Taunton station (Amtrak)

Last updated
Taunton, MA
Amtrak Station Downtown Taunton.jpg
The 1986-built platform photographed in December 2014
General information
Location2-10 Oak Street, Taunton, Massachusetts
Line(s) Middleboro Subdivision
Platforms1 side platform
Tracks1
History
OpenedAugust 1836 (New Bedford & Taunton)
1986 (Amtrak)
Closed1958 (New Haven)
1996 (Amtrak)
Previous namesTaunton Central (until 1964)
Former services
Preceding station BSicon LOGO Amtrak2.svg Amtrak Following station
Providence
toward New York
Cape Codder
1986–1996
Wareham
toward Hyannis
Preceding station Cape Cod and Hyannis Railroad Following station
Attleboro
Terminus
Attleboro Branch
(1988)
Wareham
toward Hyannis or Falmouth
Preceding station New York, New Haven and Hartford Railroad Following station
Attleboro
toward New York
Cape Codder Wareham
toward Hyannis or Woods Hole

Taunton station was a passenger rail station located south of Oak Street in downtown Taunton, Massachusetts. As Taunton Central station, it served local and Boston-focused routes from 1836 to 1964. A later station at the same site served Amtrak's Cape Codder from 1986 to 1996, and Cape Cod and Hyannis Railroad commuter trains in 1988.

Contents

History

Taunton Central station

Taunton Central station in the late 1800s Taunton Central Station, crop from Battelle.png
Taunton Central station in the late 1800s

The New Bedford and Taunton Railroad opened from Mansfield to Taunton in August 1836 - one of the first branch lines in the state. [1] Its Taunton Central station was located between Oak Street and Wales Street, surrounded by the Taunton Locomotive Manufacturing Company and Mason Machine Works. [2] [3]

The line passed to the Old Colony Railroad in 1879 and the New Haven Railroad in 1893. The New Haven operated passenger service through Taunton, including Boston - Fall River and Boston - New Bedford routes, in addition to the seasonal New York - Cape Cod Cape Codder service. [4] The railroad was obligated to eliminate grade crossings near the station by a 1913 court order, but this was vacated in 1926. [5]

Year-round NH passenger service to Taunton ended in 1958. [1] Taunton briefly saw service again, during the summers of 1960 to 1964, when the Day Cape Codder and Neptune returned. [6]

Amtrak and CC&HRR

A new station nearby was built for Amtrak's Cape Codder service from 1986 to 1996. Located off Oak Street next to the GATRA Bloom Bus Terminal (where a ticket counter was located), the station consisted of a single bare asphalt platform serving the single track. [7]

The old Cape Codder ticket window, shortly before renovations at the station. Cape Codder Ticket Window in Bloom Bus Terminal, April 2015.jpg
The old Cape Codder ticket window, shortly before renovations at the station.

Cape Cod & Hyannis Railroad commuter trains stopped at the station on Attleboro-Cape Cod runs in 1988. [8]

As of 2014 the 1980s-built platform is still extant, though partially covered by vegetation, and the old ticket window could be seen in the Bloom Bus Station that served as the terminal, until a renovation in 2015.

South Coast Rail

Under current plans, Taunton will have an MBTA Commuter Rail station at the Dean Street site (pictured) instead of the Oak Street site. Old Colony Station Taunton.jpg
Under current plans, Taunton will have an MBTA Commuter Rail station at the Dean Street site (pictured) instead of the Oak Street site.

At several times during the South Coast Rail planning process, the site was under consideration as a station for MBTA Commuter Rail service to Boston. In September 1995, the MBTA filed an environmental notification form for construction of the project, with a routing following the Northeast Corridor to just north of Attleboro and a new bypass connecting to the branch line to Taunton. The station would have been upgraded to a full-length high-level platform to meet Americans with Disabilities Act requirements. [9] However, further reports suggested a route through Stoughton which would not stop at the station location, and the project was eventually cancelled in 2003.

