Newburyport/Rockport Line

Last updated

Newburyport/Rockport Line
MBTA 1009 leads an outbound train over Manchester Draw, May 2014.JPG
An outbound train in Manchester-by-the-Sea in 2014
Overview
Owner Massachusetts Bay Transportation Authority
Locale Greater Boston
Termini
Stations12 (Newburyport–Boston)
14 (Rockport–Boston)
(7 serve both routes)
Service
Type Commuter Rail
System MBTA Commuter Rail
Services2
Train number(s)100–198 (weekday)
1100–1167 (Saturday)
2100–2167 (Sunday)
Operator(s) Keolis North America
Daily ridership11,333 (October 2022) [1]
Technical
Line length36.2 miles (58.3 km) (Newburyport–Boston)
35.3 miles (56.8 km) (Rockport–Boston) [2]
Track gauge 4 ft 8+12 in (1,435 mm)
Route map

Contents

BSicon exCONTg.svg
BSicon exBHF.svg
56.9 mi
91.6 km
Portsmouth (closed)
BSicon exHST.svg
48.7 mi
78.4 km
North Hampton (closed)
BSicon exHST.svg
46.5 mi
74.8 km
Hampton (closed)
BSicon xSTR+GRZq.svg
NH
MA
BSicon exhKRZWae.svg
BSicon KACCxa.svg
36.2 mi
58.3 km
Newburyport
BSicon ABZg+l.svg
BSicon YRDaq.svg
BSicon HSTACC.svg
31.2 mi
50.2 km
Rowley
BSicon ACC.svg
27.6 mi
44.4 km
Ipswich
BSicon ACC.svg
22.7 mi
36.5 km
Hamilton/Wenham
BSicon HSTACC.svg
20.8 mi
33.5 km
North Beverly
BSicon LSTR.svg
BSicon LSTR.svg
Gloucester Branch
BSicon LSTR.svg
BSicon KACCa.svg
35.3 mi
56.8 km
Rockport
BSicon LSTR.svg
BSicon YRD.svg
BSicon LSTR.svg
BSicon ACC.svg
31.6 mi
50.9 km
Gloucester
BSicon LSTR.svg
BSicon hKRZWae.svg
BSicon LSTR.svg
BSicon eHST.svg
30.6 mi
49.2 km
Harbor (closed)
BSicon LSTR.svg
BSicon HSTACC.svg
29.6 mi
47.6 km
West Gloucester
BSicon LSTR.svg
BSicon ACC.svg
25.4 mi
40.9 km
Manchester
BSicon LSTR.svg
BSicon hKRZWae.svg
Manchester Draw
BSicon LSTR.svg
BSicon HSTACC.svg
22.9 mi
36.9 km
Beverly Farms
BSicon LSTR.svg
BSicon eHST.svg
22.2 mi
35.7 km
Prides Crossing (closed)
BSicon LSTR.svg
BSicon HSTACC.svg
19.8 mi
31.9 km
Montserrat
BSicon KRWl.svg
BSicon KRWg+r.svg
BSicon ACC.svg
18.3 mi
29.5 km
Beverly Depot
BSicon hbKRZWae.svg
Beverly Draw (Danvers River)
BSicon ACC.svg
16.8 mi
27 km
Salem
BSicon CONTgq.svg
BSicon PORTALf.svg
BSicon ABZgr+xr.svg
BSicon tCSTRa@f.svg
Salem Tunnel
BSicon eHST.svg
BSicon CSTRe@f.svg
Salem
(pre-1987 location)
BSicon lDSTRa@g.svg
BSicon eHSTACC.svg
South Salem
(proposed)
BSicon HSTACC.svg
BSicon lDBHF.svg
12.8 mi
20.6 km
Swampscott
BSicon hACC.svg
11.5 mi
18.5 km
Lynn
BSicon exKRW+l.svg
BSicon eKRWgr.svg
BSicon lDSTRe@g.svg
BSicon MFADEf.svg
BSicon exLSTR.svg
BSicon HST.svg
9.9 mi
15.9 km
River Works
BSicon hbKRZWae.svg
BSicon dSTR~L.svg
BSicon uSTR+l.svg
BSicon STR~R.svg
BSicon udCONTfq.svg
BSicon cdHUBaq.svg
BSicon exldHSTACC.svg
BSicon edHST.svg
BSicon cdHUBeq.svg
BSicon udACC.svg
4.6 mi
7.4 km
Bellingham Square
  SL3  
BSicon MFADEg.svg
BSicon exLSTR.svg
BSicon cdHUBaq.svg
BSicon dACC.svg
BSicon ldACC.svg
BSicon cdHUBeq.svg
BSicon udKBHFe.svg
Chelsea
  SL3  
BSicon exKRWl.svg
BSicon eKRWg+r.svg
BSicon hbKRZWae.svg
BSicon CONTgq.svg
BSicon ABZg+r.svg
  Haverhill  
BSicon udCONTgq.svg
BSicon STR~L.svg
BSicon uSTR+r.svg
BSicon dSTR~R.svg
BSicon ldACC.svg
BSicon udSTR2.svg
BSicon udSTRc3.svg
BSicon dSTR.svg
MBTA white T logo.svg Sullivan Square
BSicon -CONTgq.svg
BSicon udSTRc1.svg
BSicon d-STRq.svg
BSicon dKRZ2+4u-.svg
BSicon udSTR2+4-.svg
BSicon d-STRr.svg
BSicon ud-STR2+4.svg
BSicon uSTRc3.svg
BSicon dCONTgq.svg
BSicon STR~L.svg
BSicon STR+r.svg
BSicon ucdSTRc1.svg
BSicon cdSTR~R.svg
BSicon udSTR+4.svg
  Lowell  
BSicon vDST.svg
BSicon uSTR.svg
0.8 mi
1.3 km
BSicon CONTgq.svg
BSicon v-SHI2g+r.svg
BSicon v-STR+r.svg
BSicon uSTR.svg
  Fitchburg  
BSicon STR.svg
BSicon uHSTACC.svg
MBTA white T logo.svg Community College
BSicon uCONT4+f.svg
BSicon STR.svg
BSicon uSTR.svg
  D  to Union Square
  E  to Medford/​Tufts
BSicon uACC.svg
BSicon STR.svg
BSicon utSTRa.svg
Lechmere
BSicon uhKRZWa.svg
BSicon hKRZWae.svg
BSicon utKRZW.svg
BSicon uhHSTACC.svg
BSicon STR.svg
BSicon utSTR.svg
Science Park
BSicon uhtSTR2a.svg
BSicon BLa.svg
BSicon KACCe.svg
BSicon utSTRc3.svg
BSicon utSTR.svg
0 mi
0 km
North Station
MBTA white T logo.svg MBTA white T logo.svg MBTA white T logo.svg BSicon LOGO Amtrak2.svg
BSicon utSTRc1.svg
BSicon utSTR+4.svg
BSicon utKXACCa-L.svg
BSicon BLe.svg
BSicon utXACC-R.svg
BSicon utSTR.svg
BSicon utCONTf.svg
BSicon utCONTf.svg
  D  to Riverside
  E  to Heath Street

