Rail logo.svg Euston station facade.jpg 12 May 1907Change for southbound Northern line service via Charing Cross from platform 2, Victoria line, London Overground and National Rail services map 23
King's Cross St Pancras Wheelchair symbol.svg ThameslinkSymbol.svg National Rail logo.svg Eurostar icon RDT (2023).svg ( BSicon FLUG.svg Trains Gatwick and Luton ) King's Cross St Pancras tube stn Euston Rd NE entrance.JPG Metropolitan Railway station opened 10 January 1863. Change for Circle, Hammersmith & City, Metropolitan, Piccadilly and Victoria lines, National Rail services and Eurostar map 31
Angel Angel station entrance.JPG 17 November 1901Has the longest escalator on the entire Underground network map 32
Old Street National Rail logo.svg Old Street stn northwest entrance.JPG Northern line platforms opened February 1904. Connects with National Rail services. map 33
Moorgate National Rail logo.svg Elizabeth line roundel (no text).svg Moorgate entrance Mgate.JPG 25 February 1900Metropolitan Railway station opened 23 December 1865. Change for Circle, Hammersmith & City and Metropolitan lines and National Rail services. map 34 Has an interchange with the Elizabeth line via Liverpool Street station.
Bank Wheelchair symbol.svg DLR no-text roundel.svg Bank station entrance look to Bank.JPG Linked with Monument by escalator 18 September 1933, change for Central, Circle, District and Waterloo & City lines and Docklands Light Railway. map 35
London Bridge Wheelchair symbol.svg ThameslinkSymbol.svg National Rail logo.svg ( BSicon FLUG.svg Trains to Gatwick and Luton ) ( BSicon FERRY.svg London Bridge City Pier ) London Bridge tube stn entrance Borough High St.JPG Change for Jubilee line and National Rail services map 36
Borough Borough station building.JPG 18 December 1890 map 37
Elephant & Castle National Rail logo.svg ThameslinkSymbol.svg Elephant & Castle stn south entrance.JPG Change for Bakerloo line and National Rail services map 38

Kennington

StationImageOpenedBranchAdditional information
Kennington Kennington station building.JPG 18 December 1890Charing Cross, Bank, Battersea and Morden branches [lower-alpha 2] The station has four platforms arranged in two pairs: one pair for northbound services to each central branch of the Northern line, the other pair for southbound services from each central branch. The junctions connecting the central branches to the southern branches are just south of Kennington station. Southbound trains from the Charing Cross branch can terminate at this station, which has a reversing loop, or join either southern branch; southbound trains from the Bank branch can proceed onto the Morden branch but not the Battersea branch. map 39

Battersea branch

StationImageOpenedAdditional information
Nine Elms Wheelchair symbol.svg Nine Elms Station, Platform Concourse (51497388149).jpg 20 September 2021
Battersea Power Station Wheelchair symbol.svg Battersea Power Station Station (51496672361).jpg Terminus

Morden branch

StationImageOpenedAdditional information
Oval Oval station building.JPG 18 December 1890 map 40
Stockwell Stockwell station building.JPG Change for Victoria line. Original terminus until 1900, when the line was extended to Clapham Common. The station platforms were resited south of the original island platform. Formerly a depot existed here; it was branched off from the current southbound track. It is one of the eight stations that have a deep level air-raid shelter. map 41
Clapham North Clapham North stn entrance.JPG 3 June 1900One of the two remaining stations to have an island platform underground. It is also one of the eight stations that have a deep level air-raid shelter. map 42
Clapham Common Clapham Common Tube Station Exterior - Oct 2007.jpg Terminus from 1900 to 1926. It is also one of the two remaining stations to have an island platform underground. It is also one of the eight stations that have a deep level air-raid shelter. map 43
Clapham South ClaphamSouthTube.jpg 13 September 1926One of the eight stations that have a deep level air-raid shelter. map 44
Balham National Rail logo.svg Balham station.jpg 6 December 1926Change for National Rail services map 45
Tooting Bec Tooting Bec stn west entrance.JPG 13 September 1926Opened as "Trinity Road"; renamed 1 October 1950 map 46
Tooting Broadway Tooting Broadway stn building.JPG Used as a terminus for some trains heading south map 47
Colliers Wood Colliers Wood stn entrance.JPG map 48
South Wimbledon South Wimbledon stn entrance.JPG Opened as "South Wimbledon (Merton)". The suffix gradually fell out of use, but still can be seen on some platform signage. map 49
Morden Wheelchair symbol.svg Morden Tube Station.jpg Terminus map 50

