This article needs additional citations for verification .(October 2022) |
Mitsubishi Heavy Industries Crystal Mover C810/C810A | |
---|---|
A Mitsubishi Heavy Industries Crystal Mover C810 train with the original coupler design on the Sengkang-Punggol LRT line. A Mitsubishi Heavy Industries Crystal Mover C810 train with a modified coupler design for multiple working on the Sengkang-Punggol LRT line. A Mitsubishi Heavy Industries Crystal Mover C810A train on the Sengkang-Punggol LRT line. | |
Interior of C810 train Interior of C810A train | |
Stock type | Rubber-tyres automated people mover |
In service | 18 January 2003 – Present |
Manufacturer | Mitsubishi Heavy Industries |
Designer | GK Industrial Design [1] |
Built at | Mihara, Hiroshima, Japan |
Family name | Crystal Mover |
Constructed | 2000–2003 (C810) 2012–2016 (C810A) |
Entered service | 18 January 2003 (C810) 5 April 2016 (C810A) |
Number built | 41 vehicles (C810) 16 vehicles (C810A) |
Number in service | 41 vehicles (C810) 16 vehicles (C810A) |
Successor | Mitsubishi Heavy Industries Crystal Mover C810D |
Formation | Single vehicles (M) that can be coupled to form 2-car trains |
Fleet numbers | 01 – 41 (C810) 42 – 57 (C810A) |
Capacity |
|
Operators | SBS Transit Ltd (ComfortDelGro Corporation) |
Depots | Sengkang |
Lines served | |
Specifications | |
Car body construction | Aluminum-alloy weighed |
Car length | 11.84 m (38 ft 10+1⁄8 in) [2] |
Width | 2.69 m (8 ft 9+7⁄8 in) |
Height | 3,615 mm (11 ft 10+3⁄8 in) |
Doors | 2 × 2 per car |
Maximum speed |
|
Weight | 14.9 t (14.7 long tons; 16.4 short tons) per car |
Traction system | Mitsubishi IGBT–VVVF inverter vector control |
Traction motors | 2 × 80 kW (110 hp) 3-phase AC induction motor |
Power output | 160 kW (210 hp) |
Acceleration | 1 m/s2 (2.2 mph/s) |
Deceleration |
|
Electric system(s) | 750 V DC third rail |
Current collector(s) | Collector shoe |
UIC classification | AA |
Braking system(s) | Electric command pneumatic brake with regenerative brake with stand-by brake, parking brake (with variable load control and wheel slide prevention control) |
Safety system(s) | Kyosan APM fixed block ATC under ATO GoA 4 (UTO), with subsystems of ATP, ATS and CBI [3] |
Coupling system | |
Multiple working | Within and between type |
Track gauge | 1,850 mm (6 ft 27⁄32 in) Guideway span: 3.2 m (10 ft 6 in) |
The Mitsubishi Heavy Industries Crystal Mover C810/C810A is an automated people mover train that serves the Sengkang LRT line and Punggol LRT line in Singapore. The C810 has been operating since 18 January 2003, with its first service on the Sengkang East Loop. The C810A commenced revenue service on 5 April 2016.
The C810 and C810A were developed and built by Mitsubishi Heavy Industries in cooperation with Crystal Mover Bodywork, the same company that developed the newer Changi Airport Skytrain. The trains were developed for airport and light rail applications. They are fully automated and driverless, relying on Automatic Train Control (ATC) technology.
Singapore's Light Rail Transit purchased 41 C810s and 16 C810As to be used on the Sengkang LRT line and Punggol LRT line. From 2013 to 2015, 16 of the 41 C810s were modified to enable two-car formations to cope with higher demand for the Sengkang and Punggol LRT lines.
The exterior of the C810 and C810A has a dual-color of indigo and white. They feature the SBS Transit logo in white. The serial numbers of the trains are marked on the right side of the train at the front and rear. Both the windshield wipers and emergency doors were specially designed for the LRT.
Compared to the C810, the newer C810A has headlights that are vertical instead of horizontal and luminously white instead of yellow, and a different coupling mechanism as well as door frame. [4]
The interior of the Sengkang and Punggol LRT trains feature an indigo seats and red grab poles. 16 of the C810s that underwent modification have two seats in the front and back converted into perch seats, thus reducing the number of seats to 14 from the usual 18 seats.
As the carriages are closed-end, the train must be stationary and the doors must be open for passengers to move between carriages during 2-car operations.
The configuration of a C810/C810A in revenue service is just the one car. With both the motors and the third rail current collectors, certain C810 and C810A train cars can be coupled up to 2 cars during service.
The car numbers of the C810s range from 01 to 41, while those of the C810As range from 42 to 57. Individual cars are assigned a two-digit serial number by the rail operator SBS Transit. A trainset consists of one motor car, e.g. set 01 is car 01. Both digits identify the car number.
