Ringedals Dam | |
---|---|
Location | Ringedalsvatnet, Norway |
Construction began | 1909 |
Opening date | 1918 |
Dam and spillways | |
Type of dam | Gravity dam |
Height | 33 metres (108 ft) |
Length | 521 metres (1,709 ft) |
Width (crest) | 4 metres (13 ft) |
Width (base) | 21.5 metres (71 ft) |
Reservoir | |
Total capacity | 426 million m3 |
Ringedals Dam is a gravity dam by Ringedalsvatnet at Tyssedal in Odda municipality in the county of Hordaland, Norway. The dam was built in stages between 1909 and 1918 in connection with the hydroelectric power plant in Tyssedal and the factories in Odda. When the dam was completed in 1918 it was one of Europe’s largest gravity dams with a reservoir capacity of 222 million m3. The dam is built in Cyclopean concrete with 30% large-sized stones (plums) and dressed on both sides with approximately 20,000 m² of hand-cut granite stone, the largest of its kind in Norway. The dam is crowned by the date and initials of managing director Ragnvald Blakstad and topped with merlons in Neo-Romanesque style.
Ringedalsvatnet is today the reservoir of Oksla Hydroelectric Power Plant at Sørfjorden. The reservoir has a capacity of 426 million m³ and the power station is every year producing approximately 900 GWh.
In the bedrock under the Ringedals Dam there are three tunnels. In 1903, three years before AS Tyssefaldene was established, the first underwater tunnel that pierced into the natural lake reservoir was made by the drill and blast method. The transfer tunnel was 100 meters long and named after the owner, Bruuns tunnel. The tunnel could lower the Ringedalsvatnet 10 meters, down to 428 meters above sea level. Later Bruuns Tunnel was made bigger and today a penstock pipe lifts the water from Skjeggedal Pumping Station to Ringedalsvatnet (pumped-storage hydroelectricity).
When the first stage of Tyssedal Power Station was built from 1906 to 1908, there was no need for a dam and reservoir. Ringedalsvatnet could be regulated 16 meters by a new transfer tunnel and valves. In 1907 a 160-meter-long tunnel with a cross section of 6.5–7 m² was cut out of the bedrock. The tunnel is named after the responsible engineer, Thorvald Schult (1874-1937). The valve house is also called "Schultsynken". The last tunnel under the dam is called Brekkes tunnel and is not in use.
When the smelting works in Odda needed more power from Tyssedal Power Station, a new dam had to be built at Vassendfossen in Skjeggedal.
In 1909 the construction work for the first dam started. It was built in dry-stone in granite downstream and upstream 3-meter-thick masonry. The dam consisted of 13000 m³ of stone and cement. When it was completed in 1912 it was 280 meters long and 16 meters high. At the bottom it was 12.5 meters and at the top 2.5 meters wide.
From 1911 the engineer office Ing. Kinck's Vandbygningskontor made plans for the next stage. The construction work started in 1914. AS Kristiania Monier og Cementvarefabrik and AS Høyer-Ellefsen were responsible for the construction of the dam. The new dam was built upstream and on top of the old dam.
The dam is 521 meters long and 33 meters high. At the bottom it is 21.5 meters and at the top 4 meters wide. For the construction they used 80,000 m³ of stone and cement. The top is at 465 m above sea level and it can be regulated down to 418 m.
The Ringedals Dam was controlled by three valve houses placed at different levels with a spillway on the top. The 41-meter-long spillway was originally controlled manually by five gates with needle sluices. In the 1950s two of the needle sluices were replaced by slide gates. Today all the needle gates are changed to the safer slide gates.
After a while, Tyssefaldene experienced leakage from the dam. In 1929, the engineers at Ingeniørfirmaet Chr. F. Grøner planned a new upstream dam plate in reinforced concrete. The pioneering project was built by AS Høyer-Ellefsen using gliding formwork. The new plate was constructed two meter upstream from the original granite wall and horizontally supported by 1,700 beams. The plate is 20–47 cm thick and covers an area of 9,700 m². It consist of 68 sections with 1 horizontal and 38 vertical expansion joints with plates of copper, bitumen and asphalt. The construction of the new dam plate was finished in 1931.
