London Underground 1935 Stock

Last updated

1935 Stock
1935 scrap line Ruislip.jpg
A 1935 Stock driving motor and a 1927 trailer at Ruislip depot in August 1971. Both were scrapped less than 2 months later.
In service1936–1976
Manufacturer Metro Cammell
Specifications
Car length52 ft 6 in (16.00 m)
Width8 ft 6+14 in (2.597 m)
Height9 ft 5+12 in (2.883 m)
Notes/references
Underground sign at Westminster.jpg  London transportportal

The London Underground 1935 Stock was an experimental train design by Metropolitan Cammell in London. Twelve two-car units, marshalled into four six-car trains, were built. They served as the prototypes for the later 1938 Stock.

Contents

Three of these trains had the cars streamlined, based upon trial with a 1923 Standard Stock Control Trailer built by Metropolitan Cammell. The cars in the fourth set had flat fronts almost identical to the later 1938 stock, for which the cars of the 1935 Stock were in effect the prototypes.

These were the first tube cars built for London Underground with the motors and control equipment, etc., under the frame, freeing the space behind the cabs for use by passengers. For evaluation purposes each trainset had different equipment.

The cars were used on the Piccadilly line from 1937 to 1940. During World War II all the 1935 Stock cars were stored at Cockfosters depot. After the war the streamlined cars were sent to Acton works, where they were rebuilt into trailer cars, used with the 1938 stock. They were eventually withdrawn between 1972 and 1976. The unit with the flat fronts re-entered service and was also used with the 1938 stock, the main difference between the 1935 Stock and 1938 stock DMs being that the driver's door on the 1935 stock was taller, extending into the roof.

History

The London Passenger Transport Board was formed by Act of Parliament in 1933, bringing all of London's underground railways under common control. This allowed large-scale planning to be undertaken, and the 1935-1940 New Works Programme included extensions to what became the Northern Line and major extensions at both ends of the Central London Railway, which became the Central Line. The plan envisaged significant purchases of rolling stock, to service the extended lines, and the 1935 Stock was the forerunner for those purchases. [1] Existing motor cars had a switch compartment behind the drivers cab, occupying nearly one third of the car, and this caused particular problems at busy times. Where two motor cars were coupled together in the centre of the train, there was a length of nearly 50 feet (15 m) with no doors for passengers to use. [2]

Prior to placing an order, experiments had been carried out to test various features. A Standard Stock control trailer dating from 1923 had been fitted with a streamlined end. A Tomlinson coupler, which as well as connecting cars together mechanically, also connected the electric and hydraulic systems together automatically, was tried out on two cars, and another had an experimental air-conditioning system fitted. When an order was placed with Metropolitan Cammell for four six-car trains in 1935, variations of all of these features were included in the designs. The trains were supplied as two-car units, permanently coupled together, and three such units made up each six-car train. By careful design, all of the electrical equipment was mounted below the car floor, which meant that the whole length of the motor cars was available for passengers, apart from the drivers cab. A six-car train of the new stock could thus carry as many passengers as a seven-car train of Standard Stock. To meet the second major requirement of improved performance, all of the cars were motor cars. [3]

The inner two axles of each car were fitted with a motor, and adhesion was improved by making the bogies asymmetric. The wheelbase of each bogie was 6.25 feet (1.91 m), but the pivot point was 3.5 feet (1.1 m) from the front axle, resulting in 58 per cent of the weight of the car being used for adhesion. All of the trains were fitted with Crompton Parkinson Type C200 motors, which had been specially designed to fit in the limited space available. They were mounted onto the axle by a roller suspension sleeve. [4] Each motor was rated at 138 horsepower (103 kW), and the car floors sloped upwards at the ends in order to give adequate clearance for the motorised bogies. [5]