When planning was restarted in 2005, alternatives through Attleboro and Stoughton were considered. The Stoughton alternate chosen in 2009 included two possible routing options, one following the former Whittenton Branch which would have a station at the Oak Street location. This would have provided convenient transfers to GATRA bus services, but resulted in longer travel times as the Whittenton Branch includes several major curves. [10]

The Final Environmental Impact Statement, released in 2013, selected a route further east with Dean Street station as a downtown stop instead. The FEIS included the possibility of using the Whittenton Branch, but a station would have been built at Dana Street several blocks to the north of the Oak Street location, where the straighter track geometry would be more favorable for the construction of full-length high-level platforms. [11]

Related Research Articles

<span class="mw-page-title-main">MBTA Commuter Rail</span> Greater Boston commuter rail system

The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 134 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).

<span class="mw-page-title-main">Old Colony Railroad</span> Former railroad system in Massachusetts and Rhode Island

The Old Colony Railroad (OC) was a major railroad system, mainly covering southeastern Massachusetts and parts of Rhode Island, which operated from 1845 to 1893. Old Colony trains ran from Boston to points such as Plymouth, Fall River, New Bedford, Newport, Providence, Fitchburg, Lowell and Cape Cod. For many years the Old Colony Railroad Company also operated steamboat and ferry lines, including those of the Fall River Line with express train service from Boston to its wharf in Fall River where passengers boarded luxury liners to New York City. The company also briefly operated a railroad line on Martha's Vineyard, as well as the freight-only Union Freight Railroad in Boston. The OC was named after the "Old Colony", the nickname for the Plymouth Colony.

<span class="mw-page-title-main">South Attleboro station</span> Railway station in Attleboro, Massachusetts, US

South Attleboro station is a temporarily closed MBTA Commuter Rail Providence/Stoughton Line station in Attleboro, Massachusetts. It is located under Newport Avenue in the South Attleboro neighborhood, just north of the Rhode Island border. The station had two side platforms serving the two tracks of the Northeast Corridor, connected by a footbridge to a park-and-ride lot.

<span class="mw-page-title-main">Boston and Providence Railroad</span>

The Boston and Providence Railroad was a railroad company in the states of Massachusetts and Rhode Island which connected its namesake cities. It opened in two sections in 1834 and 1835 - one of the first rail lines in the United States - with a more direct route into Providence built in 1847. Branches were built to Dedham in 1834, Stoughton in 1845, and North Attleboro in 1871. It was acquired by the Old Colony Railroad in 1888, which in turn was leased by the New Haven Railroad in 1893. The line became the New Haven's primary mainline to Boston; it was realigned in Boston in 1899 during the construction of South Station, and in Pawtucket and Central Falls in 1916 for grade crossing elimination.

<i>Cape Codder</i> (train) Seasonal passenger train operated by Amtrak

The Cape Codder was a seasonal passenger train operated by Amtrak between New York City and Hyannis, Massachusetts, on Cape Cod. It operated during the summer between 1986 and 1996. It was the first regular service from New York to the Cape since 1964. The New York, New Haven and Hartford Railroad previously had operated a train under this name until 1958.

<span class="mw-page-title-main">Providence/Stoughton Line</span> Line of the Boston MBTA Commuter Rail system

The Providence/Stoughton Line is an MBTA Commuter Rail service in Massachusetts and Rhode Island, primarily serving the southwestern suburbs of Boston. Most service runs entirely on the Northeast Corridor between South Station in Boston and Providence station or Wickford Junction station in Rhode Island, while the Stoughton Branch splits at Canton Junction and terminates at Stoughton. It is the longest MBTA Commuter Rail line, and the only one that operates outside Massachusetts. The line is the busiest on the MBTA Commuter Rail system, with 17,648 daily boardings in an October 2022 count.

<span class="mw-page-title-main">Middleboro Secondary</span>

The Middleboro Secondary is a railroad line owned by MassDOT in the U.S. state of Massachusetts. The line runs from Attleboro to Middleborough via Taunton.

