Construction of the Pequest Fill near Tranquility, New Jersey, nears completion in summer 1911. Looking east from where a signal bridge at the east end of Greendell Siding will be located, the edge of the borrow pit is visible to the right. Andover Station will be built at the far end of the Fill, where the right-of-way begins to curve to the right, about three miles away. Cut-Off Construction - 1911.jpg
Construction of the Pequest Fill near Tranquility, New Jersey, nears completion in summer 1911. Looking east from where a signal bridge at the east end of Greendell Siding will be located, the edge of the borrow pit is visible to the right. Andover Station will be built at the far end of the Fill, where the right-of-way begins to curve to the right, about three miles away.
The most familiar view of the Pequest Fill to those who travel northwest New Jersey is in Andover, where US Route 206 passes under it. In this view looking north, the new Andover Station on the Lackawanna Cut-Off will be about a half-mile to the right (east). Route 206 going under Pequest Fill.jpg
The most familiar view of the Pequest Fill to those who travel northwest New Jersey is in Andover, where US Route 206 passes under it. In this view looking north, the new Andover Station on the Lackawanna Cut-Off will be about a half-mile to the right (east).

The Pequest Fill is a large railroad embankment on the Lackawanna Cut-Off in northwestern New Jersey, touted at its 1911 completion as the largest railroad fill in the world. [1] [2]

Thought to have been the brainchild of Lackawanna Railroad president William Truesdale, the Pequest Fill was one of several remarkable features of the Lackawanna Cut-Off, a project that aimed to reduce the length, grades, and curvature of the railroad's main line over the hilly terrain between Port Morris, New Jersey, and the Delaware Water Gap. During planning, Truesdale rejected 13 prospective routes that skirted the Pequest Valley in favor of a bold, costly, yet operationally superior route across it. In order to maintain a more or less level grade across the valley, a fill of enormous proportions would be required to connect Andover and Green Township. [3] [2]

Planning for the route continued through 1906; the final survey map for the line was completed on September 1, allowing the railroad to proceed with eminent domain and hire contractors. The 28.6-mile (46-km) Cut-Off project was divided among seven contractors. Whether by design or happenstance, the responsibility for building the Pequest Fill was divided roughly in half between David W. Flickwir to the east and Walter H. Gahagan to the west. [2]

Construction on the Cut-Off began August 1, 1908. The foundation for the three-mile (4.8 km) Pequest Fill was constructed of 6.625 million cubic yards of fill material, far more than could be provided by classic cut-and-fill techniques. (These require a relatively even balance between the amount of dirt and rock material that is removed from an area of the right-of-way to provide a cut through a hill and the needs of a nearby fill.) So the railroad bought 760 acres of farmland and dug it out to a depth of about 20 feet (6 m). Construction wrapped up in autumn 1911. [2]

The Pequest Fill crosses four roadways (US Route 206 and three county roads), two railroad rights-of-way, the Sussex Branch and the Lehigh and Hudson River Railway, and one river, the Pequest River. There are no overhead bridges or grade crossings. The east end of Greendell Siding continued onto the Pequest Fill for a short distance; otherwise, the railroad was two tracks wide on the fill. The Cut-Off saw rail service between 1911 (when the Lackawanna Cut-Off opened) to 1979 (when Conrail discontinued rail service). In between, the Lackawanna Railroad operated trains over the Pequest Fill for 49 years; the Erie Lackawanna Railroad for 16 years; and Conrail for three years. After discontinuing service, Conrail sought abandonment of the line and eventually removed the tracks in 1984.

In 1985, the Cut-Off was sold to a land developer who proposed to use the entire Pequest Fill for the now-defunct Westway Project in New York City. That never occurred; by 2001, the entire Cut-Off had been acquired by the State of New Jersey.

In 2011, NJ Transit received approval to re-lay track between Port Morris Junction and Andover; as of 2023, the line is slated to open for rail service in 2026 or 2027. This Lackawanna Cut-Off Restoration Project also envisions replacing track westward across the Pequest Fill, but no funding has been secured and no completion date projected.

Related Research Articles

<span class="mw-page-title-main">Delaware, Lackawanna and Western Railroad</span> Former U.S. Class 1 railroad

The Delaware, Lackawanna and Western Railroad, also known as the DL&W or Lackawanna Railroad, was a U.S. Class 1 railroad that connected Buffalo, New York, and Hoboken, New Jersey, and by ferry with New York City, a distance of 395 miles (636 km). The railroad was incorporated in Pennsylvania in 1853, and created primarily to provide a means of transport of anthracite coal from the Coal Region in Northeast Pennsylvania to large coal markets in New York City. The railroad gradually expanded both east and west, and eventually linked Buffalo with New York City.

