South Fork Wind Farm | |
---|---|
Country | United States |
Location | WEA OCS-A 0486 Outer Continental Shelf Offshore Rhode Island [1] |
Coordinates | 41°05′31″N71°18′40″W / 41.092°N 71.311161°W [2] |
Status | Operational |
Construction began | 2022 |
Owner(s) | Ørsted US Offshore Wind |
Wind farm | |
Type | Offshore |
Distance from shore | 16 miles (26 km) |
Rotor diameter | 660 feet (200 m) |
Power generation | |
Make and model | SG 11-MW [3] |
Nameplate capacity | 130 MW |
External links | |
Website | Ørsted US Offshore Wind |
South Fork Wind Farm is a utility-scale offshore wind farm on the Outer Continental Shelf Offshore Rhode Island, providing energy to New York state. [4]
The 130 MW, 12-turbine wind is 16.6 nautical miles (30.7 km; 19.1 mi) southeast of Rhode Island's Block Island and 26 nautical miles (48 km; 30 mi) east of Montauk Point on the South Fork of New York's Long Island. The wind farm is projected to provide electricity to 70,000 Long Island homes. [5] [6] The turbines are Siemens Gamesa 11.0-200 DD machines. The substation is the first of its kind built in the United States, by Kiewit Offshore Services, Ltd. The project is a 97,498 acres (39,456 ha) section of Wind Energy Area (WEA) OCS-A 0486 (North Lease). [7] The wind farm connects to the power grid through an underwater cable to East Hampton, New York. [8]
New York Governor Kathy Hochul and Interior Secretary Deb Haaland held a groundbreaking ceremony in February 2022 for the project, [9] being built by Ørsted US Offshore Wind in conjunction with Eversource and the Long Island Power Authority. Power from the first turbine began being delivered to the grid on December 6, 2023. [10] Governor Hochul announced the completion of the project on March 14, 2024, at an event with Secretary Haaland and other elected officials. [11]
On September 12, 2013, BOEM awarded two commercial offshore wind energy leases, OCS-A-0486 and OCS-A-0487, to Deepwater Wind New England LLC for development of a regional offshore wind energy project. [12] Deepwater ONE (formerly Deepwater Wind Energy Center) would be located in the Atlantic Ocean on 256 square miles on the outer continental shelf, approximately 30 miles east of Montauk, New York, and 15 miles east of Martha's Vineyard, Massachusetts. The project would consist of 150 to 200 turbines with a total nameplate generating capacity of 900 to 1,200 MW. It includes a 98-mile, 600 MW submarine transmission line, a new regional HVDC transmission system, and a New York-Long Island interconnector to link the electrical supply system in New England and Long Island. [13]
Deepwater Wind, the predecessor to Orsted, originally proposed a 90-megawatt, 15-turbine wind farm in area where it had leased 256 square miles the area in 2013. [14] [15] (The leased area has a potential of supporting 200 turbines. [16] ) Long Island Power Authority recommended the project for approval in July 2016, [17] which was delayed in July 2016 at the request of the New York State Energy Research and Development Authority (NYSERDA). Regulatory approval for a 90 MW wind farm was granted in January 2017. [18] [19] Thomas Falcone, CEO of LIPA, said they hope to complete the contract in first quarter 2017 with construction beginning in 2019 and that it would be online in 2022. The target of the power to be generated is to power structures in Southampton and East Hampton on the South Fork of Long Island, the latter of which has vowed to have 100 percent of its energy coming from renewable sources. [20] [21] [22] The project was later expanded to 132 megawatt capacity in 2018. [23]
Ørsted US Offshore Wind acquired Deepwater Wind in 2019. [24] [25] [26] It partnered with Eversource Energy to construct the wind farm. The project uses twelve Siemens Gamesa 11 megawatt turbines. [3] Long Island Power Authority will purchase the electricity generated. NYSERDA has approved the project.
