Line 10 (Metrovalencia)

Last updated
Isotip de Metrovalencia.svg Line 10
Linia 10 de Metrovalencia.svg
Tranvia en Amado Granell-Montolivet.jpg
An FGV 4200 Series Tram at Amado Granell-Montolivet station  [ es ]
Overview
StatusOpened
Owner Generalitat Valenciana
Locale Valencia, Spain
Termini
Stations8
Color on mapLight green
Service
Type Tram
System Metrovalencia
Route number10
Operator(s) FGV
History
Opened17 May 2022
Technical
Track gauge 1,000 mm (3 ft 3+38 in) metre gauge
Operating speed80 km/h (50 mph)
Route map

Contents

BSicon utCONTg.svg
BSicon utXBHF-L.svg
BSicon utKXBHFa-R.svg
Alacant  [ es ]
Linia 7 de Metrovalencia.svg (at Bailén )
BSicon utCONTf.svg
BSicon utSTR.svg
BSicon utHST.svg
Russafa  [ es ]
BSicon utHST.svg
Amado Granell-Montolivet  [ es ]
BSicon PORTALg.svg
BSicon upHST.svg
Quatre Carreres  [ es ]
BSicon upBHF.svg
Ciutat Arts i Ciències-Justícia  [ es ]
BSicon upHST.svg
Oceanogràfic  [ es ]
BSicon upHST.svg
Moreres  [ es ]
BSicon uKBHFe.svg
Natzaret  [ es ]

Line 10 is a tram line which forms part of Metrovalencia in the city of Valencia, Spain. It opened on 17 May 2022. [1] From 2007 until 2014, the line was designated as line 2. However, in November 2014, this designation was given to a branch of the existing Line 1, effective from April 2015. [2] The line was then referred to as 'T2' until 1 March 2018 when it was decided to name it Line 10, to avoid confusion with existing metro lines. [3]

The first sections of the line had been built by 2007, with the part north of the city centre used by Line 6. A lack of available funds as a result of the Spanish economic crisis [4] led to work being halted on the remaining sections. In June 2017, work resumed, with funding from the European Union and regional government used to complete the southern half of the line. Construction of the central part of the line has been indefinitely halted.

Route

The route originally planned included a section between Xàtiva and Tavernes Blanques which has been suspended indefinitely. [5] The suspended section was to pass through the district of Orriols, following the current Line 6 as far as Alfauir station, entering the north-south tunnel at Pont de Fusta. Underground stops were planned in Valencia's old town at the Serrano Towers (under the old riverbed), Carme and the central market (Mercat station) before reaching the current main train station at Xàtiva.

The completed route begins at the future central station. It continues underground along Avenida del Regne de València, turning right into Luís de Santángel and Amado Granell with an underground station at Germans Maristes, reaching the surface again near the crossroads of Amado Granell/Avenida de la Plata. From there it runs on the surface to the City of Arts and Sciences, and the Natzaret neighbourhood. [6]

History

The completed Natzaret tram stop, the terminus of the line. Natzaret tram station, Valencia, Spain.jpg
The completed Natzaret tram stop, the terminus of the line.

Construction began in January 2007 [7] and the first sections of the line north of the city centre were completed later that year and put into use as part of Line 6 on 28 September 2007. The remaining sections were intended to be completed by 2010. [6] However, work was eventually halted as funding ran out. In an interview in December 2011, Isabel Bonig, the regional minister responsible, stated that completion would be impossible without external help, for example from the central government. The cost of completing the remaining sections was estimated at 160 million euros. [8]

As of May 2012, 5.2 kilometres of the southern route had been completed between Natzaret and Calle Alicante, near the main train station. This included a 2.3 km underground section. However, a half kilometre of overground track in this section had not yet been completed, including the Germans Maristes station. Between Calle Alicante and the Serranos Towers, only the Mercat station had been completed in the old town. [7]

