Galeru Nagari Sujala Sravanthi Project

Last updated

Galeru Nagari
G N Canal near Gandikota.jpg
Galeru Nagari Canal near Gandikota Reservoir
Official nameGaleru Nagari Sujala Sravanthi project
CountrySouth India
LocationSrisailam dam right main canal - Bhanakacherla
PurposeIrrigation, Drinking water
Construction began2005
Opening dateUnder Construction
Owner(s) Government of Andhra Pradesh
Dam and spillways
Length430 kilometers
Canal in Nagari Canal in Nagari.jpg
Canal in Nagari

Galeru Nagari Sujala Sravanthi Project or GNSS project is an irrigation project in Kadapa and Chitoor districts of Andhra Pradesh. [1]

It is envisaged to irrigate 265,000 acres (1,070 km2) in two phases besides providing drinking water facilities to villages and towns en route the canal alignment. [2] The main canal, Gandikota, Vamikonda and Sarvarajasagar reservoirs are under construction. [3] [4]

The scheme envisages drawl of 40 TMC surplus flood waters of river Krishna from the foreshore of Srisailam Reservoir through Srisailam Right Bank Canal (SRBC) system up to Gorakallu Reservoir and thereafter through an independent flood flow canal to feed nine storage reservoirs en route and utilize the stored water for irrigation during the Rabi season.

The project construction started in 2005, but the work is still in progress. This project doesn't have any assured water allocation and the Rayalaseema region people are strongly demanding the government to allocate assured water to the project.

Related Research Articles

<span class="mw-page-title-main">Godavari River Basin Irrigation Projects</span>

The Godavari River has its catchment area in seven states of India: Maharashtra, Telangana, Chhattisgarh, Madhya Pradesh, Andhra Pradesh, Karnataka and Odisha. The number of dams constructed in Godavari basin is the highest among all the river basins in India. Nearly 350 major and medium dams and barrages had been constructed in the river basin by the year 2012.

<span class="mw-page-title-main">Nagarjuna Sagar Dam</span> Dam in Andhra Pradesh & Nalgonda district, Telangana

Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Palnadu district in Andhra Pradesh and Nalgonda district in Telangana. The dam provides irrigation water to the districts of Krishna, Guntur, Palnadu, Prakasam and parts of West Godavari districts of Andhra Pradesh and also Nalgonda, Suryapet, Khammam, Bhadradri Kothagudem districts of Telangana. It is also a source of electricity generation for the national grid.

<span class="mw-page-title-main">Srisailam Dam</span> Dam in Andhra Pradesh and Telangana, India

The Srisailam Dam is constructed across the Krishna River in Nandyal district, Andhra Pradesh and Nagarkurnool district, Telangana near Srisailam temple town and is the 2nd largest capacity working hydroelectric station in India.

<span class="mw-page-title-main">Telugu Ganga project</span> Inter-state water supply project

The Telugu Ganga project is a joint water supply scheme implemented in 1980s by the then Andhra Pradesh chief minister Nandamuri Taraka Rama Rao and Tamil Nadu chief minister Maruthur Gopalan Ramachandran to provide drinking water to Chennai City in Tamil Nadu. It is also known as the Krishna Water Supply Project, since the source of the water is the Krishna River in erstwhile Andhra Pradesh. Water is drawn from the Srisailam reservoir and diverted towards Chennai through a series of interlinked canals, over a distance of about 406 kilometres (252 mi), before it reaches the destination at the Poondi reservoir near Chennai. The main checkpoints en route include the Somasila reservoir in Penna River valley, the Kandaleru reservoir, the 'Zero Point' near Uthukkottai where the water enters Tamil Nadu territory and finally, the Poondi reservoir, also known as Satyamurthy Sagar. From Poondi, water is distributed through a system of link canals to other storage reservoirs located at Red Hills, Sholavaram and Chembarambakkam.