Closed stations

Permanently closed stations

Resited stations

  • Stockwell – new platforms resited immediately to the south of its predecessor with the 1922–1924 upgrade of the line.
  • London Bridge – the northbound tunnel and platform converted into a concourse, and a new northbound tunnel and platform built in the late 1990s to increase the platform and circulation areas in preparation for the opening of the Jubilee line.

Abandoned plans

Northern Heights stations not transferred from LNER
Bushey Extension stations not constructed

Infrastructure

Rolling stock

A High Barnet-bound Northern line train arriving at Finchley Central 1995ts at Finchley Central.jpg
A High Barnet-bound Northern line train arriving at Finchley Central

When the line opened, it was served by 1906 Stock. This was replaced by 1938 stock as part of the New Works Programme, later supplemented with identical 1949 Stock. When the Piccadilly line was extended to Heathrow Airport in the 1970s, its 1959 Stock and 1956 Stock (prototypes of the 1959 Stock) trains were transferred to the Northern line. As there were not enough 1956 and 1959 Stock trains to replace the Northern line's 1938 Stock fleet, they were supplemented with newly built 1972 Mark 1 Stock trains, which all served the line at the same time. A few 1972 Mark 2 stock trains also ran on this line until going to the Jubilee line; they were then moved to the Bakerloo line, where they remain in service. The few 1956 Stock trains were briefly replaced by 1962 Stock transferred from the Central line in 1995, before the entire Northern line fleet was replaced with 1995 Stock between 1997 and 1999.

Today, all Northern line trains consist of 1995 Stock in the Underground livery of red, white and blue. In common with the other deep-level lines, the trains are the smaller of the two loading gauges used on the system. 1995 stock has automated announcements and quick-close doors.[ citation needed ] If the proposed split of the line takes place (initial estimates of 2018 having been abandoned to focus on completion of the Battersea and Nine Elms extension work), 19 new trains will be added to the existing fleet of 106 trains, [54] though additional trains beyond the extra 19 trains may be required to provide a full service for the new Battersea extension.

Tunnels

Although two other London Underground lines operate fully underground, the Northern line is unusual in that it is a deep-level tube line that serves the outer suburbs of South London yet there is only one station above ground (Morden tube station) while the rest of this part of the line is deep below ground. The short section to Morden depot is also above ground. This is partly because its southern extension into the outer suburbs was not done by taking over an existing surface line as was generally the case with routes such as the Central, Jubilee and Piccadilly lines. Apart from the core central underground tunnels, part of the section between Hendon and Colindale is also underground. As bicycles are not allowed in tunnel sections (even if no station is in that section) as they would hinder evacuation, they are limited to High Barnet – East Finchley, the Mill Hill East branch, Edgware – Colindale and Hendon Central – Golders Green. [55] There are also time-based restrictions for the sections where bicycles are allowed. [55]

The tunnel from Morden to East Finchley via Bank, 17 miles 528 yards (27.841 km), [1] was for a time the longest rail tunnel in the world. Other tunnels, including the Channel Tunnel that links the UK and France, are now longer.

Depots

The Northern line is serviced by four depots. The main one is at Golders Green map 51 , adjacent to Golders Green tube station, while the second, at Morden, map 52 is south of Morden tube station and is the larger of the two. The other two are at Edgware and Highgate. The Highgate depot is on the former LNER branch to Alexandra Palace. There was originally a depot at Stockwell, but this closed in 1915. There are sidings at High Barnet for stabling trains overnight.