Control of the motors used four different systems, one for each six-car train, but all of the systems were compatible, so that any combination of two-car units could be used to form a train. British Thompson-Houston (BTH) provided the only system which was based on previous experience, which became known as the Pneumatic Camshaft Motor (PCM) system. This proved to be the most reliable, and was the system adopted for subsequent batches of trains. The other three systems were new designs, produced by Metropolitan Vickers, General Electric Company, and a collaboration between Crompton Parkinson and Allen West & Co. The PCM system used an air-operated camshaft, to control the switching out of starting resistances. With the motors connected in series, the camshaft rotated in one direction, until no resistances were in circuit. A separate electro-pneumatic switch then controlled the transition from series to parallel configuration, and the camshaft moved back to its starting position, as the resistances were removed again. [6]

Crompton Parkinson provided three different systems, one on each of their two-car units. On the first, two faceplate controllers, driven by 50-volt motors, and an electro-pneumatic camshaft provided 57 notches between rest and full speed. The second system only had one faceplate controller, with the motors permanently connected in parallel, while the third used a motor-driven camshaft to control the switching of the resistances and the transition from series to parallel. The General Electric design used a motor-driven camshaft, which made three complete revolutions between rest and full speed, providing 56 notches. Transition from one notch to the next was based on time, but high motor current could delay the process. The Metropolitan Vickers system used an oil-driver power drum, which ran up to full speed in 45 notches. The resistance bank was reduced in size by using series-parallel switching of the resistances, which also meant that they heated up evenly. All four systems needed a 50-volt supply, and this was provided by a 5 kW motor generator set, which also powered the car lighting. [7]

The first three trains had streamlined cabs fitted at both ends of each two-car unit. The driver's seat was placed in the centre of the semi-elliptical cab, and the armchair seat had the brake and master controller handles on either side, similar to aeroplane joysticks. Drivers did not like the arrangement, and when it was shown that the streamlining would have little effect until speeds of 80 miles per hour (130 km/h) were reached, the fourth train, which was fitted with control equipment by Metropolitan Vickers, was built with flat ends and conventional cabs, an appearance that was carried forwards to the 1938 Stock. [8] The two-car units were fitted with Wedglock couplers at the outer ends, which were a development of the Tomlinson coupler, and joined the units mechanically, pneumatically and electrically. One unit of the first train was fitted with air conditioning and fixed windows, but this was removed and opening windows were installed, as any failure of the system resulted in the car overheating in tunnels, causing discomfort for passengers. [9]

By increasing the number of notches on the speed controller, and fitting more motors, acceleration of the new trains was around 2 mph (3.2 km/h) per second, an increase from 1.2 mph (1.9 km/h) per second on the Standard Stock. Braking rates were also improved to 3 mph (4.8 km/h) per second by fitting each brake block with its own cylinder, and using a retardation controller to control the brake pressure. This allowed higher pressure to be applied at faster speeds, and the pressure to reduce as the speed dropped, to maintain a constant rate of deceleration without wheel slip. [5]

Delivery

The first three two-car units were delivered to Lillie Bridge Depot in October and November 1936. From there, there were transferred to Ealing Common depot, [10] where staff from the various companies supplying the equipment completed installation and arranged acceptance tests. Most of the two-car units were tested and accepted individually, but the units with Metropolitan Vickers equipment ran as four cars. [11] Testing took place on the test tracks which run between Acton Town and Northfields, with the first taking place on 13 November 1936. Testing continued on most weekdays until 8 January 1937. A Press day was held at Northfields depot on 17 November 1936, and the "streamlined wonders" received widespread coverage in national newspapers. [12]

Prior to the production of the 1935 Stock, driving motor cars were designated as 'A' cars if they faced west, and 'B' cars if they faced east. However, for the new stock, the axles were lettered from 'A' to 'D', and the driving motor cars were lettered according to the nearest axle. They were thus designated as 'A' cars in they faced west and 'D' cars if they faced east, a scheme which has been carried forwards to all subsequent stock. [12]

