Crash program

Last updated

A crash program is a plan of action entailing rapid, intensive resource allocation to solve a pressing problem. [1] Rapidity may eliminate investigation and planning essential to efficient use of resources when goals are perceived as more important than those resources.

Contents

Deadlines

Time limits differentiate crash programs from normal procedures. Time reduction often results from unexpected circumstances. These time limits may originate from predictable events like weather cycles or financial deadlines, or they may be arbitrarily established as lifesaving measures in situations involving famine, disease, or military vulnerabilities. Schedule compression occurs when deadlines appropriate for expected conditions are shortened while the program is in progress. [2]

Methods

Fast-tracking involves working simultaneously on activities that would have been performed sequentially under normal circumstances. [2] Project crashing occurs when additional resources are required to meet the established deadline. Project crashing increases the cost of the goal. [3] Crash analysis compares the costs of shortened deadlines. [4]

Examples

Related Research Articles

Project management is the process of leading the work of a team to achieve all project goals within the given constraints. This information is usually described in project documentation, created at the beginning of the development process. The primary constraints are scope, time, and budget. The secondary challenge is to optimize the allocation of necessary inputs and apply them to meet pre-defined objectives.

<span class="mw-page-title-main">Risk management</span> Identification, evaluation and control of risks

Risk management is the identification, evaluation, and prioritization of risks followed by coordinated and economical application of resources to minimize, monitor, and control the probability or impact of unfortunate events or to maximize the realization of opportunities.

Time management is the process of planning and exercising conscious control of time spent on specific activities - especially to increase effectiveness, efficiency, and productivity. It involves of various demands upon a person relating to work, social life, family, hobbies, personal interests, and commitments with the finite nature of time. Using time effectively gives the person "choice" on spending or managing activities at their own time and expediency. Time management may be aided by a range of skills, tools, and techniques used to manage time when accomplishing specific tasks, projects, and goals complying with a due date. Initially, time management referred to just business or work activities, but eventually, the term broadened to include personal activities as well. A time management system is a designed combination of processes, tools, techniques, and methods. Time management is usually a necessity in any project management as it determines the project completion time and scope.

A project is any undertaking, carried out individually or collaboratively and possibly involving research or design, that is carefully planned to achieve a particular goal.

<span class="mw-page-title-main">Critical path method</span> Method of scheduling activities

The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish. It is commonly used in conjunction with the program evaluation and review technique (PERT).

Discipline is the practice of training people to obey rules or a code of behavior, using punishment to correct disobedience.

Full-time equivalent (FTE), or whole time equivalent (WTE), is a unit of measurement that indicates the workload of an employed person in a way that makes workloads or class loads comparable across various contexts. FTE is often used to measure a worker's or student's involvement in a project, or to track cost reductions in an organization. An FTE of 1.0 is equivalent to a full-time worker or student, while an FTE of 0.5 signals half of a full work or school load.

Planning is the process of thinking regarding the activities required to achieve a desired goal. Planning is based on foresight, the fundamental capacity for mental time travel. The evolution of forethought, the capacity to think ahead, is considered to have been a prime mover in human evolution. Planning is a fundamental property of intelligent behavior. It involves the use of logic and imagination to visualise not only a desired result, but the steps necessary to achieve that result.

Copland is an operating system developed by Apple for Macintosh computers between 1994 and 1996 but never commercially released. It was intended to be released as System 8, and later, Mac OS 8. Planned as a modern successor to the aging System 7, Copland introduced protected memory, preemptive multitasking, and several new underlying operating system features, while retaining compatibility with existing Mac applications. Copland's tentatively planned successor, codenamed Gershwin, was intended to add more advanced features such as application-level multithreading.

<span class="mw-page-title-main">Systems development life cycle</span> Systems engineering terms

In systems engineering, information systems and software engineering, the systems development life cycle (SDLC), also referred to as the application development life cycle, is a process for planning, creating, testing, and deploying an information system. The SDLC concept applies to a range of hardware and software configurations, as a system can be composed of hardware only, software only, or a combination of both. There are usually six stages in this cycle: requirement analysis, design, development and testing, implementation, documentation, and evaluation.

In agile principles, timeboxing allocates a maximum unit of time to an activity, called a timebox, within which a planned activity takes place. It is used by agile principles-based project management approaches and for personal time management.

An action plan is a detailed plan outlining actions needed to reach one or more goals. Alternatively, it can be defined as a "sequence of steps that must be taken, or activities that must be performed well, for a strategy to succeed".

Construction management (CM) aims to control the quality of a project's scope, time, and cost to maximize the project owner's satisfaction. It uses project management techniques and software to oversee the planning, design, construction and closeout of a construction safely, on time, on budget and within specifications.

Software project management is the process of planning and leading software projects. It is a sub-discipline of project management in which software projects are planned, implemented, monitored and controlled.

<span class="mw-page-title-main">Schedule</span> Planning of tasks and events

A schedule or a timetable, as a basic time-management tool, consists of a list of times at which possible tasks, events, or actions are intended to take place, or of a sequence of events in the chronological order in which such things are intended to take place. The process of creating a schedule — deciding how to order these tasks and how to commit resources between the variety of possible tasks — is called scheduling, and a person responsible for making a particular schedule may be called a scheduler. Making and following schedules is an ancient human activity.

<span class="mw-page-title-main">Traffic collision</span> Incident when a vehicle collides with another object

A traffic collision, also called a motor vehicle collision, occurs when a vehicle collides with another vehicle, pedestrian, animal, road debris, or other moving or stationary obstruction, such as a tree, pole or building. Traffic collisions often result in injury, disability, death, and property damage as well as financial costs to both society and the individuals involved. Road transport is the most dangerous situation people deal with on a daily basis, but casualty figures from such incidents attract less media attention than other, less frequent types of tragedy. The commonly used term car accident is increasingly falling out of favor with many government departments and organizations, with the Associated Press style guide recommending caution before using the term. Some collisions are intentional vehicle-ramming attacks, staged crashes, vehicular homicide or vehicular suicide.

A glossary of terms relating to project management and consulting.

In software engineering, a software development process is a process of planning and managing software development. It typically involves dividing software development work into smaller, parallel, or sequential steps or sub-processes to improve design and/or product management. It is also known as a software development life cycle (SDLC). The methodology may include the pre-definition of specific deliverables and artifacts that are created and completed by a project team to develop or maintain an application.

The following outline is provided as an overview of and topical guide to project management:

Schedule compression refers to a series of techniques used to shorten the duration of a project without compromising the result. Common schedule compression techniques include crashing, fast-tracking and resource reallocation.

References

  1. "crash program". Dictionary.com. Retrieved 19 August 2021.
  2. 1 2 Monnappa, Avantika. "Fast Tracking vs Crashing: Key Differences". Simpllilearn. Retrieved 19 August 2021.
  3. "What is Project Crashing in Project Management?". Wrike. Retrieved 19 August 2021.
  4. Kelly, Eamonn V. "Crash with confidence". Project Management Institute. Retrieved 19 August 2021.