Names | GOES-N GOES-13 (before September 8, 2020) |
---|---|
Mission type | Weather satellite |
Operator | NOAA/NASA and USSF |
COSPAR ID | 2006-018A |
SATCAT no. | 29155 |
Website | goes.gsfc.nasa.gov |
Mission duration | 10 years (planned) 17 years, 7 months and 8 days (elapsed) |
Spacecraft properties | |
Spacecraft type | GOES-N series |
Bus | BSS-601 |
Manufacturer | Boeing |
Launch mass | 3133 kg |
Power | 2300 watts |
Start of mission | |
Launch date | 24 May 2006, 22:11:00 UTC |
Rocket | Delta IV-M+(4,2) |
Launch site | Cape Canaveral, SLC-37B |
Contractor | Boeing |
End of mission | |
Disposal | Decommissioned [1] |
Deactivated | NET February 2024 |
Orbital parameters | |
Reference system | Geocentric orbit |
Regime | Geostationary orbit |
Longitude | 61.5° East |
Slot | Indian Ocean |
EWS-G1 (Electro-optical Infrared Weather System Geostationary) [2] is a weather satellite of the U.S. Space Force, formerly GOES-13 (also known as GOES-N before becoming operational) and part of the National Oceanic and Atmospheric Administration's Geostationary Operational Environmental Satellite system. On 14 April 2010, GOES-13 became the operational weather satellite for GOES-East. [3] It was replaced by GOES-16 on 18 December 2017 [4] and on 8 January 2018 its instruments were shut off and it began its three-week drift to an on-orbit storage location at 60.0° West longitude, arriving on 31 January 2018. It remained there as a backup satellite in case one of the operational GOES satellites had a problem until early July 2019, when it started to drift westward and was being transferred to the U.S. Air Force, and then the U.S. Space Force. [5] [6] [7]
GOES-13 arrived at 61.5° East longitude in mid-February 2020. [8] The satellite was renamed EWS-G1 and became fully operational over the Indian Ocean basin on September 8, 2020. EWS-G2 (GOES-15) was drafted to replace it in September 2023. [9]
EWS-G1 was removed from operational service on October 31, 2023. [1]
GOES-N was launched aboard a Boeing Delta IV-M+(4,2) rocket, flying from SLC-37B at the Cape Canaveral. The launch occurred at 22:11:00 UTC on 24 May 2006. [10]
The launch had been delayed significantly due to a number of issues. First, it had been scheduled to fly on a Delta III, [11] but after three consecutive failures on its first three flights, the Delta III was canceled, with GOES launches being transferred to the Delta IV. Further delays were caused after the previous Delta IV launch, the maiden flight of the Heavy configuration, suffered a partial failure. [12] Then, two launch attempts in August 2005 were scrubbed, the second attempt just four minutes and 26 seconds prior to liftoff. [13]
After these launch attempts, the rocket's flight termination system batteries expired, requiring replacement. [14] A strike by workers at Boeing subsequently pushed the launch back to May 2006. [15]
At launch, the satellite had a mass of 3,133 kilograms (6,907 lb), and an expected operational lifespan of ten years, although it carries fuel for longer. [16] It was built by Boeing, based on the BSS-601 satellite bus, [17] and was the first of three GOES-N series satellites to be launched.