<span class="mw-page-title-main">Readville station</span> Railway station in Boston, Massachusetts, US

Readville station is a Massachusetts Bay Transportation Authority (MBTA) commuter rail station located in the Readville section of the Hyde Park neighborhood of Boston, Massachusetts. It is served by MBTA Commuter Rail Fairmount Line and Franklin/Foxboro Line. Readville is the outer terminus for most Fairmount service, though some trips continue as Franklin/Foxboro Line trains. The station is located at a multi-level junction, with the Northeast Corridor tracks at ground level and the Dorchester Branch above; Franklin/Foxboro Line trains use a connecting track with a separate platform. Platforms are available for the Providence/Stoughton Line on the Northeast Corridor tracks, but they are not regularly used. An MBTA maintenance and storage yard and a CSX Transportation freight yard are located near the station.

<span class="mw-page-title-main">Attleboro station (Massachusetts)</span> Railway station in Attleboro, Massachusetts, US

Attleboro station is a commuter rail station on the MBTA's Providence/Stoughton Line located in Attleboro, Massachusetts. By a 2018 count, Attleboro had 1,547 daily riders, making it the fourth busiest station on the system outside Boston.

<span class="mw-page-title-main">Mansfield station (MBTA)</span> Rail station in Mansfield, Massachusetts, US

Mansfield station is an MBTA Commuter Rail station in Mansfield, Massachusetts. Located in downtown Mansfield, it serves the Providence/Stoughton Line. With 1,966 weekday boardings in a 2018 count, Mansfield is the third-busiest station on the system outside Boston.

<span class="mw-page-title-main">Holbrook/Randolph station</span>

Holbrook/Randolph station is an MBTA Commuter Rail station on the border of Holbrook and Randolph, Massachusetts. It is served by the Middleborough/Lakeville Line.

<span class="mw-page-title-main">Middleborough/Lakeville station</span> Commuter rail station in Lakeville, Massachusetts, US

Middleborough/Lakeville station is an MBTA Commuter Rail station in Lakeville, Massachusetts, just south of the Middleborough border. It is the southern terminus of the Middleborough/Lakeville Line; it is also an intermediate stop for seasonal CapeFlyer service to Cape Cod. Middleborough/Lakeville has a single full-length high-level side platform serving the line's single track.

<i>Beacon Hill</i> (train) Amtrak commuter train between Boston and New Haven

The Beacon Hill was a daily 157-mile (253 km) commuter rail service operated by Amtrak between Boston, Massachusetts, and New Haven, Connecticut, from 1978 to 1981. The Beacon Hill was one of the last long-haul commuter services operated by Amtrak. Service consisted of a single rush-hour round trip, with service eastbound to Boston in the morning and westbound to New Haven in the evening.

<span class="mw-page-title-main">South Coast Rail</span>

South Coast Rail is a project to build a new southern line of the MBTA Commuter Rail system along several abandoned and freight-only rail lines. The line has been planned to restore passenger rail service between Boston and the cities of Taunton, Fall River, and New Bedford, via the towns of Berkley, and Freetown, on the south coast of Massachusetts. It would restore passenger service to some of the southern lines of the former Old Colony Railroad and the New York, New Haven and Hartford Railroad.

<span class="mw-page-title-main">East Taunton station</span> Future railway station in Taunton, Massachusetts, US

East Taunton station is an under-construction MBTA Commuter Rail station in East Taunton, Massachusetts adjacent to the interchange between the Route 24 expressway and County Street. It is planned to open in mid-2024 as part of the first phase of the South Coast Rail project.

The Dighton and Somerset Railroad, currently referred to as the Dean Street Industrial Track, is a railroad that ran between Fall River and Braintree, Massachusetts. It opened in 1866; from the 1890s to the 1930s and again in the late 1950s, it was the primary rail route from Boston to the South Coast. Passenger service ended in stages with the final regular service in 1958, though freight service on two short segments continues into the 21st century. MBTA Commuter Rail service is proposed to be extended onto the northern part of the line around 2030 as part of the South Coast Rail project.

