Pawtucket/Central Falls station

Last updated

Pawtucket/Central Falls
Northbound train departing Pawtucket Central Falls station, December 2023.jpg
An MBTA train at the station in December 2023
General information
Location300 Pine Street
Pawtucket, Rhode Island
Coordinates 41°52′43″N71°23′32″W / 41.8787°N 71.3922°W / 41.8787; -71.3922
Line(s) Amtrak Northeast Corridor
Platforms2 side platforms
Tracks3
ConnectionsAiga bus trans.svg RIPTA: R-Line, 1, 71, 72, 73, 75, 76, 78, 80, QX
Construction
Parking201 spaces
AccessibleYes
History
Opened1847
January 23, 2023
ClosedFebruary 20, 1981
RebuiltJune 16, 1916
Passengers
2023400 daily boardings [1]
Services
Preceding station MBTA.svg MBTA Following station
Providence Providence/​Stoughton Line South Attleboro
Providence
Terminus
Providence/​Stoughton Line
Special events
South Attleboro
toward Foxboro
Former services
Preceding station MBTA.svg MBTA Following station
Providence
Terminus
Providence/​Stoughton Line
Station closed 1981
Attleboro
Preceding station New York, New Haven and Hartford Railroad Following station
Providence
toward New Haven
Shore Line Attleboro
toward Boston
Providence
Terminus
Providence and Worcester Railroad Valley Falls
toward Worcester
Location
Pawtucket/Central Falls station

Pawtucket/Central Falls station is a commuter rail station in Pawtucket, Rhode Island. It opened for MBTA Commuter Rail Providence/Stoughton Line service on January 23, 2023. The station has two side platforms serving the two tracks of the Northeast Corridor. It is also a hub for RIPTA local bus service.

Contents

A former station, located slightly northeast on the border of Pawtucket and Central Falls, opened in 1916 to replace separate stations in the two cities. The station building was closed in 1959, and passenger service ended in 1981. The derelict station building, located above the Northeast Corridor tracks, is still extant.

History

Combined station

The former station in August 2015 Pawtucket-Central Falls station from Barton Street (2), August 2015.JPG
The former station in August 2015

The station was originally built in 1915-16 by the New York, New Haven and Hartford Railroad as a replacement for two separate stations in both Pawtucket and Central Falls as part of a grade separation program. [2] The project was approved on April 29, 1912; grade crossings were eliminated on April 11, 1914, and trains began using the new alignment on December 20. [3] The new station opened for passengers on January 16, 1916. [2] [3] [4] It was originally built with two island platforms and four tracks, with each platform serving one center main track and one siding. [5]

In 1959, the station building itself was in disrepair and was closed. Thereafter passengers accessed the platforms via stairways from Barton Street. [5] The station was served by New Haven Railroad trains, then later by MBTA Commuter Rail, until Rhode Island stopped funding service past Attleboro on February 20, 1981. [6] The station building was considered for nomination to the National Register of Historic Places in 1984, but this was deferred due to concerns about its structural integrity. [7] During the Northeast Corridor Electrification Project in the 1990s, the station tracks were relocated to increase clearances for the Acela Express to tilt when going around the curve. The center main tracks were replaced with a single southbound main track, while the northbound siding track was replaced with a new northbound main track. The southbound siding is now the "FRIP track" (Freight Rail Improvement Project) for the exclusive use of Providence and Worcester Railroad freight trains. [5]

New station

The station under construction in 2021 Pawtucket Central Falls station construction from Weeden Street (2), December 2021.JPG
The station under construction in 2021

When Rhode Island resumed funding MBTA service to Providence in 1988, the Pawtucket/Central Falls stop was not resumed due to limited funding and the deteriorated condition of the station. The MBTA opened a new station at South Attleboro on June 20, 1990 to reach the Pawtucket/Central Falls market without adding a second stop in Rhode Island, which Rhode Island did not wish to pay for. [6] The station site at Route 1A is located less than a mile east of the point where the line enters Rhode Island, and offered room for a parking lot whereas the downtown Pawtucket location did not. However, it is too far from the old location to be walkable for most Pawtucket and Central Falls residents, and until 2013 RIPTA buses were prohibited by federal law from crossing the state line to deliver passengers to the station. [8] [9]

