The Simcoe Street tunnel is located between Front Street and Bremner Blvd. in Toronto, Ontario, Canada. This CA$40 million tunnel is situated in a densely urban site below the SkyWalk and in close proximity to Toronto Union Station and the InterContinental Toronto Centre hotel. The tunnel roof structure is designed to carry all 16 pre-existing railway tracks. The ground structure provides one vehicle lane north bound and two lanes south bound, one bicycle lane and one extra wide pedestrian sidewalk on each side of the tunnel. [1]

Contents

The Simcoe Street tunnel was officially opened on September 22, 2009 by Councillor Adam Vaughan.[ citation needed ]

Construction

The Simcoe Street Tunnel while it was under construction. Simcoe Street Tunnel Construction.jpg
The Simcoe Street Tunnel while it was under construction.

Construction of the tunnel began in late 2006 and was carried out in stages. Thin soil cover prohibited the use of bored tunnel and hacked tunnel methods. For each stage the substructure was first constructed within the excavated trenches to the underside of the temporary trestles.

A key component in building the tunnel was the readily available supply of precast deck segments nearby. The project required 1.6 kilometres of girders so Soncin, who was contracted by Fairmont Developments to construct the extension of Simcoe Street, built a precast facility on site. A total of 153 girders were produced in three months. Fifty-one girders were post tensioned and 102 girders were normally reinforced. [2]

Design and construction of the tunnel posed significant challenges as the Union Station corridor has the highest train volume for a single terminus location in North America. [2] It was necessary to maintain the normal operation schedule of the railway corridor during construction. In order to not cause any disruption to the operation of 16 tracks, construction was scheduled during train work blocks. Morrison Hershfield the project managers, designers, contract administrators and site engineers, worked with the railway companies including Via Rail, Canadian National Railway, Amtrak and GO Transit to ensure the services of 177 daily scheduled trains that passed over the tunnel were maintained. Some trains were temporarily rerouted to adjacent tracks. [2]

Environmental and social impacts

A GO Transit train passing over the Simcoe Tunnel. Simcoe Tunnel 02.jpg
A GO Transit train passing over the Simcoe Tunnel.

To help protect the environment during construction of the tunnel a Quality Management Plan was set in place. This plan ensured all waste materials were disposed of according to government regulations. Disposal techniques were also monitored for compliance.

By not affecting the existing rail service of the 177 trains per day using the corridor, a risk of loss of ridership was removed that could have occurred in relation to potential delays. Long and short distance travellers were continuously able to get to their destinations as planned, which helped to avoid an increase in the use of personal vehicles. [3] A lasting environmental impact after construction is the improved access to the Lake Ontario waterfront within the City of Toronto. The original rail corridor was a major physical barrier between the downtown and the lakefront where continuous residential, recreational and business developments are occurring. [3] The tunnel reduces the length of vehicular travel time and associated carbon emissions, and the new ease of access promotes carbon-free travel, i.e., bicycling and walking.

Former Mayor of Toronto, David Miller was quoted saying “The Simcoe Street underpass will improve downtown traffic flow and help provide important services to future development on the lands south of Union Station. But most importantly, the project will improve access to our waterfront for all Torontonians." [3]

According to the city report published in 2014, the underpass was flooded 5 times between 2010 and 2013. [4]

See also

Related Research Articles

The Frederick G. Gardiner Expressway, commonly known as the Gardiner Expressway or simply the Gardiner, is a partially at grade and elevated municipal expressway in Toronto, Ontario, Canada. Running close to the shore of Lake Ontario, it extends from the foot of the Don Valley Parkway (DVP) in the east, just past the mouth of the Don River, to the junction of Highway 427 and the Queen Elizabeth Way (QEW) in the west, for a total length of 18.0 kilometres (11.2 mi). East of Dufferin Street to just east of the Don River, the roadway is elevated for a length of 6.8 kilometres (4.2 mi), unofficially making it the longest bridge in Ontario. It runs above Lake Shore Boulevard east of Spadina Avenue.

<span class="mw-page-title-main">Union Station (Toronto)</span> Railway station in Toronto, Ontario, Canada

Union Station is a major railway station and intermodal transportation hub in Toronto, Ontario, Canada. It is located on Front Street West, on the south side of the block bounded by Bay Street and York Street in downtown Toronto. The municipal government of Toronto owns the station building while the provincial transit agency Metrolinx owns the train shed and trackage. Union Station has been a National Historic Site of Canada since 1975, and a Heritage Railway Station since 1989. It is operated by the Toronto Terminals Railway, a joint venture of the Canadian National Railway and Canadian Pacific Railway that directs and controls train movement along the Union Station Rail Corridor, the largest and busiest rail corridor in Canada.

