JFK/UMass station

Last updated

JFK/UMass
Outbound Braintree Branch train at JFK UMass station, July 2013.JPG
A southbound train on the Braintree Branch platform in 2013
General information
Location599 Old Colony Avenue
Boston, Massachusetts
Coordinates 42°19′14″N71°03′09″W / 42.32058°N 71.05239°W / 42.32058; -71.05239
Line(s) Old Colony Mainline
Ashmont branch
Braintree branch
Platforms1 side platform (Commuter Rail)
2 island platforms (Red Line)
Tracks1 (Commuter Rail)
4 (Red Line)
ConnectionsAiga bus trans.svg MBTA bus: 8, 16,  41
Aiga bus trans.svg UMass Boston shuttle
Construction
Bicycle facilitiesRacks available
AccessibleYes
Other information
Fare zone1A (Commuter Rail)
History
OpenedNovember 5, 1927 [1]
RebuiltJune 1987–December 14, 1988
Previous namesColumbia (1927–1982)
Passengers
2018362 daily boardings [2] (Commuter Rail)
Preceding station MBTA.svg MBTA Following station
Andrew
toward Alewife
Red Line
Savin Hill
toward Ashmont
North Quincy
toward Braintree
South Station
Terminus
Greenbush Line Quincy Center
toward Greenbush
Middleborough/​Lakeville Line Quincy Center
Kingston Line Quincy Center
toward Kingston
Former services (Crescent Avenue station)
Preceding station New York, New Haven and Hartford Railroad Following station
South Boston
Closed ca. 1917
toward Boston
Boston–​Mattapan Savin Hill
toward Mattapan
Boston–​Braintree Savin Hill
toward Braintree
Future services
Preceding station MBTA.svg MBTA Following station
South Station
Terminus
South Coast Rail Quincy Center
Location JFK/UMass station

JFK/UMass station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transfer station, located adjacent to the Columbia Point area of Dorchester, Boston, Massachusetts. It is served by the rapid transit Red Line; the Greenbush Line, Kingston/Plymouth Line, and Middleborough/Lakeville Line of the MBTA Commuter Rail system, and three MBTA bus routes. The station is named for the John F. Kennedy Presidential Library and Museum and the University of Massachusetts Boston, both located nearby on Columbia Point.

Contents

JFK/UMass station has four tracks and two island platforms for the Ashmont and Braintree branches of the Red Line, with one track and one side platform for Commuter Rail. A waiting room and fare lobby over the Red Line platforms is connected to Columbia Road, Sydney Street, and the busway on the east side of the station by footbridge. The station is fully accessible. North of the station, the complex Columbia Junction connects the two Red Line branches with the downtown tunnel and Cabot Yard lead tracks.

The Old Colony Railroad first opened through the area in 1845, with Crescent Avenue serving as a flag stop by 1848. A station building opened in 1868 and was rebuilt in 1883. The Boston Elevated Railway began construction of Columbia station on the Dorchester Extension of the Cambridge–Dorchester Tunnel in 1925. Crescent Avenue station closed in July 1927; Columbia station opened on November 5, with an additional footbridge added in 1929. Columbia station was modernized in 1970, though without a platform for South Shore (Braintree Branch) service, which started in 1971. UMass Boston moved to Columbia Point in 1974, while the Kennedy Library opened in 1979; the station was renamed JFK/UMass in 1982. A 1987–88 renovation added a platform for the Braintree Branch. Commuter Rail service on the former Old Colony, last operated in 1959, resumed in 1997. However, the platform at JFK/UMass did not open until 2001.

History

Old Colony Railroad and BERy

Columbia station in March 1928 Looking northwesterly toward easterly side of Columbia station, March 1928.jpg
Columbia station in March 1928

In 1845, the Old Colony Railroad opened between Boston and Plymouth, Massachusetts. [4] Crescent Avenue was a flag stop for South Braintree and Dorchester and Milton Branch trains by 1848. [5] A station building was opened at Crescent Avenue on November 2, 1868, and replaced in 1883. [6] [7] [8]

In the early 1920s, the Boston Elevated Railway (BERy) began planning an extension of the Cambridge–Dorchester Tunnel over the Shawmut Branch to Ashmont. The New York, New Haven, and Hartford Railroad, which had succeeded the Old Colony, sold the Shawmut Branch to the BERy, with service ending on September 6, 1926. [9] The mainline stations at Crescent Avenue and Savin Hill were kept open during construction. [10] Crescent Avenue station was closed on July 15, 1927, for final construction and demolished shortly thereafter. [11] [12]

Crescent Avenue was replaced with Columbia station, which primarily served the residential areas to the west. [13] The station had a single island platform, 300 feet (91 m) long and varying 20–25 feet (6.1–7.6 m) wide, covered with a full-length reinforced concrete canopy. [10] It was designed to be extended southwards if future ridership required six-car trains. [13] The entrance to the station was from the Columbia Road overpass; like other stations on the Dorchester Extension, it was a rectangular red brick structure with red sandstone and Concord granite trim. The roofs of the headhouse, the stairway to the platform, and the canopy were all flashed with copper. Fare control was in the headhouse, with a waiting room on the platform. The station was designed by William D. Austin. [10]

