NAIT/Blatchford Market station

Last updated

NAIT/Blatchford Market
Edmonton LRT station
NAIT-Blatchford Market 131715.jpg
General information
Coordinates 53°34′01″N113°30′33″W / 53.5670°N 113.5092°W / 53.5670; -113.5092
Owned by City of Edmonton
Platforms Side platforms
Tracks2
Construction
Structure typeSurface
Bicycle facilitiesYes
AccessibleYes
History
OpenedJanuary 20, 2024 (2024-01-20)
Services
Preceding station Edmonton LRT Following station
Terminus Metro Line Kingsway/Royal Alex

NAIT/Blatchford Market station is an Edmonton LRT station in Edmonton, Alberta which serves as the northern terminus of the Metro Line. [1] The station is located north of Princess Elizabeth Avenue, on the west side of the Northern Alberta Institute of Technology and Brigadier James Curry Jefferson Armoury. The station was built after a long-term comprehensive land use plan of the Edmonton City Centre Airport lands were finalized. [2] [3] [1]

Contents

NAIT station opened in 2015 at a temporary location until it was renamed and relocated approximately 200 metres northwest, to its permanent location on January 20, 2024.

History

NAIT
Former station
NAIT LRT Station with ETS Siemens-Duewag U-2 LRV, 10-21-2022.jpg
General information
Coordinates 53°33′58″N113°30′21″W / 53.5660°N 113.5058°W / 53.5660; -113.5058
Owned by City of Edmonton
Platforms Centre platform
Tracks2
Construction
Structure typeSurface
Bicycle facilitiesYes
AccessibleYes
History
OpenedSeptember 6, 2015 [4]
ClosedJanuary 20, 2024
Passengers
2019
(typical weekday)
2,931 board
2,864 alight
5,795 Total [5]

NAIT station

Preliminary engineering of the line was completed July 2009 and construction of the phase from the MacEwan station to NAIT began in the summer of 2011. The station was supposed to open in 2014. [6] However, due to delays it opened on September 6, 2015. [4]

The station was closed for four months from April 28 to August 30, 2019 due to construction on the Capital Line which shares track with southern sections of the Metro Line. [7] Because of delays that the construction caused, Edmonton Transit operated five car trains on the Metro Line. [7] Since the NAIT station island platform was only three cars long, these larger trains were unable to fit alongside the platform, hence the temporary closure.

NAIT/Blatchford Market station

NAIT/Blatchford Market station was constructed between 2020 and late 2023. [8] The original NAIT station closed on January 20, 2024, following the opening of NAIT/Blatchford Market station on the same day. [9]

Future

In the future, the Metro Line will be extended by one station and Blatchford Gate will replace NAIT/Blatchford Market as the northern terminus of the line.

The two new stations are being constructed in response to the planned community of Blatchford, which is being built on the land of the former Edmonton City Centre Airport. The redevelopment of the old airport caused the original plan of two stations to be delayed, which resulted in the creation of a temporary station to service NAIT. [10]

Station layout

NAIT/Blatchford Market station is an outdoors at-grade station. Unlike other stations on the high floor Edmonton LRT, NAIT/Blatchford Market station was built with side platforms instead of an island one.

Around the station

Communities

Related Research Articles

<span class="mw-page-title-main">Edmonton Transit Service</span> Public transit service in Canada

The Edmonton Transit Service (ETS) is the public transit service owned and operated by the City of Edmonton in Alberta, Canada. It operates Edmonton's bus and light rail systems. In 2023, the system had a ridership of 87,646,600, or about 323,800 per weekday as of the second quarter of 2024.

<span class="mw-page-title-main">Edmonton City Centre Airport</span> Former airport in Alberta, Canada

Edmonton City Centre Airport (ECCA), was an airport within the city of Edmonton, in the Canadian province of Alberta.

<span class="mw-page-title-main">Edmonton LRT</span> Light rail system in Edmonton, Alberta

Edmonton Light Rail Transit, commonly referred to as the LRT, is a light rail system in Edmonton, Alberta. Part of the Edmonton Transit Service (ETS), the system has 29 stations on three lines and 37.4 km (23.2 mi) of track. Much of the system has a dedicated right-of-way, while in the downtown area, vehicles run underground. This subway-surface alignment is known as semi-metro. As of 2018, it was number seven on a list of the busiest light rail transit systems in North America, with over 113,000 daily weekday riders.

