Sognefjord Span

Last updated

The Sognefjord Spans are the second, third, and fourth longest spans in the world situated east of Hermansverk, Norway and are part of different powerlines. As Sognefjord Span is a deep valley the pylons of these spans are not taller than ordinary pylons. In order to avoid any too close approaches or contacts between the conductors, each is mounted on a separate pylon at the end of the span, which is built as a steel framework tower.

Contents

Span 1

This span is part of the powerline between Hermansverk 61°10′49″N6°51′53″E / 61.18028°N 6.86472°E / 61.18028; 6.86472 (Hermansverk) and Vikøyri 61°04′50″N6°35′13″E / 61.08056°N 6.58694°E / 61.08056; 6.58694 (Vikøyri) and was built in the 1950s. It has a length of 4850 metres and was until the inauguration of Ameralik Span the longest span in the world. The span, which crosses Sognefjord in North-South direction, has 4 conductors, whereby one is for reserve. Its northern ends are at
61°10′30″N6°54′14″E / 61.17500°N 6.90389°E / 61.17500; 6.90389 (Sognefjord Span 1, Tower North 1)
61°10′29″N6°54′16″E / 61.17472°N 6.90444°E / 61.17472; 6.90444 (Sognefjord Span 1, Tower North 2)
61°10′29″N6°54′19″E / 61.17472°N 6.90528°E / 61.17472; 6.90528 (Sognefjord Span 1, Tower North 3)
61°10′27″N6°54′21″E / 61.17417°N 6.90583°E / 61.17417; 6.90583 (Sognefjord Span 1, Tower North 4)

and its southern ends are at
61°08′21″N6°51′13″E / 61.13917°N 6.85361°E / 61.13917; 6.85361 (Sognefjord Span1, Tower South 1)
61°08′20″N6°51′17″E / 61.13889°N 6.85472°E / 61.13889; 6.85472 (Sognefjord Span1, Tower South 2)
61°08′19″N6°51′18″E / 61.13861°N 6.85500°E / 61.13861; 6.85500 (Sognefjord Span1, Tower South 3)
61°08′16″N6°51′18″E / 61.13778°N 6.85500°E / 61.13778; 6.85500 (Sognefjord Span1, Tower South 4) .

Span 2

Just a few hundred metres east of Span 1, the powerline from Stakaldefossen 61°26′48″N6°00′49″E / 61.44667°N 6.01361°E / 61.44667; 6.01361 (Stakaldefossen) to Refsdal: 61°01′15″N6°34′08″E / 61.02083°N 6.56889°E / 61.02083; 6.56889 (Refsdal) crosses Sognefjord with a 4520 metres long spanin East-West direction. As Span 1 it has 4 conductors, whereby 1 is as reserve. The locations of the towers used for this span are at its western end:
61°08′08″N6°51′37″E / 61.13556°N 6.86028°E / 61.13556; 6.86028 (Sognefjord Span2, Tower West 1)
61°08′07″N6°51′38″E / 61.13528°N 6.86056°E / 61.13528; 6.86056 (Sognefjord Span2, Tower West 2)
61°08′05″N6°51′39″E / 61.13472°N 6.86083°E / 61.13472; 6.86083 (Sognefjord Span2, Tower West 3)
61°08′04″N6°51′40″E / 61.13444°N 6.86111°E / 61.13444; 6.86111 (Sognefjord Span2, Tower West 4)

and at its eastern end:
61°08′28″N6°56′39″E / 61.14111°N 6.94417°E / 61.14111; 6.94417 (Sognefjord Span2, Tower East 1)
61°08′27″N6°56′39″E / 61.14083°N 6.94417°E / 61.14083; 6.94417 (Sognefjord Span2, Tower East 2)
61°08′25″N6°56′36″E / 61.14028°N 6.94333°E / 61.14028; 6.94333 (Sognefjord Span2, Tower East 3)
61°08′24″N6°56′36″E / 61.14000°N 6.94333°E / 61.14000; 6.94333 (Sognefjord Span2, Tower East 4) .

