The Falkirk Wheel (Scottish Gaelic: Cuibhle na h-Eaglaise Brice) is a rotating boat lift in Tamfourhill, Falkirk, in central Scotland, connecting the Forth and Clyde Canal with the Union Canal. It reconnects the two canals for the first time since the 1930s. It opened in 2002 as part of the Millennium Link project.

Contents

The plan to regenerate central Scotland's canals and reconnect Glasgow with Edinburgh was led by British Waterways with support and funding from seven local authorities, the Scottish Enterprise Network, the European Regional Development Fund, and the Millennium Commission. Planners decided early on to create a dramatic 21st-century landmark structure to reconnect the canals, instead of simply recreating the historic lock flight.

The wheel raises boats by 24 metres (79 ft), but the Union Canal is still 11 metres (36 ft) higher than the aqueduct which meets the wheel. Boats must also pass through a pair of locks between the top of the wheel and the Union Canal. The Falkirk Wheel is the only rotating boat lift of its kind in the world, and one of two working boat lifts in the United Kingdom, the other being the Anderton Boat Lift.

History

OS-Map of the lock flight at Falkirk Map of the Flight of locks at Falkirk.png
OS-Map of the lock flight at Falkirk

The two canals served by the wheel were previously connected by a series of 11 locks. [1] [2] With a 35-metre (115 ft) difference in height, it required 3,500 tonnes (3,400 long tons; 3,900 short tons) of water per run and took most of a day to pass through the flight. [3]

By the 1930s these had fallen into disuse, and the locks were dismantled in 1933. [1] [2] The Forth and Clyde Canal closed at the end of 1962, [4] and by the mid-1970s the Union Canal was filled in at both ends, rendered impassable by culverts in two places and run in pipes under a housing estate. [5] The British Waterways Board (BWB) came into existence on 1 January 1963, the day the Forth and Clyde Canal was closed, with the objective of finding a broad strategy for the future of canals in the United Kingdom. [4] [5]

In 1976, the BWB decided after a meeting with local councils that the Forth and Clyde Canal, fragmented by various developments, was to have its remaining navigability preserved by building new bridges with sufficient headroom for boats and continuing to maintain the existing locks. [6] Restoration of sea-to-sea navigation was deemed too expensive at the time, but there were to be no further restrictions on its use. [6] A 1979 survey report documented 69 obstructions to navigation, and sought the opinions of twenty interested parties to present the Forth and Clyde Local (Subject) Plan in 1980. [6]

Proposal

The Lotteries Act 1993 resulted in the creation of the Millennium Commission to disseminate funds raised by the sale of lottery tickets for selected "good causes." [7] In 1996, when sufficient funds had been accumulated, the Commission invited applications to "do anything they thought desirable ... to support worthwhile causes which would mark the year 2000 and the start of the new millennium." [7] The conditions were that the Commission would fund no more than half of the project, with the remaining balance being covered by project backers. [7]

The BWB had made an earlier plan for the reopening of the canal link, which comprehensively covered the necessary work. [7] In 1994, the BWB announced its plan to bid for funding, which was submitted in 1995 on behalf of the Millennium Link Partnership. [8] The plans called for the canals to be opened to their original operating dimensions, with 3 metres (9.8 ft) of headroom above the water. The whole project had a budget of £78 million. [9]

On 14 February 1997, the Commission announced it would support the Link with £32 million of funding, 42% of the project cost. [10] The Wheel and its associated basin was priced at £17 million, more than a fifth of the total budget. [11] Another £46 million had to be raised in the next two years before construction could commence, with contributions from BWB, seven local councils, Scottish Enterprise, and private donations being augmented by £8.6 million from the European Regional Development Fund. [12]

Design

The Morrison-Bachy Soletanche Joint Venture Team submitted their original design, which resembled a Ferris wheel with four gondolas, in 1999. It was agreed by all parties that the design was functional, but not the showpiece the BWB were looking for. [13] [14] After being asked to reconsider, a 20-strong team of architects and engineers was assembled by British Waterways. Under the leadership of Tony Kettle from architects RMJM, the initial concepts and images were created with the mechanical concepts proposed by the design team from Butterley and M G Bennetts. This was an intense period of work with the final design concept completed in a three-week period during the summer of 1999. [15] [13] [16] The final design was a co-operative effort between the British Waterways Board, engineering consultants Arup, Butterley Engineering and RMJM. [12]

