Peixotto | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | Talence France | ||||||||||
Coordinates | 44°48′26.078″N0°35′33.328″W / 44.80724389°N 0.59259111°W Coordinates: 44°48′26.078″N0°35′33.328″W / 44.80724389°N 0.59259111°W | ||||||||||
Line(s) | Line B | ||||||||||
Construction | |||||||||||
Architect | Elizabeth de Portzamparc | ||||||||||
History | |||||||||||
Opened | 3 July 2004 | ||||||||||
Services | |||||||||||
| |||||||||||
Location | |||||||||||
Peixotto tram stop is located on line of the Bordeaux tramway network.
The station is located on the avenue Roul in Talence.
This stop serves as a terminus for some bus lines, enabling their connections with the tramway.
N. | Course | Link | Exploitant |
---|---|---|---|
10 | Gradignan -Beausoleil <=> Bordeaux-Jardin Botanique | 10 | TBM |
20 | Bordeaux-Victoire <=> Talence -Thouars | 20 | TBM |
21 | Talence-Peixotto <=> Gradignan -Stade Ornon | 21 | TBM |
31 | Gradignan -Village 5 <=> Bassens -Quai Français | 31 | TBM |
35 | Bordeaux-Cracovie <=> Talence-Peixotto | 35 | TBM |
58 | Gradignan -Village 5 <=> Bordeaux -Base sous marine | 58 | TBM |
N. | Course | Link |
---|---|---|
502 | Peixotto <=> La Brède-La Sauque | 502 |
503 | Peixotto<=> Saint-Symphorien-Place Michelet | 503 |
504 | Peixotto<=> Hostens-Village Vacances | 504 |
505 | Peixotto<=> Le Barp-Bourg ou -Laser Megajoules ou Belin-Béliet-Belin | 505 |
The Bordeaux tramway network consists of four lines serving the city of Bordeaux in Nouvelle-Aquitaine in southwestern France. The system has a route length of 77.5 kilometres (48.2 mi), serving a total of 133 tram stops.
The Palais de Justice tram stop is located on line of the tramway de Bordeaux.
The Montaigne Montesquieu tram stop is located on line of the tramway de Bordeaux.
The Talence-Centre Forum tram stop is situated on line of the Bordeaux tramway network.
Roustaing tram stop is located on ligne of the tramway de Bordeaux.
Barrière Saint-Genès tram stop is located on line of the tramway de Bordeaux.
Bergonié tram stop is located on line of the tramway de Bordeaux.
Saint-Nicolas tram stop is located on line B of the Tramway de Bordeaux, and served as terminus of that line between 24 April 2004, when the line opened, and 3 July 2004, when the line was extended to Bougnard. The stop is located in the commune of Bordeaux and is operated by Transports Bordeaux Métropole.
Quinconces tram stop is located on lines B, C and D of the Tramway de Bordeaux, and serves as an interchange between the three lines. The stop is located in the Place des Quinconces in the centre of the city of Bordeaux, and has four parallel platforms. Two of these serve lines C and D, which share tracks at this point, whilst the other two serve line B. The stop is operated by Transports Bordeaux Métropole.
Grand Théâtre tram stop is located on line of the tramway de Bordeaux.
Gambetta tram stop is located on line of the tramway de Bordeaux.
Musée d'Aquitaine tram stop is located on line of the tramway de Bordeaux.
Victoire tram stop is located on line of the tramway de Bordeaux.
Béthanie tram stop is located on line of the tramway de Bordeaux.
Arts et Métiers tram stop is located on line of the tramway de Bordeaux.
François Bordes tram stop is located on line of the tramway de Bordeaux.
Doyen Brus tram stop is located on ligne of the tramway de Bordeaux, France.
The CAPC tram stop came into service 23 July 2007 on line of the tramway de Bordeaux, Nouvelle-Aquitaine, France. It takes its name from the nearby CAPC musée d'art contemporain de Bordeaux.
The Chartrons tram stop came into service on 23 July 2007 on ligne of the tramway de Bordeaux.
The Porte de Bourgogne tram stop is located on lines A, C and D of the tramway de Bordeaux. This stations serves as a junction between two lines. It also allows the passage from one line to another through a switch between the two lines.