In 2020, the Citizens for the Preservation of Wainscott, a group of property owners in the hamlet of Wainscott started a petition to incorporate 4.4 square miles (11 km2) of the community as a village. A driving force of the petition was to fight a proposal for the preferred location for the 138-kilovolt electricity transmission line (export cable) to come ashore in the community at Beach Lane en route to an electrical substation in East Hampton. [27] [28] [29] The effort divided members of the community, with other residents organizing in support of the project. [29] The town board and town trustees have approved the project, granting an easement allowing for the export cable in Wainscott. [3] The petition to separately incorporate was rejected as "legally insufficient" in March 2021. [29]
In January 2021, New York Governor Andrew Cuomo announced that the South Brooklyn Marine Terminal would be developed to include a wind turbine assembly plant to be partially funded by New York State. [30] Turbines assembled there will be used in three offshore wind farms off the east end of Long Island. South Fork Wind Farm, Beacon Wind [31] and Sunrise Wind [32] are projected to be supplied by 2025 from the new plant, built with $200 million in state funding and $200 million in matching grants. The project is part of a $29 billion 'Green Initiative' plan for New York. [33]
During the construction of South Fork Wind, hundreds of U.S. workers and three Northeast ports were engaged, laying the foundations of a new domestic supply chain and creating local union jobs. [11] Under operation, South Fork Wind will be supported by U.S.-built, -crewed and owned crew transfer vessels and offshore wind service operations vessels. [34]
In November 2021, the Interior Department approved the project. [6] [5]
Wainscott is a hamlet in the Town of East Hampton in Suffolk County, New York, United States, on the South Fork of Long Island. As of the 2010 United States Census, the CDP population was 650. For statistical purposes, the United States Census Bureau defined a census-designated place (CDP) for the 2000 census that roughly corresponds to the same area.
Ørsted A/S is a Danish multinational energy company. Headquartered in Fredericia, Denmark, Ørsted is the largest energy company in Denmark. The company adopted its current name on 6 November 2017. It was previously known as DONG.
The New York Bight is the geological identification applied to a roughly triangular indentation, regarded as a bight, along the Atlantic coast of the United States that extends northeasterly from Cape May Inlet in New Jersey to Montauk Point on the eastern tip of Long Island. As the result of direct contact with the Gulf Stream along the coast of North America, the coastal climate of the bight area is temperate.
This is an overview of Equinor's operations in various countries. Equinor is a Norwegian petroleum company.
New York has 2,192 MW of installed wind power capacity as of 2022. Most of New York's wind power is located in upstate New York as onshore wind farms. New York has set a goal of developing 9,000 MW of offshore installed wind power capacity by 2035 that will power an estimated 6 million homes. As of October 2022, New York has five offshore wind farms in development with approximately 4,300 MW installed capacity.
Ørsted U.S. Offshore Wind is an offshore wind energy development group that is affiliated with Ørsted, a Danish firm. It is joint headquartered in Boston, Massachusetts and Providence, Rhode Island. As of 2019, it was involved in some of the largest offshore wind farm projects in the United States.
The U.S. state of Massachusetts has vast wind energy resources offshore, as well as significant resources onshore. The 2016 update to the states's Clean Energy and Climate Plan had a goal of reducing 1990 baseline greenhouse gas emissions levels by 25% by 2020. Current goals include installing 3,500 megawatts (MW) of offshore wind power in the state by 2035. However, as of Q4 2021 the state had only 120 MW of wind powered electricity generating capacity, responsible for generating 0.9% of in-state electricity production. The state has awarded contracts to two offshore projects, the 800 MW Vineyard Wind project and 804 MW Mayflower Wind project. Construction began on the Vineyard Wind 1 project on November 18, 2021, after a long fight for approval. Commonwealth Wind was selected for development in 2021, but the developer has attempted to cancel the project due to increased costs. There are eight projects planned for off the southern coast of Massachusetts, though some will deliver power to Rhode Island, Connecticut, and New York.