In May 2012, accidents suffered by pedestrians on the metro bridge over the railway line near the district of Natzaret and flooding of the tunnel already completed on Avenida Regne de València forced the Council of infrastructure to ask for tenders for the maintenance, inspection and cleaning of the sections already completed. The cost of this for six months was estimated to be 264,359 euros plus VAT. [9] [10] In November 2012, Bonig admitted that it was doubtful that Line 2 would be completed in 2013 as the required funds were not yet available. [11] In January 2014, she said that completion of the line was a financial impossibility before the Valencian regional elections scheduled to be held by May 2015. [12]

In July 2015, it was estimated that 190 million euros would be required to complete the line. The cost of maintaining the sections already built was 400,000 euros per year. [13]

As of October 2015, spending on the line totalled 195 million euro. 51 million had been spent on the Mercat station with the rest on the tram line between the proposed Natzaret station and Calle Alicante. In that month, the regional government began removing the rails which had been installed on the surface to avoid traffic accidents. [14] To complete the Natzaret to Calle Alicante section, 100 million euro was needed as of August 2015. [15]

On 11 June 2017, Valencian regional president Ximo Puig announced that work on the southern half of the line between Natzaret and Xàtiva would resume. [5] The regional government will provide €30 million of funding, with another €20 million of funds coming from the European Union. [5] Only one station on the northern half of the line, Mercat Central, was completed at a cost of 27 million euros, but remains a ghost station. In March 2021, the director of Valencian railways said that the sections north of Alacant station had been abandoned and that a decision would be taken on how to use the Mercat Central station. [16] This left Line 10 unconnected with the rest of the network. To improve accessibility, the regional government announced that a foot tunnel would be built between Xàtiva and Alacant stations, predicted to open in early 2024. [17]

Passenger numbers

In the first year of operations 1.7 million people used the line. Alacant station was used by 488,204 passengers, Ciutat Arts i Ciències-Justícia by 299,898, Quatre Carreres by 262,038; Natzaret by 202,658, Amado Granell-Montolivet by 182,791, Russafa by 142,082, Oceanogràfic by 60,887, and Moreres by 46,147 passengers. [18]

Related Research Articles

<span class="mw-page-title-main">Ferrocarrils de la Generalitat Valenciana</span> Transport company in Valencia, Spain

Ferrocarrils de la Generalitat Valenciana or FGV is a Valencian public railway company which operates several 1,000 mmmetre gauge lines, in the autonomous community of Valencia, Spain.

<span class="mw-page-title-main">Ontinyent</span> Municipality in Valencian Community, Spain

Ontinyent is a municipality in the comarca of Vall d'Albaida in the Valencian Community, Spain. It is situated on the banks of the Clariano River, a tributary of the Xúquer, and on the Xàtiva–Alcoi railway. Ontinyent is near the Sierra de Mariola Natural Park.

<span class="mw-page-title-main">Valencia Airport</span> Airport in Manises

Valencia Airport, also known as Manises Airport, is the tenth-busiest Spanish airport in terms of passengers and second in the Valencian Community after Alicante. It is situated 8 km (5.0 mi) west of the city of Valencia, in Manises. The airport has flight connections to about 20 European countries and 8.53 million passengers passed through the airport in 2019.

<span class="mw-page-title-main">Metrovalencia</span> Rapid transit system in Valencia, Spain

Metrovalencia is an urban rail system serving a large part of the metropolitan area of Valencia. The network is a modern amalgamation of former FEVE narrow gauge electric-operated suburban railways. It is a large suburban network that crosses the city of Valencia, with all trains continuing out to the suburbs. It also has destinations on lines that make it more closely resemble commuter trains. The unique system combines light railway, metro and several tram operations north of the Túria riverbed park with line 4. Trains of lines 1, 3, 5 and 9 have automatic train operation (ATO) in 25.3 kilometers of underground system. Tram lines 4, 6, 8 and 10 are operated by modern trams.