Construction of the station began in 1925 with the reconstruction of the Columbia Road bridge. [14] The station platform was built in mid-1926. [10] Construction was completed in May 1927; the station was finished during the next several months under the possibility it would open before Savin Hill and Fields Corner. [11] The three stations ultimately opened together on November 5, 1927. [1] [11]

In November 1928, the BERy began construction of a second station entrance from Sydney Street at Crescent Avenue. A footbridge was built over the southbound track at the south end of the station, with fare control located on a short extension of the platform. [15] The new entrance opened on March 18, 1929; by May, it was used by 42% of passengers at the station. [16] [17] In late 1938, the footbridge was extended east over the other tracks to serve a parking area. [18] [19]

MBTA era

The 1970-built north headhouse JFK UMass station Columbia Road headhouse, April 2016.JPG
The 1970-built north headhouse

On January 13, 1961, the MTA began operating "modified express service" on the line during the morning rush hour, following the introduction of similar service on the Forest Hills–Everett line the month before. Every other train bypassed Columbia and three other stations. [20] This was discontinued in September 1961 to reduce wait times at the skipped stations, most of which were outdoors. [21]

The New Haven Railroad ended commuter service on the Old Colony lines in 1959, but subway service to Ashmont via Columbia continued. On July 28, 1965, the MBTA signed an agreement with the New Haven Railroad to purchase 11 miles (18 km) of the former Old Colony mainline from Fort Point Channel to South Braintree in order to construct a new rapid transit line along the corridor. The line was expected to be completed within two years. [1] [22] On August 26, 1965, the Cambridge–Dorchester line was renamed as the Red Line as part of a rebranding by the Massachusetts Bay Transportation Authority (MBTA), which had taken over the system in 1964. [1]

In 1967, the MBTA began a station modernization program; modifications to Columbia took place in 1970. [23] A southward extension made the platform long enough for six-car trains (which were not run until 1987). [1] The original brick headhouse was replaced with a plain concrete headhouse, which opened on February 20, 1970, and the platform waiting room was removed. [24] [25] The footbridge was also replaced. [24] The South Shore Branch (later the Braintree Branch) opened in 1971. Trains used two new tracks on the east side of Columbia; they did not stop in order to speed travel time between Quincy and Boston. [1]

1980s

The Columbia Point Development opened to the southeast of the station in 1954; residents of the housing development secured the 1962 closure of the city dump, which opened the peninsula to development. Ridership at Columbia station grew quickly despite the MBTA's refusal to have the South Shore Branch stop. [7] :80 Three major developments opening on Columbia Point in the 1970s—the UMass Boston campus in 1974, the John F. Kennedy Presidential Library and Museum in 1979, and the Bayside Expo Center—increased the importance of the station. [26] [7] :80 On December 2, 1982, the station was renamed as JFK/UMass after the campus and library. [1] [25] Columbia was re-added as a secondary name in 1985 as part of a series of station name changes. [27] Repairs to the Columbia Road bridge closed the north entrance from early 1982 until January 10, 1983. [25]

The Braintree Branch platform and the overhead waiting room (left) opened in 1988, while the commuter platform (right) opened in 2001 JFK UMass station viewed from commuter rail platform, April 2016.JPG
The Braintree Branch platform and the overhead waiting room (left) opened in 1988, while the commuter platform (right) opened in 2001

In January 1980, the MBTA indicated that a $1 million renovation of the station, including a second platform, would be completed in 1982. [28] However, the project proved controversial; residents near Savin Hill station instead wanted a flyover there so that Braintree Branch trains would stop at both Savin Hill and JFK/UMass. State officials insisted that the flyover would be significantly more expensive than the second platform, and that five times as many South Shore riders were riding to JFK/UMass as to Savin Hill. [29] [30]

The MBTA awarded a $13.5 million construction contract on February 4, 1987, and work began that June. [31] A groundbreaking ceremony was held on July 16. [25] [7] A large waiting room and fare control lobby was built over the center of the platforms, with footbridges to Sydney Street on the west and a new busway on the east. The 1970s Columbia Road entrance became exit-only; an adjacent footbridge to the lobby was added. The south footbridge was modified with a connection to the new platform, and became exit-only. The east part of the footbridge was removed and an employee building constructed in its place. [24] The platform for the Braintree Branch opened on December 14, 1988, allowing all Red Line trains to stop at the renovated station. [1] [7] The renovation included elevators to both platforms, making the station accessible. [32] [33] [34]

2000s

Commuter rail service on the Middleborough/Lakeville and Plymouth/Kingston lines was restored in September 1997. [1] The MBTA initially did not plan to include a stop at JFK/UMass; not until November 1996 did the agency agree to built the platform. [35] Construction began in 2000, and trains began stopping on April 30, 2001. [1] [35] This was the first time that mainline commuter trains stopped at the station since 1927. Several rush-hour Greenbush Line trains began to stop concurrent with that line's restoration in 2007. [1] Not all weekday commuter trains on the lines stop, however, because the station is in a single-tracked bottleneck section of the otherwise double-tracked route. All weekend trains, which operate on more limited schedules, stop at the station. [36]