In December 2007, GOES-13 was called up to provide coverage of the East Coast of the United States during an outage of GOES-12 due to a thruster leak. After the problem with GOES-12 cleared, it resumed operations, and GOES-13 was deactivated again. It was also briefly activated in mid-May 2009 when GOES-12 developed another thruster problem, however, it did not need to take over operations, and was deactivated by the end of the month. In April 2010, GOES-13 replaced GOES-12 as GOES-East at 75.0° West. [18] GOES-13 served actively as GOES-East from April 2010 to December 2017. In December 2017, GOES-16 replaced GOES-13 as GOES-East. [4] On 14 December 2017, GOES-13's direct (GOES VARiable transmission format) GVAR was disabled. The GOES-13 GVAR and (Low Rate Information Transmission) LRIT were relayed through GOES-14 until 8 January 2018, at which time the GOES-13 GVAR relay through GOES-14 GVAR was disabled. GOES-13 ceased transmitting data, began drifting to its storage location at 60.0° West on 9 January 2018, and arrived there on 31 January 2018. [19] GOES-13 remained at 60.0° West as a backup satellite, in case one of the operational GOES satellites malfunctioned. [5]
In January 2017, the United States Air Force started to consider taking over a spare GOES satellite for monitoring the Indian Ocean as the Meteosat-8 satellite was expected to be out of fuel in 2020 (later extended to 2022). [20] GOES-13 was brought out of storage on 19 June 2019 for a period of testing, [21] and began to drift westward since 2 July 2019. [6] In September 2019, NOAA confirmed that GOES-13 had been transferred to the U.S. Air Force after the two-year negotiation in order to fill a gap in forecasting requirements, but NOAA would continue operating the satellite on behalf of the U.S. Air Force for its remaining life span. [7] GOES-13 was later transferred to the United States Space Force since its establishment in December 2019. After the 7-month drift, GOES-13 eventually arrived at 61.5° East longitude in mid-February 2020. [8] On September 8, 2020, the Space and Missile Systems Center announced the newly renamed EWS-G1 (Electro-optical Infrared Weather System Geostationary) satellite became fully operational with the joint efforts between the U.S. Space Force, NOAA, and NASA. [2] [22]
In December 2006, GOES-13 observed a solar flare so intense it damaged its Solar X-ray Imager (SXI). [23]
On 12 September 2012, GOES-13 began to return images with an excessive amount of noise. The noise gradually increased to the point at which the satellite was placed in standby mode on 24 September 2012 in order to allow engineers to diagnose the problem. GOES-15 temporarily provided backup imagery for a short time, with GOES-14 being taken out of in-orbit storage and prepared to be a longer-term replacement including movement towards the 75.0° slot normally occupied by GOES-East. [24] GOES-13 returned to normal operations on 18 October 2012. [25] [26] GOES-14 was kept in normal operations and used to monitor Hurricane Sandy in parallel with GOES-13 [27] before GOES-14 returned to standby status.
On 22 May 2013, at 03:40 UTC, GOES-13 was apparently hit by a micrometeorite or orbital debris (MMOD) which caused it to lose track of the stars that it uses to maintain attitude. The satellite then went into safe mode and shut down all of its instruments. The hit was believed to occur on the solar array yoke. In the short term GOES-15 was reconfigured to cover the entire United States, but operators activated GOES-14 to take over GOES-East operations at 06:00 UTC on 23 May 2013. [28] GOES-13 was scheduled to return to operational status at 15:45 UTC on 6 June 2013 [29] However, that was delayed due to a Critical Weather Day and Tropical Storm Andrea. [30] It returned to full duty on 10 June 2013.
On 20 November 2015, at 09:22 UTC, the GOES-13 Sounder experienced an anomaly. GOES engineers determined that the Filter Wheel had stopped moving (the filter wheel aligns the infrared detectors with the incoming data) so data were not scanned. All 18 infrared channels were affected; the visible channel (band 19) continued sending usable data until the instruments were shut down in 2018. [31]
The Geostationary Operational Environmental Satellite (GOES), operated by the United States' National Oceanic and Atmospheric Administration (NOAA)'s National Environmental Satellite, Data, and Information Service division, supports weather forecasting, severe storm tracking, and meteorology research. Spacecraft and ground-based elements of the system work together to provide a continuous stream of environmental data. The National Weather Service (NWS) and the Meteorological Service of Canada use the GOES system for their North American weather monitoring and forecasting operations, and scientific researchers use the data to better understand land, atmosphere, ocean, and climate dynamics.
Deep Space Climate Observatory is a National Oceanic and Atmospheric Administration (NOAA) space weather, space climate, and Earth observation satellite. It was launched by SpaceX on a Falcon 9 v1.1 launch vehicle on 11 February 2015, from Cape Canaveral. This is NOAA's first operational deep space satellite and became its primary system of warning Earth in the event of solar magnetic storms.