<span class="mw-page-title-main">Jalayagnam</span>

Jalayagnam or Jala Yagnam,, is a water management program in India. It has been implemented by Chief Minister of Andhra Pradesh, India, Dr. Y. S. Rajasekhara Reddy as an election promise to the farmers of the state to bring 8.2 million acres under irrigation in five years. Y.S.R has taken required approvals from central government and NGTL. Also other required permissions for all the projects before he died. Like Site clearance, environmental clearance, R & R clearance, wildlife sanctuary clearance, forest clearance and technical advisory committee clearance. By the time he supposed to execute projects on phase manner, Y.S.R died in accident. Subsequently there was other issues like state bifurcation came to high intensity, subsequent Chief Ministers failed to give priority for Jalayagnam.

<span class="mw-page-title-main">Polavaram Project</span> Dam in Eluru district, Andhra Pradesh, India

The Polavaram Project is an under construction multi-purpose irrigation project on the Godavari River in the Eluru District and East Godavari District in Andhra Pradesh. The project has been accorded National project status by the Central Government of India. Its reservoir back water spreads up to the Dummugudem Anicut and approx 115 km on Sabari River side. Thus back water spreads into parts of Chhattisgarh and Odisha States. It gives major boost to tourism sector in Godavari Districts as the reservoir covers the famous Papikonda National Park, Polavaram hydro electric project (HEP) and National Waterway 4 are under construction on left side of the river. It is located 40 km to the upstream of Sir Arthur Cotton Barrage in Rajamahendravaram City and 25 km from Rajahmundry Airport.

The Pulichintala Project is a multi-purpose water management project for irrigation, hydropower generation, and flood control in the state of Andhra Pradesh, India. It is a crucial irrigation facility for farmers in four coastal districts: West Godavari, Krishna, Guntur, Palanadu, and Prakasam, covering over 13 lakh acres. It has 24 gates and a balancing reservoir with a capacity of 46 Tmcft at 175 feet (53 m) MSL full reservoir level (FRL).

Alimineti Madhava Reddy Project earlier known as Srisailam Left Bank Canal Project is an irrigation project located in Nalgonda district in Telangana, India.

<span class="mw-page-title-main">Rajiv Dummugudem Lift Irrigation Scheme</span>

Rajiv Dummugudem Lift Irrigation Scheme is a lift irrigation scheme under execution which are located near Dummugudem, Khammam district in Telangana, India. There are three lift irrigation schemes by names Rajiv Dummugudem lift irrigation scheme, Indirasagar Rudrammakota Dummugudem lift irrigation scheme and Dummugudem to Sagar tail pond canal project. Rajiv Dummugudem lift irrigation scheme starting at 17°54′05″N80°52′45″E is planned to supply irrigation water for 200,000 acres in Khammam and Warangal districts drawing Godavari River water from the Dummugudem pond. Indira Dummugudem lift irrigation scheme starting at 17°33′49″N81°14′49″E is planned to supply irrigation water for 200,000 acres in Khammam, Krishna and West Godavari districts drawing Godavari River water from the back waters of Polavaram reservoir.

Kosasthalaiyar River, also known as Kortalaiyar, is one of the three rivers that flow in the Chennai metropolitan area.

Handri-Neeva Sujala Sravanthi project is the longest water canal project in the region of Rayalaseema, Andhra Pradesh, India. The project was conceived to provide a reliable irrigation and drinking water supply for the region through drawing flood waters from the Srisailam reservoir.

<span class="mw-page-title-main">R. Vidyasagar Rao Dindi Lift Irrigation Scheme</span> Dam in Telangana, India

R. Vidyasagar Rao Dindi Lift Irrigation Scheme is a lift irrigation project in Nalgonda, Telangana, India. It serves Nalgonda, Mahbubnagar and Khammam areas. It was named after R. Vidyasagar Rao, a foremost irrigation expert in Telangana.

