As of 2020, South Australia has 3 grid-connected energy storage devices, with a total capacity of 205 MW / 253.5 MWh.

Table

Project nameSponsoring companyCoordinatesCapacity (MW)Storage (MWh)TechnologyStatusNotes
Dalrymple ESCRI Battery AGL Energy 34°56′10″S137°44′38″E / 34.936°S 137.744°E / -34.936; 137.744 308Lithium Ion BatteryOperating
Hornsdale Power Reserve Neoen Australia 33°03′29″S138°32′38″E / 33.058°S 138.544°E / -33.058; 138.544 150193.5Lithium Ion BatteryOperatingWas 100MW/129MWh, until 50% expansion in July 2020. Expanded to 150MW/193.5MW. [1]
Lake Bonney Battery Energy Storage SystemInfigen Energy 37°44′20″S140°23′13″E / 37.739°S 140.387°E / -37.739; 140.387 2552Lithium Ion BatteryOperating [2] [3]
Lincoln Gap Wind Farm Battery Energy Storage SystemFluence1010Lithium Ion BatteryCommissioning [4] [5]
Baroota Pumped HydroRise Renewables2502000Pumped HydroApproved [6] [7] [8]
Cultana Pumped HydroEnergyAustralia / Arup Group2251800Pumped HydroCancelled [9] [10] [11] [12] [13] [7]
Goat Hill Pumped HydroAltura Group2301840Pumped HydroCancelled [14] [7]
Highbury Pumped HydroTilt Renewables3001350Pumped HydroCancelled [15] [16] [7]
Kanmantoo Pumped HydroAGL Energy2502000Pumped HydroCancelled [17] [18] [7]
Kingfisher Battery Power PlantLyon Group100400Lithium Ion BatteryProposed [19]
Bungama SolarEPS Energy140560Lithium Ion BatteryApproved [20]
Robertstown SolarEPS Energy2501000Lithium Ion BatteryApproved [21]
Solar River ProjectAlinta Energy100300BatteryProposed [22]
Playford BatteryGFG Alliance100200Lithium Ion BatteryCancelled [23] [24] [25]
Middleback Range Pumped HydroGFG Alliance90390Pumped HydroAssumed Cancelled [26] [27] [7]
Torrens Island BatteryAGL Energy250250Lithium Ion BatteryCommissioning [28] [29] [30] [31]


Related Research Articles

<span class="mw-page-title-main">ActewAGL</span>

ActewAGL is an Australian multi-utility joint venture company provides utility services in the Australian Capital Territory (ACT) and south-east New South Wales. The company was formed in October 2000 between the Australian Gas Light Company and ACTEW Corporation.

<span class="mw-page-title-main">AGL Energy</span> Australian electricity generator and retailer

AGL Energy Ltd is an Australian listed public company involved in both the generation and retailing of electricity and gas for residential and commercial use. It is one of the "big three" retailers in the National Electricity Market. AGL is Australia's largest electricity generator, and the nation's largest carbon emitter. In 2022, 83% of its energy came from burning coal.

<span class="mw-page-title-main">Solar power in Australia</span>

Solar power is a major contributor to electricity supply in Australia. As of September 2024, Australia's over 3.92 million solar PV installations had a combined capacity of 37.8 GW photovoltaic (PV) solar power. In 2019, 59 solar PV projects with a combined capacity of 2,881 MW were either under construction, constructed or due to start construction having reached financial closure. Solar accounted for 12.4% of Australia's total electrical energy production in 2021.

Kidston Dam also known as Copperfield Dam is a dam in Lyndhurst, Shire of Etheridge, Queensland, Australia. It is approximately 200 kilometres (120 mi) north of Hughenden and was built for the Kidston Gold Mine. The mine closed July 2001. The lake created by the dam has a capacity of 20,600 megalitres.

South Australia is a leader in utility-scale renewable energy generation, and also produces gas and uranium for electricity generation. Gas production is mostly concentrated in the Cooper Basin in the state's north-east. Gas is delivered from these fields by pipeline to users interstate and to Port Adelaide where it fuels three separate gas-fired power plants. Uranium is also mined in South Australia, though nuclear power generation is prohibited nationally. The Olympic Dam mine is the world's single largest known deposit of uranium and represents 30% of the world's total uranium resource. Many utility-scale wind farms and solar farms have been commissioned during the 21st century and geology with potential for geothermal energy has also been identified but is yet to be developed.