Closed south stairs in December 2022 Closed south stairs at JFK UMass station, December 2022.jpg
Closed south stairs in December 2022

JFK/UMass station was a proposed stop on the MBTA's planned Urban Ring Project. [37] The Urban Ring was to be a bus rapid transit (BRT) line designed to connect the current MBTA lines to reduce strain on the downtown stations. Under 2008 plans, the Urban Ring would access the station via Columbia Road, with a one-bay dedicated BRT platform in the existing busway. [38] The project was cancelled in January 2010. [39] In 2012 and 2013, the MBTA installed over 50 security cameras in the station—in addition to over ten already present—in response to an increase of crime in nearby areas. [40] Improvements to the station were proposed in 2014 as part of the city's bid for the 2024 Olympics, which was withdrawn in 2015. [41]

On June 11, 2019, a Red Line train derailed just north of JFK/UMass station due to a broken axle, damaging three sheds of signal equipment that control the nearby Columbia Junction. [42] [43] The Red Line was limited to 10 trains per hour (instead of the usual 13–14) for three months while repairs were made. [43] [44] Full service resumed on September 25, 2019. [45]

Structural deterioration affected the station entrances in the early 2020s. On January 29, 2020, the stairs between Columbia Road and the east side of the station were taken out of service for repairs. [46] Boston University professor David K. Jones was killed when he fell through a missing section of the still-closed stairs (owned by the Department of Conservation and Recreation) on September 11, 2021. [47] [48] The stairs from the east footbridge to the busway were closed from May to September 2022, and the southern stairs to Sydney Street were indefinitely closed in mid-2022. [49] [50] In November 2022, the MBTA closed the Columbia Road entrance, with repairs initially expected to take at least a month. [50] Part of the Red Line was closed for a weekend in January 2023 to accommodate repairs. [51] The Columbia Road entrance reopened that month. [52] The MBTA included $2.3 million in its draft fiscal year 2024–2028 capital plan for a planning study to redesign the station. [53]

Buses replaced service on the Ashmont Branch from October 14–29, 2023, to allow for track work. [54] [55] Repairs and repainting of the Red Line platforms at JFK/UMass station was also performed during the closure. [56]

Station layout

Station layout
BSicon dCONTfa red.svg
BSicon dCONTg red.svg
BSicon dCONTg violet.svg
BSicon dSKRZ-G4hl red.svg
BSicon dSKRZ-G4h red.svg
BSicon dSKRZ-G4hr violet.svg
Boston Street
BSicon tdCONTfa red.svg
BSicon tdCONTg red.svg
BSicon dSTRc2 red.svg
BSicon dABZg3 red.svg
BSicon dSTR red.svg
BSicon dSTR violet.svg
BSicon dSTRc2 red.svg
BSicon tdSTR red.svg
BSicon tdSTR red.svg
BSicon STR3+1 red.svg
BSicon STRc4 red.svg
BSicon vSTR red.svg
BSicon dSTR violet.svg
BSicon vSTR+1- red.svg
BSicon tdSTR red.svg
BSicon dSTRc4 red.svg
BSicon tdSTR red.svg
BSicon vSTR red.svg
BSicon dSTR violet.svg
BSicon dSKRZ-G4hl red.svg
BSicon tvSKRZ-G4h red.svg
BSicon hdRP4q.svg
BSicon vSKRZ-G4h red.svg
BSicon dSKRZ-G4hr violet.svg
Dorchester Avenue
BSicon dSTR red.svg
BSicon tvSTRe red.svg
BSicon vSTR red.svg
BSicon dSTR violet.svg
BSicon v-STR2 red.svg
BSicon vSTR red.svg
BSicon dSTR red.svg
BSicon STRc3 red.svg
BSicon vSTR2- red.svg
BSicon STRc3 red.svg
BSicon vSTR red.svg
BSicon dSTR violet.svg
BSicon STRc1 red.svg
BSicon vUST red.svg
BSicon dKRZ2+4o- red.svg
BSicon dSTRc1 red.svg
BSicon dSHI2+r red.svg
BSicon dKRZ2+4u- red.svg
BSicon dSHI2g+r red.svg
BSicon dSTR violet.svg
BSicon ldENDE@F.svg
BSicon dSTR red.svg
BSicon vUSTl red.svg
BSicon vSHI2g+l- red.svg
BSicon dSTR red.svg
BSicon dSTR violet.svg
BSicon dSKRZ-G4hl red.svg
BSicon vSKRZ-G4h red.svg
BSicon hdRP4q.svg
BSicon dSKRZ-G4h red.svg
BSicon dSKRZ-G4hr violet.svg
Columbia Road
BSicon v-SHI2r red.svg
BSicon vSTR red.svg
BSicon dSTR red.svg
BSicon dSTR violet.svg
BSicon dSTR red.svg
BSicon dBS.svg
BSicon vSTR red.svg
BSicon dBS.svg
BSicon dSTR red.svg
BSicon dSTR violet.svg
BSicon cBS.svg
JFK/
BSicon dNULf.svg
BSicon dSTR red.svg
BSicon dBS.svg
BSicon vNULgf.svg
BSicon vSTR red.svg
BSicon dBS.svg
BSicon dNULg.svg
BSicon dSTR red.svg
BSicon dNULf.f.svg
BSicon dNULg.g.svg
BSicon dSTR violet.svg
BSicon cBS.svg
UMass
BSicon dSTR red.svg
BSicon dBS.svg
BSicon vSTR red.svg
BSicon dBS.svg
BSicon dSTR red.svg
BSicon dSTR violet.svg
BSicon cBS.svg
station
BSicon dSTR red.svg
BSicon v-SHI2r red.svg
BSicon dSTR red.svg
BSicon v-SHI2+l violet.svg
BSicon v-SHI2r red.svg
BSicon vSHI2r- violet.svg
BSicon vSKRZ-G4h red.svg
BSicon hdRP4q.svg
BSicon vSKRZ-G4h red.svg
BSicon dSKRZ-G4hr violet.svg
I-93.svgUS 1.svgMA Route 3.svg I-93  / US 1  / Route 3
BSicon vSTR red.svg
BSicon vSTR red.svg
BSicon dSTR violet.svg
BSicon vSTR2- violet.svg
BSicon dSTRc3 violet.svg
BSicon vSTR red.svg
BSicon vSTR red.svg
BSicon lMSTRc3o.svg
BSicon tSTRc3 violet.svg
BSicon dSTR3 violet.svg
BSicon dSTRc1 violet.svg
BSicon ENDE4 violet.svg
BSicon vSTR red.svg
BSicon tdSTRc2 violet.svg
BSicon vSTR red.svg
BSicon tSTRc4 violet.svg
BSicon dSTR red.svg
BSicon lMSTRc1o.svg
BSicon tSTRc1 violet.svg
BSicon dSTR red.svg
BSicon dSTR+1 violet.svg
BSicon vSTR red.svg
BSicon dCONTf red.svg
BSicon dCONTge red.svg
BSicon dSTR violet.svg
BSicon dCONTf red.svg
BSicon dCONTge red.svg
BSicon CONTf violet.svg
Aerial view of the station, facing north Aerial view of JFK UMass station, July 2019.JPG
Aerial view of the station, facing north