Future

Northern line split

Since the 2000s, TfL has aspired to split the Northern line into two separate routes. [56] [57] Running trains between all combinations of branches and the two central sections, as at present, means only 24 trains an hour can run through each of the central sections at peak times, because merging trains have to wait for each other at the junctions at Camden Town and Kennington. [58] Completely segregating the routes could allow 36 trains an hour on all parts of the line, increasing capacity by around 25%. [56] [58]

TfL has already separated the Charing Cross and Bank branches during off-peak periods; however, four trains per hour still run to and from Morden via Charing Cross in the peak; the northern branches to Edgware and High Barnet cannot be separated until Camden Town station is upgraded to cope with the numbers of passengers changing trains. [59] The extension to Battersea would allow the Charing Cross branch to terminate at Battersea Power Station. [60] [61]

Camden Town station upgrade and expansion

The proposed split of the Northern line would require Camden Town station to be expanded and upgraded, as the station is already severely overcrowded at weekend peak times, and a split would increase the number of passengers wishing to change trains at the station. [62] [63] [59] In 2005, London Underground failed to secure planning permission for a comprehensive upgrade plan for Camden Town tube station that would have involved demolition of the existing station entrance and several other surface-level buildings, all within a conservation area. [64] [65] New redevelopment plans were first announced in 2013 by TfL, which proposed avoiding the existing station entrance and the conservation area by building a second entrance and interchange tunnels to the north, mostly on the site of a subsequently vacated infant school. [66] In 2018, plans to upgrade and rebuild Camden Town station were placed indefinitely on hold, due to TfL's financial situation. [67] As of 2022, there is currently no plan to split the line.

Incidents and accidents

In October 2003, a train derailed at Camden Town. [68] Although no one was hurt, points, signals and carriages were damaged. Concern was raised about the safety of the Tube, given the derailment at Chancery Lane earlier in 2003. [69] A joint report by the Underground and its maintenance contractor Tube Lines concluded that poor track geometry was the main cause, and therefore extra friction arising out of striations (scratches) on a newly installed set of points had allowed the leading wheel of the last carriage to climb the rail and derail. The track geometry at the derailment site is a very tight bend and tight tunnel bore, which precludes the normal solution for this sort of geometry of canting the track by raising the height of one rail relative to the other. [70]

In August 2010, a defective rail grinding train caused disruption on the Charing Cross branch, after it travelled four miles in 13 minutes without a driver. The train was being towed to the depot after becoming faulty. At Archway station, the defective train became detached and ran driverless until coming to a stop at an incline near Warren Street station. This caused morning rush-hour services to be suspended on this branch. All passenger trains were diverted via the Bank branch, with several not stopping at stations until they were safely on the Bank branch. [71] [72]

Maps

See also

Explanatory footnotes

  1. Charing Cross and Bank branches start immediately south of the station
  2. Morden and Battersea branches start immediately south of the station

Related Research Articles

<span class="mw-page-title-main">Bakerloo line</span> London Underground line

The Bakerloo line is a London Underground line that runs from Harrow & Wealdstone in suburban north-west London to Elephant & Castle in south London, via the West End. Printed in brown on the Tube map, it serves 25 stations, 15 of which are underground, over 23.2 kilometres (14.4 mi). It runs partly on the surface and partly through deep-level tube tunnels.

<span class="mw-page-title-main">Jubilee line</span> London Underground line

The Jubilee line is a London Underground line that runs between Stanmore in suburban north-west London and Stratford in east London, via the Docklands, South Bank and West End. Opened in 1979, it is the newest line on the Underground network, although some sections of track date back to 1932 and some stations to 1879.

<span class="mw-page-title-main">Mornington Crescent tube station</span> London Underground station

Mornington Crescent is a London Underground station in Somers Town in north west London, named after the nearby street. The station is on the Charing Cross branch of the Northern line, between Camden Town and Euston stations. It is in Travelcard Zone 2.

