V/Line VLocity | |
---|---|
In service | 2005–present |
Manufacturer | Bombardier Transportation/Alstom [1] |
Built at | Dandenong |
Constructed | 2004–present |
Entered service | 22 December 2005 |
Number under construction | 48 carriages (22 sets) |
Number built | 375 carriages (125 3-car sets) |
Number in service | 372 carriages (124 3-car sets) |
Number preserved | 0 |
Number scrapped | 1 (1129: accident damage, 1229 renumbered to 1241) |
Formation | 3 semi-permanently coupled cars
|
Fleet numbers |
|
Capacity | 222 seats + 6 wheelchairs (per 3 carriage consist), formerly 140 seats + 4 wheelchairs (per 2 carriage consist) |
Operators | V/Line |
Depots | Southern Cross |
Lines served | |
Specifications | |
Car body construction | Stainless steel |
Train length | 3-cars set:75.75 m (248 ft 6 in) 6-car set:151.5 m (497 ft 1 in) |
Car length | 25.25 m (82 ft 10 in) |
Width | 2.92 m (9 ft 7 in) |
Doors | 4 per carriage (2 per side) |
Maximum speed | 160 km/h (100 mph) |
Weight | 171 t (168 long tons; 188 short tons) (3-car set) |
Prime mover(s) | 1 Cummins QSK-19R per carriage |
Power output | 559 kW (750 hp) per carriage |
Transmission | Voith T312 hydraulic transmission |
Acceleration | 0.9 m/s2 (3.0 ft/s2) |
Deceleration |
|
Auxiliaries | Cummins 80 kW (110 hp) generator |
Coupling system | Scharfenberg coupler |
Track gauge |
|
The V/Line VLocity, sometimes called the VLocity 160, [a] is a diesel multiple unit train built by Bombardier Transportation and, later, by Alstom [1] in Dandenong for V/Line, the regional rail operator in the Australian state of Victoria. Continuously in production since 2003, the VLocity is the highest-speed train in the V/Line fleet, with a top speed of 160 km/h (100 mph). As of November 2024 [update] , with set 125 entering service, 124 3-car sets were in revenue service, one collision damaged set was in storage, and 16 more were under construction. [2]
To honour a commitment made when it was awarded the V/Line franchise, National Express requested tenders in early 2000 for 29 two-carriage diesel multiple unit trains. The order, which coincided with the Regional Fast Rail project then being undertaken by the state government, was awarded to Adtranz's Dandenong rolling stock factory in mid-November with a value of A$ 410,000,000. [4] [5] [6] [7] The contract was extended to 38 two-car units and an initial fifteen-year maintenance contract. [6] [8] By the time the first was delivered, the V/Line franchise had reverted to the state government, and Adtranz had been taken over by Bombardier Transportation. [9] [10]
The design was an evolution of the Xplorer/Endeavour railcars. [11] Although Bombardier originally intended to use the same body shell design as the Endeavour, difficulties with the aerodynamic drag characteristics of this shape for the intended 160 km/h (99 mph) operational speed of the VLocity led to a complete redesign of the train body. [12] Ultimately, the VLocity was designed concurrently with the B series being developed for Transperth as an electric multiple unit, resulting in a number of shared design elements. [13]
The original plan was for the 29 sets to be fitted with 2+3 seating, for a total capacity of 173 passengers per two-carriage set. However, in February 2003, that was changed to 144 seats in a 2+2 formation. [14]
In 2003, it was announced that the units would be built in Bombardier's Dandenong factory, with the bogies to be constructed at Bombardier's Derby Litchurch Lane Works in England, and the control system to be supplied by Bombardier's plant in Västerås, Sweden. [15] The first unit was completed in July 2004, [16] and testing began shortly after. The trains were tested at 160 km/h (99 mph) for the first time on 17 September, when Premier Steve Bracks joined a test run along a 30 km (19 mi) route from Warragul to Moe. [17]
Safety improvements were suggested at various stages in the development of the VLocity and, following the Waterfall accident in New South Wales, in which a train derailed when travelling too fast around a curve, and the Cairns Tilt Train derailment in Queensland, which occurred in similar circumstances, the State Government announced in December 2004 that the Train Protection & Warning System (TPWS) would be installed on Regional Fast Rail lines and the VLocity trains. [18] In August 2005, the State Government commissioned an investigation into the fitting of seat belts on the trains, although the concept was considered potentially expensive and technically challenging. [19]
Testing revealed noise levels were too high in the cabin, [20] delaying the introduction of the trains into service while the completed sets were modified.