Operation

The first train to enter passenger carrying service did so on 8 April 1937 on the Piccadilly Line, and the final one followed nearly a year later, on 10 March 1938. Initially, they ran as four-car trains during the daytime, avoiding the morning and evening peak services. From 26 April 1937, an extra two-car unit was added to the four-car trains at the end of the afternoon service, and the six-car formation ran through the evening peak. Four cars of flat-fronted stock began running from 24 January 1938, but cars 10009, 11009, 10010 and 11010 were transferred to Golders Green depot on the Northern Line on 31 March 1938, so that gauging tests for the 1938 Stock could be carried out. They returned to the Piccadilly Line on 4 July 1938. [11]

The various types of streamlined units were used interchangeably to make up four-car and six-car trains, but the flat-fronted units were kept together. There were significant teething problems with the new equipment, and when the outbreak of World War II made maintenance difficult, the trains were put into storage at Cockfosters depot. Three of the cars found temporary use as air raid precaution (ARP) shelters, one at Northfields depot, and two at Cockfosters. They were parked over a pit and surrounded by sandbags, for use in an emergency. They found no further use in service until the end of 1948, when there were plans to remove the streamlining and drivers cabs from the streamlined cars, and for them to become trailer cars which would run in 1938 Stock trains. [9] Work began on the first conversion in early 1950, and was quite extensive. In addition to the rebuilding of the bodywork, all of the traction equipment was removed, and a complete rewire of the electrical system was needed. When the work was completed, the trailers looked similar to the 1938 Stock, but there were some visible differences. The converted cars only had three windows between the single end door and the first set of double doors, whereas the 1938 Stock had four, and the single door itself was further from the end of the car. Trailer number 012484 was outshopped in August 1950, and entered service on the Northern Line in September. It was monitored to see how it performed, and the remaining 17 conversions incorporated changes to the doors and bogies as a result. [13] The motor cars became trailers 012477 to 012494, [14] and the last one to be used in passenger service was number 012489, which was withdrawn in 1976.[ citation needed ]

In 1949, the flat-fronted units were modified to run as two-car shuttle trains, and were to be transferred to the Central Line. Some of the streamlined cars had been through an overhaul process, where the bogies had been upgraded to conform to 1938 Stock standards. As the flat-fronted units had not received an overhaul, they were given bogies removed from the updated streamlined cars. [15] The Wedglock couplers at the outer ends were removed and replaced by Ward couplers, so that they could be mechanically coupled to Standard Stock trains, and air hoses were fitted. The Metropolitan Vickers control system was removed, and replaced with the British Thomson-Houston equipment, which had been removed when those units were converted to trailers. The guard's control panel, which had been located in the cab, was moved to the trailing end of the 'D' cars, so that the guard remained in the same position whichever the direction of travel. To ensure that each train ran with two compressors, KLL4-type compressors were fitted to all of the cars. [9]

By August 1950, conversion of the shuttles had been completed. Two units entered passenger service in October, with the final one following in February 1951. [15] Central Line services had been extended from Loughton to Epping on 25 September 1949, [16] and the converted trains were primarily used to provide a shuttle service on this section, although they were sometimes used on the Woodford to Hainault section, [15] which had opened on 21 November 1948. [16] The three trains were moved back to the Piccadilly Line on 17 May 1954, for use on the shuttle service from Holborn to Aldwych. Car 11010 overran Aldwych station on 3 April 1955, and was damaged when it hit the buffer stops. The cab was rebuilt at Acton Works, and the finished result looked more like the 1938 Stock than the remaining 1935 Stock cars. Two trains returned to the Central Line for the opening of the Epping to Ongar service on 18 November 1957, where they were assisted by a three-car unit of 1938 Stock, specially adapted by fitting two compressors to the trailer car. [17]