The Newburyport/Rockport Line is a branch of the MBTA Commuter Rail system, running northeast from downtown Boston, Massachusetts towards Cape Ann and the Merrimack Valley, serving the North Shore. The first leg, operating via the Eastern Route of the former Boston and Maine Railroad, serves Chelsea, Lynn, Swampscott, Salem, and Beverly. From there, a northern branch continues via the Eastern Route to serve Hamilton, Ipswich, Rowley, and Newburyport, while other trains operate east from Beverly via the Gloucester Branch, serving Manchester, Gloucester, and Rockport. A bicycle coach is offered on the Rockport branch during the summer. [3] With over 11,000 daily riders in October 2022, the line is the second-busiest on the system.

History

After 22 years terminating at Ipswich, the line was restored to Newburyport in 1998 Newburyport (MBTA station).jpg
After 22 years terminating at Ipswich, the line was restored to Newburyport in 1998

The Eastern Route main line between Boston and Portsmouth, New Hampshire opened in 1836 as the Eastern Railroad. Ferries were used to transport passengers between the East Boston terminal and Boston proper. The line was extended to Portland, Maine, in 1842 under a track-sharing agreement with the Boston and Maine Railroad. [4] The Gloucester Branch was constructed in 1847, but despite local support, it was not extended to Rockport until November 1861. [5] In 1854, with the opening of the Grand Junction Railroad, the Eastern Railroad acquired direct access to downtown Boston. [4]

The Boston & Maine leased the Eastern Railroad in 1884, and in 1893 the new North Union Station became the terminus of the B&M, its subsidiaries the Eastern Railroad and Boston & Lowell Railroad, and the Fitchburg Railroad.