The VLocity was introduced into service on the Ballarat line on 22 December 2005, with Bracks and Transport Minister Peter Batchelor travelling on the inaugural service from Southern Cross station. An unveiling ceremony was held at Ballarat and the train returned as a regular service. [21] [22] Services on the Geelong and Bendigo lines followed on 3 February 2006 [23] and 24 February 2006 [24] respectively. Services to Traralgon and Seymour were introduced in September 2006. A timetable allowing the VLocity to operate at its 160km/h designed top speed was introduced on 3 September, despite allegations by the State Opposition of ongoing problems with the TPWS. [25] In addition, the Ararat and Echuca services are operated by VLocitys. From 2010, one Ballarat line service each day was extended to Maryborough. [26]
In 2005, the VLocity received an Australian Design Award, the first rail vehicle to do so, as well as an accolade from Engineers Australia. [13]
On 10 November 2008, seven-carriage-long VLocity trains (2 x 2-carriage + 1 x 3-carriage sets) commenced regular operation on peak-hour Geelong line services. Previously, the longest trains had been six carriages long (3 x 2-carriage sets). [27] With the introduction of fixed 3-carriage sets it was no longer possible to run 7-carriage trains but, in June 2022, a limited number of 9-carriage trains began running between Melbourne and Wyndham Vale during peak times. There are plans to also run 9 car services to Melton until the Metro network is extended to Melton when the line from Sunshine to Melton is electrified.
After the initial order of 38 units, a further two VLocity units were later ordered to bring the total to 40, along with 22 new intermediate trailers to be inserted in the middle of existing VLocity sets. The first 14 were promised during the 2006 State Election, [28] and the order was placed in December the same year. [29] The order for the next eight was announced on 12 October 2007. [30]
In July 2008, the State Government ordered nine new 3-car units, and an additional intermediate car to be inserted into an existing 2-car unit, [26] [31] [32] with an extra four carriages added in February 2009. [33] The final unit of the order was delivered in September 2011.
With the availability of improved technologies for train control, from mid-2012, sets 3VL30, 3VL40 and 3VL50 were selected by Bombardier as test sets for equipment upgrades, in order to minimise the number of sets containing non-standard systems. [34]
In November 2012, the State Government announced an additional 40 carriages would be delivered between 2014 and 2016. The order comprised seven additional 3-car sets plus 19 intermediate cars to increase the remaining 2-car sets to 3-cars. [33] [35] [36] [2]
In March 2014, the order for 40 carriages was increased to 43. [37] Further orders were placed for 21 carriages In May 2015 and 27 carriages in April 2016. [38] [39] All 2-carriage VLocity sets had been converted to 3-carriage sets by May 2018.
In December 2017, a further nine sets were ordered. Once all were delivered, the fleet comprised 88 3-car sets. [40] [41] Of these, sets 76-79 were of a modified configuration, with a single toilet per three-carriage set instead of two, improvements to CCTV, downrating of the engines to 650 hp (480 kW) each for fuel economy and altered standing and seating arrangements. Sets from 80 to 88 reverted to two toilets with modified seating and a different front to accommodate a safer driving cabin. As of 6 November 2020 units 80-88 had entered revenue service.
After jockey Michelle Payne won the 2015 Melbourne Cup horse race riding Prince of Penzance, becoming the first female jockey to win the race, set 3VL9 was named Michelle Payne in honour of her regional Victorian ancestry. The set was the first and thus far only VLocity to be named and the first V/Line train to be named since the Sprinters in the late 20th century. [42]
In the 2018 Victorian state election campaign, the Andrews government promised that, if re-elected, it would place an order for 18 additional three-car VLocity sets to be delivered from 2021. [43]
In the 2022 Victorian state election campaign, the Andrews government promised that, if re-elected, it would place an order for an additional 23 three-car VLocity sets, as part of a promise to boost regional weekend services. [44] [45] The government also committed to introducing nine-car VLocity trains to service the Melton railway line in Melbourne's west. [46] Production of the 23 sets began in March 2024. [47] When completed, there will be a fleet of 141 three car VLocity sets on the V/Line network on the current confirmed contract.