High-speed railways in Spain are in operation since 1992 when the first line was opened connecting the cities of Madrid, Córdoba and Seville. Unlike the rest of the Iberian broad gauge network, the Spanish High-speed network mainly uses standard gauge. This permits direct connections to outside Spain through the link to the French network at the Perthus Tunnel. High-speed trains run on a network of high-speed rail track owned and managed by ADIF, where the dominant service is AVE while other high speed services such as Avant, Alvia, Avlo, Euromed, Ouigo España and Iryo, as well as mid-speed (Altaria) services also operate.

<span class="mw-page-title-main">La Pobla Llarga</span> Municipality in Valencian Community, Spain

La Pobla Llarga is a municipality in the comarca of Ribera Alta in the Valencian Community, Spain. Well known of the orange growth and its flourishing commerce in the 19th and 20th centuries. Currently, its inhabitants live basically on agriculture and the service sector.

<span class="mw-page-title-main">Socialist Party of the Valencian Country</span> Political party

The Socialist Party of the Valencian Country is a social-democratic political party in the Valencian Community, and is a regional branch of the national Spanish Socialist Workers' Party (PSOE).

<span class="mw-page-title-main">Gran Vía (Madrid Metro)</span> Madrid Metro station

Gran Vía is a station on Line 1 and Line 5 of the Madrid Metro, located underneath Gran Vía and Red de San Luis Plaza in the Centro district of Madrid. It is located in fare zone A.

<span class="mw-page-title-main">Madrid–Levante high-speed rail network</span>

The Madrid–Levante high-speed network is a network of high-speed rail lines that connects Madrid with the Mediterranean coast of the Levante Region, specifically with Castilla-La Mancha, the Valencian Community and the Murcia Region autonomous communities.

<span class="mw-page-title-main">Aeroport (Metrovalencia)</span>

Aeroport is a metro station of Metrovalencia network situated west of Valencia, Spain. The station is located at Valencia Manises Airport, near Avinguda d'els Arcs and the adjacent bus terminal, making it a major access point towards the Valencia city center and Valencia port.

<span class="mw-page-title-main">Alapont Group</span>

Alapont Group is a Spanish business group mainly dedicated to designing, manufacturing and installation of all types of engineering projects for lifting systems. Its headquarters are located in Alzira (Valencia). It also has offices in Madrid, Paris, Marseille, Toulouse, Alicante, Murcia, Castellón, Tarragona and distributors throughout the Spanish, French and Algerian territory.

<span class="mw-page-title-main">2019 Valencian regional election</span> Municipal election in Valencia, Spain

The 2019 Valencian regional election was held on Sunday, 28 April 2019, to elect the 10th Corts of the Valencian Community. All 99 seats in the Corts were up for election. The election was held simultaneously with the April 2019 Spanish general election. This was the first early regional election ever held in the Valencian Community, as well as the first Valencian election to not be held concurrently with other regional elections.

<span class="mw-page-title-main">Jesús (Metrovalencia)</span> Subway station in Valencia, Spain

Jesús is a station in the Metrovalencia network in the La Raiosa area of Valencia. It is served by line 1, line 2 and line 7.

The 2017–18 season of Levante UD Femenino was the 19th season of the women's team of football club Levante UD. The team was 8th in Primera División and a quarterfinalist in the Copa de la Reina.

<span class="mw-page-title-main">2023 Valencian regional election</span>

The 2023 Valencian regional election will be held on Sunday, 28 May 2023, to elect the 11th Corts of the Valencian Community. All 99 seats in the Corts will be up for election. The election will be held simultaneously with regional elections in eleven other autonomous communities and local elections all throughout Spain.

In the run up to the 2019 Spanish local elections, various organisations carried out opinion polling to gauge voting intention in local entities in Spain. Results of such polls for municipalities in the Valencian Community are displayed in this article. The date range for these opinion polls is from the previous local elections, held on 24 May 2015, to the day the next elections were held, on 26 May 2019.