Amesbury Branch service ended in 1936, and Essex Branch service in 1942. [6] Branch line service declined heavily in the 1950s, with the single Salem–Marblehead round trip gone by 1957. Massive service cuts on May 18, 1958, ended all Saugus and Danvers branch service, closed all stations south of Lynn, and halved Marblehead service. [6] Further cuts on June 14, 1959, ended Marblehead Branch service; stations at East Lynn, Salisbury, and West Manchester were also closed. [7] [6]

On February 28, 1956, a southbound Danvers–Boston commuter train crashed into the rear of a stopped Portsmouth–Boston local train just north of Swampscott station during a snowstorm. The collision, blamed on the engineer operating at unsafe speeds for the conditions, killed 13 people and injured 283. [8] :317 [9] A second collision in Revere later that morning injured 143 people — some of whom had already been in the Swampscott wreck. [10] [11] On December 27, 1966, an outbound Budd RDC struck an oil tanker truck at Second Street in Everett, killing 13 people. [8] :317

MBTA era

In the 1960s, the B&M's passenger services - which, by that time, were almost exclusively commuter services — began to become financially unviable until the MBTA subsidized, and then acquired, the services. The line beyond Newburyport was abandoned in 1982; however, commuter service had been cut back from Newburyport to Ipswich in 1976. [4] In 1998, service was restored to Newburyport at a cost of $46 million. [12]

In the late 1980s, the MBTA planned to construct a park and ride relief station off Route 107 in Saugus. A $400,000 planning study was funded in February 1988; the proposed $11-million station would have had 1,000 parking spaces and opened in late 1991. [13] The station was not built; instead, a high-level platform and parking garage opened at Lynn in January 1992. [14]

In February 2001, the MBTA began two parallel planning processes for the North Shore region: a Draft Environment Impact Statement for the Blue Line Extension (DEIS), and a Major Investment Study (MIS) for other projects primarily north of Salem. The MIS, released in 2004, identified a number of possible improvements to the Newburyport/Rockport Line, including upgrades to current stations, grade crossing eliminations, signal system improvements, increased frequencies, a second Salem tunnel, a branch line to Danvers, and new stations at Revere and South Salem. [15] None of the projects in the DEIS or MIS was actually built due to lack of funding, except for parking structures at Salem and Beverly which were mandated as Big Dig mitigation. As of 2024, design of South Salem station is being undertaken by the city. [16] [17]

In July 2019, Wynn Resorts proposed a combination commuter rail and Silver Line station in Everett to serve the newly owned Encore Boston Harbor casino and proposed surrounding development. [18]

Movable bridges and replacements

Draw Number 7 shortly before replacement Mystic river drawbridge no. 7.jpg
Draw Number 7 shortly before replacement

Owing to its position along the North Shore coastline, the Newburyport/Rockport Line has a large number of river crossings, including movable bridges over the Saugus River and Danvers River on the mainline as well as Days Creek and the Annisquam River on the Rockport Branch. Draw Number 7 over the Mystic River between Somerville and Everett, built in 1877, was the oldest horizontally folding drawbridge in the country [19] until it was replaced by a fixed high-level concrete span on August 26, 1989. The new $34.2-million bridge, which was completed nine months ahead of schedule, eliminated the 5-mile-per-hour (8.0 km/h) speed restriction on the old bridge. [20] [21]

The Beverly Drawbridge spanning the Danvers River was replaced in 2017. The abutments of the approach spans were repaired, followed by a 21-day service shutdown from July 17 to August 13, 2017, for the complete replacement of the swing bridge section. [22] [14] The MBTA Board approved the $16.2-million contract in February 2016; work will last from March 2016 to December 2017. [23] The line was shut down on weekends from July 8 through August 27, 2017, for the installation of Positive Train Control equipment in order to meet a 2020 federal deadline; four of those weekends overlapped with the already planned service curtailments for drawbridge work. [24] [14]

The Gloucester Drawbridge over the Annisquam River formerly consisted of a steel drawbridge and western approach span with a timber trestle for the eastern approach. It was built in 1911, modified in 1932, and substantially repaired in 1984–85. It was completely replaced with a modern box beam bridge on steel piles. [25] By February 2016, bidding was planned to begin by June for the four-year, then-$34-million project, though funding had not been allotted. [26] The MBTA Board approved a $56.9-million contract in October 2017; funding is split between federal and state funds. The 44-month project was to require 10 weekend shutdowns of the branch. [27] All service between West Gloucester and Rockport was replaced by buses from June 1 to 30, 2019 to allow for construction. [28]

On April 29, 2020, service between West Gloucester and Rockport was indefinitely replaced by buses due to a failure of the old bridge. [29] That June, the MBTA indicated the closure would continue until the completion of the bridge replacement in mid-2021. [30] In October 2020, weekend service was modified with the outbound bus connection at Manchester, so that trains could idle between the two stations. [14] This was repeated with weekday service on November 2, 2020. [31] On April 5, 2021, weekend bus shuttles were changed to run between Beverly and Rockport. [14] Other work during the closure included replacement of 11,000 wood ties with plastic ties, replacement of 12 culverts, and replacement of an old spring switch east of the drawbridge with a modern interlocking. [32] Portions of the line are being replaced by buses in several phases from April 11 to June 5, 2022, to allow for several construction projects including the completion of the drawbridge. [33] Regular service to Rockport over the bridge resumed on May 23, 2022. [34] Work on the bridge was completed in December 2022. [35]