<span class="mw-page-title-main">Mylavaram Dam</span> Dam in India

Mylavaram Dam is a medium irrigation project in Andhra Pradesh, India. This barrage is located across the Penna river in Kadapa district near Mylavaram. With the completion of srisailam right bank canal, Krishna River water would be fed from Srisailam reservoir to this reservoir. The reservoir has a gross storage capacity of 9.96 tmcft.

Velugodu Reservoir is a balancing reservoir and located across the Galeru river, a tributary of Kundu River in Penner River basin, at Velugodu town in Nandyal district of Andhra Pradesh. This reservoir is part of Telugu Ganga project and mainly fed by gravity canal from back waters of Srisailam Dam through Pothireddypadu head / flow regulator located across the feeder canal. Velugodu Reservoir has gross storage capacity of 16.95Tmcft at 265 m MSL full reservoir level.

<span class="mw-page-title-main">K. C. Canal</span>

Kurnool Cuddappah Canal popularly known as K.C. Canal is an irrigation canal located in Kurnool and Kadapa districts in Andhra Pradesh, India.

Jeedipalli Reservoir is an irrigation project located in Anantapur district in Andhra Pradesh, India. It receives water from Handri-Neeva canal which draws water from Srisailam reservoir. It is located in Jeedipalli village of Beluguppa mandal.

<span class="mw-page-title-main">Nagarjuna Sagar tail pond</span> Reservoir in India

Nagarjuna Sagar tail pond is a multipurpose reservoir located 21 km downstream from the Nagarjuna Sagar Dam across the Krishna River near Satrasala in Nalgonda district, India. Its gross water storage capacity is 6 Tmcft. The reservoir water spread area extends up to the toe of the Nagarjuna Sagar dam. The project was completed by July 2014.


The Veligonda Project is an irrigation project located in Markapur, Prakasam district in Andhra Pradesh, India. When completed, the project will provide irrigational facilities to 447,000 acres and drinking water to 1.5 million people in 30 Mandals of fluoride and drought affected areas in Prakasam district, Nellore district and Kadapa district by diverting 43.5 TMC of floodwater from the Krishna River from foreshore of Srisailam Reservoir near Kollamvagu and proposed to store in Nallamalasagar Reservoir. The water for the project is drawn through two 18.8 km long tunnels across Nallamala hills. The project has been renamed to the "Poola Subbaiah Irrigation Project". It displaces around 20,946 families. The oustees have protested for enhanced compensation over the years and many have not received the compensation promised to them.

<span class="mw-page-title-main">Gandikota Reservoir</span> Irrigation project in Andhra Pradesh, India

Gandikota Reservoir is an irrigation project located across Penna River of Andhra Pradesh in the Indian state. It receives water from Galeru Nagari Sujala Sravanthi Project canal. It is located between Gandikota village and Kondapur village of Kadapa district.

Jogulamba Barrage is a proposed barrage across Krishna River with full pond level (FPL) 274m. It would be located at Veltoor village, Peddamandadi mandal, Wanaparthy district, Telangana, India. This barrage is proposed to divert 3 TMC of water via lift to Yedula Reservoir being built as part of Palamuru-Rangareddy Lift Irrigation Scheme. This would also provide water for Dindi Lift Irrigation Project and Mahatma Gandhi Kalwakurthy Lift Irrigation Scheme.

References

  1. "YSR warns people against voting back TDP to power". The Hindu . 20 April 2009. Archived from the original on 23 April 2009.
  2. "Galeru Nagari Sujala Sravanthi, JI00006" . Retrieved 17 August 2015.[ permanent dead link ]
  3. "Patriotic fervour marks Republic Day". The Hindu . 27 January 2009. Archived from the original on 29 January 2009.
  4. "CPI wants Galeru Nagari works expedited". The Hindu . 20 April 2007. Archived from the original on 4 December 2007.

14°48′28″N78°14′59″E / 14.80778°N 78.24972°E / 14.80778; 78.24972