The Network Route Utilisation Strategy (Network RUS) is a Route Utilisation Strategy (RUS) produced by Network Rail (NR). The Network RUS is one of only two (the Freight RUS is the other) which have the perspective of the network as whole; most of NR's RUSs are geographical, mainly regional, in nature. Uniquely the Network RUS is divided into four separate workstreams each of which has its own management team and documentary outputs, effectively an RUS in its own right.
Network Rail (NR) has an obligation, transferred from the abolished Strategic Rail Authority, to periodically produce Route Utilisation Strategy (RUS) documents. The original programme was approved by the Office of Rail Regulation (ORR) in June 2006; under an early version of the programme all but two RUSs were scheduled to be completed by the end of Control Period 3 (CP3), 31 March 2009. The programme and its timescale were reviewed by NR and ORR at regular intervals. Despite this the delivery timescales continually slipped: at the end of CP3 no fewer than 9 remained incomplete, despite the fact that funding for infrastructure developments in CP4 was largely set.
Network Rail is the owner and infrastructure manager of most of the railway network in Great Britain. Network Rail is an arm's length public body of the Department for Transport with no shareholders, which reinvests its income in the railways.
RUSs are established by the Office of Rail Regulation (ORR) unless the latter objects within 60 days. As at mid-March 2010 two workstreams had been published and established (the Scenarios & Long Distance Forecasts workstream [1] and the Electrification workstream [2] ); they are consequently included in Network Rail's map as established, [3] and it is expected that the others will be included as they are published and established.
By definition the geographic scope is the whole Network Rail network.
This workstream was published [4] in June 2009. Originally it was to be called the Review of RUSs/Long Distance train statement, and an appropriate scoping document was accordingly published on the website. By shortly before the publication of the draft document, the perspective had been changed to Long distance services and Scenarios, and continued to be described as such on the Network Rail map even after publication of the draft, which like the final version had the above title. By the time of the publication of the draft the original scoping document was removed from the website, and not replaced, with no explicit explanation.
Unlike other RUSs and the electrification workstream this workstream does not consider any specific rail interventions. Instead the main focus of the document is to promote the concept of the use of 'Scenarios' to help determine possible variations in future demand for rail travel, in particular for trips over 50 miles. In contrast to other RUSs there is no consideration of short-term (CP4) or medium-term factors (CP5); the 'long-term' in passenger demand focussed on is overwhelmingly the year 2036, which is well beyond the time horizon of other RUSs (a single table suggests passenger growth rates to 2021); freight growth is considered to 2031.
As with other RUSs, the Scenarios workstream RUS invited responses from interested parties. The NR website acknowledged a number of responses, including the Office of Rail Regulation (ORR). [5]
This workstream was published on 28 October 2009, having been issued as a draft for consultation in May 2009.
The workstream identified four types of 'gap' potentially fulfilled by further electrification:
Four tables provide a matrix of potential lines to be electrified under one or more of the above types. Possible mainly passenger lines are ranked into 6 tiers (1 being the best case, 6 the worst).
To some extent the final conclusions of the workstream were overtaken during consultation by the Government's announcement of the approval of the electrification of major parts of the Great Western Main Line and the Liverpool-Chat Moss-Manchester line. [6] However, no further announcements have been made as regards the two further main projects recommended by the workstream, the Midland Main Line and the Gospel Oak to Barking Line.
The Midland Main Line is a major railway line in England from London to Sheffield in the north of England. The line is under the Network Rail description of Route 19; it comprises the lines from London's St Pancras station via Leicester, Derby/Nottingham and Chesterfield in the East Midlands.
A Final remit was agreed [7] in 2007.
According to the Network Rail website, a draft for consultation was previously expected in November 2009. As at early November 2009, the website stated that the date of publication of both the draft and the final version were "To be determined"; as at mid-February 2010 the projected publication date is "Early 2011" and its status is "In process".
A publication that appears to fulfill part of the Stations remit is included on the NR website under the Other publications link of the Network RUS page. [8]
A Final remit was agreed [9] in 2007.
As at early November 2009, the NR website stated that the date of publication of both the draft and the final version were "To be determined"; as at mid-February 2010 the projected publication date is "early 2011" and its status is "In process".
The railway system in Great Britain is the oldest in the world. The first locomotive-hauled public railway opened in 1825, which was followed by an era of rapid expansion. Whilst the network suffered gradual attrition from about 1900 onwards, and more severe rationalisation in the 1950s and 1960s, the network has again been growing since the 1980s. The UK was ranked eighth among national European rail systems in the 2017 European Railway Performance Index for intensity of use, quality of service and safety performance.
The Office of Rail and Road (ORR) is a non-ministerial government department responsible for the economic and safety regulation of Britain's railways, and the economic monitoring of Highways England.
The Canada Dock Branch is a 4-mile 59 chain long railway line in Liverpool, England. The line's route is from the large Edge Hill rail junction in the east of Liverpool to Seaforth Dock to the north. The line was originally built by the London and North Western Railway terminating at Canada Dock, with a later branch extension added to Alexandra Dock and links onto the MDHC railway lines. The line is not electrified.
The City Line is the name given to local and regional stopping rail services out of the main line platforms of Liverpool Lime Street railway station. It appears on some maps of the Merseyrail network as red, and covers the Liverpool–Wigan line, the two routes of the Liverpool–Manchester lines, and the Blackpool–Liverpool_line. Once branded under the Merseyrail name, the routes are operated by Northern on behalf of Merseytravel. Unlike the Merseyrail network, which is a partially underground rapid transit/commuter rail system with largely isolated infrastructure, the City Line serves a larger area and uses main line routes shared with regional, national, and high-speed services.