Diagrams of gear systems that had been proposed in the very first concepts were modelled by Kettle using his 8-year-old daughter's Lego. Drawings and artist impressions were shown to clients and funders. [15] [17] The visitor centre was designed by another RMJM architect, Paul Stallan. [18] [19]

Inspirations for the design include a double-headed Celtic axe (a bearded axe), the propeller of a ship and the ribcage of a whale. [20] Kettle described the Wheel as "a beautiful, organic flowing thing, like the spine of a fish," [17] and the Royal Fine Art Commission for Scotland described it as "a form of contemporary sculpture." [12]

Models and renderings of the Falkirk Wheel were displayed in a 2012 exhibition at the Victoria and Albert Museum in London. [21] Since 2007, the Falkirk Wheel has been featured on the obverse of the new series of £50 notes issued by the Bank of Scotland. The series of notes commemorates Scottish engineering achievements with illustrations of bridges in Scotland such as the Glenfinnan Viaduct and the Forth Bridge. [22]

Construction

View of the aqueduct and top of the wheel FalkirkWheel-pjt1.jpg
View of the aqueduct and top of the wheel

In March 1999 Donald Dewar, the Secretary of State for Scotland, cut the first sod of turf to begin work at lock 31 on the Forth and Clyde Canal. [12] Over 1000 people were employed in the construction of the wheel, [23] which has been designed to last for at least 120 years. [20] [24]

The wheel was fully constructed and assembled at the Butterley Engineering plant in Ripley, Derbyshire. The structure was then dismantled in the summer of 2001, and transported on 35 lorry loads to Falkirk, before being reassembled into five sections on the ground and lifted into place. [25] Construction of the canal required 250,000 m3 (8,800,000 cu ft) of excavation, a 160 m (520 ft) canal tunnel of 8 m (26 ft) diameter, aqueducts of 20 m (66 ft) and 120 m (390 ft), three sets of locks and a number of bridges, as well as 600 m (2,000 ft) of access roads. [3] The 180 m (590 ft) Rough Castle Tunnel was driven in three stages, with the two upper quarters being drilled with a standard excavator before the lower half was dug using a modified road planer in 100 mm (4 in) layers. This technique was 15% cheaper and reduced the build time of the tunnel by two weeks. [15]

Technical considerations

The construction of the basin The Falkirk Wheel under Construction - geograph.org.uk - 917520.jpg
The construction of the basin

The ground on which the wheel is built was previously used as an open cast fire clay mine, a coal mine, and a tar works, resulting in contamination of the canal with tar and mercury. [15] [26] Twenty metres (66 ft) of loosely packed backfill from the mining operations containing large sandstone boulders was not considered adequately solid foundation for the size of the structure, so deep foundations with thirty 22 m (72 ft) concrete piles socketed onto the bedrock were used. [15]

Due to the changing load as the wheel rotates in alternating directions, some sections experience total stress reversals. In order to avoid fatigue that could lead to cracks, sections were bolted rather than welded, using over 14,000 bolts and 45,000 bolt holes. [15] [20] [23]

The aqueduct, engineered by Arup, was originally described as "unbuildable", but was eventually realised using 40 mm (1.6 in) rebar. [3] [27] The original plans also showed the canal being built straight through the Antonine Wall, but this was changed after a petition in favour of two locks and a tunnel under the wall. [14]

Opening ceremony

Members of the Royal Family at the opening ceremony Official opening of the Falkirk Wheel on Friday 24th May 2002. Queen Elizabeth II (in the green coat and hat) tours the site with The Duke of Edinburgh.jpg
Members of the Royal Family at the opening ceremony

On 24 May 2002, Queen Elizabeth II opened the Falkirk Wheel as part of her Golden Jubilee celebrations. The opening was delayed a month due to flooding caused by vandals who forced open the wheel's gates. [28] The damage, which cost £350,000 to repair, resulted in the dry well being flooded, damaging electrical and hydraulic equipment. [28] [29]

