Nexans

Last updated
Nexans S.A.
Company type Société Anonyme
Euronext:  NEX
CAC Mid 60 Component
SBF 120
ISIN FR0000044448  OOjs UI icon edit-ltr-progressive.svg
Industry Manufacturing, technology
Founded2000
Headquarters Paris, France
Key people
Christopher Guérin (CEO) Jean Christophe Juillard (DG)
ProductsPower and data cables for building & territories, high voltage, data and telecoms, renewable energy, oil & gas, automation, transport
Revenue 6.4 billion (2017)
€281 million (2017)
€127 million (2017)
Number of employees
>26,000 (average, 2017)
Website www.nexans.com
Nexans office in Markham, Ontario, Canada NexansCanada2.jpg
Nexans office in Markham, Ontario, Canada

Nexans S.A. is a global company in the cable and optical fibre industry headquartered in Paris, France. [1] [2]

Contents

The group is active in four main business areas: buildings and territories (construction, local infrastructure, smart cities / grids, e-mobility), high voltage and projects (offshore wind farms, subsea interconnections, land high voltage), data and telecoms (telecom networks), data transmission, FTTx, LAN cabling, renewable energies, petroleum, railways and rolling stock, aeronautical and automation. [3] [4] [5]

It is the world's second largest manufacturer of cables after Prysmian S.p.A. [6] In 2017, the Group had industrial presence in 34 countries with over 26,000 employees and sales of around €6.4 billion. [7] Nexans was founded in 2000 as a business unit of the telecommunications firm Alcatel after its acquisition of a number of companies in the cable sector. It was spun out and listed on the Paris stock exchange the following year. [8] It is currently listed on Euronext Paris, Compartment A. Nexans will supply and install HVDC cables for EuroAsia Interconnector, the longest and the deepest HVDC subsea cable project ever, with bi-pole cables of 2x900km. [9]

History

Related Research Articles

<span class="mw-page-title-main">Aker Solutions</span> Norwegian energy infrastructure engineering company

Aker Solutions ASA engineers and builds energy infrastructure while providing a range of products and consultancy services to low-carbon and renewable energy projects. Based in Oslo, the company's offerings to the energy industry include the systems and services required to de-carbonize oil and gas production, build wind-to-grid infrastructure and engineer CO2 capture and sequestration.

<span class="mw-page-title-main">Moyle Interconnector</span>

The Moyle Interconnector is a 500 megawatt (MW) HVDC link between Scotland and Northern Ireland, running between Auchencrosh in Ayrshire and Ballycronan More in County Antrim. It went into service in 2001 and is owned and operated by Mutual Energy.

<span class="mw-page-title-main">Submarine power cable</span> Transoceanic electric power line placed on the seabed

A submarine power cable is a transmission cable for carrying electric power below the surface of the water. These are called "submarine" because they usually carry electric power beneath salt water but it is also possible to use submarine power cables beneath fresh water. Examples of the latter exist that connect the mainland with large islands in the St. Lawrence River.

Estlink is a set of HVDC submarine power cables between Estonia and Finland. Estlink 1 is the first interconnection between the Baltic and Nordic electricity markets followed by Estlink 2 in 2014. The main purpose of the Estlink connection is to secure power supply in both regions to integrate the Baltic and Nordic energy markets.

NKT A/S produces low-, medium- and high-voltage power cable solutions and accessories, primarily focused on the European market. It is best known for its offshore high-voltage DC cables that are connecting offshore wind farms to onshore grids. They have also supplied major interconnector projects that connect regions or countries with high voltage power highways. Their low- and medium-voltage solutions are used to support the build out of the electricity grid and onshore windfarms and solar farms. NKT is also a specialist within building wires on residential, business, and industrial scales.

TenneT is a transmission system operator in the Netherlands and in a large part of Germany.

COMETA is an undersea electric power transmission system between mainland Spain and the island of Majorca. It connects Morvedre near Valencia and Santa Ponsa near Palma de Mallorca. The project was developed by Red Electrica de España. The project aims were to connect the Balearic Islands with the Spanish peninsular grid, providing a better electrical supply to the two isolated Balearic grids.

<span class="mw-page-title-main">North Sea Link</span> Subsea electricity transmission line

The North Sea Link is a 1,400 MW high-voltage direct current submarine power cable between Norway and the United Kingdom.

Prysmian S.p.A. is an multinational company with headquarters in Milan, specialising in the production of electrical cable for use in the energy and telecom sectors and for optical fibres. Prysmian is present in North America with 23 plants, 48 in Europe, 13 in LATAM, 7 MEAT, 13 APAC.

