Space Station Processing Facility

Last updated

Space Station Processing Facility
SSPF interior.jpg
Interior of the SSPF, showing Node 2 being hoisted by overhead cranes
USA Florida relief location map.jpg
Red pog.svg
Location in Florida
Usa edcp relief location map.png
Red pog.svg
Space Station Processing Facility (the United States)
Space Station Processing Facility
Built1992
LocationKennedy Space Center
Coordinates 28°31′26″N80°38′39″W / 28.523844°N 80.6442833°W / 28.523844; -80.6442833
IndustryAerospace and Space Technology
ProductsSpace Station Modules and Equipment
Employees700+
ArchitectKSC Management
Buildings1
Area42,500 m2 (457,000 sq ft)
Volume111,888 m3 (3,951,300 cu ft) (high bay)
13,905 m3 (491,100 cu ft) (Intermediate bay)
AddressNASA Parkway East
Owner(s)NASA

The Space Station Processing Facility (SSPF) is a three-story industrial building at Kennedy Space Center for the manufacture and processing of flight hardware, modules, structural components and solar arrays of the International Space Station, and future space stations and commercial spacecraft. It was built in 1992 at the space complex's industrial area, just east of the Operations and Checkout Building. [1]

Contents

The SSPF includes two processing bays, an airlock, operational control rooms, laboratories, logistics areas for equipment and machines, office space, a ballroom and conference halls, and a cafeteria. The processing areas, airlock, and laboratories are designed to support non-hazardous Space Station and Space Shuttle payloads in 100,000 class clean work areas. The building has a total floor area of 42,500 m2 (457,000 sq ft).

History and construction

The Space Station Processing Facility under construction in December 1991. Structural steel beams, and the Neil Armstrong Building are visible in the background. SSPF under construction in 1991.jpg
The Space Station Processing Facility under construction in December 1991. Structural steel beams, and the Neil Armstrong Building are visible in the background.

During the re-designing phase of Space Station Freedom in early 1991, Congress approved new plans for NASA to lead the project and begin manufacturing its components for the future International Space Station. Kennedy Space Center was selected as the ideal launch processing complex for the ISS, as well as hosting all the internationally manufactured modules and station elements.

However the Operations and Checkout Building (which was originally to be the prime factory for station launch processing) was insufficient in size to accommodate all the components. On March 26, 1991, engineers at Kennedy Space Center; along with contractor Metric Constructions Inc. of Tampa Florida, broke ground on a new $56 million Space Station Processing Facility, situated adjacent to the O&C. The design called for a 457,000-square-foot multifunction building housing an enormous processing bay, laboratories, control rooms, staging areas, communications and control facilities, and office space for some 1,400 NASA and contractor employees. [2]

KSC Deputy Director Gene Thomas described the construction: "The skyline around here is really going to change. This will be the biggest facility that we have built since the Apollo days". The SSPF used reinforced concrete and some 4,300 tons of steel. The building was structurally completed and topped out by mid 1992.

After three years of construction, interior fitting and equipment set-up, the SSPF formally opened on June 23, 1994.

Operations and manufacturing processes

Technicians checking out and testing the ISS RapidScat antenna dish in the low bay area ISS-RapidScat in the Space Station Processing Facility (KSC-2014-2976).jpg
Technicians checking out and testing the ISS RapidScat antenna dish in the low bay area
Space Station workstations and engineers in the high bay area STS-129 ExPRESS Logistics Carrier 14.jpg
Space Station workstations and engineers in the high bay area
STS-133 MPLM in its workstand, while visitors observe the area from the observation windows STS-133 PMM Leonardo.jpg
STS-133 MPLM in its workstand, while visitors observe the area from the observation windows

At the SSPF, space station modules, trusses and solar arrays are prepped and made ready for launch. The low and high bays are fully air conditioned and ambient temperature is maintained at 12 °C (54 °F) at all times. Workers and engineers wear full non-contaminant clothing while working. Modules receive cleaning and polishing, and some areas are temporarily disassembled for the installation of cables, electrical systems and plumbing. In another area, shipments of spare materials are available for installation. International Standard Payload Rack frames are assembled and welded together, allowing the installation of instruments, machines and allowing science experiment boxes to be fitted. Once racks are fully assembled, they are hoisted by a special manually operated robotic crane and carefully maneuvered into place inside the space station modules. Each rack weighs from 700 to 1,100 kg, and connect inside the module on special mounts with screws and latches. [3]

Cargo bags for MPLM modules are filled with their cargo such as food packages, science experiments and other miscellaneous items on-site in the SSPF, and loaded into the module by the same robotic crane and strapped in securely.