Operation

Structure

The ring gears Cog mechanism falkirk.jpg
The ring gears

The wheel has an overall diameter of 35 m (115 ft) and consists of two opposing arms extending 15 m (49 ft) beyond the central axle and taking the shape of a Celtic-inspired, double-headed axe. [30] [31] [32] Two sets of these axe-shaped arms are connected to a 3.8 m (12 ft) diameter central axle of length 28 m (92 ft). [33] Two diametrically opposed water-filled caissons, each with a capacity of 250,000 litres (55,000 imp gal; 66,000 US gal), are fitted between the ends of the arms. [23]

The caissons or gondolas always carry a combined weight of 500 tonnes (490 long tons; 550 short tons) of water and boats, with the gondolas themselves each weighing 50 tonnes (49 long tons; 55 short tons). [15] Care is taken to maintain the water levels on each side, thus balancing the weight on each arm. According to Archimedes' principle, floating objects displace their own weight in water, so when the boat enters, the amount of water leaving the caisson weighs exactly the same as the boat. [23] [32] This is achieved by maintaining the water levels on each side to within a difference of 37 mm (1.5 in) using a site-wide computer control system comprising water level sensors, automated sluices and pumps. [15] [13] It takes 22.5 kilowatts (30.2 hp) to power ten hydraulic motors, which consume 1.5 kilowatt-hours (5,100 BTU) per half-turn, roughly the same as boiling eight kettles of water. [15]

Each of the two caissons is 6.5 metres (21 ft) wide, and can hold up to four 20-metre-long (66 ft) canal boats. [27] The wheel raises or lowers boats a total of 24 metres (79 ft), and two subsequent locks raise or lower boats another 11 metres (36 ft). [34] [35]

Watertight doors

Watertight doors at each end match doors located on the upper structure and lower dock pit. Due to space concerns, where a normal hinged door would dramatically reduce the useful length of the caisson, vertically rising hinged doors were chosen. [36] The doors are raised from a recess in the base of the caisson and powered by a hydraulic lance when docked. [36]

After the wheel arms are moved into the vertical position, the locking mechanisms are activated. These include securing pins that are protruded into the caisson bases, and hydraulic clamps that are raised to hold the caissons in place. Additionally, a set of larger securing pins at the lower structure is used to hold the wheel. Although the door of the upper caisson and the door that holds the water at the upper aqueduct are aligned, there is a gap between them. The upper aqueduct door has a U-shape watertight frame which can be extended to push against the caisson door to seal the gap. The water is pumped into the gap to fill to the water level. Once the water in the gap is equalized, the door on the aqueduct side is lowered, followed by the door on the caisson side, allowing the boat to pass. On the reverse direction, when the boat is in the caisson, the caisson door is raised, followed by the upper aqueduct door. The water is pumped out of the gap. Then the U-shape watertight seal is recessed back closer to the upper aqueduct door. Finally, the locking mechanisms are removed before the wheel is turned. This process is similar for the door at the lower canal basin as well. [37]

Engine room

The area housing the machinery to drive the wheel is located in the final pillar of the aqueduct, and contains seven chambers connected by ladders. [38] Access is by a door located at ground level or an entrance halfway up the tower with a gantry crane to facilitate the installation of equipment. [38]

The ground floor houses the transformers for powering the wheel. When the wheel was flooded by vandals in April 2002, this room was filled to within 8 cm (3 in) of the 11 kV busbars. [38] On the first floor is a standby generator and switchgear should the mains supply to the wheel fail. [38] The second floor houses a pair of hydraulic pumps that drive the hydraulic motors in the chamber above. [38] Power is supplied directly to the axle with 10 hydraulic motors, which also double as brakes. Connected to each motor is a 100:1 gear system to reduce the rotation speed. [38]

Mechanism

A reconstruction of the mechanism using Lego. Lead architect Tony Kettle used a different Lego model to demonstrate the mechanism to clients and funders. FalkirkRotate04.jpg
A reconstruction of the mechanism using Lego. Lead architect Tony Kettle used a different Lego model to demonstrate the mechanism to clients and funders.