The MBTA plans to replace the Saugus River drawbridge in the mid-to-late 2020s. [36]

COVID-19 changes

Substantially reduced schedules due to the COVID-19 pandemic were in effect from March 16 to June 23, 2020. [14] Schedule changes effective November 2, 2020 shifted some peak service to off-peak, providing 30-minute midday headways on the inner portion of the line, as part of a transition to a regional rail model. [37] The final Newburyport-bound train on weekdays began operating as a shuttle from Salem, with a transfer from a Rockport-bound train. [31] In November 2020, as part of service cuts during the pandemic, the MBTA proposed to close Prides Crossing along with five other low-ridership stations on other lines. [38] On December 14, the MBTA Board voted to enact a more limited set of cuts, including indefinitely closing Prides Crossing and four of the other five stations. [39] [40] That day, temporary reduced schedules were again put into place, with Prides Crossing not served. [41] Full service resumed on April 5, 2021, with Prides Crossing still closed. [42]

As of February 2022, weekday service had 12 Boston–West Gloucester round trips, 13 Boston–Newburyport round trips, three Boston–Beverly round trips, and one Salem–Newburyport outbound trip. Weekend service had nine round trips on each branch, with no short turns. [43] A series of partial and complete closures of the line took place from March 5 to June 12, 2022, to allow for signal construction work. Several shorter closures took place in July through September. [14] Lynn station temporarily closed on October 1, 2022, pending a reconstruction project. [44] By October 2022, the line had 11,333 daily riders — 76% of pre-COVID ridership. [1] Rockport Branch service was replaced by buses from October 15 to December 18, 2022, for the final phase of signal work. [14] [35] All trips on the line were reduced to Zone 1A fares (the least expensive) from July 1 to August 31, 2023, during a closure of the Sumner Tunnel. [45]

Proposed electrification

As the MBTA plans to transition to a regional rail model with more frequent service, the Newburyport/Rockport Line is a priority for electrification because it serves environmental justice communities.[ clarification needed ] In April 2021, the MBTA indicated plans to electrify the line between Boston and Beverly Depot. Studies for facility needs and traction power were noted as being funded, while design and planning for required infrastructure changes were not. [46] In June 2022, the MBTA indicated plans to begin service with battery electric multiple units on the line in 2031. The section from Chelsea to Hamilton/Wenham and Manchester (save for the Salem Tunnel) would have overhead wires. A light maintenance facility would be constructed near Salem. Improvements to a turnback track near Beverly, allowing more frequent diesel service in the interim, are planned to be completed in late 2022. [47] [ needs update ]

Station listing

StateFare zoneLocation Miles (km) [2] StationConnections and notes
MA 1A Boston 0.0 (0.0) Wheelchair symbol.svg North Station BSicon LOGO Amtrak2.svg Amtrak: Downeaster
MBTA.svg MBTA Commuter Rail: Fitchburg Line, Lowell Line, and Haverhill Line
MBTA.svg MBTA subway: Orange Line, Green Line (D and E branches)
Aiga bus trans.svg MBTA bus: 4
Aiga bus trans.svg EZRide
Chelsea 4.1 (6.6) Wheelchair symbol.svg Chelsea MBTA.svg MBTA subway: Silver Line (SL3)
Aiga bus trans.svg MBTA bus: 112 ,  114
Was located 0.4 miles (0.6 km) to the east until 2021
2 Lynn 9.9 (15.9) River Works For River Works employees only
11.5 (18.5) Wheelchair symbol.svg Lynn Aiga bus trans.svg MBTA bus: 426 , 426W , 429 , 435 , 436 , 439 , 441 , 442 , 455 ,  456
3 Swampscott 12.8 (20.6) Wheelchair symbol.svg Swampscott
Salem 16.8 (27.0) Wheelchair symbol.svg Salem Aiga bus trans.svg MBTA bus: 435 , 450 , 450W , 451 , 455 ,  456
Was located 0.5 miles (0.8 km) to the south until 1987
4 Beverly 18.3 (29.5) Wheelchair symbol.svg Beverly Depot Aiga bus trans.svg CATA: City of Beverly shuttle, Beverly Commuter
Split with Gloucester Branch
520.8 (33.5) Wheelchair symbol.svg North Beverly Aiga bus trans.svg MBTA bus: 451
Hamilton 22.7 (36.5) Wheelchair symbol.svg Hamilton/Wenham
6 Ipswich 27.6 (44.4) Wheelchair symbol.svg Ipswich Aiga bus trans.svg CATA: Ipswich/Essex Explorer (summer)
7 Rowley 31.2 (50.2) Wheelchair symbol.svg Rowley
8 Newburyport 36.2 (58.3) Wheelchair symbol.svg Newburyport Aiga bus trans.svg MVRTA: 19, 20
Pre-1976 location was 1.1 miles (1.8 km) north
NH Hampton 46.5 (74.8) Hampton Closed January 4, 1965
North Hampton 48.7 (78.4) North Hampton Closed January 4, 1965
Portsmouth 56.9 (91.6) Portsmouth Closed January 4, 1965
  Currently operating station

