28th Street/Little Portugal station

Last updated
28th St/Little Portugal
Bart-logo.svg
General information
Location28th Street
San Jose, CA
Coordinates 37°21′05″N121°51′54″W / 37.3513°N 121.86509°W / 37.3513; -121.86509
Owned by Bay Area Rapid Transit
Platforms2 side platforms
Tracks2
Construction
Structure type Cut-and-cover
AccessibleYes
History
Opening2036;12 years' time (2036) (estimated)
Services
Preceding station Bart compact logo.svg Bay Area Rapid Transit Following station
Future service
Berryessa/​North San José
toward Richmond
Orange Line Downtown San Jose
toward Santa Clara
Berryessa/​North San José
toward Daly City
Green Line
Route map
BART Silicon Valley extension.svg
Location
28th Street/Little Portugal station

28th Street/Little Portugal station [1] is a proposed underground Bay Area Rapid Transit station in the Little Portugal neighborhood of San Jose, California. It would be located north of East Santa Clara Street between North 28th Street and U.S. Route 101, behind Five Wounds Portuguese National Church. [2] Preceded by Berryessa/North San José station, it would be the first station of the Phase II portion of the Silicon Valley BART extension. The station would have direct service to Santa Clara, Richmond, and San Francisco/Daly City. In planning, the station was referred to as Alum Rock/28th Street, after the Alum Rock neighborhood to the northeast. [2] [3]

Contents

When this station, and all the Silicon Valley Extension stations, is completed, it will be served by the Green and Orange Lines.

History

A separate extension [4] was built from Fremont to Warm Springs station in the Warm Springs District (also in Fremont). This was followed by phase I of the Silicon Valley BART extension into eastern San Jose, built by VTA. The entire San Jose/Santa Clara extension, including Alum Rock station (as it was referred to at the time), was originally intended to be built in a single project, but funding could not be secured; therefore, the San Jose extension was split into two phases, and Alum Rock was placed in the second phase. On November 7, 2019, VTA renamed the station to 28th Street/Little Portugal in response to community feedback. [3] [5] If funding is secured, construction is slated to begin in 2024, and open to passenger service in 2036. [6] This station will be located between the Berryessa/North San José and Downtown San Jose Stations and will be served by VTA buses.

Related Research Articles

<span class="mw-page-title-main">Santa Clara Valley Transportation Authority</span> Public transit operator in Santa Clara County, California

The Santa Clara Valley Transportation Authority, more commonly known simply as the Valley Transportation Authority (VTA), is a special district responsible for public transit services, congestion management, specific highway improvement projects, and countywide transportation planning for Santa Clara County, California. It serves San Jose, California, and the surrounding Silicon Valley. It is one of the governing parties for the Caltrain commuter rail line that serves the county. In 2022, the VTA's public transportation services had a combined ridership of 21,381,600, or about 84,800 per weekday as of the third quarter of 2023.

<span class="mw-page-title-main">Green Line (BART)</span> Bay Area Rapid Transit line

The Green Line is a Bay Area Rapid Transit (BART) line in the San Francisco Bay Area that runs between Berryessa/North San José station and Daly City station. It has 22 stations in San Jose, Milpitas, Fremont, Union City, Hayward, San Leandro, Oakland, San Francisco, and Daly City. The line shares tracks with the four other primary BART services.

<span class="mw-page-title-main">Orange Line (BART)</span> Bay Area Rapid Transit line

The Orange Line is a Bay Area Rapid Transit (BART) line in the San Francisco Bay Area that runs between Berryessa/North San José station and Richmond station. It has 21 stations in San Jose, Milpitas, Fremont, Union City, Hayward, San Leandro, Oakland, Berkeley, El Cerrito, and Richmond. It is the only one of the five primary BART services that does not run through the Transbay Tube to San Francisco; however, it shares tracks with the four other primary services in the East Bay.

<span class="mw-page-title-main">Berryessa, San Jose</span> Neighborhood of San Jose in Santa Clara, California, United States

Berryessa is a district of San Jose, California, located in North San Jose. The district is named after the Berryessa family, a prominent Californio family of the Bay Area which historically owned most of the area.