<i>CapeFlyer</i> Seasonal rail service in Massachusetts

The CapeFlyer is a passenger rail service in Massachusetts between Boston and Cape Cod that began in 2013. It is operated by the Cape Cod Regional Transit Authority (CCRTA) in collaboration with the Massachusetts Bay Transportation Authority (MBTA) and the Massachusetts Department of Transportation (MassDOT). The service runs on the weekends, beginning Friday evenings and including holidays, between Memorial Day weekend and Labor Day weekend.

<span class="mw-page-title-main">Wareham Village station</span>

Wareham Village station is a train station that is located on Merchants Way in Wareham, Massachusetts. Service to Wareham formerly ran from 1848 until 1959. A shelter, built in 1985 for short-lived Amtrak and commuter service, is currently unused. A new platform constructed nearby for the CapeFLYER summer weekend service opened for the CapeFLYER on June 27, 2014.

<span class="mw-page-title-main">Middleborough station</span> Rail station in Middleborough, Massachusetts, US

Middleborough station is an under-construction MBTA Commuter Rail station in Middleborough, Massachusetts. It is expected to open in mid-2024 as part of the South Coast Rail project, replacing Middleborough/Lakeville station for regular service. The station will have a single side platform located inside the wye between the Middleborough Main Line and the Middleboro Secondary.

<span class="mw-page-title-main">Whittenton Branch</span> Defunct railroad branch in Massachusetts

The Whittenton Branch was a short railroad branch in the state of Massachusetts that formerly connected the city of Taunton and Raynham. The 3-mile branch initially opened in 1881 and was later extended to connect the New Bedford and Taunton Railroad and the Dighton and Somerset Railroad.

References

  1. 1 2 Karr, Ronald Dale (1995). The Rail Lines of Southern New England. Branch Line Press. pp. 327–330. ISBN   0942147022.
  2. "City of Taunton". Official Topographical Atlas of Massachusetts. Walling & Gray. 1871 via Ward Maps.
  3. "City of Taunton". Atlas of Massachusetts. Walker Lithograph & Publishing Co. 1891 via Ward Maps.
  4. New Haven timetable, April 24, 1955, Tables 19, 29 https://upload.wikimedia.org/wikipedia/commons/f/fc/New_Haven_Railroad_1955_timetable.pdf
  5. "Court Vacates Crossing Order". Boston Globe. August 10, 1926. p. 8 via Newspapers.com. Open Access logo PLoS transparent.svg
  6. "The New Haven Railroad, Table 6a". Official Guide of the Railways. National Railway Publication Company. 94 (1). June 1961.
  7. Amtrak (1 April 1990). "National Train Timetables". Museum of Railway Timetables. p. 9. Retrieved 28 June 2013.
  8. Belcher, Jonathan (23 March 2013). "Changes to Transit Service in the MBTA district" (PDF). NETransit. Retrieved 28 June 2013.
  9. Massachusetts Bay Transportation Authority (September 1995). "Environmental Notification Form: Volume I" (PDF). New Bedford/Fall River Commuter Rail Project. Retrieved 7 October 2013.
  10. South Coast Rail (21 August 2009). "Downtown Taunton Engineering Layout" (PDF). EOT. Retrieved 8 December 2014.
  11. "Figure 3.2-32 Dana Street Station Conceptual Station Design" (PDF). Volume II: FEIS/FEIR Figures Final Environmental Impact Statement/Final Environmental Impact Report on the South Coast Rail Project proposed by the Massachusetts Department of Transportation. U.S. Army Corps of Engineers New England District. August 2013. Retrieved 8 December 2014.

Further reading

41°54′04″N71°06′03″W / 41.901063°N 71.100968°W / 41.901063; -71.100968