Gloucester Branch

Fare zoneLocation Miles (km) [2] StationConnections and notes
4 Beverly 18.3 (29.5) Wheelchair symbol.svg Beverly Depot Aiga bus trans.svg CATA: City of Beverly shuttle, Beverly Commuter
Split from main line
19.8 (31.9) Wheelchair symbol.svg Montserrat Aiga bus trans.svg CATA: City of Beverly Shuttle
522.2 (35.7) Prides Crossing Closed January 23, 2021
22.9 (36.9) Wheelchair symbol.svg Beverly Farms
6 Manchester-by-the-Sea 25.4 (40.9) Wheelchair symbol.svg Manchester
7 Gloucester 29.6 (47.6) Wheelchair symbol.svg West Gloucester Aiga bus trans.svg CATA: West Gloucester
30.6 (49.2) Harbor Closed January 7, 1985
31.6 (50.9) Wheelchair symbol.svg Gloucester Aiga bus trans.svg CATA: Beverly Commuter, Lanesville, Saturday Mall, Gloucester Crossing/Business Express, Stage Fort Park Shuttle (summer)
8 Rockport 35.3 (56.8) Wheelchair symbol.svg Rockport Aiga bus trans.svg CATA: Beverly Commuter, Lanesville, Rockport Shuttle (summer only)
  Currently operating station

Related Research Articles

<span class="mw-page-title-main">North Station</span> Train station in Boston, Massachusetts, US

North Station is a commuter rail and intercity rail terminal station in Boston, Massachusetts. It is served by four MBTA Commuter Rail lines – the Fitchburg Line, Haverhill Line, Lowell Line, and Newburyport/Rockport Line – and the Amtrak Downeaster intercity service. The concourse is located under the TD Garden arena, with the platforms extending north towards drawbridges over the Charles River. The eponymous subway station, served by the Green Line and Orange Line, is connected to the concourse with an underground passageway.

<span class="mw-page-title-main">MBTA Commuter Rail</span> Greater Boston commuter rail system

The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 135 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).

The Grand Junction Railroad is an 8.55-mile (13.76 km) long railroad in the Boston, Massachusetts, area, connecting the railroads heading west and north from Boston. The line is notable for its railroad bridge over the Charles River that passes under the Boston University Bridge between Boston and Cambridge, Massachusetts.

<span class="mw-page-title-main">Sullivan Square station</span> Rapid transit station in Boston, Massachusetts, US

Sullivan Square station is a rapid transit station on the MBTA subway Orange Line, located adjacent to Sullivan Square in the Charlestown neighborhood of Boston, Massachusetts. It is a major transfer point for MBTA bus service, with 12 routes using a two-level busway. The station has two island platforms serving the two active Orange Line tracks plus an unused third track. The Haverhill Line and Newburyport/Rockport Line pass through the station on separate tracks but do not stop.

<span class="mw-page-title-main">Eastern Railroad</span>

The Eastern Railroad was a railroad connecting Boston, Massachusetts to Portland, Maine. Throughout its history, it competed with the Boston and Maine Railroad for service between the two cities, until the Boston & Maine put an end to the competition by leasing the Eastern in December 1884. Much of the railroad's main line in Massachusetts is used by the MBTA's Newburyport/Rockport commuter rail line, and some unused parts of its right-of-way have been converted to rail trails.

<span class="mw-page-title-main">Bellingham Square station</span> Bus rapid transit station in Chelsea, Massachusetts, US

Bellingham Square station is a Massachusetts Bay Transportation Authority (MBTA) Silver Line bus rapid transit (BRT) station located near Bellingham Square slightly north of downtown Chelsea, Massachusetts. The station has two accessible side platforms for buses on the SL3 route. The Boston and Maine Railroad and predecessor Eastern Railroad served Chelsea station at the same location from the mid-1850s to 1958. The MBTA opened Chelsea station on the Newburyport/Rockport Line in 1985. Prior to its 2010 cancellation, the Urban Ring Project planned for a circumferential BRT line with a stop at Mystic Mall. Planning continued for the Chelsea segment; a Silver Line extension to Mystic Mall was announced in 2013. Construction began in 2015, and SL3 service to the renamed Bellingham Square station began on April 21, 2018. Commuter rail service moved to the newly constructed Chelsea station on November 15, 2021.