<span class="mw-page-title-main">Fremont station (BART)</span> Bay Area Rapid Transit (BART) station in San Francisco Bay Area

Fremont station is a Bay Area Rapid Transit (BART) station in the central district of Fremont, California. The station is served by the Orange Line and Green Line. It was the southern terminus of both lines from September 11, 1972, until March 25, 2017, when Warm Springs/South Fremont station opened.

<span class="mw-page-title-main">San Jose Diridon station</span> Transit hub in San Jose, California, U.S.

San Jose Diridon station is the central passenger rail depot for San Jose, California. It also serves as a major intermodal transit center for Santa Clara County and Silicon Valley. The station is named after former Santa Clara County Supervisor Rod Diridon Sr.

<span class="mw-page-title-main">Green Line (VTA)</span> Light rail line in Santa Clara County, California

The Green Line is a light rail line in Santa Clara County, California, and part of the Santa Clara Valley Transportation Authority (VTA) light rail system. It serves 26 stations in the cities of Santa Clara, San Jose, and Campbell, traveling between Old Ironsides and Winchester stations. The line connects Levi's Stadium, San Jose International Airport, Downtown San Jose, San Jose State University, SAP Center, Diridon station, and Downtown Campbell. It runs for 20 hours per day on weekdays, with headways of 15 minutes for most of the day. On weekends, train run at 20 minute headways for most of the day. After around 8pm on weekdays and weekends trains run at 30 minute headways.

<span class="mw-page-title-main">Santa Clara station (VTA)</span> VTA light rail station in San Jose, California

Santa Clara station is a light rail station operated by Santa Clara Valley Transportation Authority (VTA) located in the Historic District of Downtown San Jose, California on 1st and 2nd Streets just south of Santa Clara Street. The northbound platform is on 1st Street; the southbound platform is on 2nd Street. The platforms are connected via a pedestrian paseo called Fountain Alley. This station is served by the Blue and Green lines of the VTA light rail system.

<span class="mw-page-title-main">Baypointe station</span> VTA light rail station in San Jose, California

Baypointe station is an at-grade light rail station located in the center median of Tasman Drive at its intersection with Baypointe Parkway, after which the station is named, in San Jose, California. The station is owned by Santa Clara Valley Transportation Authority (VTA) and is served by the Blue Line and the Orange Line of the VTA light rail system. Baypointe station is the current northern terminus for the Blue Line.

<span class="mw-page-title-main">VTA light rail</span> Light rail system in San Jose, California

The VTA light rail system serves San Jose and nearby cities in Santa Clara County, California. It is operated by the Santa Clara Valley Transportation Authority, or VTA, and consists of 42.2 miles (67.9 km) of network comprising three main lines on standard gauge tracks. Originally opened on December 11, 1987, the light rail system has gradually expanded since then, and currently has 60 stations in operation.

Throughout the history of Bay Area Rapid Transit, there have been plans to extend service to other areas.

<span class="mw-page-title-main">Milpitas station</span> Transit center served by BART trains, VTA light rail and buses

Milpitas station, also known as Milpitas Transit Center, is an intermodal transit station located near the intersection of East Capitol Avenue and Montague Expressway in Milpitas, California. The station is served by the Orange Line and Green Line Bay Area Rapid Transit (BART) lines, the Orange Line of the VTA light rail system, VTA buses, and AC Transit buses.

<span class="mw-page-title-main">Berryessa/North San José station</span> BART station in San Jose, California, United States

Berryessa/North San José station is an intermodal transit center located in the Berryessa district of San Jose, California. The station is served by Bay Area Rapid Transit (BART) and Santa Clara Valley Transportation Authority (VTA) buses. The transit center opened for bus service on December 28, 2019, and subsequently for BART service on June 13, 2020. The station is the southern terminus of the Orange Line and Green Line.