In January 2016, V/Line removed approximately a quarter of VLocity units from service after identifying unusually high rates of wear to wheel flanges. Compared to a normal rate of 0.7–1.0 millimetre per month (0.028–0.039 in/month), Bombardier's service regime noted a maximum wear rate of 2.6 mm/month (0.10 in/month). [48] Although unusual wear patterns had been observed since December of the previous year across the V/Line fleet, V/Line CEO Theo Taifalos ordered the withdrawal of the most badly affected units for safety reasons. [49]
Meanwhile, on 15 January 2016 a VLocity set failed to activate boom gates at the Progress Street level crossing in Dandenong. This led Metro Trains to ban all sets from operating on suburban lines until the issue had been resolved. The combined restrictions on the VLocity fleet led to the daily cancellation of nearly 70 V/Line services from mid-January. [50]
By the beginning of March, Bombardier had increased its capacity to remachine affected wheels, and track identified as potentially contributing to the wheel wear situation had been reprofiled; as a consequence, VLocity units were gradually returned to service. [51]
In April, a report by the Institute of Railway Technology at Monash University identified tight curves and an inadequate track lubrication on the newly opened Regional Rail Link, particularly along the North Melbourne Flyover near North Melbourne Station, which was upgraded as part of the project as a means of allowing V/Line services to access Platforms 1-8 at Southern Cross without needing to use Metropolitan tracks, as the root cause of the increase in wheel wear, and suggested that the relatively stiff suspension of the VLocity was the reason it had been most severely affected. [52]
The New Generation Rollingstock ordered for Queensland Rail from Bombardier, although built in India, were based on the VLocity design and the 4000 class EMU used by Adelaide Metro, which was itself based on the VLocity shell and assembled in the same factory as the VLocity sets. [53] The Transperth B Series Train is closely related to the VLocity because both were designed at the same time by the same company.
A 2016 asset management report presented by V/Line noted that the VLocity would be unsuitable for higher passenger loads without a complete body redesign, and acknowledged that the operational performance of the VLocity was hampered by the inferior acceleration of V/Line's locomotive-hauled fleet. [54] The 2016–17 Victorian budget allocated funds for a project to redesign the VLocity for long-haul services, particularly those to Shepparton, Warrnambool and Albury/Wodonga. [55]
By late 2017, design work had begun on modifications to the interior for units 3VR76-3VR79.[ clarification needed (see talk)] Many of the changes were required for improved compliance with the Disability Discrimination Act . For the later order of 3VL80 and above, more significant alterations to the crash protection in the driver's cabin were introduced. [56]
In October 2018, the state government announced that a new interior layout would be introduced on units 3VR76-3VR79 and 3VL80-3VL88 with 14 extra seats per three-carriage set, at the expense of removing a toilet and bike storage rack from each set. [57] Cycling lobby groups criticised the new layout, but the government argued that the sets would be restricted to short-distance routes where the additional capacity would be valuable. [58] The first of the updated type entered service in August 2019.[ citation needed ]
The current VLocity fleet is restricted to a maximum 3 carriage length due to the size of the maintenance facilities for them making extending to 4, 5 or 6 carriage long fixed sets difficult to maintain.
In the lead up to the 2018 Victorian election, opposition leader Matthew Guy announced that his party, if elected to government, would order 16 6-car VLocity variants from Bombardier for dedicated long-distance operation, with catering and first class facilities, but the Coalition did not win the election. [59]
From May 2018, improvements to level crossing infrastructure saw VLocity test runs to Bairnsdale, ahead of an introduction to revenue service on the line later in the year. [60] At the same time, government representatives announced that the long-haul variant of the VLocity would include onboard refreshment facilities and improved seats. [61] A media event was held at Bairnsdale in July of that year, at which it was announced that 2 of 3 daily Bairnsdale trains would be taken over by VLocity sets.
