Timber Trail

Last updated

Timber Trail
Timber Trail.jpg
Above the Piropiro Valley; typical of the northern section of the Timber Trail
Length84 km (52 mi)
Locationborder of Waikato region and Manawatu-Wanganui region, New Zealand
Trailheads Pureora and Ongarue
UseWalking, cycling
Elevation change 360 m (1,180 ft)
Highest point940 m (3,080 ft)
Lowest point200 m (660 ft)
DifficultyIntermediate to easy
SeasonYear round
SightsSuspension bridges, railway spiral, native bush
Hazards mud, trees, storms

The Timber Trail, originally known as the Central North Island Rail Trail or Pureora Timber Trail, in the North Island of New Zealand is an 84-kilometre (52 mi) cycleway (also used by walkers and hunters) in Pureora Forest Park, fully opened in 2013, with 35 bridges (built by DoC staff, community max workers, [1] or contractors), [2] including eight large suspension bridges (one of the longest on a New Zealand cycleway, much more stable than the swing bridges used on older tracks). It is one of several cycleways developed as part of the New Zealand Cycle Trail and passes through some of the last remaining podocarp forests of rimu, tōtara, miro, mataī and kahikatea, as well as some exotic forestry and regenerating bush. About half the trail is on the track-bed of the old Ellis and Burnand Tramway, including a spiral and tunnel.

Contents

It is recommended to start your two-day trip on the Timber Trail from Pureora (Northern end of the Timber Trail) to Ongarue. [3] Although there is a hill climb up to Mt Pureora, it is considered easier to ride from this North to South direction. Fit riders can cover the trail in a day. Accommodation and cycle transport can be arranged at Camp Epic (camping/Glamping), Pureora Cabins, Timber Trail Lodge, or at Blackfern Lodge, Waimiha. [4] An alternative is the 4-bed Bog Inn Hut (normally for walkers), built of tōtara slabs. Bog Inn Hut is located 2 kilometres (1.2 mi) off the trail at the foot of Mt Pureora. It originally housed scientists studying a nearby wetland. [5] Since 2013, several local farmers and B&Bs have been offering nearby accommodation, meals, and shuttle services for the trail. The official end of the Timber Trail is the historic village of Ongarue, which is 2 km after Bennett Rd Car Park and has a range of historic buildings over a century old and built of native timbers. The village has a camp site with toilets and picnic table and two established accommodation providers on its main street - Timber Trail Centre and Blackfern Cottage (formerly Flashpackers) - who offer a total of 8 rooms with two hot tubs and a laundry.

There are three main access points to the Timber Trail:

Northern section

Pureora to Piropiro (39.5 km) Track category: Intermediate/Grade 3

0–8 km Easy/Grade 2 Pureroa DoC Centre to the first shelter.

The trail begins in Pikiariki Ecological Area, about 200 metres (660 ft) from the DOC Pureora Field Base on Barryville Rd, turning left a few metres into the bush, on a boardwalk, then winding some 4 kilometres (2.5 mi) through tall podocarps (frequented by kākā), [6] over Whareana Stream, through a Douglas fir plantation, across Whareana Road and Cabbage Tree Rd before winding up through an area of regenerating toitoi, cabbage tree, five finger and kamahi. It crosses Tui Rd, to the shelter below Mt Pureora. [6]

8–23 kmMt Pureora to Angel's Rest grade 3 (intermediate)

The trail winds to 940 metres (3,080 ft), [6] within a 40-minute walk of the 1,165-metre (3,822 ft) Mt Pureora summit, through various stages of regenerating bush to the existing native bush edge to the top of the Ongarue River and an old logging road. [2]

115-metre (377 ft) Bog Creek bridge 115m Bog Creek suspension bridge.JPG
115-metre (377 ft) Bog Creek bridge

Two large suspension bridges cross tributaries of the river at Bog Inn Creek (115 metres or 377 feet) and the similar sized Orauhora crossing. [7]