The caissons are required to turn with the wheel in order to remain level. Whilst the weight of the caissons on the bearings is generally sufficient to rotate them, a gearing mechanism using three large identically sized gears connected by two smaller ones ensures that they turn at precisely the correct speed and remain correctly balanced. [39]

Each end of each caisson is supported on small wheels, which run on rails on the inside face of the 8 m (26 ft) diameter holes at the ends of the arms. [39] The rotation is controlled by a train of gears: an alternating pattern of three 8 m (26 ft) diameter ring gears and two smaller idler gears, all with external teeth, as shown in the picture. [39] The large central gear is fitted loosely over the axle at its machine-room end and fixed in place to prevent it from rotating. [38] [39] The two smaller gears are fixed to each of the arms of the wheel at its machine-room end. When the motors rotate the central axle, the arms swing and the small gears engage the central gear, which results in the smaller gears rotating at a higher speed than the wheel but in the same direction. The smaller gears engage the large ring gears at the end of the caissons, driving them at the same speed as the wheel but in the opposite direction. This cancels the rotation due to the arms and keeps the caissons stable and perfectly level. [39]

Docking pit

The Falkirk Wheel in action. The wedge-shaped building on the right is the visitors' centre. The Docking Pit is at the bottom canal. Falkirk wheel.jpg
The Falkirk Wheel in action. The wedge-shaped building on the right is the visitors' centre. The Docking Pit is at the bottom canal.
Another view with the Docking Pit at the bottom Falkirk Wheel Boat Lifting.jpg
Another view with the Docking Pit at the bottom

The docking pit is a drydock-like port isolated from the lower canal basin by watertight gates and kept dry by water pumps. [20] When the wheel stops with its arms in the vertical position it is possible for boats to enter and exit the lower caisson when the gates are open without flooding the docking-pit. The space below the caisson is empty. [20] [27]

Without the docking-pit, the caissons and extremities of the arms of the wheel would be immersed in water at the lower canal basin each time the wheel rotated. [20] The buoyancy of the lower caisson would make it more difficult to turn the wheel. [20]

Visitor centre

A visitor centre is located on the east side of the lower basin. [12] Boat trips on the wheel depart approximately once an hour. [40] Since the wheel opened, around 5.5 million people have visited [41] and 1.3 million have taken a boat trip, with around 400,000 people visiting the wheel annually. [42] [43]

Falkirk Wheel panorama.jpg
Panoramic view of the wheel and aqueduct

Media mentions

The wheel has been mentioned on Smithsonian Channel in the United States twice since 2017. The first was Aerial Britain when the episode covered Scotland in 2017. The second was How Did They Build That? as part of the "Arctic Structure and Auditoria" episode which aired in 2021. It was also described in detail in the series Impossible Engineering (Series 5, Episode 15) [44] aired in 2020.

The wheel provided the inspiration for the "monorail elevator" in Bethesda's Fallout 76 computer game. [45]

See also

Related Research Articles

<span class="mw-page-title-main">Forth and Clyde Canal</span> Canal crossing central Scotland

The Forth and Clyde Canal is a canal opened in 1790, crossing central Scotland; it provided a route for the seagoing vessels of the day between the Firth of Forth and the Firth of Clyde at the narrowest part of the Scottish Lowlands. This allowed navigation from Edinburgh on the east coast to the port of Glasgow on the west coast. The canal is 35 miles (56 km) long and it runs from the River Carron at Grangemouth to the River Clyde at Bowling, and had an important basin at Port Dundas in Glasgow.

<span class="mw-page-title-main">Lock (water navigation)</span> Device for raising and lowering boats or ships

A lock is a device used for raising and lowering boats, ships and other watercraft between stretches of water of different levels on river and canal waterways. The distinguishing feature of a lock is a fixed chamber in which the water level can be varied; whereas in a caisson lock, a boat lift, or on a canal inclined plane, it is the chamber itself that rises and falls.

<span class="mw-page-title-main">History of the British canal system</span> Building, use, decline and restoration of artificial waterways in the United Kingdom

The canal network of the United Kingdom played a vital role in the Industrial Revolution. The UK was the first country to develop a nationwide canal network which, at its peak, expanded to nearly 4,000 miles in length. The canals allowed raw materials to be transported to a place of manufacture, and finished goods to be transported to consumers, more quickly and cheaply than by a land based route. The canal network was extensive and included feats of civil engineering such as the Anderton Boat Lift, the Manchester Ship Canal, the Worsley Navigable Levels and the Pontcysyllte Aqueduct.