<span class="mw-page-title-main">Camden Town tube station</span> London Underground station

Camden Town is a London Underground station in Camden Town. It is a major junction for the Northern line, as it is where the Edgware and High Barnet branches merge from the north, and is also where they split to the south into the Bank and Charing Cross branches for the journey through Central London. It is particularly busy with visitors to the Camden markets at weekends, and, until 2019, was exit-only on Sundays to prevent overcrowding.

<span class="mw-page-title-main">East Finchley tube station</span> London Underground station

East Finchley is a London Underground station in East Finchley in the London Borough of Barnet, north London. The station is on the High Barnet branch of the Northern line, between Finchley Central and Highgate stations, and is in Travelcard Zone 3.

<span class="mw-page-title-main">Highgate tube station</span> London Underground and former railway station

Highgate is a London Underground station and former railway station in Archway Road, in the London Borough of Haringey in north London. The station takes its name from nearby Highgate Village. It is on the High Barnet branch of the Northern line, between East Finchley and Archway stations, and is in Travelcard Zone 3.

<span class="mw-page-title-main">High Barnet tube station</span> London Underground and former railway station

High Barnet is a London Underground station, and former railway station, located in Chipping Barnet, North London. The station is the northern terminus of the High Barnet branch of the Northern line and is in Travelcard Zone 5. It is situated 10.2 miles (16.4 km) north north-west of Charing Cross. The next station south is Totteridge & Whetstone.

<span class="mw-page-title-main">Kennington tube station</span> London Underground station

Kennington is a London Underground station on Kennington Park Road in Kennington within the London Borough of Southwark. The station is served by the Northern line and is at the junction of the Charing Cross and Bank branches to the north and the Morden and Battersea Power Station branches to the south. Northbound, the next stations are Waterloo on the Charing Cross branch and Elephant & Castle on the Bank branch. Southbound, the next stations are Oval towards Morden and Nine Elms towards Battersea Power Station respectively. The station is in both Travelcard Zones 1 and 2.

<span class="mw-page-title-main">Kentish Town station</span> London Underground and railway station

Kentish Town is an interchange station located in Kentish Town in the London Borough of Camden for London Underground and National Rail services.

<span class="mw-page-title-main">Archway tube station</span> London Underground station

Archway is a London Underground station at the intersection of Holloway Road, Highgate Hill, Junction Road and Archway Road in Archway, north London, directly underneath the Vantage Point building. It is on the High Barnet branch of the Northern line, between Highgate and Tufnell Park stations, in Zones 2 and 3.

<span class="mw-page-title-main">Edgware tube station</span> London Underground station

Edgware is a London Underground station in Edgware, in the London Borough of Barnet, in North London. The station is the northern terminus of the Edgware branch of the Northern line and the next station towards south is Burnt Oak. Edgware is in Travelcard Zone 5.

<span class="mw-page-title-main">Mill Hill East tube station</span> London Underground station

Mill Hill East is a London Underground station in Mill Hill in the London Borough of Barnet, north London. The station is the terminus and only station of a single-track branch of the Northern line from Finchley Central station and is in Travelcard Zone 4. It is the least used station on the Northern line with 1.41 million passengers in 2022.

<span class="mw-page-title-main">Burnt Oak tube station</span> London Underground station

Burnt Oak is a London Underground station in Burnt Oak, north London, on Watling Avenue, off the A5. The station is on the Edgware branch of the Northern line, between Edgware and Colindale stations, and is in Travelcard Zone 4.

<span class="mw-page-title-main">Finchley Central tube station</span> London Underground station

Finchley Central is a London Underground station in the Church End area of Finchley, north London. The station is located on the High Barnet branch of the Northern line, between West Finchley and East Finchley stations; it is the junction for the short branch to Mill Hill East. The station is around 7 miles north-northwest of Charing Cross and is in Travelcard Zone 4.

<span class="mw-page-title-main">Totteridge & Whetstone tube station</span> London Underground station

Totteridge & Whetstone is a London Underground station in Whetstone in the London Borough of Barnet, North London. It is on the High Barnet branch of the Northern line, between High Barnet and Woodside Park stations, in Travelcard Zone 4. It was first built in 1872.

