Pleasant Hill/Contra Costa Centre station

Last updated
Pleasant Hill/Contra Costa Centre
Bart-logo.svg
Pleasant Hill station from parking garage, May 2018.JPG
The station viewed from the parking garage in 2018
General information
Location1365 Treat Boulevard
Walnut Creek, California
Coordinates 37°55′42″N122°03′22″W / 37.928399°N 122.055992°W / 37.928399; -122.055992
Line(s) BART C-Line
Platforms2 side platforms
Connections
Construction
Structure typeElevated
Parking3,011 spaces
Bicycle facilities90 lockers
AccessibleYes
ArchitectGwathmey, Sellier & Crosby
Joseph Esherick & Associates [1]
Other information
Station code BART: PHIL
History
OpenedMay 21, 1973 (1973-05-21) [2]
Passengers
20242,460 (weekday average) [3]
Services
Preceding station Bart compact logo.svg Bay Area Rapid Transit Following station
Walnut Creek Yellow Line Concord
Location
Pleasant Hill/Contra Costa Centre station

Pleasant Hill/Contra Costa Centre station is a Bay Area Rapid Transit (BART) station serving the Contra Costa Centre Transit Village in Contra Costa Centre, California, just north of Walnut Creek and just east of Pleasant Hill. It is served by the Yellow Line.

Contents

Station design

County Connection bus at the station County Connection route 14 bus at Pleasant Hill station, May 2018.JPG
County Connection bus at the station

Pleasant Hill/Contra Costa Centre station is located in the unincorporated Contra Costa Centre area of Contra Costa County, slightly east of Interstate 680 and south of incorporated Pleasant Hill. The two elevated tracks of the BART C-Line run northeast–southwest through the station location, with two side platforms at the station. All buses stop on a two-way busway on the southeast side of the station. [4] Pleasant Hill/Contra Costa Centre is a transfer point for a number of County Connection local routes: [4]

The station is also served by several longer-distance routes: the Solano Express Blue Line and Yellow Line, WHEELS route 70X, and AC Transit Early Bird Express route 702. [4]

History

Pleasant Hill station under construction in 1970 Aerial view of Pleasant Hill station construction, 1970.jpg
Pleasant Hill station under construction in 1970

The BART Board approved the name Pleasant Hill in December 1965. [5] Service at the station began on May 21, 1973. [2] AC Transit bus service began in Pleasant Hill on December 8, 1975, with Pleasant Hill station as a hub. [6] The service was taken over by County Connection in 1982. [7] By 2002, Pleasant Hill had the most parking spaces of any BART station, with 3,398 spaces in a garage and surface lots. [8] :12 A BART plan released that year proposed expansion of the paid fare lobby and the platforms. [8] :38 Seismic retrofitting of the parking garage took place in 2008–2009. [9]

Walnut Creek station was originally intended to serve the surrounding low-density suburban neighborhoods. However, apartment complexes and mid-rise office buildings were soon constructed nearby. [10] [8] :9 County plans approved in 1983 and 1984 initiated the concept of a "transit village" of mixed-use transit-oriented development around the station. [10] [11] Planning began around 2001 to replace the surface parking lots with a transit village. [8] :13 The plan called for three mixed-use buildings south of the station, an office building west of the station, and expansion of the parking garage north of the station. [8] :14

Construction of the second parking garage began in March 2006. [12] The garage opened on June 30, 2008, at a cost of $51.2 million; the surface parking lots were closed at that time. [13] [14] Construction of mixed-use buildings (Block A and Block B) began the next month. [12] The two buildings, as well as a $12 million footbridge carrying the Iron Horse Regional Trail over Treat Boulevard, were opened in October 2010. [15] [16]

On September 23, 2010, the BART Board voted to change the station name to Pleasant Hill/Contra Costa Centre to reflect the name of the transit village. [17] The name change was supported by the transit village developer and the Contra Costa County Redevelopment Agency, but opposed by the city of Pleasant Hill. [18] [19] The Contra Costa County Redevelopment Agency and the developer paid the $413,800 cost of changing station signage and system maps. [19]

Construction of a third building in the transit village, Block C, took place from 2018 to 2020. [20] [21] In March 2024, the BART Board approved plans to change the approved office building (Block D) to residential use. [22]