All sets were built by Mitsubishi Heavy Industries.
The modified C810s and all C810As have underlined serial numbers on their exterior, indicating they have couplers that allow them to be operated in 2-car formations.
On 9 September 2016, SBS Transit as the operator of Sengkang LRT line and Punggol LRT line has announced that 11 of the 41 C810 trains had hairline cracks. [5]
This is barely 2 months after the announcements that the cracks were found in C151A trains which run on both East West MRT line as well as North South MRT line and subsequently C801 trains which run on Bukit Panjang LRT line.
Similar to previous incidents, the joint statement by the SBS Transit and Land Transport Authority said that the cracks were found on the undercarriage of the trains and assure that this does not compromise their ability to bear passenger weight. [5]
SBS Transit has withdrawn affected trains while waiting for the bogie frames found in the undercarriage to be replaced as a precautionary measure. In the report, SBS Transit has said that six of the 11 trains have the issue rectified and resumed their operational duties since while the remaining 5 would be rectified by the middle of next month. [5]
At the same time, the affected bogie frame was sent to Mitsubishi Heavy Industries in Japan for detailed analysis in order to establish the root cause. [5]
The joint statement also said that both LTA and SBS Transit, as well as the manufacturer, will redesign and strengthen the bogie frame structures, which will be applied to all 57 trains including the newer C810A trains. [5] The manufacturer is expected to bear the full cost as well. [5]
On 5 February 2021, the Land Transport Authority announced that it has purchased 17 two-car C810D trains for the Sengkang and Punggol LRT systems, which will replace the 25 existing one-car trains. [6] In May 2023, the LTA ordered an additional 8 C810D trains, bringing the total number of C810D trains ordered to 25. These 8 two-car trains will replace half of the existing fleet of 16 two-car trains, bringing the total fleet to 33 two-car trains. [7]
A people mover or automated people mover (APM) is a type of small scale automated guideway transit system. The term is generally used only to describe systems serving relatively small areas such as airports, downtown districts or theme parks.
The Mass Rapid Transit system, locally known by the initialism MRT, is a rapid transit system in Singapore and the island country's principal mode of railway transportation. The system commenced operations in November 1987 after two decades of planning with an initial 6 km (3.7 mi) stretch consisting of five stations. The network has since grown to span the length and breadth of the country's main island – with the exception of the forested core and the rural northwestern region – in accordance with Singapore's aim of developing a comprehensive rail network as the backbone of the country's public transportation system, averaging a daily ridership of 3.45 million in 2023.
The North East Line (NEL) is a high-capacity Mass Rapid Transit (MRT) line in Singapore. Operated by SBS Transit, the 20-kilometre (12 mi) line is the MRT's shortest. It runs from HarbourFront station in southern Singapore to Punggol station in the northeast, serving 16 stations via Chinatown, Little India, Serangoon and Hougang. Coloured purple on official maps, it is Singapore's third MRT line and the world's first fully-automated underground driverless heavy rail line.
SBS Transit Ltd is a multi-modal public transport operator in Singapore operating bus and rail services. With a majority of its shares owned by Singaporean multinational transport conglomerate ComfortDelGro Corporation at 75%, it was formerly known as Singapore Bus Services before rebranding to SBS Transit on 1 November 2001.
The Punggol LRT is an automated guideway transit line in Singapore. The line, which initially opened on 29 January 2005, connects the residential districts and suburbs of Punggol to Punggol Digital District and Punggol Town Centre, which consist of Singapore Institute of Technology (SIT)’s campus and JTC’s Business Park, and where the town centre connects with the North East MRT line, Punggol Bus Interchange, and Waterway Point.
The Sengkang LRT is a 10.7-kilometre (6.6 mi) automated guideway transit line in Singapore. The line, which initially opened on 18 January 2003, connects the residential districts and suburbs of Sengkang to Sengkang Town Centre, where it connects with the North East MRT line, Sengkang Bus Interchange, Compass One and Compassvale Bus Interchange. It is the second line of the LRT system in Singapore and like all other LRT lines, it is fully elevated and uses automated trains. It is the first LRT line to be operated by SBS Transit.
The Light Rail Transit system, locally known by the initialism LRT, are a series of localised automated guideway transit (AGT) systems in Singapore which acts as feeder services to the heavy rail Mass Rapid Transit (MRT), and together forms the core of the country's rail transport services. The first LRT line was opened in 1999 and the system has since expanded to two lines, each serving three new towns, namely Bukit Panjang, Sengkang and Punggol, with a total system length of approximately 30 km (19 mi). Trains on these lines have at least one station interchange link to the MRT.
