British Westinghouse Electric and Manufacturing Co Ltd v Underground Electric Rlys Co of London Ltd

Last updated

British Westinghouse Ltd v Underground Ltd
Royal Coat of Arms of the United Kingdom.svg
Court House of Lords
Full case nameBritish Westinghouse Electric and Manufacturing Company, Limited v Underground Electric Railways Company of London, Limited
DecidedJuly 19, 1912
Citation(s)[1912] AC 673, [1911-13] All ER Rep 63, 81 LJKB 1132, 107 LT 325
Transcript(s) Judgment
Court membership
Judge(s) sitting Viscount Haldane LC, Lord Ashbourne, Lord Macnaghten, and Lord Atkinson
Case opinions
Viscount Haldane LC
Keywords
Remedies, Duty to mitigate

British Westinghouse Electric and Manufacturing Co Ltd v Underground Electric Railways Co of London Ltd [1912] AC 673 is an English contract law case, concerning the duty to mitigate one's loss after a breach of contract.

Contents

Facts

The defendants (British Westinghouse Electric and Manufacturing Co Ltd) supplied the plaintiffs (Underground Electric Railways Co of London Ltd) with turbines which, in breach of contract, were deficient in power. The plaintiffs accepted and used the turbines but reserved their right to claim damages. Later they replaced the turbines with others which were far more efficient than those supplied by the defendants would have been, even if they had complied with the contract. The plaintiffs claimed to recover the cost of the substitute turbines as damages.

Judgment

The House of Lords held that in assessing the damages for the breach any loss sustained by the plaintiffs had to be balanced against any gain to them arising directly out of the steps they had taken to lessen the consequences of the breach. Although the plaintiffs had not been bound to buy the new machines, having done so the consequential gain in profits and saved expenses had to be brought into account. The savings exceeded the cost of the machines and so the plaintiffs recovered nothing under this head.

Giving the leading judgment, Viscount Haldane LC, 688–9, ‘the quantum of damage is a question of fact’. He set out the principles for determining the measure of damages.

The first is that, as far as possible, he who has proved a breach of a bargain to supply what he contracted to get is to be placed, as far as money can do it, in as good a situation as if the contract had been performed. The fundamental basis is thus compensation for pecuniary loss naturally flowing from the breach; but this first principle is qualified by a second, which imposes on a plaintiff the duty of taking all reasonable steps to mitigate the loss consequent on the breach, and debars him from claiming in respect of any part of the damage which is due to his neglect to take such steps.

The duty to mitigate is not to ‘take any step which a reasonable and prudent man would not ordinarily take in the course of his business.’ Only reasonable steps.

See also

Related Research Articles

At common law, damages are a remedy in the form of a monetary award to be paid to a claimant as compensation for loss or injury. To warrant the award, the claimant must show that a breach of duty has caused foreseeable loss. To be recognised at law, the loss must involve damage to property, or mental or physical injury; pure economic loss is rarely recognised for the award of damages.

Negligence is a failure to exercise appropriate and/or ethical ruled care expected to be exercised amongst specified circumstances. The area of tort law known as negligence involves harm caused by failing to act as a form of carelessness possibly with extenuating circumstances. The core concept of negligence is that people should exercise reasonable care in their actions, by taking account of the potential harm that they might foreseeably cause to other people or property.

Punitive damages, or exemplary damages, are damages assessed in order to punish the defendant for outrageous conduct and/or to reform or deter the defendant and others from engaging in conduct similar to that which formed the basis of the lawsuit. Although the purpose of punitive damages is not to compensate the plaintiff, the plaintiff will receive all or some of the punitive damages in award.

<span class="mw-page-title-main">Misrepresentation</span> Untrue statement in contract negotiations

In common law jurisdictions, a misrepresentation is a false or misleading statement of fact made during negotiations by one party to another, the statement then inducing that other party to enter into a contract. The misled party may normally rescind the contract, and sometimes may be awarded damages as well.

Tortious interference, also known as intentional interference with contractual relations, in the common law of torts, occurs when one person intentionally damages someone else's contractual or business relationships with a third party, causing economic harm. As an example, someone could use blackmail to induce a contractor into breaking a contract; they could threaten a supplier to prevent them from supplying goods or services to another party; or they could obstruct someone's ability to honor a contract with a client by deliberately refusing to deliver necessary goods.

Damages for breach of contract is a common law remedy, available as of right. It is designed to compensate the victim for their actual loss as a result of the wrongdoer’s breach rather than to punish the wrongdoer. If no loss has been occasioned by the plaintiff, only nominal damages will be awarded.

Loss of chance in English law refers to a particular problem of causation, which arises in tort and contract. The law is invited to assess hypothetical outcomes, either affecting the claimant or a third party, where the defendant's breach of contract or of the duty of care for the purposes of negligence deprived the claimant of the opportunity to obtain a benefit and/or avoid a loss. For these purposes, the remedy of damages is normally intended to compensate for the claimant's loss of expectation. The general rule is that while a loss of chance is compensable when the chance was something promised on a contract it is not generally so in the law of tort, where most cases thus far have been concerned with medical negligence in the public health system.