23–40 kmAngel’s Rest – Okauaka Ford – Maramataha River

Uses a logging road for some 6 kilometres (3.7 mi), then mainly Okauaka Road. 500 metres (1,600 ft) beyond the concrete ford and neighbouring trail bridge over Okauaka Stream, the track joins a tramway, crosses Okauaka Road again, and continues through the bush to Kokomiko Road and Piropiro campground. After the campground, the track rejoins the tramway to Maramataha Rodd, then follows Piropiro Stream on a new track to the Maramataha Bridge. [2]

Southern section

(Easy/Grade 2) 43 km Piropiro to Ongarue

40–52 kmPiropiro to Angels Rest Intermediate/Grade 3

141-metre (463 ft) Maramataha Bridge over the Maramataha River Maramataha Bridge opened 2011.JPG
141-metre (463 ft) Maramataha Bridge over the Maramataha River
Kilometre post 52 - each kilometre is marked Cutting on the Ellis and Burnand Ongarue tramway, now the Timber Trail.JPG
Kilometre post 52 – each kilometre is marked

A 30-minute climb from the Piropiro campsite leads to the 141-metre (463 ft) Maramataha Bridge, some 60 metres (200 ft) above the Maramataha Gorge and the largest suspension bridge of its kind along any cycle trail in New Zealand. Construction required much rock drilling and anchor work. It is supported on 12.8-metre (42 ft) high glulam towers. [2]

52–64 kmMaramataha River – Deer Park junction – Waione Stream

South of the bridge the steepest climb on the trail zigzags to a plateau on a new track. From the plateau quad tracks lead to the north end of the Ellis and Burnand Tramway, Ongarue tramway, which the trail then mostly follows on easier gradients to Ongarue. These tramways were cleared in 2011. [8]

64–74 kmWaione Stream – Waikoura Stream – Goat Creek

A 40-metre (130 ft) suspension bridge crosses Waione Stream, then the tramway runs to Waikoura Stream, passing No. 11 and No. 10 camps, and the No. 9 tramway junction. [8] The information board says Waikoura Camp at No. 9 was the largest and last camp on this tramway, built in 1950 and closed in 1963, with 6 houses and 9 single men's huts. A 28-metre (92 ft) suspension bridge crosses Waikoura Stream and a tramway links to the 90-metre (300 ft) Mangatukutuku suspension bridge, then No. 7 tramway runs to Goat Creek. [8]

74–83 kmGoat Creek – Ongarue Spiral – Mangakahu Rd

A three span, curved, timber trestle bridge crosses Goat Creek, resembling many of the tramway bridges, [2] then 4 kilometres (2.5 mi) of tramway cleared in 2011 leads to the spiral. [8]

Ellis and Burnand tramway climbed 43 metres (141 ft) here Ongarue spiral Timber Trail interpretation panels.JPG
Ellis and Burnand tramway climbed 43 metres (141 ft) here

The Ongarue Spiral took the tramway up 43 metres (141 ft) on a grade the bush lokeys could cope with (for 6 kilometres or 3.7 miles the gradient averaged 1 in 30). [9] Below the spiral the tramway was built by cutting a ledge in the ignimbrite cliffs. It continues to drop until reaching the bank of the Mangakahu Stream. The final 4 kilometres (2.5 mi) are undulating to the end of the trail in a car park beside Mangakahu Road, 2 kilometres (1.2 mi) from Ongarue.

History

The Timber Trail, originally known as the Central North Island Rail Trail, [10] cost about $5.5m to build. [11] It was one of the seven 'Quick Start' Projects announced in 2009, which were publicised as promoting economic growth [12] The Timber Trail took longer to complete than some later projects, so it was the tenth New Zealand Cycle Trail to be completed since Prime Minister John Key had launched the cycleways with the Green Party. [13]

By mid-2011 only 23 kilometres (14 mi) was open, with tenders still not let for interpretation panels and five bridges. [14] It was then that the contract with the Ministry of Economic Development for community max and taskforce green workers ended. 12 staff had been trained in 12 months in basic woodwork, track construction, quad bike and 4WD driving and health and safety. DoC employed five from the MED scheme for six months to build 6 to 10 metres (20 to 33 ft) bridges, shelters, other structures, and some track construction. Another went on 'community max' with the recreation team. [14]