The third unit, consisting of cars 10011 and 11011, had been moved to Ealing Common depot in early 1957, to be used in a trial of regenerative braking. The concept, which involves the motors being used as generators, and current being fed back into the system for use by other trains, had been tried previously, on the O and P surface stock trains, which were equipped with metadyne controllers. The metadyne controllers were being replaced at the time, as they were proving increasingly unreliable, but London Underground still hoped that the system could be used to reduce energy costs. The 1935 Stock train was fitted with regenerative braking equipment manufactured by British Thomson-Houston, and the substation at Northfields was adapted to cope with the regenerated current. Because it was a trial system, the equipment was installed in the passenger area, and a self-lapping switch was fitted to the brake controller, which tilted as the brakes were applied. Testing of the system ran from May 1957 to early 1958, when a system manufactured by General Electric Co replaced it, and a third set of tests used equipment by Metropolitan Vickers. Although regenerative braking did not become part of the 1959 Stock or 1962 Stock production runs, the British Thomson-Houston equipment was modified to allow tests of rheostatic braking on a test train of 1960 Stock, which paved the way for it to be incorporated into the 1967 Stock built for the newly constructed Victoria Line. [17]

Demise

The unit used for regenerative testing was returned to passenger service in May 1960, and rejoined the other two units on the Epping to Ongar shuttle. It was fitted with a modified 1927 Stock trailer, as the other two units had been previously, to provide more passenger accommodation. Once the Central Line had been re-equipped with unpainted aluminium 1962 Stock, the red livery of the 1935 Stock looked incongruous, and they were painted silver between August 1963 and May 1965. The trailer cars were fitted with de-icing equipment in 1964, [17] and the units continued to be used on the Epping to Ongar route, until they were withdrawn from passenger service in 1966, when 1962 Stock replaced them. [18] The units, including the 1927 trailers, were stored at Hainault depot for a time, and then moved to a scrap line at Ruislip depot. [17]

When London Underground were considering the use of articulated trains on the Northern Line, to replace the 1938 Stock, the redundant 1935 Stock was used for trials. Motor cars 10010 and 11010 spent some time at Acton Works for preliminary tests, and were then returned to the Ruislip scrap line. [19] On 15 May 1969, motor cars 10011 and 11011 entered Acton Works for full-scale trials to be conducted. The trailing ends of the cars were cut back so that only one window remained beyond the rear doors. The driving end bogies were replaced by new lightweight aluminium ones, while the trailing ends of both cars were supported by a single steel bogie. The conversion work was completed for testing to begin in August 1970, and information was collected for a year. [18] There were plans to re-equip the Northern Line with 8-car articulated trains, but rolling stock requirements were reassessed when authorisation to build the Heathrow extension of the Piccadilly Line was obtained, and the idea of articulated trains was dropped in favour of using conventional 1972 Stock, similar to that running on the Victoria Line. [20] Following the tests, the articulated unit was found to be particularly useful for shunting, as the beams carrying the current collecting shoes were 64 feet (20 m) apart, enabling it to cross long gaps in the current rails at low speeds. It was given a maroon livery, and renumbered L14A and L14B, becoming part of the service fleet. The aluminium bogies were removed for further testing on a 1972 Stock car in 1975, and the 1935 cars were scrapped at Acton in early 1975. [18] The units on the Ruislip scrap line lasted until they were officially scrapped on 10 October 1971. [21]

Numbers

The 1935 stock consisted only of Driving Motor (DMs) cars. The number series was continued for the DMs of the 1938 Stock

'A' DM'D' DMElectrical equipmentNotes
1000011000Crompton Parkinson
1000111001Crompton Parkinson
1000211002General Electric Co
1000311003British Thomson-Houston
1000411004General Electric Co
1000511005Crompton Parkinson
1000611006General Electric Co
1000711007British Thomson-Houston
1000811008British Thomson-Houston
1000911009Metropolitan VickersRan with 1927 trailer 70511
1001011010Metropolitan VickersRan with 1927 trailer 70512
1001111011Metropolitan VickersRan with 1927 trailer 70510

Trailers

It had originally been planned that three trailer cars would be inserted into the three streamlined units, to lengthen them from six- to seven-car units. These would have been similar to 1938 stock trailers except that they had no compressors. After the war these three cars instead became part of the 1938 Stock and were numbered 012412 - 012414, being fitted with compressors.