In English law, remoteness between a cause of action and the loss or damage sustained as a result is addressed through a set of rules in both tort and contract, which limit the amount of compensatory damages available for a wrong.

<span class="mw-page-title-main">Expectation damages</span>

Expectation damages are damages recoverable from a breach of contract by the non-breaching party. An award of expectation damages protects the injured party's interest in realising the value of the expectancy that was created by the promise of the other party. Thus, the impact of the breach on the promisee is to be effectively "undone" with the award of expectation damages.

Economic loss is a term of art which refers to financial loss and damage suffered by a person which is seen only on a balance sheet and not as physical injury to person or property. There is a fundamental distinction between pure economic loss and consequential economic loss, as pure economic loss occurs independent of any physical damage to the person or property of the victim. It has also been suggested that this tort should be called "commercial loss" as injuries to person or property can be regarded as "economic".

<i>Spartan Steel & Alloys Ltd v Martin & Co (Contractors) Ltd</i>

Spartan Steel & Alloys Ltd v Martin & Co (Contractors) Ltd [1973] QB 27 is a well-known English Court of Appeal case concerning the recovery of pure economic loss in negligence.

<i>Addis v Gramophone Co Ltd</i>

Addis v Gramophone Co Ltd [1909] AC 488 is an old English contract law and UK labour law case, which used to restrict damages for non-pecuniary losses for breach of contract.

<i>Parsons (Livestock) Ltd v Uttley Ingham & Co Ltd</i>

Parsons (Livestock) Ltd v Uttley Ingham & Co Ltd [1978] QB 791 is an English contract law case, concerning remoteness of damage. In it, the majority held that losses for breach of contract are recoverable if the type or kind of loss is a likely result of the breach of contract. Lord Denning MR, dissenting on the reasoning, held that a distinction should be drawn between losses for physical damage and economic losses.

Mitigation in law is the principle that a party who has suffered loss has to take reasonable action to minimize the amount of the loss suffered. As stated by the Canadian Federal Court of Appeal in Redpath Industries Ltd. v. Cisco (The), "It is well established that a party who suffers damages as a result of a breach of contract has a duty to mitigate those damages, that is to say that the wrongdoer cannot be called upon to pay for avoidable losses which would result in an increase in the quantum of damages payable to the injured party." The onus on showing a failure to mitigate damages is on the defendant. In the UK, Lord Leggatt describes the "function of the doctrine of mitigation" as enabling the law

to distinguish between effects on the claimant's financial position which are to be regarded as caused by the defendant's breach of contract and for which damages can therefore be recovered and effects which are attributed to the claimant's own action or inaction in response to the breach and for which the defendant is not liable.

<i>Doyle v Olby (Ironmongers) Ltd</i>

Doyle v Olby (Ironmongers) Ltd [1969] 2 QB 158 is an English contract law case concerning fraudulent misrepresentation. It illustrates and emphasizes the differing measures of damages for deceit and breach of contract.

<i>C&P Haulage v Middleton</i>

C&P Haulage Co Ltd v Middleton [1983] EWCA Civ 5 is an English contract law case, concerning damages for costs incurred by a claimant related to a defendant's breach of contract.

<i>Southcott Estates Inc v Toronto Catholic District School Board</i> Supreme Court of Canada case

Southcott Estates Inc v Toronto Catholic District School Board, 2012 SCC 51, [2012] 2 SCR 675, is a landmark case of the Supreme Court of Canada in the area of commercial law, with significant impact in the areas of:

<span class="mw-page-title-main">Floodgates principle</span>

The floodgates principle, or the floodgates argument, is a legal principle which is sometimes applied by judges to restrict or limit the right to make claims for damages because of a concern that permitting a claimant to recover in such situations might open the metaphorical "floodgates" to large numbers of claims and lawsuits. The principle is most frequently cited in common law jurisdictions, and in English tort law in particular.

The avoidable consequences rule is a concept in United States jurisprudence which comes from a common-law rule barring recovery of damages that a tort victim "could have avoided by the use of reasonable effort or expenditure after the commission of the tort." This concept recognizes as fact, that if a plaintiff is injured by a defendant, that the plaintiff must take reasonable steps to avoid aggravating the injuries caused by the defendant.

  1. Except as stated in Subsection (2), one injured by the tort of another is not entitled to recover damages for any harm that he could have avoided by the use of reasonable effort or expenditure after the commission of the tort.
  2. One is not prevented from recovering damages for a particular harm resulting from a tort if the tortfeasor intended the harm or was aware of it and was recklessly disregardful of it, unless the injured person with knowledge of the danger of the harm intentionally or heedlessly failed to protect his own interests.

The civil liability of a recreational diver may include a duty of care to another diver during a dive. Breach of this duty that is a proximate cause of injury or loss to the other diver may lead to civil litigation for damages in compensation for the injury or loss suffered.