In the early 1990s, Rhode Island began planning for a substantial increase in commuter rail service, with more service to Boston as well as Providence-focused intrastate service. With South Attleboro station open, the need for a downtown Pawtucket/Central Falls station was initially discounted. A 1994 RIDOT study of rail corridors in the state analyzed commuter rail service to Woonsocket, but a Pawtucket station was not included. [10] During the next decade, the state focused on adding additional Boston-Providence trains and extending service to the South County area with stations at T. F. Green Airport and Wickford Junction. [11] [12] In 1998, RIDOT began planning a layover yard - but no station - in Pawtucket; the $18.5 million facility began construction in May 2003 and opened in July 2006. [13] [14]

In 2005 the City of Pawtucket began discussions with RIDOT about adding a Pawtucket stop in addition to the South County service. [5] The city commissioned a $344,000 study, released in 2007, which estimated between 1,080 and 1,161 daily riders to Boston, 269 to 562 daily riders to Providence, and 27 to 45 daily riders to T.F. Green Airport. [5] [15] The study considered reopening the former station with new platforms to the north, or building an all-new station at the Providence and Worcester Railroad yard to the south. The renovated station was estimated to cost $58.5 million versus $45.1 million for an all-new station, but the former was recommended based on better walkability, fewer impacts to businesses, and concerns about toxic materials in the rail yard. [5]

The station nearing completion in December 2022 Pawtucket Central Falls station near completion (3), December 2022.JPG
The station nearing completion in December 2022

Reusing the former station site was determined to be impractical after further analysis. The dilapidated condition of the building would markedly increase costs, and the track geometry was unsuitable for a modern station: there is insufficient room in the trench to add additional tracks to allow Amtrak trains to pass stopped commuter trains, and the sharp curve makes high-level handicapped accessible platforms impossible to build without large platform gaps. [16]

In April 2016, RIDOT submitted an application for a $14.5 million TIGER grant, which would part of the $40 million construction cost of the new station. If the grant is approved,[ needs update ] the state would contribute $3.6 million and the two cities $3.0 million, with federal funding expected to cover the remaining half. [17] Environmental review and preliminary design are to be completed by September 2016, with a $3.0 million design contract awarded in December. The TIGER application lowered the expected ridership to 519 daily boardings, of which all but 89 would be diverted from Providence and South Attleboro. [17] In October 2016, state and city officials unveiled a sign marking the site of the planned station. [18] Ground for the new station was broken in November 2018. [19] [20]

After construction delays, the station opened on January 23, 2023. [21] [22] RIPTA bus routes in Pawtucket were also moved to the new station. [23] [22] The station reached 400 daily boardings within the first week, close to projections of 520 daily. RIDOT indicated it would expand the 200-space parking lot, which was already at capacity, later in 2023. [24] Ridership was at 439 daily boardings by May 2023. [25] Construction of the 275-space lot expansion began that July and opened in January 2024. [26]

RIPTA plans to construct an indoor waiting room at the station for rail and bus passengers. It was originally planned as part of the station project; it was removed to reduce cost, then re-added with American Rescue Plan funds. RIPTA issued a request for proposals in April 2023. [27] As of January 2024, construction is expected to begin later in 2024, with completion in late 2025 or early 2026. [1] [28]

In March 2023, the Central Falls city solicitor reported that "[a]ll signs point toward demolition" of the former station. [29] Earlier that year, Amtrak estimated a $9.9 million cost to demolish the structure. [30]

Related Research Articles

<span class="mw-page-title-main">MBTA Commuter Rail</span> Greater Boston commuter rail system

The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 134 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).

<span class="mw-page-title-main">South Attleboro station</span> Railway station in Attleboro, Massachusetts, US

South Attleboro station is a temporarily closed MBTA Commuter Rail Providence/Stoughton Line station in Attleboro, Massachusetts. It is located under Newport Avenue in the South Attleboro neighborhood, just north of the Rhode Island border. The station had two side platforms serving the two tracks of the Northeast Corridor, connected by a footbridge to a park-and-ride lot.

<span class="mw-page-title-main">Boston and Providence Railroad</span> Former railroad company operating in Massachusetts and Rhode Island

The Boston and Providence Railroad was a railroad company in the states of Massachusetts and Rhode Island which connected its namesake cities. It opened in two sections in 1834 and 1835 - one of the first rail lines in the United States - with a more direct route into Providence built in 1847. Branches were built to Dedham in 1834, Stoughton in 1845, and North Attleboro in 1871. It was acquired by the Old Colony Railroad in 1888, which in turn was leased by the New Haven Railroad in 1893. The line became the New Haven's primary mainline to Boston; it was realigned in Boston in 1899 during the construction of South Station, and in Pawtucket and Central Falls in 1916 for grade crossing elimination.