<span class="mw-page-title-main">Belvedere station (Edmonton)</span> Light rail station in Edmonton, Alberta, Canada

Belvedere station is an Edmonton LRT in Edmonton, Alberta. It serves the Capital Line. It is a ground-level station located at Fort Road and 129 Avenue.

<span class="mw-page-title-main">Churchill station (Edmonton)</span> Light rail station in Edmonton, Alberta, Canada

Churchill station is an Edmonton LRT station in Edmonton, Alberta. It serves the Capital Line, Metro Line, and Valley Line.

<span class="mw-page-title-main">Central station (Edmonton)</span> Light rail station in Edmonton, Alberta, Canada

Central Station is an Edmonton LRT station in Edmonton, Alberta, Canada. It serves both the Capital Line and the Metro Line. It is an underground station located beneath Jasper Avenue between 100 Street and 101 Street.

<span class="mw-page-title-main">Government Centre station</span> Light rail station in Edmonton, Alberta, Canada

Government Centre station is an Edmonton LRT station in Edmonton, Alberta, Canada. It serves both the Capital Line and the Metro Line. It is an underground station located beneath 110 Street between 99 Avenue and 98 Avenue. The station provides service to the Government Centre part of the downtown core and the neighbourhood of Oliver. The station is connected to the Alberta Legislature Building and several other government buildings by underground walkways of the Edmonton Pedway.

<span class="mw-page-title-main">University station (Edmonton)</span> Light rail station in Edmonton, Alberta, Canada

University station is an Edmonton LRT station in Edmonton, Alberta, Canada. It serves both the Capital Line and the Metro Line. It is an underground station located beneath 112 Street at 89 Avenue on the University of Alberta campus. As of 2019, it is the busiest LRT station of the Capital and Metro lines with typical weekday traffic averaging 29,203 passengers.

<span class="mw-page-title-main">Health Sciences/Jubilee station</span> Light rail station in Edmonton, Alberta, Canada

Health Sciences/Jubilee station is an Edmonton LRT station in Edmonton, Alberta, Canada. It serves both the Capital Line and the Metro Line. As of 2021, it is the southern terminus of the Metro Line. It is a ground-level station located at 114 Street at 83 Avenue on the University of Alberta's main campus.

<span class="mw-page-title-main">Downtown Edmonton</span> Neighbourhood in Edmonton, Alberta, Canada

Downtown Edmonton is the central business district of Edmonton, Alberta. Located at the geographical centre of the city, the downtown area is bounded by 109 Street to the west, 105 Avenue to the north, 97 Street to the east, 97 Avenue and Rossdale Road to the south, and the North Saskatchewan River to the southeast.

Transport in Edmonton is fairly typical for a Canadian city of its size, involving air, rail, road and public transit. With very few natural barriers to growth and largely flat to gently rolling terrain bisected by a deep river valley, the city of Edmonton has expanded to cover an area of nearly 768 km2 (297 sq mi), of which only two-thirds is built-up, while the metropolitan area covers around 9,430 km2 (3,640 sq mi).

<span class="mw-page-title-main">MacEwan station</span> Light rail station in Edmonton, Alberta, Canada

MacEwan station is an Edmonton LRT station on the Metro Line in Edmonton, Alberta, Canada. It is located across from MacEwan University on 105 Avenue between 103 and 104 Street. The station opened on September 6, 2015.

<span class="mw-page-title-main">Kingsway/Royal Alex station</span> Light rail station in Edmonton, Alberta, Canada

Kingsway/Royal Alex station is an Edmonton LRT station in Edmonton, Alberta. It serves the Metro Line. It is located adjacent to the Royal Alexandra Hospital on the north side of Kingsway. The Kingsway/Royal Alex Transit Centre, constructed at the same time, is located next to the station.

