Formerly | North Wales Power Company |
---|---|
Company type | Public company |
Industry | Electricity supply |
Founded | 1 August 1923 |
Defunct | 31 March 1948 |
Fate | Nationalisation |
Successor | British Electricity Authority, Merseyside and North Wales Electricity Board |
Area served | North Wales, Cheshire and Staffordshire |
Services | Electricity supply |
The North Wales and South Cheshire Joint Electricity Authority supplied electricity to an extensive area of North Wales and parts of Cheshire and Shropshire. As constituted in 1923 the Joint Authority transferred all its rights to distribution of electricity in the area to the North Wales Power Company. The authority was effectively the power company. Both the joint authority and the power company were abolished in 1948 upon the nationalisation of the British electricity supply industry.
The North Wales and South Cheshire Joint Electricity Authority was the first Joint Electricity Authority to be constituted, on 1st August 1923, under the provisions of the Electricity (Supply) Act 1919 (9 & 10 Geo. 5. c. 100), and the Electricity (Supply) Act 1922 (12 & 13 Geo. 5. c. 46). [1] The JEA transferred some powers, rights and obligations to the North Wales Power Company, this included all rights of distribution of electricity in the area. From this time the JEA was effectively the North Wales Power Company. [1] The Power company developed several hydro-power stations and extended transmission lines to towns and industrial areas. [2]
The North Wales Power Company Limited was registered on 30 July 1903 as the North Wales Power and Traction Company Limited. Its business was as engineers, suppliers of electricity, and owners of tramways and railways. [3] It ran 13¼miles of 1ft 11½ gauge tramways in Llandudno & Colwyn Bay, and Wrexham and district. [1] [3] The company’s electricity was generated by hydro-electricity. At Cwm Dwli water was drawn from Lake Llydaw and flowed through tunnels and steel pipes to the power station in the Gwynant valley. In 1915 electricity was generated by four Pelton wheels coupled to four 1.5 MW 3-phase alternators. Electricity was supplied to quarries and in bulk to long distance consumers. [3]
The North Wales and South Cheshire Electric District Order was confirmed on 1 August 1923. The district included Anglesey, Caernarvonshire, Denbighshire, Flintshire, Merionethshire, Montgomeryshire, and parts of Cheshire, Shropshire, and Cardegoneshire. [2] The area served was about 1,000 square miles. At its first meeting on 12 October 1923 the joint electricity authority transferred to the company certain powers, rites and obligations regarding the generation and supply of electricity. [1]
In 1924 the North Wales Company issued stock to the value of £2.2 million. [2] This was used to construct several major projects: to build the Maentwrog power station with an initial capacity of 16,000 horsepower (12 MW); to increase the catchment area of the Cwm Dyli power station; to extend the transmission system to Crewe, to industrial districts, and to coastal towns. [2]
In 1929 the British Power & Light Corporation Limited acquired a controlling interest in the North Wales Power Company. [4]
The engineering and financial information on the North Wales Company in 1923 and 1937 is shown in the table.