Ongarue Spiral restoration work began in July 2011. The tunnel was strengthened and the stream re-diverted out of it (it had been diverted in when the tramway was replaced by logging trucks). The tunnel ceiling was reinforced with mesh, a lower bridge built to the right of the original bridge to preserve bits of the original and remnants of the upper bridge preserved in the new trail bridge. [9]

Negotiations were held to build a 30-metre (98 ft) suspension bridge over Mangakahu Stream to end the trail further east on Mangakahu Rd, but the trail as built has another 4 kilometres (2.5 mi) of undulating ride keeping north of the stream, roughly following the tramway (see map below) to within 2 kilometres (1.2 mi) of Ongarue. [14]

In July 2011 Maramataha, Waione, and Waikoura bridges were tested to their 10-person weight limit using water weights to get council consent and 1.6 kilometres (0.99 mi) of track was built (though not surfaced). [14] Maramataha Bridge was finished in early October 2012 and opened on 1 November 2012. [6] The northern end Bog Creek and Orauhora suspension bridges were ready by December 2012. [9]

On 1 December 2012 southern section opening day 150 cyclists rode its four suspension bridges, the tramline, and Ongarue Spiral. [9]

The Timber Trail was declared fully open when the Minister of Conservation cut the ribbon on Saturday, 30 March 2013. [15]

After the opening improvements and maintenance continued; in winter 2013 additional pumice was helicoptered to boggy patches on the Mt Pureora section. [16] Other changes are likely. For example, there were concession negotiations about lodgings at Piropiro Flats to supplement the existing campground, where stumps had been cleared. [14]

Ellis and Burnand Ongarue tramway, now the southern end of the Timber Trail. Sourced from 1956 1" map sheet N92. Crown Copyright Reserved. Part of 1956 one inch map sheet N92.jpg
Ellis and Burnand Ongarue tramway, now the southern end of the Timber Trail. Sourced from 1956 1" map sheet N92. Crown Copyright Reserved.

Most of the Timber Trail's southern section follows the tramway built by J. W. Ellis and Harry Burnand. Their timber sawmill at Ongarue was fed with logs (especially rimu) by a gradually growing network of tramways from 1903 until floods damaged the lines in 1958. From then until closure in 1966 the tramway was converted for use by logging trucks. However, as one of the best preserved bush tramways, it is considered a nationally significant site. [17]

Accommodation

The Timber Trail has a number of accommodation options for cyclists. All accommodation is located near the start, finish or halfway point of the track, this makes it easy for those completing any section to find accommodation. [18]

Accommodation on or near the track includes:

In 2016 the government announced a $1.2m grant to Timber Trail Adventures Ltd to develop an 80-bed lodge at the mid point of the Trail, [19] at Piropiro. [20]

Economic development

One of the purposes of the cycle trails was to encourage economic development in remote rural areas. [21] The expanding accommodation list above, appointment of a Communications Manager [22] and use of the Trail by an estimated 6,000 riders only two years after opening, [23] all indicate the economic impact.

See also

Further reading

Related Research Articles

<span class="mw-page-title-main">Hutt River (New Zealand)</span> River in New Zealand

Te Awa Kairangi / Hutt River flows through the southern North Island of New Zealand. It flows south-west from the southern Tararua Range for 56 kilometres (35 mi), forming a number of fertile floodplains, including Kaitoke, central Upper Hutt and Lower Hutt.

<span class="mw-page-title-main">Otago Central Rail Trail</span>

The Otago Central Rail Trail is a 150-kilometre walking, cycling and horse riding track in the South Island of New Zealand. A pioneering project for New Zealand, the successful rail trail joined the New Zealand Cycle Trail umbrella organisation in 2012, having been one of the inspirations for it.