United Launch Alliance, LLC, commonly referred to as ULA, is an American aerospace manufacturer, defense contractor and launch service provider that manufactures and operates rocket vehicles that launch spacecraft into orbits around Earth and other bodies in the Solar System.
NOAA-19, known as NOAA-N' before launch, is the last of the American National Oceanic and Atmospheric Administration (NOAA) series of weather satellites. NOAA-19 was launched on 6 February 2009. NOAA-19 is in an afternoon Sun-synchronous orbit and is intended to replace NOAA-18 as the prime afternoon spacecraft.
NOAA-18, also known as NOAA-N before launch, is an operational, polar orbiting, weather satellite series operated by the National Environmental Satellite Service (NESS) of the National Oceanic and Atmospheric Administration (NOAA). NOAA-18 also continued the series of Advanced TIROS-N (ATN) spacecraft begun with the launch of NOAA-8 (NOAA-E) in 1983 but with additional new and improved instrumentation over the NOAA A-M series and a new launch vehicle. NOAA-18 is in an afternoon equator-crossing orbit and replaced NOAA-17 as the prime afternoon spacecraft.
GOES-1, designated GOES-A and SMS-C prior to entering service, was a weather satellite, developed by the NASA, operated by the United States National Oceanic and Atmospheric Administration (NOAA). It was the first Geostationary Operational Environmental Satellite (GOES) to be launched.
GOES-14, known as GOES-O prior to reaching its operational orbit, is an American weather satellite, which is part of the US National Oceanic and Atmospheric Administration (NOAA)'s Geostationary Operational Environmental Satellite (GOES) system. The spacecraft was built by Boeing and is based on the BSS-601 bus. It is the second of three GOES satellites to use the BSS-601 bus, after GOES-13, which was launched in May 2006.
The Polar-orbiting Operational Environmental Satellite (POES), often confused with the South African slang term poes, is a constellation of polar orbiting weather satellites funded by the National Oceanic and Atmospheric Administration (NOAA) and the European Organisation for the Exploitation of Meteorological Satellites (EUMETSAT) with the intent of improving the accuracy and detail of weather analysis and forecasting. The spacecraft were provided by NASA and the European Space Agency (ESA), and NASA's Goddard Space Flight Center oversaw the manufacture, integration and test of the NASA-provided TIROS satellites. The first polar-orbiting weather satellite launched as part of the POES constellation was the Television Infrared Observation Satellite-N (TIROS-N), which was launched on 13 October 1978. The final spacecraft, NOAA-19, was launched on 6 February 2009. The ESA-provided MetOp satellite operated by EUMETSAT utilize POES-heritage instruments for the purpose of data continuity. The Joint Polar Satellite System, which was launched on 18 November 2017, is the successor to the POES Program.
The Space Tracking and Surveillance System was a pair of satellites developed by the United States Missile Defense Agency (MDA) to research the space-based detection and tracking of ballistic missiles. Data from STSS satellites could allow interceptors to engage incoming missiles earlier in flight than would be possible with other missile detection systems. The STSS program began in 2001, when the "SBIRS Low" program was transferred to MDA from the United States Air Force. In December 2002, SBIRS Low Research & Development was renamed Space Tracking and Surveillance System (STSS).
EWS-G2 is a weather satellite of the U.S. Space Force, formerly GOES-15. The spacecraft was constructed by Boeing, and is the last of three GOES satellites to be based on the BSS-601 bus. It was launched in 2010, while the other BSS-601 GOES satellites—GOES-13 and GOES-14—were launched in May 2006 and June 2009 respectively. It was the sixteenth GOES satellite to be launched.
NOAA-6, known as NOAA-A before launch, was an American operational weather satellite for use in the National Operational Environmental Satellite System (NOESS) and for the support of the Global Atmospheric Research Program (GARP) during 1978-1984. The satellite design provided an economical and stable Sun-synchronous platform for advanced operational instruments to measure the atmosphere of Earth, its surface and cloud cover, and the near-space environment.