<span class="mw-page-title-main">Lehigh and Hudson River Railway</span> Former U.S. Class 1 railway

The Lehigh and Hudson River Railway (L&HR) was the smallest of the six railroads that were merged into Conrail in 1976. It was a bridge line running northeast–southwest across northwestern New Jersey, connecting the line to the Poughkeepsie Bridge at Maybrook, New York, with Easton, Pennsylvania, where it interchanged with various other companies.

<span class="mw-page-title-main">Lackawanna Cut-Off</span> U.S. railway line between Port Morris, New Jersey, and Slateford, Pennsylvania

The Lackawanna Cut-Off was a rail line built by the Delaware, Lackawanna and Western Railroad (DL&W). Constructed from 1908 to 1911, the line was part of a 396-mile (637 km) main line between Hoboken, New Jersey, and Buffalo, New York. It ran west for 28.45 miles (45.79 km) from Port Morris Junction in Port Morris, New Jersey, near the south end of Lake Hopatcong about 45 miles (72 km) west-northwest of New York City, to Slateford Junction in Slateford, Pennsylvania near the Delaware Water Gap.

<span class="mw-page-title-main">Lake Hopatcong station</span> NJ Transit railway station

Lake Hopatcong is a commuter railroad station for New Jersey Transit. The station, located in the community of Landing in Roxbury Township, Morris County, New Jersey, United States, serves trains for the Montclair-Boonton Line and Morristown Line at peak hours and on holiday weekends. Service from Lake Hopatcong is provided to/from Hackettstown to New York Penn Station and Hoboken Terminal. The stop is located on the tracks below Landing Road next to the eponymous Lake Hopatcong. The station consists of one active platform with shelter, and an abandoned side platform. There is no accessibility for handicapped people.

<span class="mw-page-title-main">Roseville Avenue station</span> Former NJ Transit rail station

Roseville Avenue was a transfer station on New Jersey Transit's Morris & Essex Lines in Newark, New Jersey, United States. The station was built by the Delaware, Lackawanna and Western Railroad in 1903 as part of a project to lower the tracks below the road surface to eliminate grade crossings. It serviced Newark's Roseville neighborhood. It once had two tracks on the Lackawanna mainline and two low-wall platforms, with an additional platform along the Montclair Branch. The station remained in service during most of the 20th century, until New Jersey Transit closed the station on September 16, 1984.

<span class="mw-page-title-main">Paulinskill Viaduct</span> Bridge in Hainesburg, New Jersey

The Paulinskill Viaduct, also known as the Hainesburg Viaduct, is a reinforced concrete railroad bridge that crosses the Paulins Kill in Knowlton Township, New Jersey. When completed in 1910, it was the largest reinforced concrete structure in the world.

<span class="mw-page-title-main">Lackawanna Old Road</span> Former U.S. railway line

The Lackawanna Old Road was part of the original mainline of the Delaware, Lackawanna & Western Railroad (DL&W). Opened in 1856, it was, for a half-century, a part of the line connecting the states of New Jersey and Pennsylvania.

William Haynes Truesdale (1851–1935) was an American railroad executive. He served as the president of the Delaware, Lackawanna and Western Railroad (DL&W) from 1899 to 1925.

The Boonton Branch refers to the railroad line in New Jersey that was completed in 1870 and ran 34 miles (54.8 km) from Hoboken to East Dover Junction as part of the Morris & Essex Railroad (M&E). Although the branch hosted commuter trains, the line was primarily built as a freight bypass line. The term "branch", therefore, is somewhat of a misnomer since the Boonton Branch was built to higher mainline standards than the Morristown Line, the line that it bypassed. As a result, the Boonton Branch better meets the definition of a "cut-off" rather than a branch. Some of the towns that the Boonton Branch passed through included Lyndhurst, Passaic, Clifton, Paterson, Wayne, Lincoln Park, Mountain Lakes, and its namesake, Boonton.

<span class="mw-page-title-main">Slateford Junction</span>

Slateford Junction was a railway junction in the small town of Slateford, Pennsylvania, that operated from 1911 to 1979.

<span class="mw-page-title-main">Port Morris Junction</span>

Port Morris Junction is the railroad connection between NJ Transit's Montclair-Boonton Line and the Lackawanna Cut-Off. Opened in 1911 by the Lackawanna Railroad, it is in the Port Morris, New Jersey section of Roxbury Township, New Jersey, south of Lake Hopatcong.

<span class="mw-page-title-main">Roseville Tunnel</span> Rail tunnel in New Jersey

Roseville Tunnel is a 1,024-foot (312 m) two-track railroad tunnel on the Lackawanna Cut-Off in Byram Township, Sussex County, New Jersey. The tunnel is on a straight section of railroad between mileposts 51.6 and 51.8 (83 km), about 6 miles (9.7 km) north by northwest of Port Morris Junction. Operated for freight and passenger service from 1911 to 1979, it is undergoing work intended to return it to passenger service by 2026.

