British Rail Class D3/14

Last updated

LNER DES2
British Rail Class D3/14
Type and origin
Power typeDiesel-electric
Builder London and North Eastern Railway’s Doncaster Works
Build date1947
Total produced1
Specifications
Configuration:
   Whyte 0-6-0 DE
   UIC C
Gauge 4 ft 8+12 in (1,435 mm) standard gauge
Wheel diameter4 ft 0 in (1.219 m)
Loco weight51.20 long tons (52.02  t; 57.34 short tons)
Prime mover Petter SS4
Traction motors Brush Traction, 2 off
MU working Not fitted
Train heatingNone
Train brakes Vacuum
Performance figures
Power outputEngine: 360  bhp (270  kW)
Tractive effort 32,000  lbf (142.3  kN)
Career
Operators London and North Eastern Railway,
British Railways
Class LNER: DES2; BR: DEJ2; later D3/14; later 3/2
NumbersLNER: (none);
BR: 15004
Axle load class Route availability 5
RetiredSeptember 1962
Disposition Scrapped, Doncaster Works

British Rail Class D3/14 was a diesel-electric locomotive built by the London and North Eastern Railway at its Doncaster Works. [1] It had a Petter engine, and Brush Traction electricals. It was absorbed by British Railways on nationalisation, but was withdrawn in the pre-TOPS era.

Contents

History

Originally laid down as a D3/9, the frames were moved from Doncaster Works to Brush Traction's Falcon Works in Loughborough for final assembly. It was completed in September 1947 and undertook trials with LNER in November 1947. In January 1948, it was moved to Temple Mills Yard in London for further trials. It was then moved to March Whitemoor Yard. In December 1948, it was returned to Loughborough and was acquired by British Rail upon nationalisation. [2]

In April 1949, it was delivered to March shed. Whilst based at March, it was used on short freight services between Ferme Park and Herne Hill. It moved to Hornsey Depot in December 1951, however it was moved to Crewe Works later that month. It returned to March in January 1952 and returned to Hornsey in around 1955. In January 1957, it worked at Woodford Halse Shed and New England Shed in Peterborough where it remained until withdrawal in October 1962. [2]

Upon withdrawal, it was moved to Doncaster Works, and was finally scrapped in July 1963. [2]

See also

Sources

  1. "D3/14 0-6-0". Brdatabase.info. Retrieved 4 August 2022.
  2. 1 2 3 The Allocation History of BR Diesel Shunters. Heritage Shunters Trust. 2018. pp. 33–34.