Year | 1923 | 1937 |
Turbo-generators, MW | 4 × 1.0 1 × 1.5 | (see table below) |
Maximum load, kW | 6,000 | 35,700 |
Total connections, kW | 11,000 | 73,724 |
Electricity generated, MWh | 6,691 | 36,789 |
Electricity purchased, MWh | 3,248 | 108,378 |
Electricity sold, MWh | 8,459 | 127,844 |
Gross surplus, £ | 31,365 | 261,386 |
Number of consumers | 3,435 |
The technical and operational data for the constituent generating stations is shown in the tables. [6] [4] [7]
Electricity sent out MWh | |||||
Station name | Water turbines in 1937, MW | 1937 | 1946 | 1947 | 1948 |
---|---|---|---|---|---|
Cwm Dyli | 2 × 1.0, 1 × 1.5, 1 × 3.0 | 9,582 | 8,904 | 12,176 | 8,924 |
Dolgarrog No. 1 | 4 × 1.0 (DC) | 1,421 | 52,443 | 42,037 | 59,468 |
Dolgarrog No. 2 | 1 × 1.2, 2 × 5.0, 1 × 6.5 | 35,351 | |||
Maentwrog | 4 × 6.0 | 30,188 | 34,181 | 29,899 | 45,645 |
Name | Year commissioned | Head of water | Water wheels | Alternators MW | Output MW |
---|---|---|---|---|---|
Cwm Dyli | 1906 | 1,150 feet | 4 (total 9,000 HP, 6.7 MW), | 2 × 1.0 1 × 1.5 1 × 3.0 | 5.0 |
Dolgarrog No. 1 | 1909 | 800 feet 1,075 feet | 1 | 1.2 | |
Dolgarrog No. 2 | 1925 | 3 | 1 × 6.5 2 × 5.0 | 18.0 | |
Maentwrog | 1928 | 620 feet | 4 × 6.0 | 24.0 |
The North Wales and South Cheshire Joint Electricity Authority and the North Wales Power Company Limited were both abolished on 31 March 1948 when the British Electricity Industry was nationalised. The generating plant and transmission systems devolved to the British Electricity Authority and the distribution systems to the Merseyside and North Wales Electricity Board. [1]
Southampton Power Station was a coal fired power station built by Southampton Corporation that operated between 1904 and 1977.
The Electricity (Supply) Act 1922 was an Act of the Parliament of the United Kingdom which amended the law on the supply of electricity. This Act was construed as one with the Electricity (Supply) Acts 1882 to 1919, and was cited as the Electricity (Supply) Acts 1882 to 1922. It established the powers of electricity authorities to borrow money for the construction and operation of electricity generating and transmission systems; it amended some Sections of the Electricity (Supply) Act 1919 relating to electricity districts and joint electricity authorities; it empowered electricity authorities to provide a supply to railway companies; and established methods of reclaiming expenses of various statutory bodies.
The Yorkshire Electric Power Company was founded in 1901 to provide a supply of electricity to commercial and industrial users throughout the West Riding of Yorkshire, England. It built and operated power stations and constructed overhead electric power lines across an area of 1,800 square miles (4662 km2). The company’s power stations were at Thornhill, Barugh, Ferrybridge and Mexborough. The company promoted and stimulated demand for electric power and it was financially profitable for its shareholders. The Yorkshire Electric Power Company was dissolved in 1948 when the British electricity supply industry was nationalised. Its power stations were vested in the British Electricity Authority and its electricity distribution and sales functions were taken over by the Yorkshire Electricity Board.
Central Power House (Hanley) supplied electricity to the county borough and later city of Stoke-on-Trent, England and the surrounding area from the 10th April 1913 to the 1960s. The power station was initially owned and operated by Stoke-on-Trent Corporation, then by the North West Midlands Joint Electricity Authority prior to the nationalisation of the British electricity supply industry in 1948. The power station operated in conjunction with power stations at Burslem, Hanley (original smaller power station on the same site as the Central Power House), Stoke-upon-Trent and Longton.
Dolgarrog Power Station in Dolgarrog, Wales was originally built in 1907 as part of an aluminium smelting plant. It uses water turbines to drive electricity alternators. Public supplies began in 1922 when power lines were constructed to transmit electricity from the power station to Colwyn Bay, Conwy and Llandudno. The station was vested in the British Electricity Authority and its successors following nationalisation in 1948. It is currently (2021) operated by RWE NPower UK.
Maentwrog power station was built by the North Wales Power Company and supplied electricity to North Wales, Deeside and Cheshire. It exploits the water resources of the Snowdonia mountains, using water turbines to drive electricity alternators. The 24 MW station has been owned by several organisations; since 2004 it has been owned by the Nuclear Decommissioning Authority. It generates an annual electricity output of 60.6 GWh.
Aberystwyth power station supplied electricity to the town of Aberystwyth from 1895 to the 1970s. The oil-engine station was operated by a succession of private and public owners including Aberystwyth Corporation prior to the nationalisation of the electricity industry in 1948. The power station, with an ultimate capacity of 5 MW, was redeveloped as demand for electricity grew and old plant was replaced.