In May 2018, the Rail Tram and Bus Union (RTBU) announced that it had received confirmation that a buffet facility would be included in new intermediate carriages, added to existing sets to form 4-car trains for long-distance services. [62]
In April 2020, designs for standard gauge VLocity sets, to be used on the Albury line, were released by the Department of Transport, showing a standard 3-carriage layout with a centre trailer carriage kiosk. [63]
Standard gauge sets VS93 and VS94 entered service on 30 December 2021 on the Albury line. [64]
As of June 2022 [update] , there were six 3-carriage standard gauge sets in service, numbered VS93-98.
There are four car types in the VLocity class:
It is usual for the set of semi-permanently coupled cars to be described as zVLxx where z indicates the number of carriages in the fixed set while xx is the final two digits of the car designation – for example, the set 1150-1350-1250 would be described as 3VL50 while standard gauge sets use the VSxx format., [65] the 2VL designation has not been used since May 2018 when the last remaining 2 carriage VLocity Set was converted to 3 carriages.
From the introduction of set 100 onward, the VL designation continued as VL100 and so on. However, set 100 onward use 2xxx carriage numbering, for example set VL101 consists of 2101-2301-2201
Power is provided by a Cummins QSK 19R diesel engine (559 kW (750 hp)) under each car, attached on a separate underframe. The engine powers both axles on one bogie in each car, while the other bogie is unpowered. [66] The engine is supplemented by an 80 kW (110 hp) Cummins auxiliary power unit for lighting and air-conditioning purposes. The VLocity uses a Voith T312 hydraulic transmission system with dynamic braking capabilities. [6]
According to Cummins, as a result of that propulsion system the VLocity is the most reliable diesel railcar in the world, with a mean distance between failures (MDBF) of 150,000 km (93,000 mi). [67] V/Line reported a MDBF of 157,805 km (98,055 mi) in the 2016–17 financial year. [68] [b]
The primary suspension system of the VLocity is composed of a traction rod, with two elastomer bushes, linking the axle box and bogie frame. [66]
Among the design innovations in the VLocity units are the integration of the air-conditioning unit into the ceiling superstructure, and a structurally isolated crumple zone in the nose which can be entirely replaced with a new module following a crash. [12]
VLocity units are equipped with Scharfenberg couplers, enabling them to operate with other VLocity units.
VLocitys operate throughout the V/Line broad gauge passenger network and also on the ARTC controlled standard gauge line to Albury (NSW), as with most other V/Line services. The bogies were manufactured by Bombardier's Derby Litchurch Lane Works, and are fully gauge-convertible. [15]
The VLocity units have a design life of 35 years. [22] and a permanently coupled three-car unit has a mass of 171 tonnes. [69]
The driver's console for the VLocity is a dashboard mounted slightly below the one-piece windscreen of the train. There are two seats in the driving cabin with the active driver's seat positioned slightly to the left of the train's centre. The second seat is slightly behind. [70] The train is controlled by a combined throttle and brake lever, which has six power levels and the ability to vary the brake application. There is also an independent brake lever and a reverser handle in the driver's primary controls. [71] When the trailer cars were added to the existing 2 carriage sets the driver cabs were retro fitted with the extra gauges to monitor the trailer unit driveline.
The seating layout for the VLocity is 2+2, with a mix of club-style seats facing each other, and aircraft-style rows. The seats cannot be rotated to face any particular direction, and seat backs do not recline. Four wheelchair spaces are provided in each set through the provision of tip-up seats. The VLocity offers economy-class seating only, although the seat width is equivalent to first class seating on V/Line locomotive-hauled services. [72] In response to passenger feedback, the seatback angle in the intermediate carriages was made 2.5 degrees more upright than the original carriages. [73] New deliveries from July 2010 onwards (3VL42 and above) featured a changed seatback angle and new seat fabrics. [74]
Although VLocity carriages have tinted windows, they lack the curtains as fitted to earlier V/Line rolling stock. Passengers may move freely between the three semi-permanently coupled vehicles in a set, but not between the sets themselves. Conductors move between coupled sets at station stops.