<span class="mw-page-title-main">Karangahake Gorge</span>

The Karangahake Gorge lies between the Coromandel and Kaimai ranges, at the southern end of the Coromandel Peninsula in New Zealand's North Island. A sharply winding canyon, it was formed by the Ohinemuri River. State Highway 2 passes through this gorge between the towns of Paeroa, Waikino and Waihi. This road is the main link between the Waikato region and the Bay of Plenty.

<span class="mw-page-title-main">Ross Branch (railway line)</span>

The Ross Branch, officially known as the Hokitika Line since 2011, and previously as the Hokitika Industrial Line, is a branch line railway that forms part of New Zealand's national rail network. It is located in the Westland District of the South Island's West Coast region and opened to Hokitika in 1893. A further extension to Ross operated from 1909 until 1980.

<span class="mw-page-title-main">Cycling in New Zealand</span>

Cycling in New Zealand, while relatively popular as a sport, is a very marginal commuting mode, with the share hovering around 1–3% in most major cities. This is due to a number of factors, principally safety fears.

<span class="mw-page-title-main">Bush Tramway Club</span> Heritage railway in New Zealand

The Bush Tramway Club is a heritage railway 12 km (7.5 mi) west of Huntly along the Rotowaro Road, in the Waikato region of New Zealand. It regularly operates restored locomotives along a 5.4 km (3.4 mi) Rotowaro-Glen Afton section of the former Glen Afton Branch. Open days are the first Sunday of each month.

<span class="mw-page-title-main">New Zealand Cycle Trail</span>

The New Zealand Cycle Trail project is a New Zealand government initiative, co-funded together with local councils and charitable trusts, which is to build and operate a network of cycle routes through the country.

<span class="mw-page-title-main">Waitawheta River</span> River in New Zealand

The Waitawheta River is a river of the Waikato Region of New Zealand's North Island. It flows from a point south-east of Mount Te Aroha in the Kaimai Range to the Karangahake Gorge at the foot of the Coromandel Peninsula to reach the Ohinemuri River at Karangahake, five kilometres east of Paeroa.

<span class="mw-page-title-main">Arapuni Suspension Bridge</span> Bridge in South Waikato District

The Arapuni Suspension Bridge is located just downstream from the Arapuni Power Station on the Waikato River in the South Waikato District of New Zealand. The 152-metre (499 ft) suspension bridge in the bush-lined gorge was built in the mid-1920s to allow workers from the village of Arapuni to access the power station construction site.

<span class="mw-page-title-main">Pureora Forest Park</span> Protected rainforest park in New Zealand

Pureora Forest Park is a 760-square-kilometre (290 sq mi) protected area in the North Island of New Zealand. Within its rich rainforest are an abundance of 1,000-year-old podocarp trees. It is "recognised as one of the finest rain forests in the world". Established in 1978, after a series of protests and tree sittings, the park is one of the largest intact tracts of native forest in the North Island and has high conservation value due to the variety of plant life and animal habitats. New Zealand's largest totara tree is located nearby on private land.

<span class="mw-page-title-main">Harry Burnand</span>

John Henry Davis Burnand, known as Harry Burnand, was a New Zealand engineer and sawmiller. He was born in London, England on 2 December 1850.

<span class="mw-page-title-main">National Park railway station, Manawatū-Whanganui</span> Railway station in New Zealand

National Park railway station is a station on the North Island Main Trunk that served the area around the town of National Park in New Zealand's Ruapehu District. It was served by KiwiRail's Northern Explorer long distance train between Wellington and Auckland. There is a licensed cafe on the platform.

<span class="mw-page-title-main">Ellis and Burnand Tramway, Ongarue</span> Bush tramway in New Zealand, 1922 to 1958

The Ellis & Burnand Tramway was from 1922 to 1958 a 37 kilometres (23 mi) long bush tramway near Ongarue in the central North Island of New Zealand with a gauge of 3 ft 6 in.

<span class="mw-page-title-main">Makatote Tramway</span>

The Makatote Tramway was from the late 1920s to 1940 a 2.6 kilometres (1.6 mi) long bush tramway network near Makatote in the central North island of New Zealand with a gauge of 4 feet 1 inch (1,245 mm) using metal and wooden rails. It was operated by Dinwoodie's Timber Company with probably less than 10 employees.