<span class="mw-page-title-main">Downtown San José station</span> Planned underground BART stop

Downtown San José station is a proposed underground Bay Area Rapid Transit station underneath Santa Clara Street in Downtown San Jose, planned as part of Silicon Valley BART extension Phase II. The station would be co-located with the Santa Clara Valley Transportation Authority's existing Santa Clara light rail station, and be located between the proposed 28th Street/Little Portugal station and a transfer station at San Jose Diridon Station. The station eventually connects to the proposed Santa Clara BART station. Revenue service, which will be served by the Orange and Green Lines, is envisioned to start in 2036.

<span class="mw-page-title-main">Bay Area Rapid Transit District</span>

The San Francisco Bay Area Rapid Transit District, or BART, is a special-purpose district body that governs the Bay Area Rapid Transit system in the California counties of Alameda, Contra Costa and San Francisco. The system itself also serves northern San Mateo County and Santa Clara County; however, these counties have bought into the system and have neither a voting stake nor any representatives in the district proper. The District currently operates 50 stations, 817 rail cars, 131 miles of track

The Silicon Valley BART extension is an ongoing effort to expand the Green and Orange Line service by Bay Area Rapid Transit (BART) into Santa Clara County via the East Bay from its former terminus at the Fremont station in Alameda County. Planned since at least 1981, the project has seven stations in three sequential phases.

<span class="mw-page-title-main">Warm Springs/South Fremont station</span> Rapid transit station in San Francisco Bay Area

Warm Springs/South Fremont station is a Bay Area Rapid Transit (BART) station located in the Warm Springs district of Fremont, California. The station is served by the Orange Line and Green Line. It was the southern terminus of both lines from its opening on March 25, 2017 until June 13, 2020, when Milpitas and Berryessa/North San José stations opened as part of the Silicon Valley BART extension.

<span class="mw-page-title-main">Little Portugal, San Jose</span> Neighborhood of San Jose in Santa Clara, California, United States

Little Portugal is a historic neighborhood of San Jose, California, and historically the center of the local Portuguese-American community. Little Portugal is home to numerous Portuguese businesses, including Adega, numerous Portuguese social clubs, and the Five Wounds Portuguese National Church.

<span class="mw-page-title-main">Orange Line (VTA)</span> Light rail line in Santa Clara County, California

The Orange Line is a light rail line in Santa Clara County, California, and part of the VTA light rail system. It serves 26 stations in the cities of Mountain View, Sunnyvale, Santa Clara, Milpitas, and San Jose, traveling between Downtown Mountain View and Alum Rock stations, stopping at Ames Research Center, Great America, and Levi's Stadium along the way. The line connects to Caltrain at Mountain View and to the Bay Area Rapid Transit (BART) system at Milpitas station. The line runs for 20 hours per day on weekdays, with headways of 15 minutes for most of the day. On weekends, the train runs at 20-minute headways for most of the day. After around 8 pm on weekdays and weekends trains run at 30-minute headways.

References

  1. "FACT SHEET VTA's BART Silicon Valley Phase II Project: 28th Street/Little Portugal Station" (PDF). VTA. Retrieved 25 April 2020.
  2. 1 2 "Fact Sheet: Alum Rock/28th Street Station" (PDF). BART Silicon Valley Phase II Extension Project. Santa Clara Valley Transportation Authority. November 8, 2018. Retrieved March 6, 2019.
  3. 1 2 "Station Name". Santa Clara Valley Transportation Authority. November 7, 2019. Retrieved May 15, 2020.
  4. "Warm Springs Extension Project Overview | bart.gov". www.bart.gov. Archived from the original on 2016-12-08. Retrieved 2018-04-13.
  5. "BART & VTA Partnership Special Committee Meeting" (PDF). San Francisco Bay Area Rapid Transit District. March 21, 2019. p. 8. Retrieved May 15, 2020.
  6. "BART delays loom for downtown San Jose: BART timetable for downtown San Jose service now seen as 2030". San Jose Mercury News. September 24, 2019. Retrieved October 10, 2019. At one point, political and business leaders had anticipated BART service beginning in 2026 in downtown San Jose, but the new estimates from VTA point to a service launch more in the 2029 or 2030 time frame…