The Macclesfield group power stations are three relatively small electric power stations at Alderley Edge, Buxton, and Macclesfield, England. They supplied electricity to their respective towns from 1890s to the 1960s. The oil-engine stations were operated by a succession of private and public owners prior to the nationalisation of the British electricity industry in 1948. The power stations were redeveloped as a group in the 1950s as demand for electricity grew and old plant was replaced.
Burnley power station supplied electricity to the town of Burnley, Lancashire from 1893 to 1958. The electricity station was owned and operated by Burnley Corporation prior to the nationalisation of the British electricity industry in 1948. It was redeveloped as demand for electricity grew and old plant was replaced, and had an ultimate generating capacity of 8 MW in the 1920s. The station closed in 1958.
Nelson power station supplied electricity to the town of Nelson, Lancashire and the surrounding area from 1892 to 1960. The power station was owned and operated by Nelson Corporation prior to the nationalisation of the British electricity supply industry in 1948. It was redeveloped in 1922 to 1925 to meet the increased demand for electricity.
Stockport power station supplied electricity to the town of Stockport, Cheshire and the surrounding area from 1899 to 1976. The power station was owned and operated by Stockport Corporation prior to the nationalisation of the British electricity supply industry in 1948. It was redeveloped several times to meet the increased demand for electricity.
Warrington power station supplied electricity to the town of Warrington, Lancashire and the surrounding area from about 1900 to 1979. The power station was initially developed by the Warrington and District Electric Light and Power Company Limited, this was taken over by Warrington Corporation, which operated the power station prior to the nationalisation of the British electricity supply industry in 1948. It was redeveloped several times to meet the increased demand for electricity.
The Shropshire, Worcestershire and Staffordshire Electric Power Company was an electricity generating and supply organisation that operated in the West Midlands and South Wales. It was established in 1903 and was dissolved as a consequence of the nationalisation of the British electricity supply industry in 1948.
The Market Drayton Electric Light and Power Company Limited was established in 1902 to provide electricity to Market Drayton, Shropshire, England and the surrounding area. It was abolished upon nationalization of the British electricity supply industry in 1948.
The Leicestershire and Warwickshire Electric Power Company Limited provided electricity to consumers in parts of the English midland counties of Leicestershire and Warwickshire. Electricity was supplied by the company from 1913 until the nationalization of the electricity supply industry in 1948.
The North Metropolitan Electric Power Supply Company provided electricity to the northern suburbs of London and to parts of Hertfordshire and Essex. Supplies of electricity commenced in 1907 and continued until the company was abolished in 1948 when the British electricity supply industry was nationalized.
The West Midlands Joint Electricity Authority was a United Kingdom statutory body established in 1925 with the responsibility to "provide or secure the provision of a cheap and abundant supply of electricity” in the Midland counties of Shropshire, Staffordshire and Worcestershire. The Authority acquired electricity in bulk from electricity undertakings for distribution, and operated power stations. The Authority was abolished upon nationalisation of the British electricity industry in 1948.
The North West Midlands Joint Electricity Authority was a United Kingdom statutory body established in 1929 with the responsibility to "provide or secure the provision of a cheap and abundant supply of electricity” in parts of the Midland counties of Shropshire, Staffordshire and Cheshire. The Authority acquired electricity in bulk from electricity undertakings for distribution, and operated power stations. The Authority was abolished upon nationalisation of the British electricity industry in 1948.
Joint electricity authorities were statutory bodies established in the United Kingdom in the 1920s which aimed to provide a cheap and abundant supply of electricity to consumers. This was achieved by constructing and operating power stations, and electricity transmission and distribution systems on a coordinated basis in regional Electricity Districts overseen by Joint Electricity Authorities.
The British Power and Light Corporation Limited, also known as the British Power & Light Corporation (1929) Limited was registered in 1929 to acquire a controlling interest in electricity undertakings in North Wales; East Suffolk; South Somerset; Trent Valley and High Peak; West Hampshire; and Ringwood, Hampshire. The corporation operated for 19 years and was abolished upon the nationalisation of the British electricity supply industry in 1948.