<span class="mw-page-title-main">Charing Cross, Euston and Hampstead Railway</span> Underground railway company in London

The Charing Cross, Euston and Hampstead Railway (CCE&HR), also known as the Hampstead Tube, was a railway company established in 1891 that constructed a deep-level underground "tube" railway in London. Construction of the CCE&HR was delayed for more than a decade while funding was sought. In 1900 it became a subsidiary of the Underground Electric Railways Company of London (UERL), controlled by American financier Charles Yerkes. The UERL quickly raised the funds, mainly from foreign investors. Various routes were planned, but a number of these were rejected by Parliament. Plans for tunnels under Hampstead Heath were authorised, despite opposition by many local residents who believed they would damage the ecology of the Heath.

<span class="mw-page-title-main">Edgware, Highgate and London Railway</span> Former railway in North London

The Edgware, Highgate and London Railway was a railway in North London, England. The railway was a precursor of parts of London Underground's Northern line and was, in the 1930s, the core of an ambitious expansion plan for that line which was thwarted by the Second World War. Parts of the line were closed in the 1950s and have since been removed.

<span class="mw-page-title-main">Edgware railway station</span> Former railway station in England

Edgware was a London and North Eastern Railway (LNER) station located on Station Road in Edgware, north London. It was opened in 1867 and was in use as a passenger station until 1939, then as a goods yard until 1964.

The New Works Programme of 1935–1940 was the major investment programme delivered by the London Passenger Transport Board (LPTB), commonly known as London Transport, which had been created in 1933 to coordinate underground train, tram, trolleybus and bus services in the capital and the surrounding areas. The programme was to develop many aspects of the public transport services run by the LPTB and the suburban rail services of the Great Western Railway (GWR) and London and North Eastern Railway (LNER). The investment was largely backed by government assistance as well as by the issuing of financial bonds and was estimated to cost £42,286,000 in 1936.

The transport system now known as the London Underground began in 1863 with the Metropolitan Railway, the world's first underground railway. Over the next forty years, the early sub-surface lines reached out from the urban centre of the capital into the surrounding rural margins, leading to the development of new commuter suburbs. At the turn of the nineteenth century, new technology—including electric locomotives and improvements to the tunnelling shield—enabled new companies to construct a series of "tube" lines deeper underground. Initially rivals, the tube railway companies began to co-operate in advertising and through shared branding, eventually consolidating under the single ownership of the Underground Electric Railways Company of London (UERL), with lines stretching across London.

References

Notes

  1. A "tube" railway is an underground railway constructed in a cylindrical tunnel by the use of a tunnelling shield, usually deep below ground level.
  2. The seven companies were 1. the City & South London Railway, 2. the Charing Cross, Euston & Hampstead Railway, 3. the Edgware, Highgate & London Railway, 4. the Edgware & Hampstead Railway, 5. the Watford & Edgware Railway, 6. The Wimbledon & Sutton Railway and 7. the Great Northern & City Railway.
  3. The stations that the C&SLR were to serve on the W&SR, would not have included all those subsequently built by the Southern Railway. South Morden (not built), Sutton Common, Cheam (not built) and Sutton, would have been served, but Morden South, St Helier and West Sutton were not part of the UERL's plan.