JFK/UMass station is located south of Columbia Road near Kosciuszko Circle, with the Interstate 93 viaduct to the south and west and Morrissey Boulevard to the east. The Red Line has four tracks and two island platforms at the station; the west platform is served by the Ashmont branch, and the east platform by the Braintree branch. [57] (This unusual configuration is the result of the decision to not originally have the Braintree Branch stop at the station.) [7] [36] East of the Red Line is a single track used by the three commuter rail lines, with a high-level side platform on its east side. [57] A two-lane busway, drop-off lane, and plaza are located east of the tracks. [24]

A waiting room and fare lobby is located over the middle of the Red Line platforms, with elevators and stairs to both platforms. Footbridges connect the lobby to the Columbia Road bridge to the north, Sydney Street to the west, and the east plaza via a ramp structure. Exit-only stairs also lead from the north ends of the Red Line platforms to Columbia Road, and from the south ends to Sydney Street at Crescent Avenue. [24] Because northbound Red Line trains arrive on two different platforms, an automatic illuminated sign in the lobby indicates which platform the next northbound train will arrive at. [36]

North of the station is a complex Red Line interlocking called Columbia Junction. The two track line from downtown Boston exits the tunnel under Dorchester Avenue about 0.4 miles (0.6 km) north of JFK/UMass station and splits into the four tracks with a flying junction. The junction also connects two yard leads from Cabot Yard, the main Red Line maintenance facility, which is located on the surface near Broadway. [57] [36] South of the station, the Braintree Branch tracks cross over the commuter rail tracks via a lengthy flyover. [57] The flyover is dedicated to Milton DeVaughn, an MBTA track worker, who died in December 1993 when he fell under the wheels of an MBTA work train. [58]

Bus connections

Columbia was not built as a transfer station; streetcar—and later, bus—routes mostly served Andrew and Fields Corner. Bus service to the station began in 1954 when the Columbia Point Development was constructed, and increased in 1974 when the UMass campus opened. [1] The 1988 renovations added a dedicated two-lane busway on the east side of the station. [24] [34] The station is served by MBTA bus routes 8 , 16 , and  41. [59] During service disruptions – both planned track work and unplanned incidents – JFK/UMass is often used as the terminus of busing on either Red Line branch. [1] A privately operated shuttle bus also connects the station with the UMass campus and the John F. Kennedy Library. [59]

Related Research Articles

<span class="mw-page-title-main">Red Line (MBTA)</span> Rapid transit line in Massachusetts, US

The Red Line is a rapid transit line operated by the Massachusetts Bay Transportation Authority (MBTA) as part of the MBTA subway system. The line runs south and east underground from Alewife station in North Cambridge through Somerville and Cambridge, surfacing to cross the Longfellow Bridge then returning to tunnels under Downtown Boston. It continues underground through South Boston, splitting into two branches on the surface at JFK/UMass station. The Ashmont branch runs southwest through Dorchester to Ashmont station, where the connecting light rail Ashmont–Mattapan High Speed Line continues to Mattapan station. The Braintree branch runs southwest through Quincy and Braintree to Braintree station.