Tables were installed in one unit (2VL28) for evaluation purposes, but were later removed. In three-car VLocity units, 32 seats in the intermediate carriage have fold-down tray tables, [75] much like the first class seats on locomotive-hauled services.
Overhead racks exist for small baggage, while larger baggage is stored in designated baggage areas, with some spaces large enough for surfboards and bicycles. In January 2008, passengers were banned from taking bicycles on VLocity trains during peak hours, despite the designated bike area, [76] with the ban repealed in February 2008. [77]
The standard gauge long-distance sets have kiosk style catering.
The all-metal construction and metalised window tinting of the VLocity trains is an effective (measured at 20 dB) blocker of all forms of radio communications into and out of the carriages including Mobile phone signals preventing passengers from making reliable calls or utilising data devices. To overcome this in an Australian first a joint venture between Telstra, V/Line, VicTrack, Alstom and CommScope to retrofit specially designed 3G/4G Mobile Phone Repeater units into all existing VLocity sets in 2018 was created, this included the installation of repeater units in all new VLocity sets built after the joint venture commencement date. The Node AM repeater is manufactured by CommScope and is designed to rebroadcast the main 3G & 4G 700, 850, 900 & 1800 MHz frequency spectrum utilised by the three Mobiles Phone network providers, Telstra, Optus and TPG Telecom (Vodafone Australia) in Australia. The program included state government funding for 35 additional Mobile base stations to fix coverage Black Spots for the three networks that the internal repeaters could not overcome.
The original VLocity livery consisted of purple and green facings on a stainless steel car body.In March 2008, newly built VLocity set 3VL41 was outshopped with an altered cab livery, following recommendations in level crossing accident reports that trains be made more more visible to motorists. Portions of reflective yellow were added to the cabs, along with more reflective silver directly beneath the cab windscreen. All units were retrospectively treated.
In June 2010, newly built set 3VL42 was released in a new livery of crimson stripe at roof level replacing the purple, and red replacing the green, a red stripe along the car body below the windows, white doors, and yellow front. The set also received high-intensity discharge (HID) headlights which project light for up to 1 kilometre (0.62 mi), modified windscreen wipers and cab windows.
In 2014, 3VL40 had a new Public Transport Victoria livery applied. All sets from 3VL52 were delivered in the purple livery, and it has been applied to earlier sets.
The VLocity seating layout is 2+2 instead of the 2+3 seating provided in other V/Line saloon-type carriages. A single VLocity car seats around 70 passengers, compared to 89 in the previous generation Sprinter with its narrower 2+3 seats.
The Regional Fast Rail project for which the VLocitys were built was criticised at the time for cost blow-outs during construction. These included the cost of installing extra safety measures deemed necessary for 160 km/h operation, which were added to the project after the Waterfall rail accident in New South Wales. [18]
By 2012, the VLocity trains and attendant decreases in travel time were regarded as major factors in the economic revival of towns along V/Line routes. The combined effect of the trains' comfort, speed and reliability was noted to have enabled the creation of new commuter belt locations outside of Melbourne, and the increases in train frequency which followed the introduction of the VLocity sets was said to have substantially improved the convenience of accessing Melbourne from the Bendigo, Ballarat and Geelong regions. [78]
A 2014 report by the federal government's Department of Infrastructure and Regional Development found that the VLocity trains had contributed to the overall success of the Regional Fast Rail project in increasing the accessibility of rail services for regional Victoria. The case study concluded that the improved ride quality of the trains was a significant contributor to improved passenger perceptions of rail services, and that the increased service frequency made possible by the trains was ultimately more beneficial from an operational perspective than any real or perceived time savings. [79]
In 2021, V/line introduced Vlocity services on the Albury line, replacing locomotive hauled services. To provide that service, V/Line designed a longer-distance Vlocity variant. The move to VLocity operation generated criticism, specifically relating to the reduced comfort, overcrowding, and lack of on-train amenities. There have been regular reports on social media that the onboard catering has not been in operation due to a lack of staff, and criticism of the quality of the offerings from the snack bar substandard. [80]
V/Line has introduced short-distance Vlocity train sets on the Warrnambool line replace locomotive hauled passenger services to Warrnambool, which has also been criticised. The complaints centred on the fact that V/Line did not provide trains purpose-designed for services to more distance regional cities. [81] Other criticisms about Vlocity trains relate to engine noise within the train itself, the quality of seats, and the lack of onboard catering.