Citations

  1. 1 2 "Northern line facts". Transport for London. Archived from the original on 12 March 2012. Retrieved 12 March 2012.
  2. "London Assembly Questions to the Mayor". London Assembly. 2022. Retrieved 29 February 2024.
  3. "City Metric". Centre for Cities. 18 September 2017. Archived from the original on 22 October 2017. Retrieved 22 October 2023.
  4. 1 2 Smith, Rebecca (29 January 2018). "Northern Line passengers to get quicker and more frequent journeys as TfL boosts services to tackle crowding on busiest Tube line". City A.M. London. Archived from the original on 30 January 2018. Retrieved 29 January 2018.
  5. Badsey-Ellis 2005, p. 35.
  6. Wolmar 2005, pp. 4 & 135.
  7. Horne 2009, p. 10.
  8. Horne 2009, p. 14.
  9. Horne 2009, pp. 16–18.
  10. Horne 2009, p. 26.
  11. 1 2 3 4 5 Rose 2016.
  12. Horne 2009, p. 27.
  13. Wolmar 2005, p. 205.
  14. "No. 28665". The London Gazette . 22 November 1912. p. 8798.
  15. 1 2 3 Horne 2009, p. 32.
  16. Horne 2009, pp. 32–33.
  17. "No. 27380". The London Gazette . 26 November 1901. p. 8200.
  18. Horne 2009, p. 28.
  19. 1 2 Horne 2009, p. 29.
  20. Day & Reed 2010, p. 91.
  21. "No. 32770". The London Gazette . 24 November 1922. pp. 8314–8315.
  22. "Underground Journeys: Moving Underground". www.architecture.com. Royal Institute of British Architects. Archived from the original on 4 May 2011. Retrieved 20 February 2011.
  23. "Underground Journeys: South Wimbledon". www.architecture.com. Royal Institute of British Architects. Archived from the original on 7 July 2011. Retrieved 20 February 2011.
  24. Wolmar 2005, p. 225.
  25. Graves & Hodge 1940, p. 126.
  26. Rails through the Clay; Croome & Jackson; London; 2nd ed; 1993; p228
  27. "London Tubes' New Names – Northern and Central Lines". The Times (47772): 12. 25 August 1937. Retrieved 18 May 2009.(subscription required)
  28. Beard 2002, pp. 90–92.
  29. "Strategic Review 1988 – New Lines and Extensions - Northern Line Southern Extension" (PDF). What Do They Know. London Underground. 1988. Archived (PDF) from the original on 9 September 2021. Retrieved 27 September 2021.
  30. "Northern Line (Hansard, 17 March 1994)". api.parliament.uk. Archived from the original on 11 May 2021. Retrieved 27 May 2020.
  31. Pearce, Mike (22 June 1989). "Northern Line driverless trains". YouTube. Thames Television, Thames News. Archived from the original on 11 December 2021.
  32. "Call for action on Northern Line". BBC News. 12 October 2005. Archived from the original on 1 September 2007. Retrieved 10 June 2008.
  33. "Tubular hell". The Independent. 6 January 1997. Archived from the original on 15 May 2021. Retrieved 27 May 2020.
  34. "Northern line modernisation". London Transport. 2000. Archived from the original on 16 June 2000. Retrieved 14 March 2021.
  35. "Details of Tube modernisation plans unveiled". Tube Lines. 8 January 2003. Archived from the original on 19 May 2006. Retrieved 8 March 2021.
  36. Shawcross, Valerie; Livingstone, Ken (7 March 2005). "Transport Plan – Southward Extensions". Mayor's Question Time. Archived from the original on 9 September 2021. Retrieved 29 March 2021.
  37. Corfield, Gareth (9 August 2016). "London's 'automatic' Tube trains suffered 750 computer failures last year". The Register. Archived from the original on 9 August 2016. Retrieved 9 August 2016.
  38. "Network Tests for New Signalling Systems" (Press release). Tube Lines. 24 August 2005. Archived from the original on 5 January 2008.
  39. "Operational and Financial Performance Report and Investment Programme Report – Third Quarter, 2012/13" (PDF). Transport for London. 6 February 2013. Archived (PDF) from the original on 30 April 2013. Retrieved 1 March 2013.
  40. "Northern line upgrade one step closer" (Press release). Transport for London. 26 February 2013.
  41. "Mayor of London – Transport Commitments" (PDF). Archived (PDF) from the original on 11 May 2021.
  42. Kessell, Clive. "LU Northern line goes CBTC" . Retrieved 5 October 2019.[ permanent dead link ]
  43. 1 2 "The Night Tube". Transport for London. Archived from the original on 21 August 2020. Retrieved 28 September 2016.
  44. "The Night Tube". Transport for London. n.d. Archived from the original on 11 July 2015. Retrieved 24 October 2015.
  45. Topham, Gwyn (27 August 2015). "London night tube plan suspended". The Guardian. London. Archived from the original on 1 January 2017. Retrieved 15 December 2016.
  46. 1 2 Collier, Hatty (8 November 2017). "Tunnelling work to extend Tube's Northern Line to Battersea completed". London Evening Standard. Archived from the original on 9 November 2020. Retrieved 22 January 2018.
  47. 1 2 "Northern line extension to Battersea gets go-ahead" (Press release). Transport for London. 12 November 2014. Archived from the original on 26 May 2021. Retrieved 22 January 2018.
  48. "Northern line extension". Transport for London. Archived from the original on 29 July 2019. Retrieved 22 January 2018.
