The Leaning Juniper Wind Project is an electricity generating wind farm facility located in Gilliam County, Oregon, United States with a total generating capacity of 301.5 megawatts. It is owned by PacifiCorp and began operations in 2006. Leaning Juniper I became operational in September 2006 with 67 1.5 MW wind turbines with a capacity of 100.5 megawatts. [1] "Leaning Juniper II includes 133 GE 1.5 MW wind turbines with a capacity of 201 MW. This phase came online in 2011." [2] [3] [4] [5] [6] The Jones Canyon Substation was built as part of this project and to support other wind projects in the area. [7]
{{cite web}}: Missing or empty |title= (help)[ title missing ]{{cite web}}: Missing or empty |title= (help)[ title missing ]