From 1938 to 1980, Skjeggedal Power Station utilized the 30-meter fall from Ringedalsvatnet down to Vetlevatn. The power station produced 13.5 MVA. After Oksla Power Station opened in 1980 Skjeggedal Power Station was rebuilt to a pumping station in 1986.
Since 1980 the Ringdals Dam has been supporting the reservoir for Oksla Power Station. From Ringdalsvatnet there is a new tunnel wherein the water is falling 465 m down to the power station, which is located at the fjord. The tunnel can regulate Ringedalsvatnet down to 373 meters.
The Gatun Dam is a large earthen dam across the Chagres River in Panama, near the town of Gatun. The dam, constructed between 1907 and 1913, is a crucial element of the Panama Canal; it impounds the artificial Gatun Lake, which in turn carries ships 33 kilometres (21 mi) of their transit across the Isthmus of Panama. In addition, a hydro-electric generating station at the dam generates electricity which is used to operate the locks and other equipment in the canal.
A spillway is a structure used to provide the controlled release of water downstream from a dam or levee, typically into the riverbed of the dammed river itself. In the United Kingdom, they may be known as overflow channels. Spillways ensure that water does not damage parts of the structure not designed to convey water.
The Robert-Bourassa generating station, formerly known as La Grande-2 (LG-2), is a hydroelectric power station on the La Grande River that is part of Hydro-Québec's James Bay Project in Canada. The station can generate 5,616 MW and its 16 units were gradually commissioned between 1979 and 1981. Annual generation is in the vicinity of 26500 GWh.
Ringedalsvatnet is a lake in Ullensvang Municipality in Vestland county, Norway. The 7-square-kilometre (2.7 sq mi) lake sits just east of the village of Skjeggedal and about 3.5 kilometres (2.2 mi) east from the village of Tyssedal, which sits on the shore of the Sørfjorden. The lake is the main reservoir for a hydroelectric power station in Tyssedal which provides electricity for the power intensive industries in the nearby town of Odda. The 521-metre (1,709 ft) wide and 33-metre (108 ft) high Ringedals Dam was constructed from 1910–1918.
Trolltunga is a rock formation situated about 1,100 metres (3,600 ft) above sea level in Ullensvang Municipality in Vestland county, Norway. The cliff juts horizontally out from the mountain, about 700 metres (2,300 ft) above the north side of the lake Ringedalsvatnet.
The Prospect Reservoir is a heritage-listed 50,200-megalitre potable water supply and storage reservoir created by the Prospect Dam, across the Prospect Creek located in the Western Sydney suburb of Prospect, in New South Wales, Australia. The eastern bounds of the reservoir are a recreational area and the western periphery are within the bounds of Western Sydney Parklands. It was added to the New South Wales State Heritage Register on 18 November 1999.
Laggan Dam is a dam located on the River Spean south west of Loch Laggan in the Scottish Highlands.
Yellowtail Dam is a dam across the Bighorn River in south central Montana in the United States. The mid-1960s era concrete arch dam serves to regulate the flow of the Bighorn for irrigation purposes and to generate hydroelectric power. The dam and its reservoir, Bighorn Lake, are owned by the U.S. Bureau of Reclamation.
The Norwegian Museum of Hydropower and Industry is a cultural history museum at Odda in Vestland county, Norway. The museum is located in the village of Tyssedal. The museum is dedicated to the industrial history of Odda and Tyssedal, and more generally to history related to rivers and water, hydropower production, electricity, power intensive industry and its society.
Cougar Dam is a 519-foot (158 m) tall rockfill hydroelectric dam in the U.S. state of Oregon. It has a gated concrete spillway and a powerhouse with two turbines totaling 25 megawatts of electric power.
The ponmudi dam is a concrete gravity dam built across the Panniyar river which is a tributary of Periyar River at Konnathadi panchayath of Konnathadi village in Idukki district of Kerala, India. The dam was constructed in 1963 as a part of a hydroelectric project. It has a length of 294 metres (965 ft) and a length of 288.80 metres (947.5 ft). The hydropower component of the dam has an installed capacity of 30 MW with firm power of 17 MW, generating 158 GWh annually. Taluks through which the river flow are Udumpanchola, Devikulam, Kothamangalam, Muvattupuzha, Kunnathunadu, Aluva, Kodungalloor and Paravur.