  49. "Battersea Power Station scheme approved" (Press release). London Borough of Wandsworth. 11 November 2010. Archived from the original on 14 October 2013. Retrieved 12 November 2010.
  50. Prynn, Jonathan; Sleigh, Sophia (21 December 2018). "TfL under fire as Battersea Tube extension is delayed". Evening Standard. Archived from the original on 23 October 2020. Retrieved 3 February 2021.
  51. "Northern line extension: Two new Tube stations open". BBC News. 20 September 2021. Archived from the original on 20 September 2021. Retrieved 20 September 2021.
  52. Henderson, Jamie (23 June 2013). "Clapham Junction next for Northern Line says London Assembly member". Wandsworth Guardian. Archived from the original on 24 December 2013. Retrieved 12 January 2014.
  53. 1 2 "Twin Peaks: Timetable Changes on the Northern Line". London Reconnections. 14 January 2015. Archived from the original on 12 May 2015. Retrieved 25 October 2015.
  54. Abbot 2010, pp. 57–58.
  55. 1 2 "Bicycle on Tube map" (PDF). Transport for London. June 2013. Archived (PDF) from the original on 2 September 2013. Retrieved 5 April 2015.
  56. 1 2 "Transport 2025: Transport vision for a growing world city". November 2006. CiteSeerX   10.1.1.135.5972 . A segregation of services would deliver simpler service patterns on the line. This will allow more trains to be run through both the West End and City branches – enabling 30tph services on the central London branches. This will provide roughly 25 per cent extra capacity and crowding relief on these busy sections. With the core infrastructure being capable of supporting these service patterns, the main requirements are some additional trains (and stabling) and station capacity improvements at Camden Town.
  57. Lydall, Ross (12 May 2010). "Northern line service divided in £312m bid to end overcrowding". London Evening Standard. Archived from the original on 15 December 2013. Retrieved 21 March 2013.
  58. 1 2 "Twin Peaks: Timetable Changes on the Northern Line". London Reconnections. 14 January 2015. Archived from the original on 15 June 2017. Retrieved 5 June 2017.
  59. 1 2 "We Need To Talk About Camden: The Future of the Northern Line". London Reconnections. 6 May 2013. Archived from the original on 23 September 2021. Retrieved 13 September 2021.
  60. "Permanent split for the Northern line". Your Local Guardian. 15 May 2010. Archived from the original on 14 August 2020. Retrieved 13 September 2021.
  61. "Plans to split Northern Line in two move forward another step". Rail Technology Magazine. 4 August 2015. Archived from the original on 13 September 2021. Retrieved 13 September 2021.
  62. "Plans to split Northern Line in two move forward another step". Rail Technology Magazine. 4 August 2015. Archived from the original on 13 September 2021. Retrieved 13 September 2021.
  63. "Improving capacity at Camden Town station". Transport for London. 2017. Archived from the original on 21 February 2018. Retrieved 20 February 2018. Detailed report, with updated timeline etc.
  64. "Camden Town Redevelopment". Alwaystouchout.com. 25 January 2006. Archived from the original on 11 November 2007. Retrieved 30 June 2008.
  65. Bull, John (14 October 2015). "Second Time Lucky: Rebuilding Camden Town Station". London Reconnections. Archived from the original on 28 June 2017. Retrieved 5 June 2017.
  66. "Improving capacity at Camden Town station". Transport for London. 2017. Archived from the original on 21 February 2018. Retrieved 20 February 2018. Detailed report, with updated timeline etc.
  67. Topham, Gwyn (11 December 2018). "Major tube upgrades shelved as TfL struggles to balance books". The Guardian. London. Archived from the original on 26 December 2019. Retrieved 26 January 2020.
  68. "Second Tube train derailed". BBC News. 19 October 2003. Archived from the original on 25 July 2020. Retrieved 27 May 2020.
  69. "Thirty hurt after Tube crash". BBC News. 25 January 2003. Archived from the original on 30 April 2020. Retrieved 27 May 2020.
  70. "Track design flaws may have led to Camden Town Tube derailment". New Civil Engineer. 4 December 2003. Retrieved 27 May 2020.
  71. "Runaway train on London Tube's Northern Line". BBC News. 13 August 2010. Archived from the original on 17 August 2010. Retrieved 18 August 2010.
  72. Runaway of an engineering train from Highgate 13 August 2010 (Technical report). RAIB. 2011. 09-2011.
  73. TJ Dawe. "Literary Excerpt: David Mitchell and the Character of the London Underground Lines". Archived from the original on 2 April 2015. Retrieved 31 March 2014.
  74. "BlocParty.net - Waiting For The 7.18". Archived from the original on 15 April 2013.
  75. "A Northern Line Minute, The Northern Line by William Leith". Penguin. 7 March 2013. Archived from the original on 3 April 2015. Retrieved 28 August 2017.
  76. "Parasite". Archived from the original on 24 October 2015. Retrieved 9 November 2015.
  77. "Fifty Two Stations". Archived from the original on 14 August 2018. Retrieved 13 August 2018.