Related Research Articles

<span class="mw-page-title-main">Bay Area Rapid Transit</span> Rapid transit system serving the San Francisco Bay Area

Bay Area Rapid Transit (BART) is a rapid transit system serving the San Francisco Bay Area in California. BART serves 50 stations along six routes and 131 miles of track, including eBART, a 9-mile (14 km) spur line running to Antioch, and Oakland Airport Connector, a 3-mile (4.8 km) automated guideway transit line serving San Francisco Bay Oakland International Airport. With an average of 169,800 weekday passenger trips as of the third quarter of 2024 and 48,119,400 annual passenger trips in 2023, BART is the sixth-busiest rapid transit system in the United States.

<span class="mw-page-title-main">Yellow Line (BART)</span> Rapid transit line in the San Francisco Bay Area

The Yellow Line is a Bay Area Rapid Transit (BART) line in the San Francisco Bay Area that runs between Antioch and San Francisco International Airport (SFO). Some morning trains and all trains after 9 pm are extended from SFO to serve Millbrae station when the Red Line is not running. It serves 28 stations in Antioch, Pittsburg, Bay Point, Concord, Pleasant Hill, Walnut Creek, Lafayette, Orinda, Oakland, San Francisco, Daly City, Colma, South San Francisco, San Bruno, and Millbrae. It is the most-used BART line, and the only line with additional trains on weekdays. It runs for 62.2 miles (100.1 km), making it the system's longest line.

<span class="mw-page-title-main">Daly City station</span> Rapid transit station in California, US

Daly City station is an elevated Bay Area Rapid Transit (BART) station in Daly City, California, just south of the city limits of San Francisco. It is adjacent to Interstate 280 and California Route 1, which it serves as a park-and-ride station. The station is served by the Red, Yellow, Green, and Blue lines; it is the western terminus of the Green and Blue lines.

<span class="mw-page-title-main">Lake Merritt station</span> Rapid transit station in Oakland, California, US

Lake Merritt station is an underground Bay Area Rapid Transit (BART) station located east of Downtown Oakland near the eponymous Lake Merritt. The station is served by the Orange, Green, and Blue lines. It is the nearest BART station to Chinatown, Laney College, and Jack London Square station.

<span class="mw-page-title-main">Fruitvale station</span> Rapid transit station in San Francisco Bay Area

Fruitvale station is a Bay Area Rapid Transit (BART) station located in the Fruitvale District of Oakland, California. The elevated station has two side platforms. The station is served by the Orange, Green, and Blue lines.

<span class="mw-page-title-main">Orinda station</span> Rapid transit station in Orinda, California, US

Orinda station is a Bay Area Rapid Transit station in Orinda, California. The station has an island platform in the center median of State Route 24. It is served by the Yellow Line. An abstract mural by Win Ng, partially covered by advertisements, is located in the fare lobby.

<span class="mw-page-title-main">Lafayette station (BART)</span> Rapid transit station in the San Francisco Bay Area

Lafayette station is a Bay Area Rapid Transit (BART) station in Lafayette, California. The station consists of one island platform in the center median of State Route 24 just south of the Lafayette Hillside Memorial. It is served by the Yellow Line.

<span class="mw-page-title-main">Walnut Creek station</span> Rapid transit station in San Francisco Bay Area

Walnut Creek station is an elevated Bay Area Rapid Transit (BART) station in Walnut Creek, California, served by the Yellow Line. The station is located north of downtown Walnut Creek, adjacent to Interstate 680 and near the Ygnacio Valley Road and California Boulevard arterial roads.

<span class="mw-page-title-main">Concord station (BART)</span> Rapid transit station in San Francisco Bay Area

Concord station is a Bay Area Rapid Transit (BART) station in Concord, California. The station is located between the downtown business district to the west and residential neighborhoods to the east. Concord station has a single elevated island platform and is served by the Yellow Line.