<span class="mw-page-title-main">Australian Renewable Energy Agency</span> Independent agency of the Australian federal government

The Australian Renewable Energy Agency (ARENA) is an independent agency of the Australian federal government, established in 2012 to manage Australia's renewable energy programs, with the objective of increasing supply and competitiveness of Australian renewable energy sources.

<span class="mw-page-title-main">Electricity sector in Australia</span>

The electricity sector in Australia has been historically dominated by coal-fired power stations, but renewables are forming a rapidly growing fraction of supply. In 2021, Australia's electricity production reached 265 TWh, with coal accounting for 52.9% and natural gas for 18.8%. Renewable sources, comprising solar, wind, hydro, and bioenergy with waste, collectively made up 26.7% of the total electricity generation mix.

<span class="mw-page-title-main">Tilt Renewables</span> Australian utilities company

Tilt Renewables Pty Ltd is an Australian electricity generation company. It was previously dual listed on the New Zealand stock exchange and Australian stock exchange. As of 2022, the Powering Australian Renewables has merged with Tilt Renewables following a complex acquisition and merger, making it the largest private developer and generator of renewable electricity in Australia.

<span class="mw-page-title-main">Broken Hill Solar Plant</span>

The Broken Hill Solar Plant, which became operational in December 2015, is a 53 megawatt farm located near Broken Hill in western New South Wales, Australia. It is associated with the Nyngan Solar Plant, making the total capacity of the combined plants 155 megawatts.

Hornsdale Power Reserve is a 150 MW grid-connected energy storage system owned by Neoen co-located with the Hornsdale Wind Farm in the Mid North region of South Australia, also owned by Neoen.

The Lincoln Gap Wind Farm is a wind farm in the vicinity of Lincoln Gap on northeastern Eyre Peninsula in South Australia, Australia. It consists of 59 wind turbines and generates a total of 212 MW of electricity. Construction began in late 2017 and was initially expected to be commissioned in late 2018. Construction was delayed in July 2018 when unexploded ordnance was discovered on the site, left from historic military testing. The site is not far from the Cultana Training Area.

<span class="mw-page-title-main">Tailem Bend Solar Power Farm</span>

The Tailem Bend Solar Power Farm is a solar power farm near Tailem Bend in South Australia. It has 108MW of generation capacity but is limited to supplying 95MW to the national grid. An additional 85MW is proposed in stage 2. It is developed and owned by Singapore-based Vena Energy, a new name for the former Equis Energy following acquisition by Global Infrastructure Partners in January 2018. The output will be sold to Snowy Hydro for retail sale under its Lumo Energy brand. Stage 2 is also expected to provide battery storage.

Solar River Project is a proposed photovoltaic power station planned to be built near Robertstown in South Australia. The project received development approval from the Government of South Australia in June 2018 and was expected to start construction early in 2019. However, as of November 2021, the project was still proposed to be constructed, but work on site was not expected until at least the second half of 2022.

<span class="mw-page-title-main">Tesla Megapack</span> Large-scale battery energy storage product manufactured by Tesla Energy

The Tesla Megapack is a large-scale rechargeable lithium-ion battery stationary energy storage product, intended for use at battery storage power stations, manufactured by Tesla Energy, the energy subsidiary of Tesla, Inc.

Tasmania, as an advanced economy with a globally high standard of living, uses a great deal of energy. Distinctive features of energy use in Tasmania include the high fraction of hydroelectricity usage, the absence of coal-fired electrical generation, relatively light usage of natural gas, particularly for domestic use, and a wide use of domestic wood-burning stoves. Energy production through hydroelectricity has been politically contentious, and conflicts over Tasmanian hydroelectric projects were integral to the formation of Green parties in Australia and across the world.

Shell Energy Australia provides gas, electricity, environmental products and energy productivity services to commercial and industrial customers.