<span class="mw-page-title-main">Lynn station</span> MBTA rail station in Lynn, Massachusetts, US

Lynn station is an intermodal transit station in downtown Lynn, Massachusetts. It is a station on the MBTA Commuter Rail Newburyport/Rockport Line and a hub for the MBTA bus system.

<span class="mw-page-title-main">Salem station (MBTA)</span> Rail station in Salem, Massachusetts, US

Salem station is an MBTA Commuter Rail station served by the Newburyport/Rockport Line. The station is located off Bridge Street near its interchange with North Street at the north end of downtown Salem, Massachusetts. The station has a single accessible full-length high-level platform serving the single track of the Eastern Route. Just south of the station is the Salem Tunnel, which carries the line under Washington Street. Salem is a major park and ride center, with a 700-space parking garage, as well as an MBTA bus terminal. It is the busiest commuter rail station in the MBTA system outside of the central Boston stations, with an average of 2,326 daily boardings in a 2018 count.

<span class="mw-page-title-main">Beverly Depot</span> Train station in Beverly, Massachusetts, US

Beverly Depot is an MBTA Commuter Rail station in Beverly, Massachusetts. Located in Downtown Beverly, it serves the Newburyport/Rockport Line. It is the junction of the line's two branches to Newburyport and Rockport and is served by every train on both branches.

<span class="mw-page-title-main">Prides Crossing station</span> Former railway station in Beverly, Massachusetts

Prides Crossing station is a former MBTA Commuter Rail station on the Newburyport/Rockport Line, located in the village of Prides Crossing in Beverly, Massachusetts. It was opened by the Eastern Railroad as a flag stop in the mid-19th century. A stick style wooden station building was constructed around 1880 as wealthy residents built summer homes in the area. The Eastern Railroad was acquired in 1885 by the Boston and Maine Railroad (B&M), which operated commuter service to Prides Crossing until the Massachusetts Bay Transportation Authority (MBTA) took over in the 1970s. Prides Crossing was reduced to peak-hour-only service in 1981. It was temporarily closed in December 2020 because of low ridership and a lack of accessibility, with the closure becoming indefinite in April 2021. The former station building, not used by the railroad since the mid-20th century, is occupied by a private business.

<span class="mw-page-title-main">Beverly Farms station</span> Railway station in Beverly, Massachusetts, US

Beverly Farms station is an MBTA Commuter Rail station in the Beverly Farms village of Beverly, Massachusetts. Located at the intersection of Oak Street and West Street, it serves the Newburyport/Rockport Line. The 1898-built station building is still present but no longer used for railroad purposes. The station has two side platforms serving the line's two tracks, each with a mini-high section to make the station accessible.

<span class="mw-page-title-main">Manchester station (MBTA)</span> Railway station in Manchester-by-the-Sea, Massachusetts

Manchester station is an MBTA Commuter Rail Newburyport/Rockport Line station in Manchester-by-the-Sea, Massachusetts. The station is accessible, with mini-high platforms at the outbound end of the platform.

<span class="mw-page-title-main">West Gloucester station</span>

West Gloucester station is an MBTA Commuter Rail station on the Newburyport/Rockport Line, located off Massachusetts Route 133 in the west part of Gloucester, Massachusetts.

<span class="mw-page-title-main">Gloucester station (MBTA)</span>

Gloucester station is an MBTA Commuter Rail station in Gloucester, Massachusetts. Located off Railroad Avenue and Washington Street in downtown Gloucester, it serves the Rockport branch of the Newburyport/Rockport Line. The station consists of a single side platform serving the line's single track. The station has a mini-high platform, making it accessible.

<span class="mw-page-title-main">Rockport station</span>

Rockport station is an MBTA Commuter Rail station in Rockport, Massachusetts. It is the terminus of the Rockport branch of the Newburyport/Rockport Line. The station complex consists of a single side platform with one revenue track plus 4 layover tracks for parked trains and a short stretch of auxiliary track.

<span class="mw-page-title-main">Rowley station (MBTA)</span> Railway station in Rowley, MA

Rowley station is an MBTA Commuter Rail station in Rowley, Massachusetts. It is the penultimate station on the Newburyport branch of the Newburyport/Rockport Line.

<span class="mw-page-title-main">Saugus Branch Railroad</span>

The Saugus Branch Railroad was an American rail line that operated passenger service from 1853 to 1958. It serviced the Massachusetts communities of Saugus, Malden, Everett, Revere, and Lynn.