<span class="mw-page-title-main">Providence station</span> Railway station in Providence, Rhode Island, US

Providence station is a railroad station in Providence, Rhode Island, served by Amtrak and MBTA Commuter Rail. The station has four tracks and two island platforms for passenger service, with a fifth track passing through for Providence and Worcester Railroad freight trains. It is now the 11th busiest Amtrak station in the country, and the second-busiest on the MBTA Commuter Rail system outside of Boston.

<span class="mw-page-title-main">Foxboro station</span> Train station in Foxborough, Massachusetts, US

Foxboro station is an MBTA Commuter Rail station in Foxborough, Massachusetts, located adjacent to Gillette Stadium and the Patriot Place shopping center. The station has a single side platform serving the main track of the Framingham Secondary. It is the terminus of a branch of the Franklin/Foxboro Line service, and is served by trains from Boston via the Franklin/Foxboro Line and from Providence via the Providence/Stoughton Line during events at Gillette Stadium.

<span class="mw-page-title-main">T. F. Green Airport station</span> Railway station in Warwick, Rhode Island

T. F. Green Airport station is a train station and intermodal facility in Warwick, Rhode Island, on the Northeast Corridor, adjacent to T. F. Green Airport. It extends the MBTA Commuter Rail Providence/Stoughton Line from Boston, which previously only went as far as the Providence train station. The station was completed in October 2010 and MBTA service began on December 6, 2010. On November 14, 2011, service expanded to 10 weekday trains in each direction. Trips to and from Boston's South Station take 75 to 90 minutes.

<i>Cape Codder</i> (train) Seasonal passenger train operated by Amtrak

The Cape Codder was a seasonal passenger train operated by Amtrak between New York City and Hyannis, Massachusetts, on Cape Cod. It operated during the summer between 1986 and 1996. It was the first regular service from New York to the Cape since 1964. The New York, New Haven and Hartford Railroad previously had operated a train under this name until 1958.

<span class="mw-page-title-main">Rhode Island Public Transit Authority</span> Public transport agency in Rhode Island, US

The Rhode Island Public Transit Authority (RIPTA) provides public transportation, primarily buses, in the state of Rhode Island. The main hub of the RIPTA system is Kennedy Plaza, a large bus terminal in downtown Providence, Rhode Island. Average daily ridership as of the fourth quarter of 2023 is 41,800. The agency operates 59 fixed-route bus routes and 7 demand-responsive routes, together serving 37 out of 39 Rhode Island municipalities.

<span class="mw-page-title-main">Wickford Junction station</span> Railway station in North Kingstown, RI

Wickford Junction station is a commuter rail station located in North Kingstown, Rhode Island, United States. It is the southern terminus of the MBTA Commuter Rail Providence/Stoughton Line and serves as a park and ride location for commuters to Providence and Boston. The station consists of a single high-level side platform on a stub-end siding next to the Northeast Corridor mainline.

<span class="mw-page-title-main">Providence/Stoughton Line</span> Line of the Boston MBTA Commuter Rail system

The Providence/Stoughton Line is an MBTA Commuter Rail service in Massachusetts and Rhode Island, primarily serving the southwestern suburbs of Boston. Most service runs entirely on the Northeast Corridor between South Station in Boston and Providence station or Wickford Junction station in Rhode Island, while the Stoughton Branch splits at Canton Junction and terminates at Stoughton. It is the longest MBTA Commuter Rail line, and the only one that operates outside Massachusetts. The line is the busiest on the MBTA Commuter Rail system, with 17,648 daily boardings in an October 2022 count.

<span class="mw-page-title-main">East Junction Branch</span> Railroad line

The East Junction Branch is a rail line in Rhode Island and Massachusetts, in the United States. Originally built by the Boston and Providence Railroad (B&P) in 1835, the line connects Attleboro, Massachusetts, and East Providence, Rhode Island via Seekonk, Massachusetts. As built, the line continued across the Seekonk River to Providence via the India Point Railroad Bridge; this connection was removed during the 1970s. The East Junction Branch meets the Northeast Corridor in Attleboro at a point known as East Junction, and ends at a connection to the East Providence Branch in East Providence. CSX Transportation operates freight service on the branch in Attleboro, while the Providence and Worcester Railroad (P&W) operates freight service in East Providence and across the state line into Seekonk. The line is owned by the P&W in Rhode Island, and by the Massachusetts Bay Transportation Authority in Massachusetts.