Bibliography

  • Abbott, James (February 2010). "Northern Line split planned". Modern Railways . 67 (737). ISSN   0026-8356.
  • Day, John R; Reed, John (2010) [1963]. The Story of London's Underground (11th ed.). Capital Transport. ISBN   978-1-85414-341-9.
  • Badsey-Ellis, Antony (2005). London's Lost Tube Schemes. Capital Transport. ISBN   185414-293-3.
  • Beard, Tony (2002). By Tube Beyond Edgware. Capital Transport. ISBN   978-1-85414-246-7.
  • Blake, Jim; James, Jonathan (1993). Northern Wastes: Scandal of the Uncompleted Northern Line. London: North London Transport Society. ISBN   978-0-946383-04-7.
  • Demuth, Tim (2004). The Spread of London's Underground (2 ed.). London: Capital Transport Publishing. ISBN   978-1-85414-277-1.
  • Graves, Robert; Hodge, Alan (1940). The Long Week-End . Faber & Faber.
  • Horne, Mike (1987). Northern Line: A Short History. London: Douglas Rose. ISBN   978-1-870354-00-4.
  • Horne, Mike (2009). The Northern Line: An Illustrated History (3 ed.). London: Capital Transport Publishing. ISBN   978-1-85414-326-6.
  • Lee, Charles Edward (1973). Northern Line. London: London Transport. ISBN   978-0-85329-044-5.
  • Lee, Charles Edward (1967). Sixty Years of the Northern. London: London Transport. OCLC   505166556.
  • Lee, Charles Edward (1957). Fifty Years of the Hampstead Tube. London: London Transport. OCLC   23376254.
  • Murphy, Simon (2005). Northern Line Extensions: Golders Green to Edgware, 1922–24. London: The History Press. ISBN   978-0-7524-3498-8.
  • Rose, Douglas (2016) [1980]. The London Underground, A Diagrammatic History (9th ed.). Douglas Rose/Capital Transport. ISBN   978-1-85414-404-1.
  • Wolmar, Christian (2005) [2004]. The Subterranean Railway: How the London Underground Was Built and How It Changed the City Forever. London: Atlantic Books. ISBN   978-1-84354-023-6.
Template:Attached KML/Northern line
KML is from Wikidata