Eaton's / John Maryon Tower

Last updated
Eaton's / John Maryon Tower
John Maryon Tower 1971.jpg
General information
StatusNever built
TypeOffice, Communications tower
Location Toronto, Ontario, Canada
Height
Antenna spire2,250 ft (685.8 m)
Roof1,650 ft (502.9 m)
Technical details
Floor count140
Design and construction
Architect(s)John Maryon & Partners Ltd.
DeveloperJohn Maryon

Eaton's / John Maryon Tower was a proposed supertall 140-storey office skyscraper, to be built in Toronto, Ontario, Canada. [1] [2] In 1971, Eaton's was to partner with a developer named John Maryon to build a 503 metre [2] tower in the College Park area of Downtown Toronto. With a 183-metre communication mast added to the roof of the triangular glass office tower, the total proposed height was 686 metres. Plans for the tower were cancelled, because building a structure of this height was considered impossible at the time of its planning. The skyscraper was planned two years before the Willis Tower was completed, and five years before the CN Tower was completed. Had the tower been built, it would have been the world's tallest building until 2008, when the Burj Khalifa surpassed its planned height.

Contents

A tower at this site was not a new idea. In the late 1920s, Eaton's College Street (now called College Park) was proposed as a 38-storey tower. In 1978, a residential condo tower was built near College Park, followed by a 30-storey office tower in 1984. In 2014, the final phase of a series of new condominiums near College Park was completed with the construction of Aura, Canada's tallest residential building (78 floors). [3]

See also

Related Research Articles

<span class="mw-page-title-main">Harry Stinson</span> Canadian real estate developer

Harry Stinson is a Canadian real estate developer from Hamilton, Ontario, Canada. He is president of Stinson Properties, Inc. He has been called Toronto's "condo king".

The Sapphire Tower was a proposed luxury hotel and condominium skyscraper in Toronto, Ontario, Canada, to be built by developer Harry Stinson. It was so named because all plans for it had deep blue glass curtain walls. This site had been involved in numerous other proposals, including Stinson's own Downtown Plaza concept, and an earlier proposal that would have incorporated the neighbouring Graphic Arts Building.

<span class="mw-page-title-main">One Yonge Street</span> Toronto Star headquarters

One Yonge Street is a 25-storey office building in Toronto, Ontario, Canada. The building served as the headquarters of Torstar and its flagship newspaper, the Toronto Star, from 1971 to 2022. It is 100 metres tall and built in the International style. It was built as a replacement to the Old Toronto Star Building, which was located at 80 King Street West. That building was torn down to make room for First Canadian Place.

<span class="mw-page-title-main">Downtown Toronto</span> Central business district in Toronto, Ontario, Canada

Downtown Toronto is the main central business district of Toronto, Ontario, Canada. Located entirely within the district of Old Toronto, it is approximately 16.6 square kilometres in area, bounded by Bloor Street to the northeast and Dupont Street to the northwest, Lake Ontario to the south, the Don Valley to the east, and Bathurst Street to the west. It is also the home of the municipal government of Toronto and the Government of Ontario.

<span class="mw-page-title-main">Architecture of Toronto</span> Overview of the architecture of Toronto

The architecture of Toronto is an eclectic combination of architectural styles, ranging from 19th century Georgian architecture to 21st century postmodern architecture and beyond.

<span class="mw-page-title-main">Minto Midtown</span> Residential complex on Yonge Street in Toronto

The Minto Midtown is a residential complex on Yonge Street in Toronto in the Davisville neighbourhood near Yonge and Eglinton consisting of two towers, Quantum and Quantum 2 developed by Minto Developments Inc. The proposed project—which substantially exceeded existing height and zoning limits—was met with substantial neighborhood and city opposition, until Minto appealed to the Ontario Municipal Board and worked out a deal with the City of Toronto.

<span class="mw-page-title-main">One Bloor</span> Skyscraper on Bloor Street and Yonge Street in downtown Toronto, Ontario, Canada

One Bloor, previously One Bloor East and Number One Bloor, is a mixed-use skyscraper at the intersection of Bloor Street and Yonge Street in downtown Toronto, Ontario, Canada. The project was initially launched by developer Bazis International Inc. in 2007, before being cancelled and re-developed by Great Gulf. As of 2018, it is the tenth-tallest residential building outside of Asia and the 40th tallest residential building in the world.

<span class="mw-page-title-main">Aura (Toronto)</span> Mixed-use skyscraper completed in 2014 in Toronto, Ontario, Canada

Aura is a mixed-use skyscraper completed in 2014 in Toronto, Ontario, Canada. It is the final phase of a series of condominium buildings near College Park in Toronto's Downtown Yonge district. It is part of the Residences of College Park project. Construction lasted from 2010 to 2014. With 79 floors, as of 2018 it is the tallest residential building in Canada and the 38th tallest residential building in the world.

<span class="mw-page-title-main">One Queensbridge</span> Proposed skyscraper in Melbourne

One Queensbridge was a proposed mixed–used supertall skyscraper to be located in the Southbank precinct of Melbourne, Australia. The skyscraper would have become the tallest building in Melbourne, surpassing the height of Australia 108, and the tallest building in Australia, eclipsing the height of Q1. In addition to being the tallest, the development would have been one of the biggest single–building projects in Australia, encompassing 300,376 square metres of floor area.

<span class="mw-page-title-main">Stantec Tower</span> Skyscraper in Edmonton, Canada (opened 2018)

Stantec Tower is a 66-story building and 4 underground, 250.8 m (823 ft) mixed-use skyscraper in Ice District in the downtown core of Edmonton, Alberta, Canada. On May 23, 2018, it reached a construction height of 197 m (646.3 ft) and surpassed the JW Marriott Edmonton Ice District & Residences, becoming the tallest building in Edmonton and one of the largest mixed-use projects in Canada. The office area of the tower opened on September 26, 2018, and the residential portion opened in 2019.

<span class="mw-page-title-main">The One (Toronto)</span> Supertall skyscraper in Toronto

The One is a supertall skyscraper currently under construction in Toronto, Ontario, Canada. If completed, it will be the tallest building in Canada. At 328.4 metres and 91 storeys, it will be taller than First Canadian Place, which has been Canada's tallest building since 1975. It will also be Canada's first supertall skyscraper, as defined by the Council on Tall Buildings and Urban Habitat. Construction of the building is estimated to be completed by March 2025.

References

  1. McDowell, Adam (2010-04-23). "Ground-breaking today for Toronto's tallest all-residential tower". National Post. Retrieved 2019-12-14.
  2. 1 2 Bateman, Chris (September 14, 2013). "That time Eaton's planned the tallest tower in the world". blogTO. Retrieved December 14, 2019.
  3. Pigg, Susan (February 17, 2012). "Toronto condo tower takes title of tallest residential skyscraper in Canada". The Toronto Star . Retrieved 2017-08-31.