The Suomi National Polar-orbiting Partnership, previously known as the National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) and NPP-Bridge, is a weather satellite operated by the United States National Oceanic and Atmospheric Administration (NOAA). It was launched in 2011 and is currently in operation.
GOES-16, formerly known as GOES-R before reaching geostationary orbit, is the first of the GOES-R series of Geostationary Operational Environmental Satellites (GOES) operated by NASA and the National Oceanic and Atmospheric Administration (NOAA). GOES-16 serves as the operational geostationary weather satellite in the GOES East position at 75.2°W, providing a view centered on the Americas. GOES-16 provides high spatial and temporal resolution imagery of the Earth through 16 spectral bands at visible and infrared wavelengths using its Advanced Baseline Imager (ABI). GOES-16's Geostationary Lightning Mapper (GLM) is the first operational lightning mapper flown in geostationary orbit. The spacecraft also includes four other scientific instruments for monitoring space weather and the Sun.
GOES-17 is an environmental satellite operated by the National Oceanic and Atmospheric Administration (NOAA). The satellite is second in the four-satellite GOES-R series. GOES-17 supports the Geostationary Operational Environmental Satellite (GOES) system, providing multi-spectral imaging for weather forecasts and meteorological and environmental research. The satellite was built by Lockheed Martin, based on the A2100A platform, and expected to have a useful life of 15 years. GOES-17 is intended to deliver high-resolution visible and infrared imagery and lightning observations of more than half the globe.
GOES-18 is the third of the "GOES-R Series", the current generation of weather satellites operated by the National Oceanic and Atmospheric Administration (NOAA). The current and next satellites of the Series will extend the availability of the Geostationary Operational Environmental Satellite (GOES) satellite system until 2037. The satellite is built by Lockheed Martin in Littleton, Colorado. It is based on the A2100A satellite bus and will have an expected useful life of 15 years.
NOAA-21, designated JPSS-2 prior to launch, is the second of the United States National Oceanic and Atmospheric Administration (NOAA)'s latest generation of U.S. polar-orbiting, non-geosynchronous, environmental satellites called the Joint Polar Satellite System. NOAA-21 was launched on 10 November 2022 and join NOAA-20 and Suomi NPP in the same orbit. Circling the Earth from pole-to-pole, it will cross the equator about 14 times daily, providing full global coverage twice a day. It was launched with LOFTID.
NOAA-20, designated JPSS-1 prior to launch, is the first of the United States National Oceanic and Atmospheric Administration's latest generation of U.S. polar-orbiting, non-geosynchronous, environmental satellites called the Joint Polar Satellite System. NOAA-20 was launched on 18 November 2017 and joined the Suomi National Polar-orbiting Partnership satellite in the same orbit. NOAA-20 operates about 50 minutes behind Suomi NPP, allowing important overlap in observational coverage. Circling the Earth from pole-to-pole, it crosses the equator about 14 times daily, providing full global coverage twice a day. This gives meteorologists information on "atmospheric temperature and moisture, clouds, sea-surface temperature, ocean color, sea ice cover, volcanic ash, and fire detection" so as to enhance weather forecasting including hurricane tracking, post-hurricane recovery by detailing storm damage and mapping of power outages.
GOES-U is a planned weather satellite, the fourth and last of the GOES-R series of satellites operated by the National Oceanic and Atmospheric Administration (NOAA). The GOES-R series will extend the availability of the Geostationary Operational Environmental Satellite (GOES) system until 2036. The satellite will be built by Lockheed Martin, based on the A2100 platform.
NOAA-12, also known as NOAA-D before launch, was an American weather satellite operated by National Oceanic and Atmospheric Administration (NOAA), an operational meteorological satellite for use in the National Environmental Satellite, Data, and Information Service (NESDIS). The satellite design provided an economical and stable Sun-synchronous platform for advanced operational instruments to measure the atmosphere of Earth, its surface and cloud cover, and the near-space environment.
Media related to GOES 13 at Wikimedia Commons