Related Research Articles

<span class="mw-page-title-main">London Underground rolling stock</span> Passenger trains that run on the London Underground

London Underground rolling stock includes the electric multiple-unit trains used on the London Underground. These come in two sizes, smaller deep-level tube trains and larger sub-surface trains of a similar size to those on British main lines. New trains are designed for the maximum number of standing passengers and for speed of access to the cars.

<span class="mw-page-title-main">London Underground 1938 Stock</span>

The London Underground 1938 Stock was a London Underground tube stock design. A total of 1,121 cars were built by Metro-Cammell and Birmingham RC&W. An additional 173 cars were added to the fleet by the end of 1953, comprising 91 new builds, 76 conversions from Pre-1938 Tube Stock or 1935 Tube Stock, and six unconverted cars of 1935 Tube Stock, and the stock was used on the London Underground until 1988. During their long lives they worked on the Bakerloo, Northern, Piccadilly, East London and Central lines. Ten sets were refurbished and ran on the Isle of Wight as Class 483, making them the oldest passenger rolling stock operating timetabled services on the National Rail network at the time of their withdrawal in January 2021. The trains represented a major technical advance, as all the electrical equipment was located under the floor for the first time. All previous tube stock had large equipment compartments behind the driving cabs in motor cars, which reduced the space available for passengers by about a third.

<span class="mw-page-title-main">London Underground Standard Stock</span>

The Standard Stock title was applied to a variety of Tube stock built between 1923 and 1934, all of which shared the same basic characteristics, but with some detailed differences. This design is also sometimes referred to as 1923 Tube Stock, 1923 Stock, or Pre 1938 Stock. Most of the Standard Stock was built to replace the first generation of "Gate Stock" Tube trains or to provide additional trains for extensions built in the 1920s and early 1930s. Standard Stock cars consisted of motor cars, plus trailer cars and "control trailers". All were equipped with air operated sliding doors, although the guard's door on the earlier trains was a manually operated inward-opening hinged door.

The Lancashire and Yorkshire Railway (LYR) built suburban electric stock for lines in Liverpool and Manchester. The line between Liverpool to Southport began using electric multiple units (EMUs) on 22 March 1904, using a third rail 625 V DC. Additional trains were later built for this route, and in 1913 incompatible stock for the route to Ormskirk. Lightweight units were built to run on the Liverpool Overhead Railway.

<span class="mw-page-title-main">London Underground O and P Stock</span>

The London Underground O and P Stock electric multiple units were used on the London Underground from 1937 to 1981. O Stock trains were built for the Hammersmith & City line, using metadyne control equipment with regenerative braking, but the trains were made up entirely of motor cars and this caused technical problems with the traction supply so trailer cars were added. P Stock cars were built to run together with the O Stock cars now surplus on Metropolitan line Uxbridge services. The trains had air-operated sliding doors under control of the guard; the O Stock with controls in the cab whereas the P Stock controls in the trailing end of the motor cars. The P Stock was introduced with first class accommodation, but this was withdrawn in 1940.

<span class="mw-page-title-main">London Underground 1960 Stock</span>

The London Underground 1960 Stock was a class of electric multiple unit for the London Underground Central line. Twelve motor cars were supplied by Cravens, and pairs were made up to four cars by the addition of two converted standard stock trailers. A production run of 338 motor cars was shelved, due to the time needed to assess the new features and the cost of converting the trailer cars. Some of the pre-1938 trailers were later replaced by 1938 stock trailers.

<span class="mw-page-title-main">London Underground C69 and C77 Stock</span> Type of sub-surface railway vehicle

The London Underground C69 and C77 Stock, commonly referred to as the C Stock, was a type of sub-surface rolling stock used on the Circle, District and Hammersmith & City lines of the London Underground between 1970 and 2014. These were replaced with S stock trains, which also operate on the District, Hammersmith and City, Circle and Metropolitan lines.