References

  1. "Hornsdale Power Reserve | South Australia's Big Battery". hornsdalepowerreserve.com.au. Archived from the original on 18 October 2020. Retrieved 17 October 2020.
  2. "Lake Bonney Battery Energy Storage System - Infigen Energy". www.infigenenergy.com. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
  3. Parkinson, Giles (8 May 2019). "Tesla big battery at Lake Bonney wind farm faces connection delays". RenewEconomy. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
  4. "Lincoln Gap Wind Farm Battery Energy Storage System". Enerven. Archived from the original on 9 March 2021. Retrieved 24 March 2021.
  5. Parkinson, Giles (24 January 2018). "Construction begins on 212MW wind farm and storage project in S.A." RenewEconomy. Archived from the original on 3 March 2021. Retrieved 24 March 2021.
  6. "Baroota Pumped Hydro Project | Rise Renewables". Archived from the original on 4 July 2019. Retrieved 5 August 2019.
  7. 1 2 3 4 5 6 Parkinson, Giles (12 November 2021). "One pumped hydro project still standing as South Australia heads to 100pct wind and solar". RenewEconomy. Retrieved 14 November 2021.
  8. "Baroota Pumped Hydro". UPC/AC Renewables. Retrieved 14 November 2021.
  9. "Cultana Pumped Hydro Energy Storage Project ARENA Knowledge Sharing Report (Public)" (PDF). Archived (PDF) from the original on 13 November 2020. Retrieved 14 November 2020.
  10. "World's largest saltwater pumped hydro for South Australia". Archived from the original on 5 August 2019. Retrieved 5 August 2019.
  11. "Australia's Pumped Hydro Prospects "Destroy" Wind And Solar Arguments". Solar Quotes Blog. 25 March 2019. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
  12. "Cultana Pumped Hydro Project". EnergyAustralia. Archived from the original on 18 June 2019. Retrieved 5 August 2019.
  13. "Cultana Pumped Hydropower Project, Port Augusta, Australia". Archived from the original on 5 August 2019. Retrieved 5 August 2019.
  14. "Goat Hill Pumped Storage Hydro Project". Altura Group. Archived from the original on 22 July 2019. Retrieved 5 August 2019.
  15. "Highbury Pumped Hydro Energy Storage". Tilt Renewables. Archived from the original on 22 July 2019. Retrieved 5 August 2019.
  16. "Adelaidenow.com.au | Subscribe to The Advertiser for exclusive stories". www.adelaidenow.com.au. Archived from the original on 3 September 2021. Retrieved 31 May 2020.
  17. Parkinson, Giles (16 April 2019). "AGL plans 250MW pumped hydro plant in South Australia as replacement for gas". RenewEconomy. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
  18. "AGL, Hillgrove Resources scrap 250 MW pumped hydro plans". pv magazine Australia. Archived from the original on 21 May 2020. Retrieved 31 May 2020.
  19. "Kingfisher Battery Power Plant | Lyon Group" . Retrieved 5 August 2019.
  20. Vorrath, Sophie (19 July 2019). "Fourth huge solar and battery project approved for South Australia". RenewEconomy. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
  21. Vorrath, Sophie (4 July 2019). "Huge solar and battery project wins development approval in South Australia". RenewEconomy. Archived from the original on 18 August 2019. Retrieved 5 August 2019.
  22. Vorrath, Sophie (18 July 2019). "Alinta signs up for huge solar and battery project in South Australia". RenewEconomy. Archived from the original on 18 July 2019. Retrieved 5 August 2019.
  23. Vorrath, Sophie (19 July 2019). "Fourth huge solar and battery project approved for South Australia". RenewEconomy. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
  24. Parkinson, Giles (28 May 2019). "Gupta seeks regulatory approval for 135MW battery near Port Augusta". RenewEconomy. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
  25. Parkinson, Giles (8 June 2021). "Gupta's GFG Alliance cancels plans for Cultana solar farm and Playford battery". RenewEconomy. Archived from the original on 8 June 2021. Retrieved 3 September 2021.
  26. Parkinson, Giles (1 February 2019). "Gupta challenges coalers with $1 billion plus solar and storage plan". RenewEconomy. Archived from the original on 5 August 2019. Retrieved 5 August 2019.
  27. "Cultana Solar Farm eyes project kick-off". Energy Magazine. 1 June 2020. Archived from the original on 26 September 2020. Retrieved 26 March 2021.
  28. "AGL unveils plans for grid-scale battery in South Australia". AGL.com.au. 16 November 2020. Archived from the original on 3 April 2021. Retrieved 24 March 2021.
  29. "AGL prepares for construction of grid-scale battery at Torrens Island". AGL.com.au. 24 March 2021. Archived from the original on 2 April 2021. Retrieved 24 March 2021.
  30. Parkinson, Giles (23 March 2021). "AGL gives green light to 250MW Torrens big battery in South Australia". RenewEconomy. Archived from the original on 24 March 2021. Retrieved 24 March 2021.
  31. https://reneweconomy.com.au/tesla-big-battery-loses-biggest-title-as-torrens-island-finally-ready-to-charge-up/