Many of the builders accompanied their modules from around the world during their manufacturing, and worked at KSC for months to years during final assembly. Many ISS modules were renamed after successfully launching.

Station Integration Testing

Regarding the launch of modules of the International Space Station (ISS), there had been philosophical differences for years between designers and payload processors whether to ship-and-shoot or perform integration testing prior to launch. The former involved building a station module and launching it without ever physically testing it with other modules. The integration testing was not originally in the ISS plan, but in 1995 Johnson Space Center designers began to consider it and embedding KSC personnel at module factories. Multi-Element Integration Testing (MEIT) of ISS modules at KSC was officially in the books in 1997. [4] [5] [6]

Three MEIT and one Integration Systems Test (IST) tests were conducted for the ISS, taking about three years from planning to completion and closure: [7]

After the launch of the Destiny, an emulator was built for MEIT testing, since the lab controlled many other modules. Among the items checked were mechanical connections, the ability to flow power and fluids between modules, and the flight software.

Numerous issues were found and rectified from these on the ground tests, many of which could not have been fixed in orbit.

Building specifications

Cygnus CRS OA-7 in Kennedy SSPF (KSC-20170214-PH JBS01 0198).jpg
A Cygnus spacecraft being moved by overhead cranes to another work area in the high bay. Note the ceiling height in comparison to the engineers.
STS-134 ExPRESS Logistics Carrier 3 a.jpg
ExPRESS Logitics Carrier no.3 for STS-134
The I-bay area SAGE III at Space Station Processing Facility (23390877722).jpg
The I-bay area
S3-S4 Truss being hoist to the payload transfer container ISS s3-s4 truss hoist in the SSPF factory.jpg
S3-S4 Truss being hoist to the payload transfer container

The SSPF's High Bays provide maximum flexibility for manufacturing, assembly, testing and processing payloads and elements destined for space. The bays are enormous cleanrooms equipped with overhead cranes, commodities-servicing equipment and a secure backup-power supply. The facility also has 15 offline labs. [8]

Intermediate Bay (I-bay)

High Bay

Cranes

Commodities and Servicing Equipment

Electrical Services

Laboratory facilities

Office floor area: 140,000 sq ft (13,000 m2) of office/work space

Space Station and space hardware components currently in the SSPF

A panorama view of the high bay area in August 2010. Note the lights sometimes tend to change color from pink to gold hues. NASA SSPF factory panorama.jpg
A panorama view of the high bay area in August 2010. Note the lights sometimes tend to change color from pink to gold hues.

As of 24 June 2023:[ citation needed ]

When the lights in the building are on, most of these components can be seen on the live webcam from the facility. [11]

Current and future activities

Engineers and students make and prep a LunaH-Map cubesat for Artemis 1 in the SSPF, July 2021. Workers make LunaH-Map cube sat in SSPF.jpg
Engineers and students make and prep a LunaH-Map cubesat for Artemis 1 in the SSPF, July 2021.

After the completion of the International Space Station in 2011, the SSPF factory was dormant for several months until early 2012, where the building was slightly refurbished for the moving in of space companies (such as Orbital ATK, SpaceX and eventually Sierra Nevada Corporation) to manufacture, process and load-up Cygnus and Dragon spacecraft [12] and on-board payloads, as part of the Commercial Resupply Services program. NASA's upcoming Artemis mission hardware such as Moon and Mars space station modules and Space Launch System core stage engine sections, [13] [14] as well as the Dream Chaser mini-space shuttle, [15] have begun manufacturing and processing operations in the high bay as of December 2022. [16]

The building itself is open to the public and tours are offered free of charge by the employees. [17] Exclusive tours of many areas of the SSPF are part of the Kennedy visitor complex's enhanced bus tour package. [18] [19] [20]

