1889 in South Africa

Last updated

Flag of the Cape Colony 1876-1910.svg
Flag of the Natal Colony 1875-1910.svg
Flag of the Orange Free State.svg
Flag of Transvaal.svg
1889
in
South Africa
Decades:
See also:

The following lists events that happened during 1889 in South Africa .

Contents

Incumbents

Events

March
October
Unknown date

Births

Railways

Railway lines opened

CGR 3rd Class 4-4-0 CGR 3rd Class 4-4-0 1889 no. 114.jpg
CGR 3rd Class 4-4-0

Locomotives

Cape

The Cape Government Railways places twenty-four 3rd Class 4-4-0 American type tender locomotives in passenger service on the Cape Western System, the first stock locomotives to be built in quantity to detailed designs prepared in the Cape Colony. [5]

Transvaal
NZASM 10 Tonner 0-4-0T NZASM 10 Tonner 0-4-0T.jpg
NZASM 10 Tonner 0-4-0T

Three locomotive types enter service on the newly established Nederlandsche-Zuid-Afrikaansche Spoorwegmaatschappij:

References

  1. Palmer, Alan; Palmer, Veronica (1992). The Chronology of British History. London: Century Ltd. pp. 315–316. ISBN   0-7126-5616-2.
  2. 1 2 Statement Showing, in Chronological Order, the Date of Opening and the Mileage of Each Section of Railway, Statement No. 19, p. 182, ref. no. 200954-13
  3. Bagshawe, Peter (2012). Locomotives of the Namaqualand Railway and Copper Mines (1st ed.). Stenvalls. ISBN   978-91-7266-179-0.
  4. Report for year ending 31 December 1909, Cape Government Railways, Section VIII - Dates of Opening and the Length of the different Sections in the Cape Colony, from the Year 1873 to 31st December, 1909.
  5. 1 2 3 Holland, D.F. (1971). Steam Locomotives of the South African Railways. Vol. 1: 1859–1910 (1st ed.). Newton Abbott, England: David & Charles. pp. 37–39, 109–112. ISBN   978-0-7153-5382-0.
  6. Espitalier, T.J.; Day, W.A.J. (1944). The Locomotive in South Africa - A Brief History of Railway Development. Chapter IV - The N.Z.A.S.M.. South African Railways and Harbours Magazine, October 1944. pp. 761–764.