Skanled

Last updated
Skanled
Location
Country Norway
Sweden
Denmark
General directionnorth–south
From Kårstø, Norway
Passes throughRafnes
Lysekil
Vallby Kile
Bua
To Jutland, Denmark
General information
Type natural gas
OwnerSkanled Project Group
Partners Petoro
Skagerak Energi
E.ON Ruhrgas
PGNiG
Energinet.dk
VNG - Verbundnetz Gas AG
Gasunie
Göteborg Energi
Operator Gassco
Expectedsuspended
Technical information
Maximum discharge7 billion cubic meter per year

Skanled was a planned natural gas offshore pipeline connecting Norway to Sweden and Denmark.

Contents

Technical features

The submarine pipeline was to start in the Kårstø natural gas processing plant in western Norway, where it was to be connected with the Europipe II. It was to be run to eastern Norway, western Sweden and Denmark with exit points in Rafnes (Norway), Lysekil, Vallby Kile, Bua (Sweden) and Jutland (Denmark). [1] It consist of:

As part of the project, the pipeline was to transport also ethane, which would injected into the natural gas at Kårstø and transported with the natural gas to Rafnes, where it would separated and extracted from the gas. The separation facilities at Rafnes and the installations downstream the reduction stations in Sweden and Denmark were not part of the project. [2]

The originally planned capacity of the pipeline was 6 billion cubic meter (bcm) of natural gas per year. The plans were upgraded to 7 bcm. The likelihood of greater future demand from Denmark and Poland, which plan to connect Skanled through Denmark with other planned pipeline, the Baltic Pipe between Denmark and Poland, may lead to widen the diameter of the pipe from the initial design. [3]

The pipeline was to be operational by October 2012. [4] It was designed for 50 years of operation. [2] It expected to cost 10 billion Norwegian kroner. [4]

Suspension

The final investment decision depended on decisions by Yara International and Ineos, major potential consumers of gas provided by Skanled. [5] [6] In April 2009, the Skanled Project Group announced that they had decided to suspend the project "due to increased commercial risk combined with the global economic developments that have given an uncertain view on future gas demand." [7]

Contractors

The IKM Gruppen was selected for design activities related to the pipeline system with associated subsea structures, landfalls, and receiving and metering stations. [4]

Project company

The project was developed by the Skanled Project Group. Shareholders of the consortium were:

Gasunie accepted the invitation to join the project to replace Swedegas and, in part, Göteborg Energi in the consortium. [9] [10]

The project was managed by Gassco with Swedegas and Energinet.dk participating as partners. [2] The Skanled project director is Thor Otto Lohne. [6]

Related Research Articles

<span class="mw-page-title-main">Ormen Lange (gas field)</span> Large fossil fuel deposit off the coast of Norway

Ormen Lange is a natural gas field on the Norwegian continental shelf. It is situated 120 kilometres (75 mi) northwest of Kristiansund, where seabed depths vary between 800 and 1,100 metres. The field is named after the famous longship Ormen Lange of Olaf Tryggvason, a 10th-century Viking king of Norway.

Nord Stream is a pair of offshore natural gas pipelines in Europe that run under the Baltic Sea from Russia to Germany. It consists of the Nord Stream 1 (NS1) pipeline running from Vyborg in northwestern Russia, near Finland, and the Nord Stream 2 (NS2) pipeline running from Ust-Luga in northwestern Russia near Estonia. Both pipelines run to Lubmin in the northeastern German state of Mecklenburg-Vorpommern. Each pipeline contains two pipes, denoted A and B; each of the four pipes is approximately 1,200 kilometres (750 mi) long and with approximate diameters of 1,220 millimetres (48 in). The combined capacity of the four pipes is 110 billion cubic metres per annum of natural gas.

<span class="mw-page-title-main">Nabucco pipeline</span> Proposed natural gas pipeline from the Turkish-Bulgarian border to Austria

The Nabucco pipeline was a failed natural gas pipeline project from Erzurum, Turkey to Baumgarten an der March, Austria to diversify natural gas suppliers and delivery routes for Europe. The pipeline was to lessen European dependence on Russian energy. The project was backed by several European Union states and the United States and was seen as rival to the Gazprom-Eni South Stream pipeline project. The main supplier was to be Iraq with potential supplies from Azerbaijan, Turkmenistan, and Egypt.

The BBL Pipeline is a natural gas interconnector between the Netherlands and the United Kingdom.

Polskie Górnictwo Naftowe i Gazownictwo S.A., abbreviated to PGNiG, was a Polish state-controlled oil and gas company, headquartered in Warsaw, Poland. The company has branches and representative offices in Russia, Pakistan, Belarus and Ukraine and holds equity interests in some 30 subsidiaries, including providers of specialist geophysical, drilling and well services.

<span class="mw-page-title-main">Langeled pipeline</span> Gas pipeline from Norway to the UK

The Langeled pipeline is an underwater gas pipeline transporting Norwegian natural gas to the United Kingdom. Before the completion of the Nord Stream 1 pipeline, it was the longest subsea pipeline in the world.

Gassco is a Norwegian state owned company that operates 7,800 kilometres (4,800 mi) of natural gas pipes transporting annually of 100 billion cubic meter (bcm) of natural gas from the Norwegian continental shelf to Continental Europe and Great Britain.

The Baltic Gas Interconnector was a 2001 project of a natural gas submarine pipeline in the Baltic Sea between Germany, Denmark and Sweden. The pipeline would connect the existing pipeline networks of southern Scandinavian and Continental European countries in order to secure uninterrupted supply of natural gas.

<span class="mw-page-title-main">Trans-Mediterranean Pipeline</span>

The Trans-Mediterranean Pipeline is a natural gas pipeline from Algeria via Tunisia to Sicily and thence to mainland Italy. An extension of the TransMed pipeline delivers Algerian gas to Slovenia.