Blatchford is a community being developed on the site of the decommissioned City Centre Airport in Edmonton, Alberta. With an area of 2.17 km2 (0.84 sq mi), Blatchford is approximately the size of Edmonton's downtown core. It is planned to be a medium-high density neighbourhood which will rely on renewable energy and a district energy sharing system, contain two Light Rail Transit (LRT) stations, and be carbon neutral.

<span class="mw-page-title-main">Metro Line</span> Light rail line in Edmonton, Alberta

The Metro Line is a light rail line on the Edmonton LRT system. The line operates from northwest Edmonton to south Edmonton, and began operation on September 6, 2015. The line consists of ten stations, three of which are exclusive to the line and the remaining seven are shared with the Capital Line.

<span class="mw-page-title-main">Capital Line</span> Light rail line in Edmonton, Alberta

The Capital Line is a light rail line on the Edmonton LRT system. The line operates from northeast Edmonton to the south. Operated by the Edmonton Transit Service, the line provides access to Downtown Edmonton and the University of Alberta. The Capital Line currently consists of fifteen stations, six of which are underground. Seven stations are shared with the Metro Line.

<span class="mw-page-title-main">Valley Line (Edmonton)</span> Light rail line in Edmonton, Alberta

The Valley Line is a low-floor urban light rail line in Edmonton, Alberta, Canada. The 13.1-kilometre (8.1 mi) line runs southeast from downtown at 102 Street stop to Mill Woods Town Centre at Mill Woods stop and connects to the Capital and Metro lines at Churchill station, downtown. The line is being constructed in phases, with phase 1 being the current open 12-station portion between 102 Street and Mill Woods that commenced operations on November 4, 2023. The second phase, consisting of the 14-kilometre (8.7 mi), 16-station portion between 102 Street and Lewis Farms, began construction in 2021 and is expected to be completed in 2028. Upon completion, the entire Valley Line is expected to serve more than 100,000 commuters daily, nearly matching the current Capital Line and Metro Line in terms of capacity and ridership.

<span class="mw-page-title-main">Urban rail transit in Canada</span> List of Canadian passenger rail systems confined to urban areas

Urban rail transit in Canada encompasses a broad range of rail mass transit systems, including commuter rail, rapid transit, light rail, and streetcar systems.

<span class="mw-page-title-main">Blatchford Gate station</span> Future Edmonton light rail station

Blatchford Gate station is a non-operational Edmonton LRT station in Edmonton, Alberta. It will serve the Metro Line and will be the northern terminus station until the line is further extended. The station is located in the northeastern section of the developing Blatchford community, and west of the Westwood neighbourhood. The station was completed in December 2023 as part of 1.6 km (0.99 mi) Metro Line Northwest Phase 1 extension. The station however, will not open for passenger service until a later unknown date due to a lack of demand.

References

  1. 1 2 "North LRT to NAIT". City of Edmonton. Archived from the original on June 16, 2011. Retrieved February 6, 2010.
  2. "North LRT Fact Sheet" (PDF). City of Edmonton. February 2012. Archived from the original (PDF) on June 1, 2012. Retrieved May 30, 2012.
  3. "North LRT Stations". City of Edmonton. Archived from the original on June 16, 2011. Retrieved October 20, 2010.
  4. 1 2 Ramsay, Caley (September 6, 2015). "After lengthy delay, Metro Line LRT opens to riders". Global News Edmonton. Retrieved September 6, 2015.
  5. "2019 LRT Passenger Count Report" (PDF). City of Edmonton. April 2020. Retrieved February 5, 2021.
  6. "Metro Line Delay FAQ" (PDF). City of Edmonton. October 8, 2014. Archived from the original (PDF) on October 13, 2014. Retrieved October 8, 2014.
  7. 1 2 Heidenreich, Phil (March 25, 2019). "City of Edmonton to suspend LRT services to NAIT campus for 4 months". Global News. Retrieved March 25, 2019.
  8. "Metro Line - Northwest Extension". City of Edmonton. Retrieved December 31, 2023.
  9. Siemens, Nicole (January 16, 2024). "New NAIT LRT station ahead of schedule, opening of other Blatchford stop remains unclear". Global News . Corus Entertainment . Retrieved January 20, 2024.
  10. "Blatchford Edmonton". Blatchford. Retrieved December 31, 2023.