<span class="mw-page-title-main">Harbourfront, Toronto</span> Neighbourhood in Toronto, Ontario, Canada

Harbourfront is a neighbourhood on the northern shore of Lake Ontario within the downtown core of the city of Toronto, Ontario, Canada. Part of the Toronto waterfront, Harbourfront extends from Bathurst Street in the west, along Queens Quay, with its ill-defined eastern boundary being either Yonge Street or York Street. Its northern boundary is the Gardiner Expressway. Much of the district was former water lots filled in during the early 1900s to create a larger harbour district. After shipping patterns changed and the use of the Toronto harbour declined, the area was converted from industrial uses to a mixed-use district that is mostly residential and leisure.

<span class="mw-page-title-main">Barrie line</span> Commuter rail line in Ontario, Canada

Barrie is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It extends from Union Station in Toronto in a generally northward direction to Barrie, and includes ten stations along its 101.4 kilometres (63.0 mi) route. From 1982 to 1990 and again from 1993 to 2007, it was known as the Bradford line, named after its former terminus at Bradford GO Station until the opening of Barrie South GO Station.

<span class="mw-page-title-main">Stouffville line</span> Commuter rail line serving Toronto, Canada

Stouffville is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. Its southern terminus is Union Station in Toronto, and its northern terminus is Old Elm in Whitchurch-Stouffville. There are connections from almost every station to Toronto Transit Commission or York Region Transit bus services.

<span class="mw-page-title-main">Agincourt GO Station</span> GO Transit railway station in Ontario, Canada

Agincourt GO Station is a GO Transit railway station in Toronto, Ontario, Canada. The Stouffville line station serves the Agincourt neighbourhood of the former suburb of Scarborough.

<span class="mw-page-title-main">Sunnyside, Toronto</span> Lakefront district

Sunnyside is a lakefront district in Toronto, Ontario, Canada. It includes a beach and park area along Lake Ontario's Humber Bay, from west of Exhibition Place to the mouth of the Humber River. The area has several recreation uses, including rowing clubs, sports clubs, picnic areas, playgrounds, a nightclub, a bathing pavilion and public pool. The area is a 3 kilometres (1.9 mi) long strip along the lakeshore, bounded by the Gardiner Expressway and rail lines, which separate it from the Parkdale, Roncesvalles and Swansea neighbourhoods to the north. The name originates in a local farm owned by John Howard, which was situated just to the north, on the location of the current St. Joseph's Health Centre hospital.

<span class="mw-page-title-main">Montreal Central Station</span> Railway station in Montreal, Canada

Montreal Central Station is the major inter-city rail station and a major commuter rail hub in Montreal, Quebec, Canada. Nearly 11 million rail passengers use the station every year, making it the second-busiest train station in Canada, after Toronto Union Station.

<span class="mw-page-title-main">West Toronto Railpath</span> Multi-use trail in Toronto, Canada

The West Toronto Railpath is a multi-use trail in Toronto, Ontario, Canada, running from The Junction neighbourhood toward downtown Toronto. The Railpath was developed by the City of Toronto for bicycle and pedestrian use. Like Toronto's Beltline and Don Mills trails, it is an urban rail-to-trail project. Phase 1 of the path opened in 2009. Phase 2, an extension south from Dundas Street West to Liberty Village, was approved and proceeding with detailed design as of September 2020 with funding of $2.9 million jointly from the City and the Government of Canada. Construction of Phase 2 is expected to begin in 2023.

<span class="mw-page-title-main">Metrolinx</span> Crown agency owned by the Government of Ontario

Metrolinx is a Crown agency of the Government of Ontario that manages and integrates road and public transport in the Greater Toronto and Hamilton Area (GTHA), which comprises much of Ontario's Golden Horseshoe region. Headquartered at Union Station in Toronto, the agency was created as the Greater Toronto Transportation Authority on June 22, 2006. The agency adopted its present name as a brand name in 2007 and eventually as the legal name in 2009.

The Chrysler Canada Greenway is a 42 km-long rail trail in Essex County, Ontario, Canada, stretching from Oldcastle to Leamington.

<span class="mw-page-title-main">Alaskan Way</span> Street in Seattle, Washington

Alaskan Way, originally Railroad Avenue, is a street in Seattle, Washington, that runs along the Elliott Bay waterfront from just north of S. Holgate Street in the Industrial District—south of which it becomes East Marginal Way S.— to Broad Street in Belltown, north of which is Myrtle Edwards Park and the Olympic Sculpture Park. The right-of-way continues northwest through the park, just west of the BNSF Railway mainline, and the roadway picks up again for a few blocks at Smith Cove. It follows a route known in the late 19th century as the "Ram's Horn" because of its shape. The street gave its name to the Alaskan Way Viaduct, which until 2019 carried Washington State Route 99 through Downtown Seattle. The northern section of Alaskan Way is also signed as its honorary name, Dzidzilalich.