Span 3

Approximately 9 kilometres east-south east of these spans, there crosses the line from Aurland1 60°51′46″N7°18′04″E / 60.86278°N 7.30111°E / 60.86278; 7.30111 (Aurland1) to Langedøla 61°26′14″N7°14′44″E / 61.43722°N 7.24556°E / 61.43722; 7.24556 (Langedøla) Sognefjord in a span with a length of 4500 metres in North-South direction. It has no reserve conductor and consists therefore of 3 ropes. Its towers are situated at its southern end at
61°6′19″N7°03′53″E / 61.10528°N 7.06472°E / 61.10528; 7.06472 (Sognefjord Span3, Tower South 1)
61°6′20″N7°03′55″E / 61.10556°N 7.06528°E / 61.10556; 7.06528 (Sognefjord Span3, Tower South 2)
61°6′21″N7°03′58″E / 61.10583°N 7.06611°E / 61.10583; 7.06611 (Sognefjord Span3, Tower South 3)

and at its north end at
61°8′45″N7°02′56″E / 61.14583°N 7.04889°E / 61.14583; 7.04889 (Sognefjord Span3, Tower North 1)
61°8′45″N7°02′59″E / 61.14583°N 7.04972°E / 61.14583; 7.04972 (Sognefjord Span3, Tower North 2)
61°8′46″N7°03′02″E / 61.14611°N 7.05056°E / 61.14611; 7.05056 (Sognefjord Span3, Tower North 3)
.

See also


Related Research Articles

Transmission tower Structure used to support an overhead power line

A transmission tower or power tower is a tall structure, usually a steel lattice tower, used to support an overhead power line.

Baltic Cable HVDC power line between Sweden and Germany

The Baltic Cable is a monopolar HVDC power line running beneath the Baltic Sea that interconnects the electric power grids of Germany and Sweden. Its maximum transmission power is 600 megawatts (MW).

The HVDC Volgograd–Donbass is a 475 kilometres (295 mi) long bipolar ±400 kV high voltage direct current powerline used for transmitting electric power from Volga Hydroelectric Station at Volgograd in Russia to Donbass in eastern Ukraine and vice versa.

Pylons of Messina

The Pylons of Messina are two free-standing steel towers, the Sicilian one in Torre Faro and the Calabrian one in Villa San Giovanni. They were used from 1955 to 1994 to carry a 220 kilovolt power line across the Strait of Messina, between the Scilla substation in Calabria on the Italian mainland at 38°14′42″N15°40′59″E and the Messina-Santo substation in Sicily at 38°15′57″N15°39′04″E.

Pylons of Cádiz architectural structure

The Pylons of Cádiz, also known as the Towers of Cádiz, are two 158m-tall pylons supporting a double-circuit 132 kV three-phase AC powerline over the bay of Cádiz, Spain, running from Puerto Real Substation to the substation of the former Cadiz Thermal Power Station, situated on the peninsula upon which the city of Cádiz stands.

The Ameralik Span is the longest span of an electrical overhead power line in the world. It is situated near Nuuk on Greenland and crosses Ameralik Fjord with a span width of 5,376 metres at 64°6′18″N51°14′16″W. It was built in 1993 by the Norwegian company NTE Entreprise and is part of a single-circuit 132 kV powerline running from Buksefjord hydroelectric power plant to Nuuk.

Overhead line crossing crossing of an obstacle (e.g. river, traffic route, other power line) by an overhead power line

An overhead line crossing is the crossing of an obstacle—such as a traffic route, a river, a valley or a strait—by an overhead power line. The style of crossing depends on the local conditions and regulations at the time the power line is constructed. Overhead line crossings can sometimes require extensive construction and can also have operational issues. In such cases, those in charge of construction should consider whether a crossing of the obstacle would be better accomplished by an underground or submarine cable.

Sognefjord fjord in Norway

The Sognefjord or Sognefjorden, nicknamed the King of the Fjords, is the largest and deepest fjord in Norway. Located in Vestland county in Western Norway, it stretches 205 kilometres (127 mi) inland from the ocean to the small village of Skjolden in the municipality of Luster.

Kerinchi Pylon

The Kerinchi Pylon is a lattice-steel transmission tower located near Menara Telekom in Kerinchi, Kuala Lumpur, Malaysia.

The Yangtze River power line crossings are overhead power lines that cross the Yangtze River in China. There are at least three power line crossings on the Yangtze River at Jiangyin, Nanjing, and Wuhu. The towers of the crossing in Jiangyin are among the highest in the world.