<span class="mw-page-title-main">Anderton Boat Lift</span> Two caisson lift lock near Anderton, Cheshire, England

The Anderton Boat Lift is a two-caisson lift lock near the village of Anderton, Cheshire, in North West England. It provides a 50-foot (15.2 m) vertical link between two navigable waterways: the River Weaver and the Trent and Mersey Canal. The structure is designated as a scheduled monument, and is included in the National Heritage List for England; it is also known as one of the Seven Wonders of the Waterways.

The Grand Western Canal ran between Taunton in Somerset and Tiverton in Devon in the United Kingdom. The canal had its origins in various plans, going back to 1796, to link the Bristol Channel and the English Channel by a canal, bypassing Lands End. An additional purpose of the canal was the supply of limestone and coal to lime kilns along with the removal of the resulting quicklime, which was used as a fertiliser and for building houses. This intended canal-link was never completed as planned, as the coming of the railways removed the need for its existence.

<span class="mw-page-title-main">Union Canal (Scotland)</span> Canal in Scotland, running from Falkirk to Edinburgh

The Union Canal, full name the Edinburgh and Glasgow Union Canal, is a canal in Scotland, running from Falkirk to Edinburgh, constructed to bring minerals, especially coal, to the capital. It was opened in 1822 and was initially successful, but the construction of railways, particularly the Edinburgh and Glasgow Railway, which opened in 1842, diminished its value as a transport medium. It fell into slow commercial decline and was closed to commercial traffic in 1933. It was officially closed in 1965. The canal is listed as three individual scheduled monuments by Historic Scotland according to the three former counties, Midlothian, West Lothian and Stirlingshire, through which it flows.

<span class="mw-page-title-main">Canals of the United Kingdom</span> Network of inland waterways

The canals of the United Kingdom are a major part of the network of inland waterways in the United Kingdom. They have a varied history, from use for irrigation and transport, through becoming the focus of the Industrial Revolution, to today's role of recreational boating. Despite a period of abandonment, today the canal system in the United Kingdom is again increasing in use, with abandoned and derelict canals being reopened, and the construction of some new routes. Canals in England and Wales are maintained by navigation authorities. The biggest navigation authorities are the Canal & River Trust and the Environment Agency, but other canals are managed by companies, local authorities or charitable trusts.

<span class="mw-page-title-main">Boat lift</span> Machine to move boats vertically between waterways

A boat lift, ship lift, or lift lock is a machine for transporting boats between water at two different elevations, and is an alternative to the canal lock.

<span class="mw-page-title-main">Peterborough Lift Lock</span> Boat lift

The Peterborough Lift Lock is a boat lift located on the Trent Canal in the city of Peterborough, Ontario, Canada, and is Lock 21 on the Trent-Severn Waterway.

<span class="mw-page-title-main">Monkland Canal</span>

The Monkland Canal was a 12+14-mile-long (19.7 km) canal designed to bring coal from the mining areas of Monklands to Glasgow in Scotland. In the course of a long and difficult construction process, it was opened progressively as short sections were completed, from 1771. It reached Gartcraig in 1782, and in 1794 it reached its full originally planned extent, from pits at Calderbank to a basin at Townhead in Glasgow; at first this was in two sections with a 96-foot (29 m) vertical interval between them at Blackhill; coal was unloaded and carted to the lower section and loaded onto a fresh barge. Locks were later constructed linking the two sections, and the canal was also connected to the Forth and Clyde Canal, giving additional business potential.

<span class="mw-page-title-main">Strépy-Thieu boat lift</span> Architectural structure, Belgium

The Strépy-Thieu boat lift lies on a branch of the Canal du Centre in the municipality of Le Rœulx, Hainaut, Belgium. With a height difference of 73.15 metres (240.0 ft) between the upstream and downstream reaches, it was the tallest boat lift in the world upon its completion, and remained so until the Three Gorges Dam ship lift in China was completed in January 2016.