<span class="mw-page-title-main">Wilmington Rail Viaduct</span> United States historic place

The Wilmington Rail Viaduct is a series of fills and bridges, about 4 miles (6.4 km) long, that carries the Northeast Corridor through the city of Wilmington, Delaware, above street level. Constructed between 1902 and 1908, the structure consists principally of fills supported by heavy stone retaining walls, punctuated with plate girder bridges over streets, and augmented by a few sections of brick arch viaduct. Its construction is typical of the Pennsylvania Railroad's architectural practices at the time, and the viaduct has been documented by the Historic American Engineering Record and listed on the National Register of Historic Places. Built by the Pennsylvania Railroad (PRR) as part of a series of grade crossing eliminations along the Northeast Corridor, the elevation of the rail line necessitated several other changes to rail infrastructure in Wilmington, including the construction of the Wilmington Shops at the east end of the viaduct, and the construction of the Wilmington Station and adjacent Pennsylvania Railroad Office Building along the elevated right-of-way.

<span class="mw-page-title-main">Railway Lands</span> Redevelopment district in Toronto, Ontario, Canada

Railway Lands is an area in Downtown Toronto, Ontario, Canada. Originally a large railway switching yard near the Toronto waterfront, including the CNR Spadina Roundhouse and the CPR John Roundhouse, it has since been redeveloped and today is home to mostly mixed-used development, including the CN Tower and the Rogers Centre. The lands were owned and maintained by the Canadian National Railway and later transferred to the federal crown corporation Canada Lands Company. The area is bounded by Front Street, Yonge Street, Gardiner Expressway and Bathurst Street. The western portion of the Railway Lands is now part of the CityPlace neighbourhood and the eastern portion is now called South Core.

The Sahar Elevated Access Road, abbreviated to SEAR, is a dedicated, elevated, express access road in Mumbai that connects the Western Express Highway (WEH) near Hanuman Nagar junction in Vile Parle, with the forecourts of Terminal T2 of the Chhatrapati Shivaji International Airport. The road improves access and travel times between the WEH and the airport. The 2.2 km long access road has 4 entry and 2 exit points. The road also includes an underpass for vehicles travelling on the WEH and a pedestrian subway; as well as an underpass, a tunnel, and ramps connecting the highway to the terminal which bypasses the congested roadways below.

<span class="mw-page-title-main">A-Line (Hamilton)</span>

The A-Line is a proposed rapid transit line running along James Street in downtown and Upper James Street on the escarpment in Hamilton, Ontario. It is part of Hamilton's proposed BLAST network, involving four other rapid transit corridors. It is identified by Metrolinx in its regional transportation plan The Big Move as a project to be completed by 2023. The route is currently served by Hamilton Street Railway's Route 20 A-Line Express bus.

The Rathole, officially the 109 Street subway, was a two-lane tunnel constructed in 1927 on 109 Street in the northwest corner of Downtown, in Edmonton, Alberta, Canada. It traversed north-south under the former Canadian National (CN) railyards between 104 Avenue and 105 Avenue,. It was 168 m in length, 3.3 m in height, and constructed to accommodate automobile, bicycle and pedestrian traffic.

<span class="mw-page-title-main">Toronto Union Station (1858)</span> Railway station in Toronto, Ontario, Canada

Toronto’s first Union Station was a passenger rail station located west of York Street at Station Street, south of Front Street in downtown Toronto. It was built by the Grand Trunk Railway (GTR) and opened in 1858.

The Ontario Line is an under-construction rapid transit line in Toronto, Ontario, Canada. Its northern terminus will be at Eglinton Avenue and Don Mills Road, at Science Centre station, where it will connect with Line 5 Eglinton. Its southern terminus will be at the existing Exhibition GO Station on the Lakeshore West line. The Ontario Line was announced by the Government of Ontario on April 10, 2019. As of November 2022, the estimated cost for the 15.6-kilometre (9.7 mi) line is CA$17 to $19 billion with an estimated completion in 2031. Originally, the cost was estimated at $10.9 billion with completion by 2027. A groundbreaking ceremony for the project took place on March 27, 2022. Upon opening, the plan is for the line to assume the "Line 3" name which was used by Line 3 Scarborough until its closure in July 2023.

References

  1. 1 2 3 Versace, Vince (February 28, 2008). "Commuter traffic will gain new corridor as work done daily underfoot and undercover". Daily Commercial News. Retrieved February 4, 2020.
  2. 1 2 3 "Simcoe Street underpass now open". National Post. Retrieved 2011-03-10.
  3. "Flooding on Lower Simcoe underpass 'warning sign,' Tory says". CBC News. July 28, 2016. Retrieved February 4, 2020.

43°38′37″N79°23′04.5″W / 43.64361°N 79.384583°W / 43.64361; -79.384583