<span class="mw-page-title-main">London Underground 1967 Stock</span> Train sets

The London Underground 1967 Stock was a type of deep-level train that operated on the Victoria line of the London Underground from the line's opening on 1 September 1968 until 30 June 2011. It was also used on the Central line between Woodford and Hainault between 21 February 1968 and 1984, as the same automatic train operation (ATO) system was used on both lines.

<span class="mw-page-title-main">London Underground battery-electric locomotives</span>

London Underground battery-electric locomotives are battery locomotives used for hauling engineers' trains on the London Underground network where they can operate when the electric traction current is switched off. The first two locomotives were built in 1905 for the construction of the Great Northern, Piccadilly and Brompton Railway, and their success prompted the District Railway to buy two more in 1909, which were the only ones built to the loading gauge of the subsurface lines. Following this, a number of battery vehicles were built by converting redundant motor cars, with the batteries placed in the unused passenger compartment. One exception to this was made by the City and South London Railway, who used a trailer car to hold the batteries, and wired them to a separate locomotive.

<span class="mw-page-title-main">Electric multiple unit</span> Electric train with no locomotive

An electric multiple unit or EMU is a multiple-unit train consisting of self-propelled carriages using electricity as the motive power. An EMU requires no separate locomotive, as electric traction motors are incorporated within one or a number of the carriages. An EMU is usually formed of two or more semi-permanently coupled carriages, but electrically powered single-unit railcars are also generally classed as EMUs. The great majority of EMUs are passenger trains, but versions also exist for carrying mail.

<span class="mw-page-title-main">London Underground electric locomotives</span>

Electric locomotives were first used on the London Underground when the first deep-level tube line, the City and South London Railway (C&SLR), was opened in 1890. The first underground railways in London, the Metropolitan Railway (MR) and the District Railway (DR), used specially built steam locomotives to haul their trains through shallow tunnels which had many ventilation openings to allow steam and smoke to clear from the tunnels. It was impractical to use steam locomotives in the small unvented tubular tunnels of the deep-level lines, and the only options were rope haulage or electric locomotives.

<span class="mw-page-title-main">London Underground 1900 and 1903 Stock</span>

The Central London Railway Stock were electric multiple units composed of trailers that had been converted from carriages designed to be hauled by electric locomotives with new motor cars. The Central London Railway opened in 1900 with electric locomotives hauling wooden carriages, but the heavy locomotives caused vibrations that could be felt in the buildings above the route. Following investigation it was found that conversion to electric multiple units solved the problem, so new motor cars were bought and replaced all the locomotives by June 1903. Trains normally ran with six-cars, four trailers and two motor-cars, although some trailers were equipped with control equipment to allow trains to be formed with three cars.

<span class="mw-page-title-main">London Underground 1956 Stock</span> Prototype electric multiple unit of the London Underground

The London Underground 1956 Stock consisted of three prototype units built before mass production of the 1959 tube stock. These units were tested on the Piccadilly line and remained in service after production trains were introduced. Later they were transferred to the Northern line, but in 1995 they were replaced as non-standard by 1962 Stock cascaded from the Central line.

<span class="mw-page-title-main">ER9 electric trainset</span>

For servicing suburban commuter lines, electrified on 25 kV, AC, the Railcar Manufacturing Plant of Riga produced ER9, then ER9P and other modifications of electric trainsets in the 1962-2002 period. The mass production of these trains had begun in 1964.

<span class="mw-page-title-main">ER2 electric trainset</span> Electric multiple unit

ER2 electric trainset is a DC electric multiple unit which was in production by the Railroad Machinery Plants of Riga from June 1962 to mid-1984. It was essentially an improvement of the ER1 design, featuring footboards for low platforms, and aprons for high platforms, as well as improved electrical equipment and minor changes to the bodywork. Since the mid-1960s, the ER2 has been the most widely used type of suburban train in the Soviet Union and its successor states.

