Birmingham and Bristol Railway

Last updated

Birmingham and Bristol Railway
Birm bris rly.jpg
Sketchmap of the Birmingham and Gloucester Railway and its relationship to other lines
Bridge at Mill Lane and Station Road, Northfield - geograph.org.uk - 175070.jpg
Bridge under the old Birmingham and Bristol Railway
Overview
Dates of operation18451846
Predecessor Birmingham and Gloucester Railway
Bristol and Gloucester Railway
Successor Midland Railway
Technical
Track gauge 4 ft 8 12 in (1,435 mm) standard gauge

The Birmingham and Bristol Railway was a short-lived railway company, formed in 1845 by the merger of the Birmingham and Gloucester Railway and the Bristol and Gloucester Railway.

Contents

Origin

At Gloucester the latter had formed a junction with the 7 ft (2,134 mm) broad gauge Cheltenham and Great Western Union Railway running into the town on mixed gauge tracks. In 1843 the C&GWU had been taken over by the Great Western Railway which began putting pressure on the Bristol and Gloucester to join the GWR at Bristol, to subscribe to the proposed South Devon Railway, and to convert to broad gauge track, to the alarm of the Northern "narrow" gauge railways.

The "break-of-gauge" at Gloucester was a major problem. It caused pandemonium as whole trainloads of passengers, and their luggage, changed from one to another, together with the transshipment of goods.

Formation

Parliament had established a commission to examine the problem and there was a consensus that the track should be unified throughout the line. The GWR made an offer to the Birmingham and Bristol directors. The latter's shareholders held out for more, and the GWR deferred its decision for three days. At this moment the Midland Railway made its move.

True or not, the story of how it came about is a part of railway legend, when the Midland's John Ellis was travelling, quite by chance it is said, in a train with two Bristol & Gloucester directors. He overheard them discussing the matter, and took it on himself to offer better terms.

In 1846, the Bristol and Birmingham and Midland Railways Act allowed the lines to merge and become part of the Midland Railway. The bill was managed by Samuel Carter, who was solicitor to both Midland and LNWR.

The LNWR was also alarmed at the idea of the GWR's broad gauge reaching the Midlands and it offered to share any losses the Midland might incur. In the event, all that was needed was a nominal rent for the Midland's use of the LNWR's Birmingham New Street station.

There were, of course, still problems with gauge. In 1848 the Midland built its own line into Gloucester, avoiding the GWR ex-Cheltenham & Great Western Union line, and laid mixed gauge to Bristol. By 1857 the whole line had been converted to standard gauge.

Related Research Articles

Great Western Railway Former railway company in the United Kingdom

The Great Western Railway (GWR) was a British railway company that linked London with the southwest and west of England, the West Midlands, and most of Wales. It was founded in 1833, received its enabling Act of Parliament on 31 August 1835 and ran its first trains in 1838. It was engineered by Isambard Kingdom Brunel, who chose a broad gauge of 7 ft —later slightly widened to 7 ft 14 in —but, from 1854, a series of amalgamations saw it also operate 4 ft 8 12 in standard-gauge trains; the last broad-gauge services were operated in 1892.

Midland Railway British pre-grouping railway company (1844–1922)

The Midland Railway (MR) was a railway company in the United Kingdom from 1844. The Midland was one of the largest railway companies in Britain in the early 20th century, and the largest employer in Derby, where it had its headquarters. It amalgamated with several other railways to create the London, Midland and Scottish Railway at grouping in 1922.

The Great Western Railway Swindon Class 0-6-0 broad gauge steam locomotives for goods train work. This class was introduced into service between November 1865 and March 1866, and withdrawn between June 1887 and the end of the GWR broad gauge in May 1892. The entire class was sold to the Bristol and Exeter Railway between July 1872 and September 1874, where they were numbered 96-109, but returned to the GWR when that railway was absorbed. The locomotives were then renumbered 2077-2090; their names were not restored.

The Birmingham and Gloucester Railway (B&GR) was the first name of the railway linking the cities in its name and of the company which pioneered and developed it; the line opened in stages in 1840, using a terminus at Camp Hill in Birmingham. It linked with the Bristol and Gloucester Railway in Gloucester, but at first that company's line was broad gauge, and Gloucester was a point of the necessary but inconvenient transhipment of goods and passengers onto 4 ft 8 12 in gauge that became the national standard. Nearly all of the original main line remains active as a "trunk" route, also known as an arterial route or line.

Cheltenham Spa railway station Railway station in Gloucestershire, England

Cheltenham Spa railway station is a railway station serving Cheltenham in Gloucestershire, England. Situated on the Bristol-Birmingham main line, it is managed by Great Western Railway and is about one mile from the town centre. The official name of the town is simply Cheltenham, but, when the station was renamed in 1925, the London, Midland and Scottish Railway chose to add Spa to the station name.