<span class="mw-page-title-main">Malta–Sicily interconnector</span> Submarine power cable

The Malta–Sicily interconnector is the submarine power cable which connects the power grid of Malta with the Italian Transmission Network managed by Terna, which is part of the European grid. It was constructed in 2014-2015, and supplies roughly 14 of Malta's electrical power.

<span class="mw-page-title-main">EuroAsia Interconnector</span> Planned submarine electricity cable

The Great Sea Interconnector, formerly known as the EuroAsia Interconnector is a planned HVDC interconnector between the Greek, Cypriot, and Israeli power grids via the world's longest submarine power cable, with a length of 310 kilometres (190 mi) from Israel to Cyprus and 898 kilometres (558 mi) from Cyprus to Greece for a total of 1,208 kilometres (751 mi).

Shetland HVDC Connection is a high-voltage direct current submarine power cable under construction to connect Shetland to the British mainland.

The Western HVDC Link is a high-voltage direct current (HVDC) undersea electrical link in the United Kingdom, between Hunterston in Western Scotland and Flintshire Bridge in North Wales, routed to the west of the Isle of Man. It has a transmission capacity of 2,250 MW and became fully operational in 2019.

COBRAcable is a ±320 kV, 700 MW HVDC submarine power cable pair between Eemshaven, the Netherlands and Endrup near Esbjerg, Denmark. The cable is jointly owned by Energinet.dk and TenneT. Its purpose is to improve the European transmission grid and thus increase the amount of variable wind power in the system while improving supply reliability. Its 700 MW capacity corresponds to an annual transmission capacity of 6.1 TWh.

Viking Link is a 1,400 MW HVDC submarine power cable between the United Kingdom and Denmark completed in 2023.

IFA-2 is a subsea electrical interconnector, running beneath the English Channel between France and the United Kingdom. The 204-kilometre (127 mi) high voltage direct current (HVDC) cable operates at +/-320kV with the capacity to transmit 1,000 MW of power. IFA-2 is the second interconnector built between France and Great Britain, after IFA link.

<span class="mw-page-title-main">EuroAfrica Interconnector</span>

EuroAfrica Interconnector is a planned HVDC interconnector and submarine power cable between the Greek, Cypriot, and Egypt power grids. The Interconnector is an energy highway bridging Africa and Europe. It will have a capacity to transmit 2,000 megawatts of electricity in either direction. Annual transmission capacity will be rated at 17.5 TWh, much more than the annual production at the Aswan Dam power stations. President of Egypt Abdel Fattah el-Sisi, President of Cyprus Nicos Anastasiades and Prime Minister of Greece Kyriakos Mitsotakis, issued a joint declaration at the conclusion of the 7th Trilateral Summit, held in Cairo on October 8, 2019, in which they expressed their desire to continue strengthening their cooperation in matters of energy. In particular, the joint declaration by the three leaders stated they recognised the importance of establishing an electrical grid between Egypt, Cyprus and Greece, building on the framework agreement between the Egyptian Electricity Holding Company and the Euro Africa Interconnector Company on 22 May 2019.

Greenlink is a 190 km high-voltage direct current (HVDC) submarine power cable under construction between County Wexford in Ireland and Pembrokeshire in Wales.

Eastern HVDC and Eastern HVDC projects are the names used by Ofgem for two planned HVDC submarine power cables from the East coast of Scotland to Northeast England to strengthen the National Grid. The two links combined will deliver 4 GW of renewable energy from Scottish wind farms to England.

References

  1. "Analysts Are Updating Their Nexans S.A. (EPA:NEX) Estimates After Its Interim Results". simplywall.st. 30 July 2021. Retrieved 2021-07-31.
  2. Ltd, Renews (2021-07-28). "Nexans HV earnings hit by lack of repair contracts". reNEWS - Renewable Energy News. Retrieved 2021-07-31.
  3. Largue, Pamela (2021-07-30). "Equinor's first offshore floating solar plant to use Nexans cable". Power Engineering International. Retrieved 2021-07-31.
  4. "Nexans' Cable for World's First Harsh-environment Floating Solar Plant". Offshore Engineer Magazine. 2021-07-28. Retrieved 2021-07-31.
  5. Nexans (2021-07-28). "Nexans: Strong Performance Supports Structural Value Growth". GlobeNewswire News Room (Press release). Retrieved 2021-07-31.
  6. "Prysmian Group Tops Nexans in the Global Specialty Cable Market in 2011".
  7. 2017 Registration document, Nexans
  8. "Nexans rises on debut". CNN Money . 13 June 2001. Retrieved 2009-09-13.
  9. Nexans inks reservation agreement for EuroAsia Interconnector
  10. "75-year-old Chester cable maker to close, nearly 200 to be laid off".
  11. Ltd, Renews (2021-07-02). "Nexans opens new cable facility in China". reNEWS - Renewable Energy News. Retrieved 2021-07-31.