Rail transport in Singapore mainly consists of a passenger urban rail transit system spanning the entire city-state: a rapid transit system collectively known as the Mass Rapid Transit (MRT) system operated by the two biggest public transport operators SMRT Trains and SBS Transit, as well as several Light Rail Transit (LRT) rubber-tyred automated guideway transit lines also operated by both companies. In addition, local specialised light rail lines are in operation in places such as the Singapore Changi Airport and Sentosa.
The Crystal Mover is a rubber-tired automated people mover (APM) system for airport and urban rail transit applications manufactured at Mitsubishi Heavy Industries (MHI) Mihara Machinery Works in Mihara, Hiroshima Prefecture, Japan. The Crystal Mover, initially based on the Japanese APM standard, is used in automated guideway transit (AGT) systems in China, Japan, Singapore, South Korea, the United Arab Emirates and the United States.
Sengkang Depot is a train depot in Sengkang, Singapore operated by SBS Transit. It is the first co-location of facilities for both the Mass Rapid Transit (MRT) and Light Rail Transit (LRT). It maintains the trains for the North East line, Sengkang LRT line, and Punggol LRT line, and houses the control centre of the three lines.
Sengkang is a planning area and residential town located in the North-East Region of Singapore. The town is the second most populous in the region, being home to 249,370 residents in 2020. Sengkang shares boundaries with Seletar and Punggol in the north, Pasir Ris and Paya Lebar in the east, Hougang and Serangoon to the south, as well as Yishun and Ang Mo Kio to the west.
Riviera LRT station is an elevated Light Rail Transit (LRT) station in Punggol, Singapore. Serving the east loop of the Punggol LRT line (PGLRT), the station is along Punggol East between the junctions of Punggol Central and Punggol Field. Surrounding landmarks include Punggol Joint Temple and Punggol Promenade Riverside Park.
Teck Lee LRT station is an elevated Light Rail Transit (LRT) station on the Punggol LRT line West Loop in Punggol, Singapore, located above Sentul Walk. The station is walking distance from the future Singapore Institute of Technology (SIT) campus in Punggol. The station commenced operations on 15 August 2024, about 22 years after construction, in light of Punggol Digital District and SIT Punggol campus in the vicinity. It was the last station on the Punggol LRT line and of all LRT lines in Singapore to open. The station was named after Lim Teck Lee.
The Alstom Metropolis C751A is the first generation of communications-based train control (CBTC) electric multiple unit rolling stock in operation on the North East line (NEL) of Singapore's Mass Rapid Transit (MRT) system since 2003. 25 trainsets were purchased for the line.
Punggol MRT/LRT station is a Mass Rapid Transit (MRT) and Light Rail Transit (LRT) interchange station in Punggol, Singapore. It is an interchange station between the North East Line (NEL) and Punggol LRT (PGLRT), and the only MRT station located within Punggol planning area. Stretching across Punggol Central, the station is situated next to Punggol Temporary Bus Interchange and the retail development of Waterway Point.
Sengkang MRT/LRT station is a Mass Rapid Transit (MRT) and Light Rail Transit (LRT) interchange station in Sengkang, Singapore. It is an interchange between the North East line (NEL) and Sengkang LRT (SKLRT). Along with Buangkok station, it is located within the Sengkang planning area.
The Bombardier Innovia APM 100 C801 is the first generation of an automated people mover (APM) train built by Adtranz for use on the Bukit Panjang LRT (BPLRT), Singapore.
The Kawasaki Heavy Industries & CRRC Qingdao Sifang T251 is the first generation electric multiple unit rolling stock in operation on the Thomson–East Coast line of Singapore's Mass Rapid Transit (MRT) system, manufactured by a consortium of Kawasaki Heavy Industries (KHI) and CRRC Qingdao Sifang under Contract T251.
The Alstom Metropolis C851E is the third generation electric multiple unit rolling stock introduced on the existing North East and Circle lines of Singapore's Mass Rapid Transit (MRT) system, manufactured by Alstom under Contract 851E. It consists of six North East line trains and 23 Circle line trains. The trains will be manufactured and assembled in Alstom's manufacturing facility in Barcelona, Spain and progressively shipped to Singapore from 2021 for the NEL and 2022 for the CCL. The contract, valued at S$249,854,305.00, was awarded by the Land Transport Authority during a ceremony held at Sengkang Depot. Alstom is the sole bidder for this contract. An additional 12 3-car trains will be purchased for use on the Circle line, from 2024 onwards.
The Mitsubishi Heavy Industries Crystal Mover C810D is an automated people mover vehicle which serves the Sengkang LRT line and Punggol LRT line as the third generation train after their previous counterparts Mitsubishi Heavy Industries Crystal Mover C810 and Mitsubishi Heavy Industries Crystal Mover C810A.