<span class="mw-page-title-main">Forth and Clyde Canal Pathway</span> Canal walkway

The Forth and Clyde canal pathway runs between the Firth of Forth and the Firth of Clyde and is a 106-kilometre-long (66 mi) footpath and cycleway that runs across Scotland, between Bowling, west of Glasgow, and Lochrin Basin in Edinburgh. The path runs on the towpaths of the Forth & Clyde and Union Canals and is entirely off-road. The path is well maintained and its surface is generally good, although there are some stretches particularly between Falkirk and the outskirts of Edinburgh where wet weather leads to muddy conditions unsuitable for road intended bicycles. It is well used by walkers and cyclists, and designated as one of Scotland's Great Trails by NatureScot. It also forms part of the National Cycle Network, being designated as Route 754. Sustrans advises that the path is best followed from the Clyde to the Forth because the prevailing wind is from the south west. Much of the path is also suitable for experienced horseriders, although in some places low bridges, narrow aqueducts and gates may restrict access for horses.

<span class="mw-page-title-main">Caisson lock</span> Type of canal lock

The caisson lock is a type of canal lock in which a narrowboat is floated into a sealed watertight box and raised or lowered between two different canal water levels. It was invented in the late 18th century as a solution to the problem posed by the excessive demand for water when conventional locks were used to raise and lower canal boats through large height differences. Such locks, each of which would only raise and lower boats through small height differences of a few feet, would not suffice when large height differences had to be tackled nor when water was in short supply. The caisson was thought to be one solution, although it transpired that the technology of the day was not capable of achieving this type of construction economically.

<span class="mw-page-title-main">Ronquières inclined plane</span>

The Ronquières Inclined Plane is a canal inclined plane on the Brussels-Charleroi Canal in the province of Hainaut in Wallonia, Belgium. It opened in April 1968 having taken six years to build. It is in the municipality of Braine-le-Comte and takes its name from the nearby village of Ronquières.

<span class="mw-page-title-main">Rothensee boat lift</span>

The Rothensee boat lift is North of Magdeburg and connects the Mittellandkanal with the Elbe via the Elbeabstiegskanal.

The Millennium Link is one of the biggest engineering projects ever undertaken by British Waterways. The Union Canal and the Forth & Clyde Canal were originally joined by a flight of locks. The Millennium Link project replaced the locks with a boat lift, the Falkirk Wheel.

<span class="mw-page-title-main">Linlithgow Union Canal Society</span>

The Linlithgow Union Canal Society is a waterway society and a Scottish registered charity based at Linlithgow Canal Centre on the Union Canal at Linlithgow, West Lothian, Scotland. Also known as "LUCS", it was founded in 1975 by Melville Gray to "promote and encourage the restoration and use of the Union Canal, particularly in the vicinity of Linlithgow".

<span class="mw-page-title-main">Stockingfield Junction</span>

Stockingfield Junction is a canal junction which lies between Maryhill and Ruchill in Glasgow, Scotland. It opened in 1777, and closed in 1963, followed by restoration and a re-opening in 2022. At first a terminus it formed the junction for the Port Dundas branch off the Forth and Clyde Canal main line from 1777.

The Seven Wonders of the Waterways is a list of landmarks on the navigable waterways of the United Kingdom. The list was originally compiled in 1946 by Robert Aickman, co-founder of the Inland Waterways Association (IWA), at a time when the waterways network was largely derelict. Today, the Canal & River Trust—formerly British Waterways—has jurisdiction over all of the sites except for the Barton Swing Aqueduct, which is owned and operated by the Bridgewater Canal Company.