<span class="mw-page-title-main">Bicycling and the MBTA</span>

The Massachusetts Bay Transportation Authority operates subway, bus, commuter rail, and ferry service in the Greater Boston region. Boston has some of the highest rates of non-motorized commuting in the United States, including high bicycle usage. The MBTA offers certain provisions for riders wishing to make part of their trips by bicycle. The agency allows bicycles to be carried on all fixed-route services except the Green Line and the Ashmont-Mattapan High Speed Line light rail lines, although they are restricted on the commuter rail and heavy rail subway services at peak hours. Bicycle storage areas are offered at many stations, with "Pedal and Park" locking bicycle cages at certain high-usage stations.

<span class="mw-page-title-main">Chelsea station (MBTA)</span> Intermodal transit station in Chelsea, Massachusetts, US

Chelsea station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station located adjacent to the Mystic Mall in Chelsea, Massachusetts. It is the terminus of the SL3 route of the MBTA Silver Line bus rapid transit (BRT) network, and is served by the Newburyport/Rockport Line of the MBTA Commuter Rail. The accessible station has a loop with two small platforms for the Silver Line, and two full-length side platforms for commuter rail trains.

References

  1. 1 2 Poftak, Steve (October 27, 2022). "GM Report" (PDF). Massachusetts Bay Transportation Authority. p. 6.
  2. 1 2 3 "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  3. MBTA. "MBTA Bike Train" (PDF). Archived from the original (PDF) on October 23, 2014. Retrieved August 11, 2013.
  4. 1 2 3 T. Zabek (January 1, 2010). "Eastern Division". Remnants of the Boston & Maine Railroad. Archived from the original on March 31, 2012. Retrieved August 22, 2011.
  5. Hurd, Duane Hamilton (1888). History of Essex County, Massachusetts: with biographical sketches of many of its pioneers and prominent men, Volume 2, Part 1. J. W. Lewis & Co.
  6. 1 2 3 Humphrey, Thomas J.; Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. pp. 75–77. ISBN   9780685412947.
  7. "Cities, Towns, Labor Officials Protest State O.K. of B&M Cutbacks". Boston Globe. May 13, 1959. p. 6 via Newspapers.com. Lock-green.svg
  8. 1 2 Karr, Ronald Dale (2017). The Rail Lines of Southern New England (2 ed.). Branch Line Press. ISBN   9780942147124.
  9. "Train Crashed at 50 M.P.H., Three Say". Boston Globe. March 9, 1956. pp. 1, 13 via Newspapers.com. Lock-green.svg
  10. "B. & M. Sure Signals O.K." Boston Globe. March 9, 1956. p. 1 via Newspapers.com. Lock-green.svg
  11. "Two Railroad Wrecks in One Day Enough for Seven B&M Riders". Boston Globe. February 28, 1956. p. 10 via Newspapers.com. Lock-green.svg
  12. Dodge, John (October 1998). "The railroad returns to Newburyport". Trains . 57 (10): 48.
  13. Howe, Peter J. (February 18, 1988). "MBTA OK's funds for Saugus study". Boston Globe via Newspapers.com. Lock-green.svg
  14. 1 2 3 4 5 6 7 8 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  15. PB/DMJM+HARRIS, Joint Venture (March 2004). "Chapter 3: Project Definition & Assessment" (PDF). Draft North Shore Transit Improvements Project-MIS. Massachusetts Bay Transportation Authority. Archived from the original (PDF) on March 10, 2016. Retrieved March 25, 2016.
  16. "MBTA South Salem Commuter Rail Stop Conceptual Design Neighborhood Meeting" (PDF). City of Salem. June 18, 2024.
  17. "Healey-Driscoll Administration Celebrates over $25 Million in Federal Funding for Three Critical Transportation Projects" (Press release). Massachusetts Bay Transportation Authority. June 26, 2024.
  18. Chesto, Jon (July 11, 2019). "Wynn offers investors a glimpse of Everett's development potential". Boston Globe.
  19. "Mystic River Drawbridge No. 7, Spanning Mystic River at Boston & Maine Railroad Eastern Route, Somerville, Middlesex County, MA". Historic American Engineering Record (Library of Congress Prints and Photographs Division). December 1988.
  20. Coughlin, William (August 25, 1989). "Swing-Bridge Operators Drawing Down Curtain". Boston Globe via Newspapers.com.
  21. Ackerman, Jerry (August 28, 1989). "MBTA mulls asking state for $6m". Boston Globe via Newspapers.com. Lock-green.svg