<span class="mw-page-title-main">Kingston station (Rhode Island)</span> Railway station in Kingston, Rhode Island

Kingston is a historic railroad station located on the Northeast Corridor in the village of West Kingston, in the town of South Kingstown, Rhode Island. It was built at this location in 1875 by the New York, Providence and Boston Railroad, replacing earlier stations dating back to the opening of the line in 1837. Current rail services consist of Northeast Regional trains in each direction, most of which stop at the station. Historically Kingston provided commuter rail service to Providence and Boston via Amtrak's commuter rail services. The MBTA is looking at extending their commuter service on the Providence/Stoughton Line.

<span class="mw-page-title-main">Franklin/Dean College station</span> Railway station in Franklin, Massachusetts, US

Franklin/Dean College station is an MBTA Commuter Rail station located in Franklin, Massachusetts near Dean College. It serves the Franklin/Foxboro Line, for which it was the terminus from 1966 to 1988. The station has a mid-sized park and ride lot to serve town residents; Forge Park/495 station is intended to serve commuters from other nearby towns. The 1912-built station building still serves as a waiting hall and café, open during morning commute hours on weekdays. Franklin/Dean College station has a single side platform serving the line's single track; it is not accessible.

<span class="mw-page-title-main">Providence metropolitan area</span> Metropolitan Statistical Area in the United States

The Providence metropolitan area is a region extending into eight counties in two states. Its core is in the states of Rhode Island and Massachusetts, and it is the 38th largest metropolitan area in the United States. The largest city in the Providence MSA is Providence, Rhode Island, with an estimated population of 1,622,520, exceeding that of Rhode Island by slightly over 60%. The MSA covers all of Rhode Island and Bristol County, Massachusetts, with an average population density of 2300 per mi2.

<span class="mw-page-title-main">Attleboro station (Massachusetts)</span> Railway station in Attleboro, Massachusetts, US

Attleboro station is a commuter rail station on the MBTA's Providence/Stoughton Line located in Attleboro, Massachusetts. By a 2018 count, Attleboro had 1,547 daily riders, making it the fourth busiest station on the system outside Boston.

<i>Beacon Hill</i> (train) Amtrak commuter train between Boston and New Haven

The Beacon Hill was a daily 157-mile (253 km) commuter rail service operated by Amtrak between Boston, Massachusetts, and New Haven, Connecticut, from 1978 to 1981. The Beacon Hill was one of the last long-haul commuter services operated by Amtrak. Service consisted of a single rush-hour round trip, with service eastbound to Boston in the morning and westbound to New Haven in the evening.

<span class="mw-page-title-main">Union Station (Worcester, Massachusetts)</span> Railway station in Worcester, Massachusetts, US

Union Station is a railway station located at Washington Square in downtown Worcester, Massachusetts. It is the western terminus of the MBTA Commuter Rail Framingham/Worcester Line and a stop for the Amtrak Lake Shore Limited service. A bus terminal adjacent to the station is the hub for Worcester Regional Transit Authority (WRTA) local bus service; it is also used by PVTA, MART, Peter Pan, and Greyhound intercity buses.

<span class="mw-page-title-main">R-Line (RIPTA)</span> Bus service in Rhode Island, United States

The R-Line is a Rapid Bus service in Rhode Island, United States, running from Pawtucket to Cranston via downtown Providence. This route was a combination of the old routes 11 and 99. Operated by the Rhode Island Public Transit Authority (RIPTA), it is the agency's first rapid bus route, and the second such system to open in New England. After several years of planning and construction, R-Line service began on June 21, 2014.

<span class="mw-page-title-main">United Electric Railways</span> Streetcar operator in Providence, Rhode Island, US (1919-1966)

The United Electric Railways Company (UER) was the Providence-based operator of the system of interurban streetcars, trolleybuses, and trolley freight in the state of Rhode Island in the early- to mid-twentieth century.