In 2016, the laboratories of the SSPF were utilized by many small science companies and student unions with scientific equipment to study the feasibility of growing vegetables in space, such as the Veggie plant growth system, and the Advanced Plant Habitat; to launch as scientific payloads to the International Space Station. [21]

Events

Main ballroom of the SSPF, typically used for NASA lectures and sometimes special dinner events Main Ballroom of the NASA Space Station Processing Facility.jpg
Main ballroom of the SSPF, typically used for NASA lectures and sometimes special dinner events

When the high bay area is less busy at times, a variety of events and conferences are held in various places within the SSPF building. Occasional STEM exhibitions take place where visitors (from children and teenagers to university students) [22] [23] can visit the SSPF and its ballroom to learn about the building's history, [24] manufacturing acitivies, biological and chemical sciences, and the future vision of space operations at Kennedy Space Center, including the Lunar Gateway mockup module. [25] [26] [27] The ballroom also doubles as a lecture hall for presentations. [28] On rare occasions the high bay was once used for the National Space Council's second revived meeting on February 21, 2018.

Tenants including Northrop Grumman, Lockheed Martin and Airbus have also moved facilities into the SSPF. [29] [30]

Related Research Articles

<span class="mw-page-title-main">Kennedy Space Center</span> United States space launch site in Florida

The John F. Kennedy Space Center, located on Merritt Island, Florida, is one of the National Aeronautics and Space Administration's (NASA) ten field centers. Since December 1968, KSC has been NASA's primary launch center of human spaceflight. Launch operations for the Apollo, Skylab and Space Shuttle programs were carried out from Kennedy Space Center Launch Complex 39 and managed by KSC. Located on the east coast of Florida, KSC is adjacent to Cape Canaveral Space Force Station (CCSFS). The management of the two entities work very closely together, share resources and operate facilities on each other's property.

<span class="mw-page-title-main">Space Shuttle program</span> 1972–2011 United States human spaceflight program

The Space Shuttle program was the fourth human spaceflight program carried out by the U.S. National Aeronautics and Space Administration (NASA), which accomplished routine transportation for Earth-to-orbit crew and cargo from 1981 to 2011. Its official name, Space Transportation System (STS), was taken from a 1969 plan for a system of reusable spacecraft of which it was the only item funded for development. It flew 135 missions and carried 355 astronauts from 16 countries, many on multiple trips.

<i>Columbus</i> (ISS module) ESA science observatory on the International Space Station

Columbus is a science laboratory that is part of the International Space Station (ISS) and is the largest single contribution to the ISS made by the European Space Agency (ESA).

<i>Kibō</i> (ISS module) Japanese ISS module, used on ISS press conferences

The Japanese Experiment Module (JEM), nicknamed Kibō, is a Japanese science module for the International Space Station (ISS) developed by JAXA. It is the largest single ISS module, and is attached to the Harmony module. The first two pieces of the module were launched on Space Shuttle missions STS-123 and STS-124. The third and final components were launched on STS-127.

<span class="mw-page-title-main">STS-112</span> 2002 American crewed spaceflight to the ISS

STS-112 was an 11-day Space Shuttle mission to the International Space Station (ISS) flown by Space ShuttleAtlantis. Space Shuttle Atlantis was launched on 7 October 2002 at 19:45 UTC from the Kennedy Space Center's launch pad 39B to deliver the 28,000 pound Starboard 1 (S1) truss segment to the Space Station. Ending a 4.5-million-mile journey, Atlantis landed at 15:44 UTC on 18 October 2002 on runway 33 at the Kennedy Space Center's Shuttle Landing Facility.

<span class="mw-page-title-main">STS-105</span> 2001 American crewed spaceflight to the ISS

STS-105 was a mission of the Space Shuttle Discovery to the International Space Station, launched from Kennedy Space Center, Florida, 10 August 2001. This mission was Discovery's final mission until STS-114, because Discovery was grounded for a refit, and then all Shuttles were grounded in the wake of the Columbia disaster. The refit included an update of the flight deck to the glass cockpit layout, which was already installed on Atlantis and Columbia.