Glen Canyon Dam, a concrete arch dam on the Colorado River in the American state of Arizona, is viewed as carrying a large amount of risk, most notably due to siltation. The Colorado and San Juan rivers deposit large volumes of silt into Lake Powell, slowly decreasing its capacity. The sediment will eventually build up against the dam and could affect its safe operation and lead to its failure.
Feicui Dam is a double curvature concrete arch dam on the Beishi River in Shiding District, New Taipei, Taiwan, forming Feicui Reservoir (翡翠水庫). The dam is located in Shiding District, New Taipei City, and is usually misunderstood as the principal water source for the Greater Taipei area. The name of the dam and reservoir translates as "emerald lake", in reference to the pure quality of the water. The area is managed by the Taipei Feicui Reservoir Administration. Public access is heavily restricted in order to protect water quality, which is among the highest of Taiwan's reservoirs.
Deriner Dam is a concrete double-curved arch dam on the Çoruh River 5 km (3.1 mi) east of Artvin in Artvin Province, Turkey. The main purpose of the dam is hydroelectric power production and additionally flood control. Construction on the dam began in 1998, the reservoir began to fill in February 2012 and the power station was completed by February 2013. It will have a 670 MW power house and is the tallest dam in Turkey. The dam is being implemented by Turkey's State Hydraulic Works and constructed by a consortium of Turkish, Russian and Swiss companies.
Richard B. Russell Dam is a concrete-gravity and embankment dam located on the Savannah River at the border of South Carolina and Georgia, creating Richard B. Russell Lake. The dam was built by the U.S. Army Corps of Engineers between 1974 and 1985 for the purposes of flood control, hydroelectricity, recreation, additional stream flow regulation, water supply, and fish and wildlife management. The concrete structure of the dam spans 1,904 feet (580 m) and rises 210 feet (64 m) above the riverbed, housing a hydro-power plant with an installed 600 megawatts (800,000 hp) capacity. The Richard B. Russell Dam is the final large dam completed by the U.S. Army Corps in the Savannah River Basin and lies 30 miles downstream from the Hartwell Dam (1962) and 37 miles (60 km) upstream from the J. Strom Thurmond Dam (1954).
Aldeadávila Dam is a concrete arch-gravity dam on the Duero River in Spain, near the border with Portugal. The nearest town is Aldeadávila de la Ribera in the Province of Salamanca, about 11.3 kilometres (7.0 mi) to the east. The nearest Portuguese town is Fornos in Bragança District, about 8 kilometres (5.0 mi) to the southwest. The Portuguese side of the river around the dam site lies within the Arribes del Duero Natural Park.
Mågelibanen was a funicular with double track line arranged on a timber trestle work in Skjeggedal in Odda, Hordaland, Norway. From the station close to the Ringedals Dam and the lake Vetlavatn, the funicular ascended 430 meters (1,411 ft) to the top station Mågelitopp, 860 meters (2,822 ft) above sea level. The Mågelibanen was part of an industrial landscape connected to the listed hydroelectric power station in Tyssedal and the industry in the city of Odda.
New Don Pedro Dam, often known simply as Don Pedro Dam, is an earthen embankment dam across the Tuolumne River, about 2 miles (3.2 km) northeast of La Grange, in Tuolumne County, California. The dam was completed in 1971, after four years of construction, to replace the 1924 concrete-arch Don Pedro Dam.
Skjeggedal is a small village in the municipality of Ullensvang in Vestland county, Norway. The village lies on the northern shore of the lake Vetlevatnet, about 5 kilometres (3.1 mi) northeast of the village of Tyssedal and about 10 kilometres (6.2 mi) northwest of the town of Odda. The village is mostly made up of holiday cottages and a large hydroelectric power station near the large Ringedals Dam on the lake Ringedalsvatnet.
Wujie Dam is a concrete gravity dam on the Zhuoshui River in Ren'ai Township, Nantou County, Taiwan. The dam was built in two stages, from 1919 to 1922 and 1927–1934, and serves primarily to divert water from the Zhuoshui River to a storage reservoir at Sun Moon Lake and its associated hydroelectric projects. During the Japanese occupation of Taiwan it was known as Bukai Dam.