On 28 April 2006, set 2VL29 was involved in a collision at a level crossing at Trawalla while travelling from Ararat, only seven days after it entered service. It collided with a large tri-axle road trailer carrying a 16-tonne block of stone and two heavy press machines. The front of the train withstood the impact with the trailer, but the press machines were thrown loose, striking and penetrating the cab. The incident caused two fatalities. At the time of the impact, three people were in the cab: the driver, who was seriously injured, and two off-duty Pacific National drivers, one of whom was killed and the other injured. As the train continued through the crossing, the rear trailer swung around and the stone block was thrown off, striking and partially penetrating the side of the leading car 1129, killing one passenger and injuring forty others. [82] The unit had been in service for seven days before the accident. [83] After the accident, both cars were taken to Newport Workshops for examination. Carriage 1129 suffered the most damage and was written off. Carriage 1229, having received relatively minor damage, was sent to Bombardier in Dandenong for repairs. It was later renumbered 1241 and marshalled together with new cars 1141 and 1341.
On 5 May 2006, set 2VL4, travelling on the 09:38 service from Southern Cross to Ararat, collided with a car at the protected Rockbank level crossing near Melton. Thirty train passengers and the driver of the car were taken to hospital.
On 26 February 2010, during a passenger service to Bendigo, the driver of sets 2VL6, 2VL5 and 2VL17, three two-car sets coupled together, was alerted to the smell of smoke in the leading car of 2VL5. The train stopped at Watergardens, where the driver, and a relief driver also on board the train, discovered a fire in the park brake system of 2VL5, which they were able to extinguish quickly. [84] 2VL6 was decoupled and continued to Bendigo without incident. [85] An investigation found that the park brake had either not been released on departure, or had been inadvertently activated by the relief driver who was travelling in the empty cab of the 2VL5 lead car. [86]
On 22 August 2014, a Metro Trains Comeng train, which had departed Laverton en route to Flinders Street, stopped after the driver noticed a loud noise and an apparent fault in his train's braking system. [87] VLocity set 2VL5, which was being transferred from Geelong to Southern Cross without passengers, passed a red automatic signal in a manner that did not conform to Section 3, Rule 1 of the 1994 Book of Rules and Operating Procedures, and the driver was unable to stop before colliding with the stationary Metro train. The driver of the VLocity and 8 passengers on the Metro train sustained minor injuries. [88] An investigation by the Australian Transport Safety Bureau found that the driver of the VLocity, travelling too fast for the situation, was distracted and failed to notice the inadequate rear marker lights of the Metro train. [89]
On 15 February 2017, set 3VL34 collided with a vehicle that had been abandoned on the line near Kangaroo Flat and derailed. Two people were injured. [90]
On 30 May 2020, set 3VL70 failed to stop at Ballarat station, due to a braking problem, and smashed through the historic Lydiard Street interlocked level crossing gates at 93 km/h, finally stopping some 600m past the station platform. The Lydiard Street level crossing was closed for a year. In May 2021, the Victorian government announced that the gates at the Lydiard Street level crossing gates would not be repaired, and would be replaced by boom barriers. The level crossing re-opened to traffic on 16 November 2021.
On 14 July 2022, set 3VL35, on a scheduled Echuca - Southern Cross service, collided with a semi trailer at an unprotected level crossing near Goornong, 30 km north-east of Bendigo. None of the 40 passengers on the train were injured, but both the train and truck driver were taken to hospital. VL35 was repaired and returned to revenue service.
On 11 December 2023, set 3VL100, on a scheduled Geelong Service, collided with a semi trailer that was blocking the Station Street level crossing in Norlane. None of the crew or 25 passengers on the train were injured, but the driver of the truck was killed.