Gloucester railway station Railway station in Gloucester, England

Gloucester railway station is a railway station serving the city of Gloucester in England. The station was originally built as the terminus of the Birmingham and Gloucester Railway in 1840, but the arrival of the Bristol and Gloucester Railway and Cheltenham and Great Western Union Railway in 1844, and then conversion to a through station for the South Wales Railway in 1851 resulted in a very complex layout. Subsequent closures and rationalization have left Gloucester with a station that is located off the main Bristol-Birmingham line, meaning trains that call at Gloucester must reverse except for trains that continue along the Gloucester to Newport Line.

The Bristol and Gloucester Railway was a railway company opened in 1844 between the cities in its name. It was built on the 7 ftBrunel gauge, but it was acquired in 1845 by the 4 ft 8 12 instandard gauge Midland Railway, which also acquired the Birmingham and Gloucester Railway at the same time.

The Oxford, Worcester and Wolverhampton Railway (OW&WR) was a railway company in England. It built a line from Wolvercot Junction near Oxford to Worcester, Stourbridge, Dudley and Wolverhampton, as well as some branches.

History of rail transport in Great Britain 1830–1922 history of railroads in Britain between 1830 and 1922

The history of rail transport in Great Britain 1830–1922 covers the period between the opening of the Liverpool and Manchester Railway (L&MR), and the Grouping, the amalgamation of almost all of Britain's many railway companies into the Big Four by the Railways Act 1921.

The Pontypool, Caerleon & Newport Railway was promoted independently to relieve congestion on the heavily worked Eastern Valley Line of the Monmouthshire Railway and Canal Company. The Great Western Railway put up half the capital, making it in effect a GWR subsidiary. It opened in 1874, and most long distance passenger and goods traffic, especially the heavy mineral traffic, transferred to it. It amalgamated with the GWR in 1876.

The South Wales Railway was a main line railway which opened in stages from 1850, connecting the Great Western Railway from Gloucester to South Wales. It was constructed on the broad gauge. An original aspiration was to reach Fishguard to engender an Irish ferry transit and transatlantic trade, but the latter did not materialise for many years, and never became an important sector of the business. Neyland was the western terminus of the line until 1906.

The Cheltenham and Great Western Union Railway was a railway company intended to link Cheltenham, Gloucester and Swindon, in England. It was authorised in 1836 but it found it very hard to raise money for the construction, and it opened only a part of its line, between Swindon and Cirencester, in 1841. It sold its business to the Great Western Railway, which quickly built the line through to Gloucester in 1845 and Cheltenham in 1847; part of that route was shared with other companies.

The Shrewsbury and Hereford Railway was an English railway company that built a standard gauge line between those places. It opened its main line in 1853.

Haresfield railway station

Haresfield railway station served the village of Haresfield in Gloucestershire, England.

Gloucester and Cheltenham Tramroad

The Gloucester and Cheltenham Tramroad, also known as the Gloucester and Cheltenham Railway, connected Gloucester and Cheltenham with horse-drawn trams. Its primary economic purpose was the transport of coal from Gloucester's docks to the rapidly developing spa town of Cheltenham and the transport of building stone from quarries on nearby Leckhampton Hill.

Severn Bridge Railway

The Severn Bridge Railway was a railway company which constructed a railway from Lydney to Sharpness in Gloucestershire, England. It was intended chiefly to give access for minerals in the Forest of Dean to Sharpness Docks, and the company built a long bridge, 1,387 yards (1,268 m) in length, over the River Severn. The line opened in 1879.

The Bristol and Gloucestershire Railway was an early mineral railway, opened in two stages in 1832 and 1834, which connected collieries near Coalpit Heath with Bristol, at the river Avon. Horse traction was used. It was later taken over by the Bristol and Gloucester Railway, and much of the route became part of the main line between Birmingham and Bristol, though that was later by-passed and closed. Part of it now forms the Bristol and Bath Railway Path.

The Oxford and Rugby Railway was promoted by the Great Western Railway as a means of connecting to the West Midlands and the north of England, by joining existing railways at Rugby. It was authorised in 1845, but the GWR soon decided to make its own line to Birmingham, and in 1846 it acquired the O&RR; work had not started on its construction. In the same year the GWR obtained Parliamentary authorisation for its Birmingham line. The two railways were treated as a single project, to connect Birmingham and Oxford. In 1850 a single line was opened between Oxford and Banbury, and in 1852 the whole line to Birmingham was opened.

The Birmingham and Oxford Junction Railway was an English railway line promoted by the Great Western Railway to gain a route from its southern base towards the industrial centres of the West Midlands, and in due course the north-west. It overtook another GWR subsidiary, the unbuilt Oxford and Rugby Railway, and the Birmingham Extension Railway which was to build a new independent station in the city. It was authorised in 1846 and formed a single project to connect Birmingham and Oxford.

The Birmingham, Wolverhampton and Dudley Railway was an English railway company promoted to connect those places by rail. It was authorised by Parliament in 1846. It became apparent that it would be advantageous to merge with the Great Western Railway. The rival London and North Western Railway went to great lengths to frustrate the amalgamation, but ultimately failed, and the merger took place in 1847.

References