<span class="mw-page-title-main">Multi-Purpose Logistics Module</span> Large pressurized container for cargo resupply of the International Space Station

A Multi-Purpose Logistics Module (MPLM) is a large pressurized container that was used on Space Shuttle missions to transfer cargo to and from the International Space Station (ISS). Two MPLMs made a dozen trips in the Shuttle cargo bay and initially berthed to the Unity module and later the Harmony module on the ISS. From there, supplies were offloaded, and finished experiments and waste were reloaded. The MPLM was then reberthed in the Shuttle for return to Earth. Three modules were built by the Italian Space Agency (ASI): Leonardo, Raffaello, and Donatello.

<i>Destiny</i> (ISS module) Primary US ISS module

The Destiny module, also known as the U.S. Lab, is the primary operating facility for U.S. research payloads aboard the International Space Station (ISS). It was berthed to the Unity module and activated over a period of five days in February, 2001. Destiny is NASA's first permanent operating orbital research station since Skylab was vacated in February 1974.

<span class="mw-page-title-main">STS-127</span> 2009 American crewed spaceflight to the ISS

STS-127 was a NASA Space Shuttle mission to the International Space Station (ISS). It was the twenty-third flight of Space ShuttleEndeavour. The primary purpose of the STS-127 mission was to deliver and install the final two components of the Japanese Experiment Module: the Exposed Facility, and the Exposed Section of the Experiment Logistics Module (ELM-ES). When Endeavour docked with the ISS on this mission in July 2009, it set a record for the most humans in space at the same time in the same vehicle, the first time thirteen people have been at the station at the same time. Together they represented all ISS program partners and tied the general record of thirteen people in space with the first such occurrence of 1995.

<span class="mw-page-title-main">STS-124</span> 2008 American crewed spaceflight to the ISS

STS-124 was a Space Shuttle mission, flown by Space Shuttle Discovery to the International Space Station. Discovery launched on May 31, 2008, at 17:02 EDT, moved from an earlier scheduled launch date of May 25, 2008, and landed safely at the Kennedy Space Center's Shuttle Landing Facility, at 11:15 EDT on June 14, 2008. Its objective was to deliver the largest module of the space station – Kibō, the Japanese Experiment Module pressurized section. The mission is also referred to as ISS-1J by the ISS program.

<span class="mw-page-title-main">STS-132</span> 2010 American crewed spaceflight to the ISS

STS-132 was a NASA Space Shuttle mission, during which Space Shuttle Atlantis docked with the International Space Station on May 16, 2010. STS-132 was launched from the Kennedy Space Center on May 14, 2010. The primary payload was the Russian Rassvet Mini-Research Module, along with an Integrated Cargo Carrier-Vertical Light Deployable (ICC-VLD). Atlantis landed at the Kennedy Space Center on May 26, 2010.

<span class="mw-page-title-main">Operations and Checkout Building</span> Historic American spaceflight facility in Cape Canaveral, Florida

The Neil Armstrong Operations and Checkout Building (O&C) is a historic building on Merritt Island, Florida, United States. The five-story structure is in the Industrial Area of NASA's Kennedy Space Center. Its has twin-block facilities that include the crew quarter dormitories for astronauts, suit-up preparations prior to their flights, and the other is a large spacecraft workshop used for manufacturing and checking activities on crewed spacecraft. On January 21, 2000, it was added to the U.S. National Register of Historic Places.

<span class="mw-page-title-main">LOCAD</span>

The Lab-on-a-Chip Applications Development (LOCAD) element is a set of related lab-on-a-chip projects at NASA. The projects develop integrated lab-on-a-chip products in three areas related to space exploration: Environmental Control and Life Systems Support (ECLSS), Medical Systems, and Remote Exploration. NASA conducts activities related to these projects both at NASA Marshall Space Flight Center and aboard the International Space Station (ISS).