Technically, a maximum of four 3-car VLocity sets can be coupled together as a single train. [2] Between 2008 and 2016, some 7-car VLocity trains operated on the Geelong line, made up of two 2-car sets and a 3-car set. [27] However, following the conversion of the entire VLocity fleet to run as 3-car sets, almost all VLocity services have operated as three or six car trains. The exception is that, from 30 May 2022, due to heavy peak period patronage, some 9-car VLocity trains started operating between Wyndham Vale and Southern Cross during peak times, [91] although they are often reduced to six cars due to reliability problems.[ citation needed ]
VLocity trains are authorised to run in revenue service on the following lines: [2]
VLocity trains are permitted to run up to 160 km/h (99 mph) only on lines where all level crossings are protected by boom gates and lights and track upgrades have been completed. However, services to Echuca and Ararat (past Wendouree) run on lines that do not meet these standards, and as a result, cannot reach their full speed. The Echuca line is currently undergoing works to allow trains to reach 130 km/h (81 mph). [93] In 2017, the State Government announced upgrade works to extend VLocity services to Warrnambool, Albury and Bairnsdale, [94] and in 2019 announced upgrades to allow them to run to Shepparton. [95]
A VLocity simulator is used by V/Line for driver training. The simulator replicates the driving cabin of the VLocity and includes forward vision and rear mirror graphics and audio effects. An instructor positioned outside the simulator can control track conditions and replicate some faults with the train itself. [96]
On 21 June 2020, a 9-car train, consisting of sets 3VL7, 3VL63 and 3VL23, undertook a test run from Southern Cross to Wyndham Vale to test 9-car operation and platform fit at several stations. [97] As of June 2022 there is now selected 9 carriage services from Wyndham Vale and Melton to Southern Cross in peak periods.
Standard gauge VLocity services on the Albury line began on 30 December 2021, [92] while V/Locity services to Shepparton began revenue services from 31 October 2022.[ citation needed ] and VLocity services to Warrnambool began from 1 November 2024 with all Warrnambool services to be using VLocity sets once the upgraded stabling facilities at Warrnambool are completed in 2025.
VLocity Diesel Multiple Units
V/Line is a statutory authority that operates regional passenger rail and coach services in the Australian state of Victoria. It provides passenger train services on five commuter routes and eight long-distance services from its major hub at Southern Cross railway station in Melbourne. It also provides coach bus services across Victoria and into New South Wales, the Australian Capital Territory and South Australia. In addition, V/Line is responsible for the maintenance of the Victorian freight and passenger rail network outside of the areas managed by Metro Trains Melbourne and the Australian Rail Track Corporation.
The British Rail Class 456 was an electric multiple unit passenger train introduced by Network SouthEast on inner-suburban services in South London to replace the elderly Class 416 2EPB units. Twenty-four two-car units were built by British Rail Engineering Limited's York Carriage Works in 1990 and 1991.
Rail transport in the Australian state of Victoria is provided by a number of railway operators who operate over the government-owned railway lines. The network consists of 2,357 km of Victorian broad gauge lines, and 1,912 km of standard gauge freight and interstate lines; the latter increasing with gauge conversion of the former. Historically, a few experimental 762 mm gauge lines were built, along with various private logging, mining and industrial railways. The rail network radiates from the state capital, Melbourne, with main interstate links to Sydney and to Adelaide, as well as major lines running to regional centres, upgraded as part of the Regional Fast Rail project.
The Geelong line is a regional passenger rail service operated by V/Line in Victoria, Australia. It serves 15 stations towards its terminus in Waurn Ponds, a southern suburb of Geelong, via the Regional Rail Link. It is the most used regional rail service in Victoria, carrying 8.15 million people in the 2022-23 financial year.
The Warrnambool line is a long-distance regional rail service in Victoria, Australia. Operated by V/Line, it is the state's fourth longest railway line at 267.3 kilometres (166.1 mi). The line runs from Southern Cross station in central Melbourne to Warrnambool station in the south-west, serving 21 stations via Wyndham Vale, Geelong, Waurn Ponds, and Colac. The line has five return services each weekday and three return services on weekends. Trains on the Warrnambool service run with three- to five-car N-class carriage sets, which are hauled by N class locomotives.