<span class="mw-page-title-main">Ashmont–Mattapan High-Speed Line</span> Light rail line in Boston and Milton, Massachusetts

The Ashmont–Mattapan High-Speed Line, commonly referred to as the Mattapan Trolley, is a partially grade-separated light rail line which forms part of the MBTA's Red Line rapid transit line. The line, which runs through Boston and Milton, Massachusetts, opened on August 26, 1929, as a conversion of a former commuter rail line. It exclusively uses PCC streetcars built in the 1940s. Passengers must transfer at Ashmont to access the rest of the Red Line, which uses heavy rail metro rolling stock.

<span class="mw-page-title-main">Kendall/MIT station</span> Subway station in Cambridge, Massachusetts

Kendall/MIT station is an underground rapid transit station in Cambridge, Massachusetts. It serves the MBTA Red Line, Located at the intersection of Main Street and Broadway, it is named for the primary areas it serves - the Kendall Square business district and the Massachusetts Institute of Technology (MIT). Opened in March 1912 as part of the original Cambridge subway, Kendall/MIT has two side platforms serving the line's two tracks. The Kendall Band, a public art installation of hand-operated musical sculptures, is located between the tracks in the station with controls located on the platforms. Kendall/MIT station is accessible. With 17,018 weekday boardings by a FY2019 count, Kendall/MIT has the fourth highest ridership among MBTA subway stations.

<span class="mw-page-title-main">Fields Corner station</span> Rapid transit station in Boston, Massachusetts, US

Fields Corner station is a rapid transit station on the Ashmont branch of the Massachusetts Bay Transportation Authority (MBTA) Red Line, located in the Fields Corner district of Dorchester, Boston, Massachusetts. It is a major transfer point for MBTA bus service, serving routes 15, 17, 18, 19, 201, 202, and 210. The station opened in 1927 and was completely rebuilt from 2004 to 2008, making it fully accessible.

<span class="mw-page-title-main">Ashmont station</span> Rapid transit station in Boston, Massachusetts, US

Ashmont station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station located at Peabody Square in the Dorchester neighborhood of Boston, Massachusetts. It is the southern terminus of the Ashmont branch of the rapid transit Red Line, the northern terminus of the connecting light rail Ashmont–Mattapan High-Speed Line, and a major terminal for MBTA bus service. Ashmont has two side platforms serving the below-grade Red Line and a single side platform on an elevated balloon loop for the Mattapan Line. The station is fully accessible for all modes.

<span class="mw-page-title-main">Braintree station (MBTA)</span> Transit station in Braintree, Massachusetts, US

Braintree station is an intermodal transit station in Braintree, Massachusetts. It serves the MBTA's Red Line and the MBTA Commuter Rail Old Colony Lines as well as MBTA buses.

<span class="mw-page-title-main">Quincy Adams station</span> Rapid transit station in Quincy, Massachusetts, US

Quincy Adams station is a rapid transit station in Quincy, Massachusetts. It serves the Braintree Branch of the MBTA's Red Line. Located in southern Quincy on Burgin Parkway near the Braintree Split, the station features a large park and ride garage, with space for 2,538 automobiles, built over the station tracks and platforms. It is fully accessible.

<span class="mw-page-title-main">Andrew station</span> Subway station in Boston, Massachusetts, US

Andrew station is a rapid transit station in Boston, Massachusetts. Located at Andrew Square in South Boston, it serves the MBTA Red Line and the MBTA bus system. Named for John Albion Andrew, the square is at the intersection of several major thoroughfares: Dorchester Avenue, Dorchester Street, Southampton Street, and Boston Street. Andrew is the primary transfer point between the Red Line subway and the MBTA surface bus routes into South Boston. Opened in 1918 and renovated in 1990–1994, it is fully accessible.

<span class="mw-page-title-main">Savin Hill station</span> Rapid transit station in Boston, Massachusetts, US

Savin Hill station is a rapid transit station in Boston, Massachusetts. It serves the Ashmont branch of the MBTA's Red Line. It is located at 121 Savin Hill Avenue adjacent to Sydney Street in the Savin Hill area of the Dorchester neighborhood. Opened in 1845 as a commuter rail station, Savin Hill was converted to rapid transit in 1927 and rebuilt in 2004–05 for accessibility. Averaging 2,199 daily boardings by a FY 2019 count, Savin Hill is the least-used station on the Red Line.

<span class="mw-page-title-main">Quincy Center station</span> Transit station in Quincy, Massachusetts, US

Quincy Center station is an intermodal transit station in Quincy, Massachusetts. It is a transfer station between the MBTA Red Line subway, MBTA Commuter Rail's Old Colony Lines and Greenbush Line, and a number of MBTA bus routes. It is located between Hancock Street and Burgin Parkway in the Quincy Center district. Opened in 1971, the station was covered by a large parking garage which was closed in 2012 due to structural problems and removed several years later. The station is accessible on all modes.