<span class="mw-page-title-main">Lackawanna Cut-Off Restoration Project</span> American railway infrastructure project

The Lackawanna Cut-Off Restoration Project is a New Jersey Transit and Amtrak effort to restore passenger service to the Lackawanna Cut-Off in northwest New Jersey.

<span class="mw-page-title-main">McMickle Cut (Lackawanna Cut-Off)</span>

McMickle Cut is the longest cut on the Lackawanna Cut-Off railroad line in northwest New Jersey. It was built between 1908 and 1911 by contractor Timothy Burke between mileposts 47.1 and 48.1 where Stanhope and Byram Township meet. Some 600,000 cubic yards of material was removed by dynamite and other methods to make the cut, which is 1.04 miles long, has an average depth of 29 feet, and a maximum depth of 54 feet.

<span class="mw-page-title-main">Lubber Run Fill</span>

Lubber Run Fill is a fill on the Lackawanna Cut-Off railroad line in northwest New Jersey. Located between mileposts 50.1 and 50.5 in Byram Township, it was built between 1908 and 1911 by contractor Waltz & Reece Construction Company. It is 0.40 miles (0.64 km) long, has an average height of 64 feet, and a maximum height of 98 feet. Most of its 720,000 cubic yards (550500 m3) of fill material was excavated from the surrounding low-lying area.

<span class="mw-page-title-main">Wharton Fill</span>

Wharton Fill is one of a number of fills (embankments) on the Lackawanna Cut-Off railroad line in northwest New Jersey. Located between mileposts 51.1 and 51.6 in Byram Township, the fill was constructed between 1908 and 1911 by contractor David W. Flickwir. The fill, which was created by placing fill material obtained by blasting with dynamite or other methods, is about 0.5 miles (0.64 km) long. Most of the material that was used to create Wharton Fill was excavated from the surrounding low-lying area through which Pumpkin Run runs; several of the borrow pits have since flooded and become ponds.

<span class="mw-page-title-main">Colby Cut</span> Cut on the Lackawanna Cut-Off railroad line in New Jersey, US

Colby Cut is one of a number of cuts on the Lackawanna Cut-Off railroad line in northwest New Jersey. Located between approximately mileposts 51.8 and 52.3 in Byram Township, the cut was constructed between 1908 and 1911 by contractor David W. Flickwir. The cut, which was created by removing fill material obtained by blasting with dynamite or other methods, is 0.53 miles (0.85 km) long, has an average depth of 45 feet (14 m), and a maximum depth of 110 feet (34 m). The cut was the result of the removal of 462,342 cubic yards of fill material within this section.

<span class="mw-page-title-main">Greendell station</span>

Greendell is one of three original railway stations built by the Delaware, Lackawanna & Western Railroad (DL&W) along its Lackawanna Cut-Off line in northwestern New Jersey. The station, which still stands in Green Township at milepost 57.61 on the Cut-Off, began operations on December 23, 1911, one day before the line itself opened and the first revenue train arrived.

<span class="mw-page-title-main">Andover station (NJ Transit)</span>

Andover is a planned New Jersey Transit passenger railroad station in Andover Township, in Sussex County, New Jersey, United States, providing service on its Lackawanna Cut-Off line. The line remains under construction. The station will be built at a site on Andover's Roseville Road, about 1.1 miles (1.8 km) from U.S. Route 206 and about 0.9 miles (1.4 km) from County Route 517. On the rail line, it will be located about 7.3 miles (11.7 km) west of Port Morris Junction.

<span class="mw-page-title-main">Nicholson Cutoff</span> Rail line segment

The Nicholson Cutoff is a rail line segment of the Sunbury Line rail line and formerly a rail line segment of the Delaware, Lackawanna and Western Railroad main line and the Delaware and Hudson Railway South Line. The Nicholson Cutoff and the rest of the Sunbury Line is owned by Norfolk Southern Railway.

References

  1. "Pequest Fill - The Lackawanna Cutoff - Then & Now". GSMRRClub. Archived from the original on 6 April 2012. Retrieved 17 December 2011.
  2. 1 2 3 4 Taber, Thomas Townsend; Taber, Thomas Townsend III (1980). The Delaware, Lackawanna & Western Railroad in the Twentieth Century. Vol. 1. Muncy, PA: Privately printed. pp. 36–40. ISBN   0-9603398-2-5.
  3. The Lackawanna Railroad in Northwest New Jersey, Larry Lowenthal and William T. Greenberg, Jr., Tri-State Railway Historical Society, Inc., 1987.

40°58′44″N74°45′47″W / 40.979°N 74.763°W / 40.979; -74.763