Bombardier Transportation was a Canadian-German rolling stock and rail transport manufacturer, with headquarters in Berlin, Germany. It was one of the world's largest companies in the rail vehicle and equipment manufacturing and servicing industry. Bombardier Transportation had many regional offices, production and development facilities worldwide. It produced a wide range of products including passenger rail vehicles, locomotives, bogies, propulsion and controls. In February 2020, the company had 36,000 employees, and 63 manufacturing and engineering locations around the world. Formerly a division of Bombardier Inc., the company was acquired by French manufacturer Alstom on 29 January 2021.
The B-series trains are a class of electric multiple unit built by Downer Rail in Maryborough, Queensland for Transperth between 2004 and 2019.
The Endeavour Railcars are a class of diesel multiple units (DMU) operated by Sydney Trains on its intercity passenger rail services in New South Wales, Australia on the Hunter, Blue Mountains, Southern Highlands and South Coast lines. They are mechanically identical to the Xplorers, but are fitted out for shorter travel distances. All 30 carriages were built by ABB's Dandenong rolling stock factory.
Donnybrook railway station is a regional railway station on the Tocumwal line. It serves the northern suburb of the same name, in Melbourne, Victoria, Australia. Donnybrook is a ground-level unstaffed station, with two side platforms. It opened on 14 October 1872, and the current station was provided in 2020.
The New South Wales XPT is a class of diesel-powered passenger trains built by Comeng and ABB. Based on the British Rail-designed High Speed Train, each XPT set comprises two XP power cars in a push-pull configuration and, between them, between four and seven passenger carriages.
The N Class are a class of diesel locomotives built by Clyde Engineering in Somerton for V/Line between 1985 and 1987.
The Vline Sprinters are diesel railcars which are operated by V/line on its Seymour line service with some also leased to Metro Trains Melbourne for its Stony Point line commuter service. They were built between 1993 and 1995 by A Goninan & Co in Broadmeadow, New South Wales.
The N type carriages are an intercity passenger carriage used on the railways of Victoria, Australia. They were introduced between 1981 and 1984 as part of the 'New Deal' reforms of country passenger rail services. Today they are seen on both V/Line long distance InterCity services, and limited commuter services to Geelong.
The Z type carriages are an air conditioned steel passenger carriage used on the railways of Victoria, Australia. The carriages were constructed by the Victorian Railways from 1957 for use on interstate services.
The Seymour line is a regional passenger rail service operated by V/Line in Victoria, Australia. It serves 13 stations towards its terminus in the regional city of Seymour. It is the fifth most-used regional rail service in Victoria, carrying 1.29 million passengers in the 2022–23 financial year.
The Albury line is a regional passenger rail service operated by V/Line in Victoria, Australia. It serves passengers between the state capital of Melbourne and the regional cities of Benalla, Wangaratta, Wodonga, and the NSW border city of Albury.
The New Deal for Country Passengers was a timetable introduced on 4 October 1981 in Victoria, Australia which revolutionised the provision of country passenger railway services in that state. Thirty-five little-used passenger stations were closed, rolling stock utilisation was improved, and new rolling stock introduced. The timetable and associated service changes resulted in an average patronage growth of 8.7% per year, from 3 million in 1981 to 5.6 million passengers in 1990/91.
The Alstom Aventra is a family of electric multiple unit (EMU) passenger trains produced at Derby Litchurch Lane Works in the United Kingdom, originally by Bombardier Transportation and later by Alstom, as a successor to the Bombardier Electrostar. A large proportion of its design is based on the Electrostar, adding new technologies and achieving compliance with more stringent requirements and operator demands.
The British Rail Class 720 Aventra is a class of electric multiple unit (EMU) passenger train designed and produced by the rolling stock manufacturer Bombardier Transportation and its acquirer Alstom. The Class 720 is operated by both Greater Anglia and c2c.
The Bendigo line is a regional passenger rail service operated by V/Line in Victoria, Australia. It serves 14 stations towards its terminus in the regional city of Bendigo. It is the third most-used regional rail service in Victoria, carrying 2.06 million passengers in the 2022-23 financial year.