<span class="mw-page-title-main">Richmond station (California)</span> Railway station in Richmond, California, US

Richmond station is an Amtrak intercity rail and Bay Area Rapid Transit (BART) station located in downtown Richmond, California. Richmond is the north terminus of BART service on the Orange Line and Red Line; it is a stop for Amtrak's Capitol Corridor, San Joaquins, and California Zephyr routes. The accessible station has one island platform for the two BART tracks, with a second island platform serving two of the three tracks of the Union Pacific Railroad Martinez Subdivision for Amtrak trains. It is one of two transfer points between BART and Amtrak, along with Oakland Coliseum station.

<span class="mw-page-title-main">Fremont station (BART)</span> Metro station in Fremont, California, US

Fremont station is a Bay Area Rapid Transit (BART) station in the central district of Fremont, California. The station is served by the Orange and Green lines. It was the southern terminus of both lines from September 11, 1972, until March 25, 2017, when Warm Springs/South Fremont station opened.

<span class="mw-page-title-main">MacArthur station (BART)</span> Rapid transit station in San Francisco Bay Area

MacArthur station is a Bay Area Rapid Transit (BART) station in the Temescal District of Oakland, California. It is the largest station in the BART system, being the only one with four platform tracks. Service through MacArthur is timed for cross-platform transfers between the southbound lines that pass through the station. MacArthur station is located in the median of SR 24 just north of its interchange with I-580. The station is perpendicular to 40th Street and MacArthur Boulevard. The surrounding neighborhood is mostly low-density residential, making MacArthur station primarily a commuting hub.

<span class="mw-page-title-main">Union City station</span> Metro station in Union City, California, US

Union City station is a Bay Area Rapid Transit (BART) station in Union City, California. The station sits near Decoto Road east of Alvarado-Niles Road, directly behind the James Logan High School campus. The station is served by the Orange and Green lines. Local bus service is provided by Union City Transit and AC Transit.

<span class="mw-page-title-main">North Berkeley station</span> Metro station in Berkeley, California, US

North Berkeley station is an underground Bay Area Rapid Transit (BART) station located in the North Berkeley neighborhood of Berkeley, California. It is bounded by Virginia Street, Sacramento Street, Delaware Street, and Acton Street in a residential area north of University Avenue. The main station entrance sits within a circular building at the center of a parking lot, while an elevator between the surface and the platform is located at the parking lot's Sacramento Street edge. The station is served by the Orange and Red lines.

<span class="mw-page-title-main">Dublin/Pleasanton station</span> Rapid transit station in Pleasanton, California, US

Dublin/Pleasanton station is a Bay Area Rapid Transit (BART) station on the border of Dublin and Pleasanton in California. It is the eastern terminus of the Blue Line. It is also a major bus terminal served by six providers.

<span class="mw-page-title-main">Hayward station (BART)</span> Metro station in Hayward, California, US

Hayward station is a Bay Area Rapid Transit (BART) station in Hayward, California, serving Downtown Hayward and the surrounding areas. It is served by the Orange and Green lines. The elevated station has two side platforms. A two-lane bus terminal is located on the northeast side of the station. A pedestrian tunnel under the Union Pacific Railroad Oakland Subdivision connects the fare lobby to a parking lot and a five-level parking garage.

<span class="mw-page-title-main">El Cerrito del Norte station</span> Rapid transit station in San Francisco Bay Area

El Cerrito del Norte station is a Bay Area Rapid Transit (BART) station located on Cutting Boulevard in El Cerrito, California. The station is served by the Orange and Red lines. Located near San Pablo Avenue and Interstate 80, it serves as a regional transit hub for local AC Transit bus services, and for commuter feeder services from Solano, Napa, and Marin Counties in the North Bay plus western Contra Costa County. Opened in 1973, the station was renovated in 2017–2021 to add additional elevators, stairs, and lobby space.

<span class="mw-page-title-main">Pittsburg Center station</span> Rapid transit station in San Francisco Bay Area

Pittsburg Center station is a Bay Area Rapid Transit station on the Yellow Line. It is located at the Railroad Avenue overpass of Highway 4 in Pittsburg, California and serves the downtown area of about one mile (1.6 km) away via connecting buses provided by Tri Delta Transit. There is no reserved parking available at this station.