<span class="mw-page-title-main">North Quincy station</span> Rapid transit station in Quincy, Massachusetts, US

North Quincy station is an MBTA subway Red Line station in Quincy, Massachusetts. It is located in North Quincy, off Hancock Street. A major park-and-ride stop, it has over 1200 parking spaces for commuters. The station is fully accessible.

<span class="mw-page-title-main">Wollaston station</span> Rapid transit station in Quincy, Massachusetts, US

Wollaston station is a rapid transit station in Quincy, Massachusetts. Located in the Wollaston neighborhood, it serves the MBTA's Red Line. It was opened in September 1971 as the second of three stations in the original South Shore Extension, replacing a mainline rail station which had been located there from 1845 to 1959. Wollaston station was closed from January 8, 2018, to August 16, 2019, for renovations to the station, including flood mitigation and accessibility improvements.

<span class="mw-page-title-main">Broadway station (MBTA)</span> Subway station in Boston, Massachusetts, US

Broadway station is a subway station in Boston, Massachusetts. It serves the MBTA's Red Line. It is located at the intersection of Dorchester Avenue and Broadway in South Boston. It was opened on December 15, 1917, as part of the Dorchester Extension from Downtown Crossing to Andrew. The station has a single island platform to serve the two tracks.

<span class="mw-page-title-main">Readville station</span> Railway station in Boston, Massachusetts, US

Readville station is a Massachusetts Bay Transportation Authority (MBTA) commuter rail station located in the Readville section of the Hyde Park neighborhood of Boston, Massachusetts. It is served by MBTA Commuter Rail Fairmount Line and Franklin/Foxboro Line. Readville is the outer terminus for most Fairmount service, though some trips continue as Franklin/Foxboro Line trains. The station is located at a multi-level junction, with the Northeast Corridor tracks at ground level and the Dorchester Branch above; Franklin/Foxboro Line trains use a connecting track with a separate platform. Platforms are available for the Providence/Stoughton Line on the Northeast Corridor tracks, but they are not regularly used. An MBTA maintenance and storage yard and a CSX Transportation freight yard are located near the station.

<span class="mw-page-title-main">Shawmut station</span> Subway station in Boston, Massachusetts, US

Shawmut station is a subway station in Boston, Massachusetts. It serves the Ashmont branch of the MBTA's Red Line. It is located on Dayton Street in the Dorchester neighborhood. The station, the only underground station on the Red Line south of Andrew station, sits in a shallow cut-and-cover subway tunnel that runs from Park Street south to Peabody Square where it surfaces at Ashmont station. Shawmut opened along with Ashmont on September 1, 1928, as part of a southward extension of the Cambridge–Dorchester line.

<span class="mw-page-title-main">Milton station (MBTA)</span> Light rail station in Milton, Massachusetts, US

Milton station is a light rail station in Milton, Massachusetts. Located in the Dorchester-Milton Lower Mills Industrial District, it serves the MBTA's Ashmont–Mattapan High-Speed Line. This station is accessible via wooden ramps on both platforms.

<span class="mw-page-title-main">Cedar Grove station</span> Light rail station in Boston, Massachusetts, US

Cedar Grove station is a light rail station on the Ashmont–Mattapan High Speed Line located in the southern part of the Dorchester neighborhood of Boston, Massachusetts. The station, named for the adjacent Cedar Grove Cemetery, has two side platforms serving the line's two tracks. It is accessible via wooden ramps on both platforms.

<span class="mw-page-title-main">Butler station (MBTA)</span> Light rail station in Boston

Butler station is a light rail station in Boston, Massachusetts. It serves the MBTA Ashmont–Mattapan High-Speed Line. It is located at Butler Street in the Lower Mills section of the Dorchester neighborhood. It serves a small residential area sandwiched between the Neponset River, Cedar Grove Cemetery, and Dorchester Park. Butler station has no MBTA bus connections. It is accessible via a wooden mini-high ramp on the station's single island platform.

<span class="mw-page-title-main">Central Avenue station (MBTA)</span> Light rail station in Milton, Massachusetts, US

Central Avenue station is a light rail station located off Central Avenue near Eliot Street in Milton, Massachusetts. It serves the Ashmont–Mattapan High Speed Line, a branch of the MBTA Red Line. Central Avenue consists of two side platforms which serve the Ashmont–Mattapan High Speed Line's two tracks.

<span class="mw-page-title-main">Newmarket station (MBTA)</span> Train station in Boston, Massachusetts, US

Newmarket station is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Fairmount Line and a small number of Franklin/Foxboro Line trains. It is located off Massachusetts Avenue at Newmarket Square in the Dorchester neighborhood. The station has two 800-foot (240 m) high-level platforms and sloping walkways connecting it to Massachusetts Avenue. Originally planned to be in service in 2011, it opened on July 1, 2013, along with Four Corners/Geneva station.