Wind power in New Jersey is in the early stages of development. New Jersey has just six wind turbines, but the state has plans to develop several major offshore wind projects on the continental shelf of the Atlantic Ocean off the southern Jersey Shore. Legislation has been enacted to support the industry through economic incentives and to permit wind turbines on existing piers.
Block Island Wind Farm is the first commercial offshore wind farm in the United States, located 3.8 mi (6.1 km) from Block Island, Rhode Island in the Atlantic Ocean. The five-turbine, 30 MW project was developed by Deepwater Wind, now known as Ørsted US Offshore Wind.
Wind power in Rhode Island is in the early stages of development. There are several small scale wind turbine projects in the state. As of December 2013 there were 11 turbines at 10 sites in the state. In 2014, Rhode Island had 9 MW of installed wind power capacity, which quickly rose to 75 MW in 2019.
Wind power in Maryland, which has land-based and offshore resources, is in the early stages of development. As of 2016, Maryland has 191 megawatts (MW) of wind powered electricity generating capacity, responsible for 1.4% of in-state generated electricity. Two offshore wind farm projects that will supply wind-generated power to the state are underway.
Wind power in North Carolina is found along the coastal areas in the east and mountain regions in the western part of the state. The state has significant offshore wind resources. In 2015, small scale wind turbine projects were found throughout the state. In 2016, North Carolina's first large scale wind project, and the first in the southeastern U.S., was completed near Elizabeth City.
Ocean Wind was a proposed utility-scale 2,248 MW offshore wind farm to be located on the Outer Continental Shelf approximately 15 miles (24 km) off the coast of Atlantic City, New Jersey. It was being developed by Ørsted US Offshore Wind in conjunction with Public Service Enterprise Group (PSE&G). Construction and commissioning were planned for the mid-2020s. The closed Oyster Creek Nuclear Generating Station and B.L. England Generating Station would provide transmission points for energy generated by the wind farm.
US Wind is an offshore wind energy development company founded in 2011 that is a subsidiary of Italy-based Renexia SpA, part of Toto Holdings. It is headquartered in Baltimore, Maryland. Since 2014, it has been involved in one of the largest offshore wind farm projects in the United States.
Skipjack is a 966 MW capacity off shore wind farm, proposed by Ørsted US Offshore Wind to be built on the Outer Continental Shelf Offshore Delaware, approximately 16.9 nautical miles from the coast opposite Fenwick Island. It was originally projected that the project, which will provide power to Maryland, would be commissioned in 2022, It is one of the wind farm projects providing wind power to Maryland, the others being MarWin and Momentum Wind.
The Coastal Virginia Offshore Wind (CVOW) is an offshore wind energy project located about 43 km (27 mi) off the coast of Virginia Beach, Virginia, U.S. The initial phase, a two-turbine, 12-MW pilot project constructed in 2020, is the second utility scale offshore wind farm operating in the United States. Dominion Energy and Ørsted US Offshore Wind collaborated on the project, which is estimated to have cost $300 million and is expected to generate enough electricity to power up to 3,000 homes. It is the first utility scale wind farm serving Virginia and the first built in U.S. federal waters, in a wind lease area that covers about 2,135 acres.
Empire Wind is a proposed utility-scale offshore wind farm on the Outer Continental Shelf Offshore New York. It will be located in Bureau of Ocean Energy Management (BOEM) lease area OCS-A 0512 in the New York Bight about 15 miles (24 km) south of Jones Beach, Long Island.
Offshore wind power is in the early stages of development in the United States. In 2016, the United States Department of Energy estimated that the country has a gross resource potential of 10,800GW of offshore wind capacity, with a "technical" resource potential of 2,058GW. Offshore wind projects are under development in wind-rich areas of the East Coast, Great Lakes, and Pacific coast. The first commercial offshore wind farm, Block Island Wind Farm, began operation in 2016. As of 2017, about 30 projects totaling 24 gigawatts (GW) of potential installed capacity were being planned.
{{cite web}}
: CS1 maint: location (link)