<span class="mw-page-title-main">ExPRESS Logistics Carrier</span> Module on the International Space Station

An EXpedite the PRocessing of Experiments to Space Station (ExPRESS) Logistics Carrier (ELC) is an unpressurized attached payload platform for the International Space Station (ISS) that provides mechanical mounting surfaces, electrical power, and command and data handling services for Orbital Replacement Units (ORUs) as well as science experiments on the ISS. The ELCs were developed primarily at the Goddard Space Flight Center in Greenbelt, Maryland, with support from JSC, KSC, and MSFC. ELC was formerly called "Express Pallet" and is the unpressurized counterpart to the pressurized ExPRESS Rack. An ELC provides scientists with a platform and infrastructure to deploy experiments in the vacuum of space without requiring a separate dedicated Earth-orbiting satellite.

<span class="mw-page-title-main">US Orbital Segment</span> US components of the International Space Station

The US Orbital Segment (USOS) is the name given to the components of the International Space Station (ISS) constructed and operated by the United States National Aeronautics and Space Administration (NASA), European Space Agency (ESA), Canadian Space Agency (CSA) and Japan Aerospace Exploration Agency (JAXA). The segment consists of eleven pressurized components and various external elements, all of which were delivered by the Space Shuttle.

<span class="mw-page-title-main">Node 4</span> Proposed module/Unity static test article for the International Space Station

Node 4, also known as the Docking Hub System (DHS), was a proposed module of the International Space Station (ISS). In 2011 NASA was considering a 40-month design and development effort for Node 4 that would result in its launch in late 2013.

<span class="mw-page-title-main">NASA Launch Services Program</span> NASA program

The NASA Launch Services Program (LSP) is responsible for procurement of launch services for NASA uncrewed missions and oversight of launch integration and launch preparation activity, providing added quality and mission assurance to meet program objectives. LSP operates under the NASA Space Operations Mission Directorate (SOMD).

<span class="mw-page-title-main">Nanoracks Bishop Airlock</span> Component of the International Space Station

The Nanoracks Bishop Airlock is a commercially-funded airlock module launched to the International Space Station on SpaceX CRS-21 on 6 December 2020. It was berthed to the Tranquility module on 19 December 2020 by the Canadarm2. The module was built by Nanoracks, Thales Alenia Space, and Boeing. It is used to deploy CubeSats, small satellites, and other external payloads for NASA, Center for the Advancement of Science in Space (CASIS), and other commercial and governmental customers. NASA plans on using the airlock as a brand new way to dispose large pieces of trash. The name refers to the bishop chess piece, which moves diagonally.

<span class="mw-page-title-main">Swamp Works</span> Cutting-edge research laboratory at Kennedy Space Center, FL, US (founded 2012)

The Swamp Works is a lean-development, rapid innovation environment at NASA's Kennedy Space Center. It was founded in 2012, when four laboratories in the Surface Systems Office were merged into an enlarged facility with a modified philosophy for rapid technology development. Those laboratories are the Granular Mechanics and Regolith Operations Lab, the Electrostatics and Surface Physics Lab, the Applied Chemistry Lab, and the Life Support and Habitation Systems (LSHS) team. The first two of these are located inside the main Swamp Works building, while the other two use the facility although their primary work is located elsewhere. The team developed the Swamp Works operating philosophy from Kelly Johnson's Skunk Works, including the "14 Rules of Management", from the NASA development shops of Wernher von Braun, and from the innovation culture of Silicon Valley. The team prototypes space technologies rapidly to learn early in the process how to write better requirements, enabling them to build better products, rapidly, and at reduced cost. It was named the Swamp Works for similarity with the Skunk Works and the Phantom Works, but branded by the widespread marshes (swamps) on the Cape Canaveral and Merritt Island property of the Kennedy Space Center. The Swamp Works was co-founded by NASA engineers and scientists Jack Fox, Rob Mueller, and Philip Metzger. The logo, a robotic alligator, was designed by Rosie Mueller, a professional designer and the spouse of Rob Mueller.

<span class="mw-page-title-main">Manufacture of the International Space Station</span> Fabrication of the ISS elements

The project to create the International Space Station required the utilization and/or construction of new and existing manufacturing facilities around the world, mostly in the United States and Europe. The agencies overseeing the manufacturing involved NASA, Roscosmos, the European Space Agency, JAXA, and the Canadian Space Agency. Hundreds of contractors working for the five space agencies were assigned the task of fabricating the modules, trusses, experiments and other hardware elements for the station.