References

  1. 1 2 3 4 5 6 7 8 9 10 11 12 13 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  2. Central Transportation Planning Staff (2019). "2018 Commuter Rail Counts". Massachusetts Bay Transportation Authority.
  3. "A Guide to Ridership Data". MassDOT/MBTA Office of Performance Management and Innovation. June 22, 2020. p. 8.
  4. Karr, Ronald Dale (1995). The Rail Lines of Southern New England. Branch Line Press. pp. 310–315. ISBN   0942147022.
  5. "Old Colony Railroad". Boston Evening Transcript. January 20, 1848. p. 1 via Newspapers.com.
  6. Jacobs, Warren (October 1928). "Dates of Some of the Principal Events in the History of 100 Years of the Railroad in New England. 1826-1926". Railway and Locomotive Historical Society Bulletin . Railway and Locomotive Historical Society. 17 (17): 15–28. JSTOR   43504499.
  7. 1 2 3 4 5 6 Cheney, Frank (2002). Boston's Red Line: Bridging the Charles from Alewife to Braintree. Arcadia Publishing. pp. 77–80. ISBN   9780738510477.
  8. Twentieth Annual Report of the Old Colony Railroad Co. to the Stockholders. Old Colony Railroad Company. November 1883. p. 7.
  9. "GETS PERMISSION TO CLOSE STATIONS: N. Y., N. H. & H. Abandons Shawmut Branch Sept 6 Commission Rules It Necessary to Complete New Service". Boston Daily Globe. August 27, 1926. p. 13 via Newspapers.com. Open Access logo PLoS transparent.svg
  10. 1 2 3 4 Boston Transit Department (1927). Report of the Transit Department for the Year ending December 31, 1926. City of Boston. pp.  31-32, 36–37 via Internet Archive.
  11. 1 2 3 Boston Transit Department (1928). Report of the Transit Department for the Year ending December 31, 1927. City of Boston. pp.  26, 28, 33 via Internet Archive.
  12. "State Approves Closing of Crescent-Av Station". Boston Globe. July 19, 1927. p. 28 via Newspapers.com. Open Access logo PLoS transparent.svg
  13. 1 2 "First Station Completed on Dorchester Rapid Transit". Electric Railway Journal . McGraw-Hill Company. 70 (11): 428. 10 September 1927 via Internet Archive.
  14. Boston Transit Department (1926). Report of the Transit Department for Eleven Months ending December 31, 1925. City of Boston. pp.  35–36 via Internet Archive.
  15. Boston Transit Department (1929). Report of the Transit Department for the Year ending December 31, 1928. City of Boston. pp.  28–29 via Internet Archive.
  16. Boston Transit Department (1930). Report of the Transit Department for the Year ending December 31, 1929. City of Boston. p.  55 via Internet Archive.
  17. "Novel entrance to Columbia station". Co-operation. Vol. 8, no. 5. Boston Elevated Railway. May 1929. pp. 67–68.
  18. "Columbia Station overpass to parking area". Boston Elevated Railway. December 23, 1938 via Historic New England.
  19. Twentieth Annual Report of the Board of Trustees of the Boston Elevated Railway Company for the Year Ending December 31, 1938. Boston Elevated Railway. 1939. pp.  21-22 via Internet Archive.
  20. "MTA Boosts Service For New Year's Eve". The Boston Globe. December 29, 1960. p. 8 via Newspapers.com.
  21. "M.T.A. Dropping Morning Express". The Boston Globe. September 27, 1961. p. 10 via Newspapers.com.
  22. Carr, Robert (July 29, 1965). "MBTA Buys Old Colony Line For a South Shore Express". The Boston Globe via Newspapers.com. Open Access logo PLoS transparent.svg
  23. Sixth Annual Report. Massachusetts Bay Transportation Authority. 1970. pp. 12, 18 via Internet Archive.
  24. 1 2 3 4 5 6 O'Regan, Gerry (2005). "MBTA Red Line". nycsubway.org. Retrieved February 23, 2020.
  25. 1 2 3 4 Sanborn, George M. (1992). A Chronicle of the Boston Transit System. Massachusetts Bay Transportation Authority. Archived from the original on 2019-11-27. Retrieved 2019-10-30 via Massachusetts Institute of Technology.
  26. Malone, M.E. (September 27, 1986). "Planned Red Line stop expected to give easier access to UMass area". The Boston Globe. p. 18 via Newspapers.com. Open Access logo PLoS transparent.svg
  27. Crocket, Douglas S. (July 27, 1985). "T board votes to change the names of some stations". Boston Globe. p. 26 via Newspapers.com. Open Access logo PLoS transparent.svg
  28. Richard, Ray (January 26, 1980). "A Better Day for Columbia Point / 'New' Columbia Point". The Boston Globe. pp. 1, 12 via Newspapers.com. Open Access logo PLoS transparent.svg
  29. Crocket, Douglas S. (June 28, 1984). "MBTA board approves contract for new North Station trestle". The Boston Globe. p. 27 via Newspapers.com. Open Access logo PLoS transparent.svg
  30. Crocket, Douglas S. (May 19, 1984). "MBTA says Savin Hill sign was removed as 'hazardous'". The Boston Globe. pp. 17, 20 via Newspapers.com. Open Access logo PLoS transparent.svg