The Cross London Route Utilisation Strategy (CLRUS) was the second of the route utilisation strategies (RUS) published by Network Rail (NR), in August 2006. It was included in a map published by the Office of Rail Regulation as established in May 2007.
The Freight Route Utilisation Strategy is a Route Utilisation Strategy in the United Kingdom, published by Network Rail in March 2007. It is one of only two which have the perspective of the network as whole. It was included in a map published by the Office of Rail Regulation (ORR) as established in May 2007. As with other RUSs, the Freight RUS took into account a number of responses to a Draft for Consultation, including those from the ORR.
The South West Main Line Route Utilisation Strategy was the first Route Utilisation Strategy (RUS) to be produced under the new Network Rail regime. As such it did not completely adhere to the format that has subsequently become 'standard', and needs to be read in conjunction with the prior Draft for Consultation. It was published in May 2006 and was included in a map published by the Office of Rail Regulation as established in May 2007.
The Scotland Route Utilisation Strategy is a Route Utilisation Strategy, published by Network Rail in March 2007, the third RUS to be published. The railways in Scotland are divided into three strategic routes, namely Route 24, Route 25 (Highlands) and Route 26 together with parts of Route 8 and Route 18. The three strategic routes form the scope of Network Rail's Scotland Route Utilisation Strategy. Separate RUSs for the ECML and WCML encompass the relevant parts of routes 8 and 18. The Edinburgh Crossrail service, which provides a direct route between Stirling, Dunblane and Bathgate in the west to Newcraighall in the east, operates over part of the ECML east of Edinburgh Waverley to Portobello Junction.
The North West Route Utilisation Strategy (NWRUS) is a Route Utilisation Strategy, published by Network Rail in May 2007. It was the fifth RUS to be produced. It was included in a map published by the Office of Rail Regulation as established in May 2007. It was the first of no fewer than 5 RUSs which cover specific routes in the north-west of England; the others are the Lancashire & Cumbria RUS, the Yorkshire & Humber RUS, the Merseyside RUS, and the West Coast Main Line RUS. In particular it "broadly covers the Manchester journey to work area, the City lines into Liverpool Lime Street and routes from Manchester to Kirkby, Southport and Blackpool", corresponding to Network Rail's then Route 20 - North West Urban.
The Greater Anglia Route Utilisation Strategy is a Route Utilisation Strategy published by Network Rail in December 2007. It was the sixth RUS to be produced. The area covered includes the whole of Route 5 West Anglia (WA) and Route 7 Great Eastern (GE), which both focus for passenger purposes on London Liverpool Street, and the London Fenchurch Street services from Route 6. As with other RUSs, the Greater Anglia RUS took into account a number of responses, including the Office of Rail Regulation (ORR).
The East Coast Main Line Route Utilisation Strategy (RUS), published by Network Rail in February 2008, was the seventh RUS.
Network Rail's (NR) South London Route Utilisation Strategy (SLRUS), published in March 2008 (SLRUS) was the eighth Route Utilisation Strategy to be produced. By default, RUSs are established by the Office of Rail Regulation (ORR) unless the latter objects within 60 days. The RUS is included in NR's map as established.
The Lancashire and Cumbria Route Utilisation Strategy is a Route Utilisation Strategy, published by Network Rail on 29 August 2008 It was the ninth RUS to be produced.
The Wales Route Utilisation Strategy is a Route Utilisation Strategy, published by Network Rail in November 2008. It was the tenth RUS to be produced. By default, RUSs are established by the Office of Rail Regulation (ORR) unless the latter objects within 60 days. A letter formally confirming establishment was sent by ORR to Network Rail in January 2009, and the RUS is included in Network Rail's map as established.
London TravelWatch is a statutory British consumer organisation that campaigns for improvements to transport in London. It deals with all complaints from passengers using any Transport for London modes including some cycling and pedestrian issues, Victoria coach station, passengers using Eurostar, the Heathrow Express rail service to Heathrow Airport and some aspects of rail travel including issues arising from the stations. It also deals with all rail complaints that are outside of the scope of the rail ombudsman and within its geographical remit. It is therefore in consumer representation terms an "appeals body". It is funded by the London Assembly and was established in its current form in July 2000.
The Merseyside Route Utilisation Strategy is a Route Utilisation Strategy published by Network Rail in March 2009. It was the eleventh RUS to be produced. By default, RUSs are established by the Office of Rail Regulation (ORR) unless the latter objects within 60 days. The RUS is included in Network Rail's map as established.
The Yorkshire and Humber Route Utilisation Strategy is a Route Utilisation Strategy (RUS), published by Network Rail in July 2009; it was the twelfth RUS to be completed, not counting the partially completed Network RUS.
The Kent Route Utilisation Strategy (KRUS) is a Route Utilisation Strategy (RUS), published by Network Rail (NR) in January 2010. it was the thirteenth RUS to be completed, not counting the partially completed Network RUS. By default, RUSs are established by the Office of Rail Regulation (ORR) unless the latter objects within 60 days; and the ORR have confirmed no objection to the establishment of the Kent RUS.
The Sussex Route Utilisation Strategy is a Route Utilisation Strategy (RUS), published by Network Rail (NR) in January 2010. It was the fourteenth RUS to be completed, not counting the partially completed Network RUS. By default, RUSs are established by the Office of Rail Regulation (ORR) unless the latter objects within 60 days, and the ORR have confirmed no objection to the establishment of the Sussex RUS.