| Location | |
|---|---|
| Jalal-Abad Region | |
| Country | Kyrgyzstan |
| Production | |
| Products | Copper |
| History | |
| Opened | commissioning commenced in 2014 |
| Owner | |
| Company | KAZ Minerals |
| Year of acquisition | 2007 [1] |
Bozymchak is an open-pit copper mine and concentrator in Ala-Bukinsky region, Jalal-Abad, Kyrgyzstan; it also contains gold by-product. It is being developed by KAZ Minerals. The project commenced commissioning in 2014. [2] [3]
In 2014, 426 kt of ore was mined at Bozymchak mine with an average copper grade of 1%. [2] Bozymchak is expected to have an average annual output of 6 kt of copper cathode and 28 koz of gold bar over the 18 years of operational life. [2] [3]
41°15′31″N71°03′53″E / 41.2586°N 71.0647°E