References

  1. 1 2 Leslie, Alexandra (January 10, 2024). "RIPTA: Pawtucket bus passenger facility to open within 2 years". WPRI. Retrieved January 11, 2024.
  2. 1 2 Roy, John H. Jr. (2007). A Field Guide to Southern New England Railroad Depots and Freight Houses. Branch Line Press. pp. 287–88. ISBN   9780942147087.
  3. 1 2 Jacobs, Warren (October 1928). "Dates of Some of the Principal Events in the History of 100 Years of the Railroad in New England. 1826-1926". Railway and Locomotive Historical Society Bulletin . 17 (17). Railway and Locomotive Historical Society: 15–28. JSTOR   43504499.
  4. Annual Report of the Board of Railroad Commissioners. Vol. 5. Wright & Potter Printing Company. January 1918. p. 398 via Google Books.
  5. 1 2 3 4 5 6 Vanasse Hangen Brustlin, Inc. (June 2007). "Pawtucket/Central Falls Commuter Rail Facility: Feasibility Study & Site Analysis" (PDF). City of Pawtucket Department of Planning and Redevelopment. Archived from the original (PDF) on December 16, 2019.
  6. 1 2 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  7. "National Register of Historic Places Inventory - Nomination Form" (PDF). City of Central Falls. October 31, 1984. p. 62.
  8. Barrett, Chris (December 24, 2009). "RIPTA buses may stop near Mass. trains". Providence Business Journal. Archived from the original on July 3, 2014. Retrieved July 3, 2014.
  9. Landis, Bruce (May 21, 2013). "RIPTA prepares to reorganize routes to improve service". Providence Journal. Retrieved July 8, 2014.
  10. "Rail Corridor Feasibility Study" (PDF). Rhode Island Department of Transportation. November 1994. Archived from the original (PDF) on April 24, 2013. Retrieved August 31, 2015.
  11. Edwards and Kelcey, Inc (July 2001). "South County Commuter Rail Service Plan" (PDF). Rhode Island Department of Transportation. Archived from the original (PDF) on April 16, 2009. Retrieved August 31, 2015.
  12. "South County Commuter Rail Environmental Assessment" (PDF). Rhode Island Department of Transportation. February 2003. Archived from the original (PDF) on April 16, 2009. Retrieved August 31, 2015.
  13. Castellucci, John (April 25, 2006). "Planned rail yard will expand routes, relieve neighbors". Providence Journal. Archived from the original on September 24, 2009.
  14. "MBTA, U.S. Senator Jack Reed, RI Governor Carcieri, RIDOT Officially Open Pawtucket Layover Facility" (Press release). Massachusetts Bay Transportation Authority. August 2, 2006.
  15. Sayles, Justin (November 4, 2006). "Study finds rail stop makes sense in Pawtucket". Providence Business News. Retrieved September 1, 2015.
  16. "Public Outreach Meeting: June 13, 2013" (PDF). Pawtucket Commuter Rail Station Preliminary Engineering and Environmental Assessment. Vanasse Hangen Brustlin, Inc. June 13, 2013. Archived from the original (PDF) on March 4, 2016. Retrieved September 1, 2015.
  17. 1 2 Nesi, Ted (May 17, 2016). "RI seeks $14.5M from feds for new Pawtucket train station". WPRI 12 Eyewitness News. Retrieved May 19, 2016.
  18. AP (October 29, 2016). "Sign to be planted at site of future MBTA station". Boston Globe. Retrieved November 26, 2016.
  19. Heim, R.J. (November 2, 2018). "Ground breaks on new $40M Pawtucket/Central Falls Transportation Hub". WJAR-TV. Retrieved November 9, 2018.
  20. Paul Edward Parker (February 6, 2021). "COVID doesn't stop Pawtucket train station construction". The Providence Journal. Retrieved February 21, 2021.
  21. Zack Deluca (August 3, 2022). "Construction delays push train station opening to December". The Valley Breeze. Retrieved September 20, 2022.
  22. 1 2 "Governor McKee, RIDOT Announce January 23 Opening Date for Pawtucket-Central Falls Transit Center" (Press release). Office of the Governor of Rhode Island. January 9, 2023.
  23. "Major Transit Centers". Rhode Island Public Transit Authority. Archived from the original on January 23, 2023.
  24. Shorey, Ethan (February 1, 2023). "Ridership booming at new train station; parking to be expanded". The Valley Breeze. Retrieved February 2, 2023.
  25. Shorey, Ethan (June 7, 2023). "State expects new lot at train station soon". The Valley Breeze. Retrieved June 7, 2023.
  26. Shorey, Ethan (August 16, 2023). "Expansion of train station parking lot in Pawtucket proceeds". The Valley Breeze. Retrieved September 21, 2023.
  27. "The Pawtucket Central Falls Transit Center's New Passenger Facilities Building: Request for Proposal (RFP) For Design Services" (PDF). Rhode Island Public Transit Authority. April 24, 2023.
  28. Medeiros, Ryan (January 15, 2024). "New parking opens for Pawtucket-Central Falls commuters". ABC6. Retrieved January 16, 2024.
  29. Shorey, Ethan (March 8, 2023). "All signs point toward demolition of old train station". The Valley Breeze. Retrieved March 8, 2023.
  30. Shorey, Ethan (May 3, 2023). "Huge price tag for removal of old train station". The Valley Breeze. Retrieved May 3, 2023.

Further reading