<span class="mw-page-title-main">Kokiri Tramway</span>

The Kokiri Tramway was at least from 1895 to the 1902 a bush tramway with a gauge of 1,067 mm near Kokiri on the Arnold River in the west of New Zealand's South Island.

<span class="mw-page-title-main">Ellis and Burnand</span>

Ellis and Burnand was a New Zealand sawmilling and timber retailing company, formed by businessman John William Ellis and engineer Harry Burnand in 1891.

<span class="mw-page-title-main">Taringamotu railway station</span> Artist

Taringamotu railway station was a station at Taringamotu on the North Island Main Trunk, in the Ruapehu District and Manawatū-Whanganui region.

<span class="mw-page-title-main">Mangapehi railway station</span> Defunct railway station in New Zealand

Mangapehi was a flag station on the North Island Main Trunk line, in the Waitomo District of New Zealand. It was 5.89 km (3.66 mi) north of Poro-O-Tarao and 5.15 km (3.20 mi) south of Kopaki.

<span class="mw-page-title-main">Horopito railway station</span> Railway station in New Zealand

Horopito was a station on the North Island Main Trunk line, in the Ruapehu District of New Zealand. It served the small village of Horopito and lies just to the north of two of the five largest NIMT viaducts. It and Pokaka also lay to the south of Makatote Viaduct, the late completion of which held up opening of the station.

<span class="mw-page-title-main">Erua railway station</span> Railway station in New Zealand

Erua was a station on the North Island Main Trunk line, in the Ruapehu District of New Zealand. It served the small village of Erua. For a month in 1908 it was the terminus of the line from Auckland. Makatote Viaduct and tramway are about 3 mi (4.8 km) south of Erua.

References

  1. Ministry of Social Development explanation of 'Community Max' in 2010.
  2. 1 2 3 4 5 Ediface constructors
  3. "The Timber Trail: Pureora – Ongarue". www.doc.govt.nz. Retrieved 18 November 2017.
  4. "DoC Timber Trail information". Department of Conservation . Retrieved 9 September 2013.
  5. DoC Bog Hut information
  6. 1 2 3 4 5 DoC Timber Trail information
  7. Malcolm Hutchinson website map and route description.
  8. 1 2 3 4 Poutama update August 2011 [ permanent dead link ]
  9. 1 2 3 4 "Ongarue Tramway and Spiral".
  10. DoC NZ Cycle Trail project: The Timber Trail
  11. Māori Affairs Ministry press release 3 Dec 2012.
  12. Tourism NZ announcement 11 February 2010. Archived 5 November 2013 at archive.today
  13. 'Chill' – photos and article on March 2013 opening. Archived 17 January 2015 at the Wayback Machine
  14. 1 2 3 4 5 Cycleway update Aug 2011. [ permanent dead link ]
  15. 4 April 2013 media release
  16. Facebook Timber Trail page
  17. 1 2 DoC Ongarue Tramway information
  18. "Timber Trail Accommodation". Blue Tui Shuttles.
  19. "It's fantastic to be back here at TRENZ. | Scoop News". www.scoop.co.nz. Retrieved 18 November 2017.
  20. Contributor (19 May 2017). "An Operator's View: The Timber Trail Lodge's Bruce Maunsell | Tourism Ticker". tourismticker.com. Retrieved 18 November 2017.{{cite web}}: |last= has generic name (help)
  21. "Brighter Future? Cycle trails the gimmick that grew". Radio New Zealand. 20 June 2017. Retrieved 18 November 2017.
  22. "Cycle tourism specialist appointed for the Timber Trail | Waitomo District Council". waitomo.govt.nz. Retrieved 18 November 2017.
  23. "Ngā Haerenga NZ Cycle Trail Evaluation Report 2016" (PDF). MINISTRY OF BUSINESS, INNOVATION & EMPLOYMENT.

Biographies of Ellis & Burnand directors –