In the run up to the 2015 Spanish local elections, various organisations carried out opinion polling to gauge voting intention in local entities in Spain. Results of such polls for municipalities in the Valencian Community are displayed in this article. The date range for these opinion polls is from the previous local elections, held on 22 May 2011, to the day the next elections were held, on 24 May 2015.

Blood Orange Summer Glut is a sculpture made of junk metal by Robert Rauschenberg in 1987. Belonging to the Glut series, it is part of the Institut Valencià d'Art Modern collection. It is widely recognized as one of the best pieces in this museum's collection, being exhibited in exhibitions at centers such as MAXXI in Rome, or MACA in Alicante.

Prensa Ibérica Media, S.L., or simply Prensa Ibérica, is a Spanish mass media company owned by Javier Moll. It primarily owns regional newspapers.

References

  1. "La T2 del metro de Valencia cambia de nombre". Levante-EMV . 29 April 2022.
  2. "Así serán las nuevas líneas de Metrovalencia". ABC . 27 November 2014.
  3. "La T2 del metro de Valencia cambia de nombre". Las Provincias. EFE. 1 March 2018.
  4. Álvarez, Francisco (21 May 2012). "Tranvía a la modernidad". El Mundo.
  5. 1 2 3 Zafra, Ignacio (12 June 2017). "La Generalitat reactiva las obras de la línea de metro T2 de Valencia, paralizadas desde 2011" [The Generalitat reactivates work on Valencia's T2 metro line, paralised since 2011]. El País (in Spanish). Spain. Retrieved 18 June 2017.
  6. 1 2 "Metro Valencia". Urbanrail.net. Retrieved 19 June 2012.
  7. 1 2 "La Generalitat gastará más de 1.500 euros al día en mantener la línea de metro sin trenes". Levante-EMV. 24 May 2012. Retrieved 19 June 2012.
  8. "PSPV y Compromís exigen a Barberá y Bonig que pidan dinero para la línea 2 del metro". Levante-EMV. 12 January 2012. Retrieved 19 June 2012.
  9. "Las quejas y caídas fuerzan a gastar un millón en la línea del metro sin estrenar". Las Provincias. 24 May 2012.
  10. "Sacan a licitación por 264.359 euros el mantenimiento de la línea T2". ABC. 23 May 2012.
  11. "Montoro niega 37 millones financiar metro". Levante EMT. 8 November 2012.
  12. "Bonig: 'Acabar la línea 2 del metro de Valencia es imposible e inviable esta legislatura'". El Mundo . 13 January 2014.
  13. "Hemeroteca: La línea 2, 'navegable' en Russafa". Levante-EMV. 21 July 2015.
  14. "La retirada de raíles certifica el final de la línea 2" [The removal of rails marks the end of Line 2]. Las Provincias (in Spanish). 25 October 2015. Retrieved 26 July 2016.
  15. "La finalización de la línea entre Nazaret y el centro necesita cien millones" [100 million is needed to finish the line between Natzaret and the centre]. Las Provincias (in Spanish). 31 August 2015. Retrieved 26 July 2016.
  16. Navarro Castelló, Carlos (11 March 2021). "FGV no contempla que la Línea 10 del metro atraviese el centro de València y busca alternativas para la estación fantasma del Mercat Central" [FGV doesn't plan to continue Line 10 through the centre of Valencia and is looking for alternatives for the Mercat Central ghost station]. elDiario.es (in Spanish). Spain. Retrieved 19 February 2022.
  17. "Las obras del túnel peatonal de la Línea 10 del metro empezarán este verano". Las Provincias. EFE. 9 April 2022.
  18. "Más de 1,7 millones de viajeros utilizan la L10 de Metrovalencia en su primer año" [1More than 1.7 million passengers used Line 10 in its first year]. Valencia Plaza (in Spanish). 17 May 2023. Retrieved 18 May 2023.