  22. Jessen, Klark (March 24, 2015). "Beverly: Drawbridge Project Community Meeting April 1" (Press release). Massachusetts Department of Transportation. Archived from the original on April 2, 2015. Retrieved March 24, 2015.
  23. Oemig, Jennie (February 10, 2016). "Contractor named for Beverly drawbridge project". Wicked Local Beverly. Retrieved February 24, 2016.
  24. "Commuter Rail Positive Train Control (PTC): Update and Communications Plan for Suspension of Weekend Service" (PDF). Massachusetts Bay Transportation Authority. March 27, 2017. p. 6. Archived from the original (PDF) on March 31, 2017. Retrieved March 30, 2017.
  25. "Gloucester Drawbridge Replacement". Massachusetts Bay Transportation Authority. Retrieved March 30, 2015.
  26. Lamont, Ray (February 23, 2016). "'We need to get going on this': MBTA bridge plans to be outlined Tuesday night". Gloucester Times. Retrieved February 24, 2016.
  27. "Contract H62CN03: Replacement of Gloucester Drawbridge over the Annisquam River" (PDF). Massachusetts Bay Transportation Authority. October 16, 2017.
  28. "Rockport and West Gloucester Shuttle Bus Replacement Extended 2 Weeks Through June 30" (Press release). Massachusetts Bay Transportation Authority. June 13, 2019.
  29. "Rockport Line Service Changes". Massachusetts Bay Transportation Authority. April 29, 2020. Archived from the original on May 1, 2020.
  30. "Newburyport/Rockport Trains between Rockport and West Gloucester Replaced with Shuttle Buses through Summer 2021" (Press release). Massachusetts Bay Transportation Authority. June 9, 2020.
  31. 1 2 "Newburyport/Rockport Line Fall/Winter Schedule" (PDF). Massachusetts Bay Transportation Authority. November 2, 2020.
  32. "Gloucester Drawbridge Replacement Project: Rockport Commuter Rail Service Restoration Expected May 2022" (Press release). Massachusetts Bay Transportation Authority. December 23, 2021.
  33. "Newburyport/Rockport Commuter Rail Line Service Changes" (Press release). Massachusetts Bay Transportation Authority. April 7, 2022.
  34. "MBTA Commuter Rail Spring/Summer Schedule to Take Effect May 23" (Press release). Keolis Commuter Services. May 10, 2022. Archived from the original on May 13, 2022. Retrieved May 10, 2022.
  35. 1 2 "Gloucester Drawbridge on Newburyport/Rockport Commuter Rail Line Has Been Successfully Completed" (Press release). Massachusetts Bay Transportation Authority. December 14, 2022.
  36. "Capital Investment Plan Update: Initial FY23-27 program sizes and public engagement process preview" (PDF). Massachusetts Bay Transportation Authority. February 10, 2022.
  37. DiAdamo, Rob (September 14, 2020). "Fall 2020 Commuter Rail Schedule Changes" (PDF). Massachusetts Bay Transportation Authority.
  38. Paget-Seekins, Laurel; Benesh, Kat (November 9, 2020). "Forging Ahead: Scenario and Service Planning" (PDF). Massachusetts Bay Transportation Authority. p. 21.
  39. Enwemeka, Zeninjor (December 14, 2020). "MBTA Control Board Votes To Scale Back Bus, Train And Ferry Service". WBUR. Retrieved February 5, 2021.
  40. Paget-Seekins, Laurel; Benesh, Kat (December 14, 2020). "Forging Ahead: Service Proposal" (PDF). Massachusetts Bay Transportation Authority. p. 17.
  41. "Commuter Rail to Temporarily Operate Reduced Service Schedule Starting December 14" (Press release). Massachusetts Bay Transportation Authority. December 10, 2021.
  42. "Kingston Line Spring 2021 Schedule, Effective April 5th, 2021" (PDF). Massachusetts Bay Transportation Authority. April 5, 2021.
  43. Belcher, Jonathan (January–February 2022). "MBTA Vehicle Inventory as of February 28, 2022". Rollsign. Vol. 59, no. 1–2. Boston Street Railway Association. p. 17.
  44. "Lynn Station to Close on October 1 for Improvements" (Press release). Massachusetts Bay Transportation Authority. September 16, 2022.
  45. "Entire Newburyport/Rockport Line to Accept Zone 1A Fares July 1 – August 31" (Press release). Massachusetts Bay Transportation Authority. June 22, 2023.
  46. Alistair Sawers (April 12, 2021). "Regional Rail Transformation Update: EMU Pilot and Phase 1 Planning Update" (PDF). Retrieved April 15, 2021.
  47. Sawers, Alistar (June 23, 2022). "Regional Rail Transformation Update: Traction Power Planning for Regional and Urban Rail Services" (PDF). Massachusetts Bay Transportation Authority.
Template:Attached KML/Newburyport/Rockport Line
KML is from Wikidata