<span class="mw-page-title-main">Antioch station (BART)</span> Rapid transit station in San Francisco Bay Area

Antioch station is a Bay Area Rapid Transit (BART) station on the Yellow Line. It is located in the median of Highway 4 at Hillcrest Avenue in Antioch, California. Antioch station is the eastern terminus of the BART to Antioch (eBART) section of the line.

eBART Hybrid rail line in Contra Costa County, California

eBART is a hybrid rail branch line of the Bay Area Rapid Transit (BART) system in eastern Contra Costa County, California, United States. The line extends the Yellow Line beyond Pittsburg/Bay Point station to Antioch station.

References

  1. Cerny, Susan Dinkelspiel (2007). An Architectural Guidebook to San Francisco and the Bay Area (1st ed.). Layton, UT: Gibbs Smith. pp. 501–502. ISBN   978-1-58685-432-4. OCLC   85623396.
  2. 1 2 "BART Chronology January 1947 – March 2009" (PDF). San Francisco Bay Area Rapid Transit District. March 2009. Archived from the original (PDF) on October 13, 2013.
  3. "Monthly Ridership Reports". San Francisco Bay Area Rapid Transit District. June 2024.
  4. 1 2 3 "Transit Stops: Pleasant Hill Station Area". Metropolitan Transportation Commission. January 24, 2024.
  5. "Names Approved for 38 Rapid Transit Stations Around Bay". Oakland Tribune. December 10, 1965. p. 10 via Newspapers.com.
  6. History of Lines by Line: Major Changes Since 1960 (PDF). Alameda-Contra Costa Transit District). July 17, 1978. p. 5.
  7. "Will extra miles dim the smiles of genial county service?". The San Francisco Examiner. June 1, 1982. p. 3 via Newspapers.com.
  8. 1 2 3 4 5 Pleasant Hill Station Comprehensive Plan (PDF). San Francisco Bay Area Rapid Transit District. July 2002.
  9. "Earthquake Safety Program Construction Updates (archive)". San Francisco Bay Area Rapid Transit District. 2009.
  10. 1 2 Amended Pleasant Hill BART Station Area Specific Plan. Contra Costa County. October 6, 1998. pp. 5, 10.
  11. "Record of Special Meeting". Pleasant Hill BART Station Leasing Authority. June 20, 2022. p. 11.
  12. 1 2 "BART breaks ground for transit village at Pleasant Hill Station" (Press release). San Francisco Bay Area Rapid Transit District. July 17, 2008.
  13. "New Garage at Pleasant Hill Station" (Press release). San Francisco Bay Area Rapid Transit District. June 20, 2008.
  14. Macias Gini & O'Connell LLP (November 24, 2020). "Annual Financial Report for the Years Ended June 30, 2020 and 2019" (PDF). San Francisco Bay Area Rapid Transit District. p. 99.
  15. "Street closures near Pleasant Hill Station Oct. 1-2 for grand opening ceremony" (Press release). San Francisco Bay Area Rapid Transit District. September 27, 2010.
  16. King, John (October 9, 2010). "Footbridge an elegant new icon in East Bay". SF Gate. Retrieved May 2, 2024.
  17. "Board of Directors: Minutes of the 1,608th Meeting: September 23, 2010" (PDF). San Francisco Bay Area Rapid Transit District. September 23, 2010. p. 3.
  18. "A Resolution of the City Council of Pleasant Hill Opposing Contra Costa County's Proposal to Rename the Pleasant Hill BART Station". City of Pleasant Hill. October 4, 2010.
  19. 1 2 White, Lisa P. (September 22, 2010). "Pleasant Hill BART station now 'Pleasant Hill/Contra Costa Centre". East Bay Times.
  20. Toms, Maureen; Brooks, Sean (February 19, 2019). "Agenda Item 8 – Real Property Negotiations Block D of the Pleasant Hill/Contra Costa Centre BART Transit Village". Pleasant Hill BART Leasing Authority. p. 2.
  21. Toms, Maureen (April 19, 2021). "Agenda Item 4 - Resolution Approving the Second Amendment to the License Agreement that permits Block D to be used for temporary parking". Pleasant Hill BART Station Leasing Authority.
  22. "Board Meeting Agenda". San Francisco Bay Area Rapid Transit District. March 14, 2024. p. 94. Archived from the original on May 3, 2024.