References

  1. NASA. "Space Station Processing Facility". Archived from the original on February 6, 2007. Retrieved February 8, 2007.
  2. "Discovery STS-39 – Sky Ballet". forum.nasaspaceflight.com.
  3. Holder, L.; de Jong, M. (1992). "International Standard Payload Rack Interface and Systems Requirements". SAE Technical Paper Series. Vol. 1. doi:10.4271/921263 . Retrieved December 21, 2022.
  4. Lipartito, Kenneth; Butler, Orville (2007). 'A History of the Kennedy Space Center . University Press of Florida. ISBN   978-0-8130-3069-2.
  5. "International Space Station Program/Hardware/Multi-Element Integration Testing (MEIT)". Lessons Learned. NASA. February 1, 1999. Archived from the original on March 5, 2016. Retrieved November 6, 2015.
  6. "International Space Station (ISS) Program/Ground Processing Schedule/Test and Verification". Lessons Learned. NASA. February 1, 1997. Archived from the original on March 5, 2016. Retrieved November 6, 2015.
  7. Beyer, Jeff (October 2009). "STRATEGIES FOR GROUND BASED TESTING OF MANNED LUNAR SURFACE SYSTEMS" (PDF). NASA Technical Reports Server (NTRS). NASA. Archived (PDF) from the original on February 27, 2017. Retrieved November 6, 2015.
  8. "Notice of Availability for Information Seeking Potential Industry Interest and Uses for Some NASA Kennedy Space Center Facilities". SpaceRef.com. January 24, 2011. Retrieved December 21, 2022.
  9. "NextSTEP Lunar Habitat". March 5, 2019 via Flickr.
  10. "MSolo Testing". NASA. July 13, 2021. Retrieved December 21, 2022.
  11. NASA. "Space Station Processing Facility - KSC Video Feeds". Archived from the original on February 8, 2007. Retrieved February 8, 2007.
  12. "Bartolomeo Unboxing for SpaceX CRS-20". NASA. January 30, 2020. Retrieved December 21, 2022.
  13. Cawley, James (December 19, 2022). "Artemis III Core Stage Engine Section Arrives at Kennedy". NASA. Retrieved June 24, 2023.
  14. Foust, Jeff (December 7, 2022). "NASA and Boeing change SLS core stage assembly process". SpaceNews. Retrieved June 24, 2023.
  15. "SNC Pressure Test Article Arrival". NASA. June 3, 2020. Retrieved December 21, 2022.
  16. "SSPF - 25 Year Anniversary Then & Now Pic1". NASA. May 16, 2019. Retrieved December 21, 2022.
  17. "NASA KSC Space Station Processing Facility (SSPF)". Foursquare.
  18. https://www.kennedyspacecenter.com/explore-attractions/behind-the-gates/kennedy-space-center-explore-tour
  19. "Event Registration - NASA Gateway Logistics Element Tour".
  20. "Kennedy Space Center Explore Tour". www.kennedyspacecenter.com. Archived from the original on June 17, 2017.
  21. "SSPF - 25 Year Anniversary Then & Now Pic2". NASA. May 16, 2019. Retrieved December 21, 2022.
  22. "My Brother's Keeper National Lab Week". NASA. March 2, 2016. Retrieved December 21, 2022.
  23. "Zero Robotics Finals at KSC (image)". NASA. August 15, 2014. Retrieved December 22, 2022.
  24. "Innovation Expo with Bob Cabana Pic1". NASA. November 2, 2016. Retrieved December 29, 2022.
  25. "Innovation Expo with Bob Cabana Pic2". NASA. November 2, 2016. Retrieved December 29, 2022.
  26. "Langston University Faculty/Student Group Tour". NASA. Retrieved December 29, 2022.
  27. "NextSTEP Hab Testing with Astronauts". NASA. March 25, 2019. Retrieved December 21, 2022.
  28. "Insight Employee Event". NASA. March 12, 2019. Retrieved December 21, 2022.
  29. "Bartolomeo Unboxing for SpaceX CRS-20". NASA. January 30, 2020.
  30. "Sierra Nevada Open House at SSPF". NASA. September 20, 2019. Retrieved December 21, 2022.