  31. Howe Globe Staff, Peter J. (June 7, 1987). "Construction starts on platform for Braintree at JFK-UMass station". Boston Globe. p. 34 via Newspapers.com.
  32. Tran Systems and Planners Collaborative (August 24, 2007). "Evaluation of MBTA Paratransit and Accessible Fixed Route Transit Services: Final Report" (PDF). Massachusetts Bay Transportation Authority.
  33. Operations Directorate Planning Division (November 1990). "Ridership and Service Statistics" (3 ed.). Massachusetts Bay Transportation Authority. pp. 1–4 via Internet Archive.
  34. 1 2 "New JFK/UMass T station opens". The Boston Globe. December 15, 1988 via Newspapers.com. Open Access logo PLoS transparent.svg
  35. 1 2 Kahn, Ric (July 1, 2001). "T trains bypass new JFK stop". The Boston Globe City Weekly. pp. 1, 9 via Newspapers.com. (second page, third page) Open Access logo PLoS transparent.svg
  36. 1 2 3 4 Central Transportation Planning Staff (January 2012). "Improving the Southwest Expressway: A Conceptual Plan" (PDF). Boston Region Metropolitan Planning Organization.
  37. "Urban Ring Phase 2 FACT SHEET" (PDF). Massachusetts Executive Office of Transportation. January 2009. Archived from the original (PDF) on 8 July 2011.
  38. "Conceptual alignments, profiles, station locations, and typical sections" (PDF). The Urban Ring Phase 2: Revised Draft Environmental Impact Report/Statement. Massachusetts Executive Office of Transportation. November 2008. Archived from the original (PDF) on July 28, 2013. Retrieved 19 July 2011.
  39. Mullan, Jeffery B. (January 22, 2010). "Re: Urban Ring Phase 2, EOEEA #12565" (PDF). Massachusetts Executive Office of Energy and Environmental Affairs.
  40. Feathers, Todd (January 30, 2013). "MBTA installs 50 surveillance cameras at JFK/UMass Red Line stop to fight crime in area". The Boston Globe. Retrieved February 23, 2020.
  41. Levenson, Michael; Dungca, Nicole (January 10, 2015). "Revenue to dictate difficult choices on Olympic transit projects". The Boston Globe. Retrieved February 23, 2020.
  42. Buell, Spencer (September 16, 2019). "At Long Last, We Know What Caused the Red Line Derailment". Boston Magazine. Metrocorp. Retrieved September 13, 2023.
  43. 1 2 "Plans to Accelerate Red Line Signal Repairs" (Press release). Massachusetts Bay Transportation Authority. June 21, 2019.
  44. Stout, Matt; Siu, Diamond Naga (June 21, 2019). "T says Red Line reduced schedule to last through summer". The Boston Globe.
  45. "Completion of Red Line Signal Repairs" (Press release). Massachusetts Bay Transportation Authority. September 25, 2019.
  46. "Alerts: Commuter Rail". Massachusetts Bay Transportation Authority. January 29, 2020. Archived from the original on March 1, 2020.
  47. Fortier, Marc (September 13, 2021). "BU Professor Dies After Apparent Fall From Stairs Near MBTA Station in Boston". NBC Boston . Retrieved September 14, 2021.
  48. MilNeil, Christian (September 14, 2021). "BU Professor Dies On Crumbling DCR Staircase In Dorchester". Streetsblog Massachusetts.
  49. Dumcius, Gintautas (June 23, 2022). "MBTA stairs at JFK/UMass shut down, fixes are a 'priority'". Dorchester Reporter. Archived from the original on June 25, 2022.
  50. 1 2 Dumcius, Gintautas. "Citing 'critical structural finding,' MBTA closes Columbia Rd. entrance to JFK/UMass station". Dorchester Reporter. Archived from the original on November 22, 2022.
  51. "Upcoming Weekend Service Changes on Orange, Green, Red Lines in January" (Press release). Massachusetts Bay Transportation Authority. January 2, 2023.
  52. Armanini, Kate (January 10, 2023). "Pedestrian entrance at JFK/UMass stop set to reopen by the end of the week, MBTA says". Archived from the original on January 10, 2023.
  53. Dumcius, Gintautas (March 29, 2023). "T finally adds JFK/UMass upgrade to list of projects". Dorchester Reporter. Retrieved March 30, 2023.
  54. Dumcius, Gintautas (August 24, 2023). "MBTA to shut down Ashmont, Mattapan branches in October". Dorchester Reporter. Retrieved September 13, 2023.
  55. "MBTA to Expedite Critical Track Work Between JFK/UMass and Ashmont Stations and on the Mattapan Line, Shuttle Buses to Replace Service on Ashmont Branch and Mattapan Line October 14-29" (Press release). Massachusetts Bay Transportation Authority. August 24, 2023.
  56. Dumcius, Gintautas (September 13, 2023). "T chief, top aide tour JFK/UMass Station as Oct. shutdown looms". Dorchester Reporter. Retrieved September 13, 2023.
  57. 1 2 3 4 "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  58. "T worker dies following accident". The Boston Globe. December 4, 1993 via Newspapers.com. Open Access logo PLoS transparent.svg
  59. 1 2 "2023–24 System Map". Massachusetts Bay Transportation Authority. December 17, 2023.