References

Citations

  1. 1 2 "History of The Falkirk Wheel". Scottish Waterways Trust. Archived from the original on 7 January 2014. Retrieved 6 January 2013.
  2. 1 2 "History". The Falkirk Wheel. Archived from the original on 29 December 2012. Retrieved 6 January 2013.
  3. 1 2 3 "The Millennium Link" (PDF). University of Edinburgh. Archived from the original (PDF) on 8 January 2014. Retrieved 8 January 2014.
  4. 1 2 Paterson 2013 , p. 1875
  5. 1 2 Paterson 2013 , p. 1877
  6. 1 2 3 Paterson 2013 , p. 1880
  7. 1 2 3 4 Paterson 2013 , p. 1885
  8. Paterson 2013 , pp. 1885–1886
  9. Paterson 2013 , p. 1886
  10. Paterson 2013 , p. 1887
  11. Paterson 2013 , p. 1889
  12. 1 2 3 4 5 Paterson 2013 , p. 1890
  13. 1 2 3 "Civil Engineering: The Falkirk Wheel" (PDF). bacsol.co.uk. Archived from the original (PDF) on 14 January 2014. Retrieved 14 January 2014.
  14. 1 2 "The Falkirk Ferris Wheel". gentles.info. Retrieved 11 January 2014.
  15. 1 2 3 4 5 6 7 8 9 "Falkirk Wheel site visit – information sheet" (PDF). University of Edinburgh. Archived from the original (PDF) on 12 January 2014. Retrieved 11 January 2014.
  16. "Building the missing link". millenniumnow.org.uk. Archived from the original on 6 January 2014. Retrieved 11 January 2014.
  17. 1 2 Crawford 2013 , p. 206
  18. "Falkirk Wheel". urbanrealm.com. Retrieved 7 February 2014.
  19. Richard Waite (15 July 2011). "Rebrand: Paul Stallan leads RMJM rebirth". Architects' Journal. Retrieved 7 February 2014.
  20. 1 2 3 4 5 6 7 Freeland, Lee. "The Falkirk Wheel" (PDF). elevator-world.com. Archived from the original (PDF) on 3 March 2016. Retrieved 19 September 2008.
  21. "British Design 1948-2012: Innovation in the Modern Age" (PDF). Victoria and Albert Museum. Retrieved 11 January 2014.
  22. "Banknote Design Features: Bank of Scotland Bridges Series". The Committee of Scottish Clearing Bankers. Retrieved 12 January 2014.
  23. 1 2 3 4 "Quick quirky facts". The Falkirk Wheel. Archived from the original on 16 January 2014. Retrieved 12 January 2014.
  24. "Reinventing the Wheel". gentles.info. Retrieved 13 January 2014.
  25. "Design and engineering". The Falkirk Wheel. Archived from the original on 30 December 2012. Retrieved 6 January 2013.
  26. Review of the Session. Royal Society of Edinburgh. 2003. pp. 91–92.
  27. 1 2 3 "Falkirk Wheel". engineering-timelines.com. Archived from the original on 13 January 2014. Retrieved 13 January 2014.
  28. 1 2 "Wheel back on roll after vandalism repair work". The Scotsman. 14 October 2002. Retrieved 6 January 2014.
  29. "Falkirk Wheel Vandalism". gentles.info. Retrieved 12 January 2014.
  30. "Giant rotating wheel carries boats between canals". Siviele Ingenieurswese. 10: 145. 2002.
  31. InCom 2009 , p. 26
  32. 1 2 "Symbol of the Millennium: The Falkirk Wheel". ASME. Retrieved 12 January 2014.
  33. American Society of Civil Engineers 2001 , p. 48
  34. West, Timothy (2 November 2017). Our Great Canal Journeys: A Lifetime of Memories on Britain's Most Beautiful Waterways: A Lifetime of Memories on Britain's Most Beautiful Waterways. Kings Road Publishing. p. n.p. ISBN   978-1-78606-862-0.
  35. "Falkirk Wheel". Institution of Civil Engineers (ICE). 15 February 2018. Retrieved 8 January 2021.
  36. 1 2 "Falkirk Wheel Doors and Seals". gentles.info. Retrieved 13 January 2014.
  37. "How it Works". Scottish Canals. Archived from the original on 9 April 2018. Retrieved 9 April 2018.
  38. 1 2 3 4 5 6 7 "Falkirk Wheel Drive Chamber Visit". gentles.info. Retrieved 12 January 2013.
  39. 1 2 3 4 5 "How does it work?". The Falkirk Wheel. Archived from the original on 8 January 2013. Retrieved 12 January 2013.
  40. "Opening Times". The Falkirk Wheel. Archived from the original on 6 January 2014. Retrieved 15 January 2014.
  41. "About The Falkirk Wheel".
  42. "Falkirk Wheel is a big success". Scottish Tourism Alliance. Archived from the original on 16 January 2014. Retrieved 14 January 2014.
  43. "British tourist attraction visitors figures: who's up and who's down?". The Guardian. 23 February 2011. Retrieved 14 January 2014.
  44. "Watch Impossible Engineering Series 5 Episode 15 Online". UKTV Media Limited. Retrieved 5 June 2023.
  45. "Nate Purkeypile on Twitter". Twitter. Retrieved 9 August 2023.

Sources

56°0′1″N3°50′30″W / 56.00028°N 3.84167°W / 56.00028; -3.84167