<span class="mw-page-title-main">Europipe II</span> Natural gas pipeline from Norway to Germany

Europipe II is a natural gas pipeline from the Kårstø processing plant north of Stavanger to a receiving terminal at Dornum in Germany. It came on stream on 1 October 1999.

<span class="mw-page-title-main">Kårstø</span>

Kårstø is an industrial facility located near the village of Susort, along the Boknafjorden, in the municipality of Tysvær in Rogaland county, Norway. The site features a number of natural gas processing plants that refine natural gas and condensate from the fields in the northern parts of the North Sea, including the Åsgard, Mikkel, and Sleipner gas fields. The Kårstø processing complex is Europe's biggest export port for natural gas liquids (NGL) and the third largest in the world. The industrial site is also the location for the now-closed Kårstø Power Station.

<span class="mw-page-title-main">Sleipner gas field</span> North Sea off Norway

The Sleipner gas field is a natural gas field in the block 15/9 of the North Sea, about 250 kilometres (160 mi) west of Stavanger, Norway. Two parts of the field are in production, Sleipner West, and Sleipner East (1981). The field produces natural gas and light oil condensates from sandstone structures about 2,500 metres (8,200 ft) below sea level. It is operated by Equinor. The field is named after the eight-legged steed Sleipnir of Odin a widely revered god in Norse mythology.

The Statpipe pipeline is a natural gas system, which links northern North Sea gas fields with Norway's gas export system. It transports gas from Statfjord, Gullfaks, Heimdal, Veslefrikk, Snorre, Brage and Tordis gas fields.

<span class="mw-page-title-main">Baltic Pipe</span> Natural gas pipeline from Europipe II to Poland

The Baltic Pipe is a natural gas pipeline between Europipe II and Poland. It is a strategic infrastructure project to create a new European gas supply corridor.

Energinet is the Danish national transmission system operator for electricity and natural gas. It is an independent public enterprise owned by the Danish state under the Ministry of Climate and Energy. Energinet has some 1150 employees, and its headquarters are located in Erritsø near Fredericia in Jutland. The gas division is located in Ballerup near Copenhagen.

Gassled is a partnership to own the offshore natural gas transportation infrastructure at the Norwegian continental shelf. Its pipelines are operated by Gassco.

The Draupner platform is a gas platform for the extraction of natural gas in the North Sea consisting of the Draupner S and E riser platforms. It is located in the Norwegian North Sea block 16/11 160 km (99 mi) offshore from Norway. The complex consists of seven risers and two riser platforms standing in 70 m (230 ft) water depth and linked by a bridge. Draupner E is the first major oil platform using jacket-type construction supported on a bucket foundation and suction anchors. The complex is owned by Gassled and operated by Gassco. The technical service provider is Equinor.

Haltenpipe is a gas transport system which consists of a 250 kilometres (160 mi) long pipeline from the Heidrun field to Tjeldbergodden. It started operation in December 1996, and is operated by Gassco. Transport capacity is 2.2. billion cubic metres per year.

<span class="mw-page-title-main">Electricity sector in Denmark</span> Overview of the electricity sector in Denmark

Denmark's western electrical grid is part of the Synchronous grid of Continental Europe whereas the eastern part is connected to the Synchronous grid of Northern Europe via Sweden.

<span class="mw-page-title-main">North Sea Wind Power Hub</span>

North Sea Wind Power Hub is a proposed energy island complex to be built in the middle of the North Sea as part of a European system for sustainable electricity. One or more “Power Link” artificial islands will be created at the northeast end of the Dogger Bank, a relatively shallow area in the North Sea, just outside the continental shelf of the United Kingdom and near the point where the borders between the territorial waters of Netherlands, Germany, and Denmark come together. Dutch, German, and Danish electrical grid operators are cooperating in this project to help develop a cluster of offshore wind parks with a capacity of several gigawatts, with interconnections to the North Sea countries. Undersea cables will make international trade in electricity possible.

References

  1. "Polish Oil and Gas Company Joins SKANLED Consortium". Rigzone. PGNiG. 2007-06-22. Retrieved 2007-09-15.
  2. 1 2 3 4 "Information concerning the planning of Skanled gas pipeline" (PDF). Energinet.dk. June 2007. Archived from the original (PDF) on 2007-06-30. Retrieved 2007-09-15.
  3. Herron, James (2007-09-07). "Expansion Likely on Norway-Denmark Gas Pipeline". Downstream Today. Dow Jones Newswires . Retrieved 2007-09-15.
  4. 1 2 3 "Skanled contract for IKM Gruppen". Gassco. 2008-08-07. Archived from the original on 2012-02-18. Retrieved 2009-03-21.
  5. 1 2 Moskwa, Wojciech (2009-03-17). "Norway Gas Pipeline Plan Hit By Yara Pullout". Downstream Today. Reuters. Retrieved 2009-03-21.
  6. 1 2 Wojciech Moskwa (2009-01-05). "Ineos doubts risk Norway gas pipeline plans-paper". Forbes. Retrieved 2009-03-21.[ dead link ]
  7. "Skanled project suspended" (Press release). The Skanled Project Group. 2009-04-29. Retrieved 2009-11-05.
  8. "Norway's Petoro Taking Up To 30% In Skanled". Downstream Today. AFX News Limited. 2009-02-13. Retrieved 2009-03-21.
  9. Moskwa, Wojciech (2009-03-17). "Dutch Gasunie joins Skanled pipeline project". Reuters. Archived from the original on February 1, 2013. Retrieved 2009-03-21.
  10. "Skanled Group invites Gasunie to aid in Skanled project investment decision". Offshore. PennWell Corporation. 2009-03-19. Retrieved 2010-10-10.