Kootenay Lake Crossing was a powerline crossing of Kootenay Lake, British Columbia, Canada. The idea was to move electricity from the Hydro dam on the Kootenay River at Brilliant to the Cominco Sullivan Mine at Kimberley. The most direct route was across Kootenay Lake. It was with a span width of 3,248 metres (10,656 ft) the longest powerline span of North America and was fixed on two 90 metres (300 ft) tall electricity pylons. Roebling cable provided the steel support cable for the conductor. The height of conductor over Kootenay Lake was 37 metres (121 ft). There was a 100 metres (330 ft) steel support tower on the east shore, and rock anchored shorter towers high up on the west shore. Kootenay Lake Crossing was inaugurated in 1958, but was demolished in 1962 by explosives placed by the Sons of Freedom religious sect of the Doukhobors. The tower was rebuilt and the span lengthened in course. The powerline is still in operation today, but uses today on each site of the lake situated at 49°42'2"N 116°51'59"W and at 49°42'29"N 116°54'44"W.

Aust Severn Powerline Crossing

Aust Severn Powerline Crossing is the longest powerline span in the United Kingdom with a span width of 1,618 m (5,308 ft).

Power line crossings in Poland

In Poland, there are 6 powerline crossings of the Vistula river and one powerline crossing of the Odra river using pylons taller than 100 metres.

GKK Etzenricht former HVDC back-to-back station in Germany

GKK Etzenricht, an abbreviation of Gleichstromkurzkupplung Etzenricht, meaning Etzenricht HVDC-back-to-back station, was an HVDC back-to-back facility near Etzenricht in the district of Neustadt an der Waldnaab in Bavaria, Germany. It was built on the site of the Etzenricht substation, a 380 kV/220 kV/110 kV-substation, which went into service in 1970 and expanded afterwards several times. The facility was used between 1993 and 1995 for exchange of power between Germany and the Czech Republic, operated by Bayernwerk AG.

Chūshi Powerline Crossing

The Chūshi Powerline Crossing is a part of the Chūshi mainline, a 220 kV powerline in Japan. It has two circuits running over the Inland Sea from Takehara. It was built in 1962 and consists of two towers, each 226 metres tall, one situated in Takehara, Honshū at 34°19′55.8″N132°59′3.3″E, the other on the island of Ōkunoshima at 34°18′42.8″N132°59′32.2″E. These towers are the tallest electricity pylons in Japan and carry six conductors arranged in three levels. The span between the two towers has a length of 2,357 metres and has a minimum clearance of 42 metres. The conductors have a cross section of 170 mm2, a diameter 35.2 mm and are designed for a maximum current of 645 A.

Reisholz Rhine Powerline Crossing former overhead power line crossing in Germany

Reisholz Rhine Powerline Crossing is a powerline crossing of Rhine River in Düsseldorf south of Holthausen substation, which was built in 1917 and originally part of the 110 kV-line between Reisholz Power Station and Goldenberg Power Station. This line was the first 110 kV-powerline of RWE. Later the line was transformed into a 220 kV line with 12 conductors arranged in 4 levels in an unusual double danube pylon mode. The span width between the pylons, which are both 88 metres (289 ft) tall, is 375 metres (1,230 ft). The pylon on the east side of Rhine River has a unique feature as under its legs a normal-gauge railway connecting Holthausen substation with the railway grid passes.

The Vetrino–Isaccea–Yuzhnoukrainsk powerline is the third 750 kilovolts powerline running from Ukraine to the European Union.

Osaki Channel Crossing is a power line crossing the Seto Inland Sea south of Yoshina, Takehara in Japan, which was built in 1997 and runs to the Ozaki Power Plant. The Ozaki Power Plant is owned by Chugoku Electric Power Company and is situated on an island in the Inland Sea. It has a span width of 2145 metres.

Lutsk compact overhead powerline technically unique 10 kV overhead power line in Lutsk, Ukraine

Lutsk compact overhead line in Volyn Oblast, Ukraine is a technically unique 10 kV power transmission line that connects a thermal power plant in Lutsk to the Lutsk-Pivnichna substation.

The Zhoushan Island Overhead Powerline Tie is a 220 kV three-phase AC interconnection of the power grid of Zhoushan Island with that of the Chinese mainland. It runs over several islands and consists of several long distance spans, the longest with a length of 2.7 kilometres (1.7 mi) south of Damao Island. This span uses two 370-metre-tall (1,210 ft) pylons, which are the tallest electricity pylons in the world. The north tower on Damao Island was completed in 2009, and the south tower on Liangmao Island was completed in 2010. These pylons resemble those of the Messina Strait, but are steel-tube lattice structures.