<span class="mw-page-title-main">Metropolitan Railway electric multiple units</span>

Metropolitan Railway electric multiple units were used on London's Metropolitan Railway after the lines were electrified in the early 20th century.

<span class="mw-page-title-main">District Railway electric multiple units</span>

District Railway electric multiple units were used on London's Metropolitan District Railway after the lines were electrified in the early 20th century.

London Underground departmental stock Overview of departmental locomotives on the London Underground

Departmental locomotives on the London Underground consist of vehicles of a number of types which are used for engineering purposes. These include battery locomotives, diesel locomotives, electric locomotives, sleet locomotives, pilot motor cars and ballast motor cars. Details of the first four types are covered elsewhere. Pilot motor cars and ballast motor cars are generally vehicles which have been withdrawn from passenger service, but continue to be used by the engineering department. Pilot motor cars are used to move other vehicles around the system, while ballast motor cars are used to haul ballast trains and engineering trains.

<span class="mw-page-title-main">Ruislip Depot</span>

Ruislip depot is a London Underground traction maintenance depot on the Central line, and is situated between the stations of Ruislip Gardens and West Ruislip in the London Borough of Hillingdon. The depot is accessible from both ends, and was built for the Central Line extensions under the 1935-1940 New Works Programme. It was nearly completed by 1939, when the outbreak of the Second World War prevented further work. It was used as a factory for anti-aircraft guns during the war, and was finally opened in 1948. The main car shed has 16 tracks, and there is also a three-track car cleaning shed.

<span class="mw-page-title-main">Acton Works</span> London Underground depot

Acton Works is a London Underground maintenance facility in West London, England. It is accessed from the District line and Piccadilly line tracks to the east of Acton Town station, and was opened in 1922. It was responsible for the overhaul of rolling stock, and gradually took on this role for more lines, until the formation of the London Passenger Transport Board in 1933, when all major overhauls of underground vehicles were carried out at the works. By 1985, when rolling stock had become more reliable and maintenance intervals had increased, this function was devolved to depots on each line. Subsequently, Acton continued to overhaul major items after they had been removed from trains at the depots, and tendered for work, which included the conversion of the A60 Stock to One Person Operation. It is likely to be reorganised and expanded to house the departments displaced from Lillie Bridge Depot which is being demolished as part of the redevelopment of Earls Court Exhibition Centre.

References

  1. Bruce 1968, p. 62.
  2. Bruce 1988, p. 72.
  3. Bruce 1988, p. 73.
  4. Bruce 1968, pp. 62–63.
  5. 1 2 Bruce 1988, p. 74.
  6. Bruce 1968, p. 63.
  7. Bruce 1968, pp. 63–64.
  8. Bruce 1988, pp. 75–76.
  9. 1 2 3 Bruce 1988, p. 76.
  10. Connor 1989, p. 13.
  11. 1 2 Connor 1989, p. 18.
  12. 1 2 Connor 1989, p. 17.
  13. Connor 1989, p. 70.
  14. Connor 1989, p. 120.
  15. 1 2 3 Connor 1989, p. 67.
  16. 1 2 Lee 1970, p. 7.
  17. 1 2 3 4 Connor 1989, p. 68.
  18. 1 2 3 Bruce 1987, p. 25.
  19. Connor 1989, pp. 68–60.
  20. Bruce 1988, pp. 107–109.
  21. Connor 1989, p. 69.

Bibliography

  • Bruce, J Graeme (1968). Tube Trains Under London. London Transport Board.
  • Bruce, J Graeme (1987). Workhorses of the London Underground. Harrow Weald: Capital Transport. ISBN   978-0-904711-87-5.
  • Bruce, J Graeme (1988). The London Underground Tube Stock. Ian Allan. ISBN   978-0-7110-1707-8.
  • Connor, Piers (1989). The 1938 Tube Stock. Capital Transport. ISBN   978-1-85414-115-6.
  • Lee, Charles E (1970). Seventy Years of the Central. London Transport. ISBN   978-0-85329-013-1.