Technical performance measure

Last updated

Technical performance measures (TPM) is a term used by the US military to refer to key technical goals that needed to be met, where the technical goals were vital for the functioning of a system in its environment.

Contents

Definitions

TPM is defined as "the continuing prediction and demonstration of the degree of anticipated or actual achievement of selected technical objectives." [1]

A definition given by Dr. Norman Waks, formerly Director of Defense Research and Engineering in the Office of the Secretary of Defense is as follows:

"... we know that the regular demonstration through test or prediction, extrapolation, or other forecasting technique, of the degree of actual or anticipated achievement of selected technical goals or objectives of a system, component, or equipment project/program and an accounting, in the causal sense, for the difference between the result of this status reading and that which was planned, in a fashion which permits appropriate managers to take timely action on indicated problems." [2]

Related Research Articles

Earned value management (EVM), earned value project management, or earned value performance management (EVPM) is a project management technique for measuring project performance and progress in an objective manner.

Systems engineering Interdisciplinary field of engineering

Systems engineering is an interdisciplinary field of engineering and engineering management that focuses on how to design, integrate, and manage complex systems over their life cycles. At its core, systems engineering utilizes systems thinking principles to organize this body of knowledge. The individual outcome of such efforts, an engineered system, can be defined as a combination of components that work in synergy to collectively perform a useful function.

Performance management (PM) is the process of ensuring that a set of activities and outputs meets an organization's goals in an effective and efficient manner. Performance management can focus on the performance of an organization, a department, an employee, or the processes in place to manage particular tasks. Performance management standards are generally organized and disseminated by senior leadership at an organization and by task owners, it can include specifying tasks and outcomes of a job, providing timely feedback and coaching, comparing employee's actual performance and behaviors with desired performance and behaviors, instituting rewards, etc. It is necessary to outline the role of each individual in the organization in terms of functions and responsibilities to ensure that performance management is successful.

A software metric is a standard of measure of a degree to which a software system or process possesses some property. Even if a metric is not a measurement, often the two terms are used as synonyms. Since quantitative measurements are essential in all sciences, there is a continuous effort by computer science practitioners and theoreticians to bring similar approaches to software development. The goal is obtaining objective, reproducible and quantifiable measurements, which may have numerous valuable applications in schedule and budget planning, cost estimation, quality assurance, testing, software debugging, software performance optimization, and optimal personnel task assignments.

Program management or programme management is the process of managing several related projects, often with the intention of improving an organization's performance. In practice and in its aims, program management is often closely related to systems engineering, industrial engineering, change management, and business transformation. In the defense sector, it is the dominant approach to managing very large projects. Because major defense programs entail working with contractors, it is often called acquisition management, indicating that the government buyer acquires goods and services by means of contractors.

Management by objectives (MBO), also known as management by planning (MBP), was first popularized by Peter Drucker in his 1954 book The Practice of Management. Management by objectives is the process of defining specific objectives within an organization that management can convey to organization members, then deciding how to achieve each objective in sequence. This process allows managers to take work that needs to be done one step at a time to allow for a calm, yet productive work environment. In this system of management, individual goals are synchronized with the goals of the organization.

Expectancy theory proposes that an individual will behave or act in a certain way because they are motivated to select a specific behavior over others due to what they expect the result of that selected behavior will be. In essence, the motivation of the behavior selection is determined by the desirability of the outcome. However, at the core of the theory is the cognitive process of how an individual processes the different motivational elements. This is done before making the ultimate choice. The outcome is not the sole determining factor in making the decision of how to behave.

Performance indicator Measurement that evaluates the success of an organization

A performance indicator or key performance indicator (KPI) is a type of performance measurement. KPIs evaluate the success of an organization or of a particular activity in which it engages.

The Capability Maturity Model Integration (CMMI) defines a Process Area as, "A cluster of related practices in an area that, when implemented collectively, satisfies a set of goals considered important for making improvement in that area." Both CMMI for Development v1.3 and CMMI for Acquisition v1.3 identify 22 process areas, whereas CMMI for Services v1.3 identifies 24 process areas. Many of the process areas are the same in these three models.

Performance-based budgeting is the practice of developing budgets based on the relationship between program funding levels and expected results from that program. The performance-based budgeting process is a tool that program administrators can use to manage more cost-efficient and effective budgeting outlays.

The Society of Allied Weight Engineers (SAWE) is a professional society of engineers that pertains to the specific field of Mass Properties.

Control is a function of management which helps to check errors in order to take corrective actions. This is done to minimize deviation from standards and ensure that the stated goals of the organization are achieved in a desired manner.

The Government Performance and Results Act of 1993 (GPRA) is a United States law enacted in 1993, one of a series of laws designed to improve government performance management. The GPRA requires agencies to engage in performance management tasks such as setting goals, measuring results, and reporting their progress. In order to comply with the GPRA, agencies produce strategic plans, performance plans, and conduct gap analyses of projects. The GPRA of 1993 established project planning, strategic planning, and set up a framework of reporting for agencies to show the progress they make towards achieving their goals.

Goal Idea of the future or result that a person or group wants to achieve

A goal is an idea of the future or desired result that a person or a group of people envision, plan and commit to achieve. People endeavour to reach goals within a finite time by setting deadlines.

Overall Equipment Effectiveness (OEE) is a measure of how well a manufacturing operation is utilized compared to its full potential, during the periods when it is scheduled to run. It identifies the percentage of manufacturing time that is truly productive. An OEE of 100% means that only good parts are produced, at the maximum speed, and without interruption.

Alan Bovik

Alan Conrad Bovik is an American engineer and vision scientist. He is a Professor at The University of Texas at Austin (UT-Austin), where he holds the Cockrell Family Regents Endowed Chair in the Cockrell School of Engineering and is Director of the Laboratory for Image and Video Engineering. He is a faculty member in the UT-Austin Department of Electrical and Computer Engineering, the Machine Learning Laboratory, the Institute for Neuroscience, and the Wireless Networking and Communications Group.

In the United States military integrated acquisition lifecycle the Technical section has multiple acquisition "Technical Reviews". Technical reviews and audits assist the acquisition and the number and types are tailored to the acquisition. Overall guidance flows from the Defense Acquisition Guidebook chapter 4, with local details further defined by the review organizations. Typical topics examined include adequacy of program/contract metrics, proper staffing, risks, budget, and schedule.

Department of Commerce Gold Medal Award

The Department of Commerce Gold Medal is the highest honor award of the United States Department of Commerce. Since 1949, the Department of Commerce Gold Medal is presented by the Secretary of Commerce for distinguished performance. The award may be presented to an individual, group, or organization in the Commerce Department for extraordinary, noble, or prestigious contributions that impact the mission of the department and/or one or more operating units, which reflects favorable on the department.

Total Productive Maintenance (TPM) started as a method of physical asset management focused on maintaining and improving manufacturing machinery, in order to reduce the operating cost to an organization. After the PM award was created and awarded to Nippon Denso in 1971, the JIPM, expanded it to include 8 pillars of TPM that required involvement from all areas of manufacturing in the concepts of lean Manufacturing. TPM is designed to disseminate the responsibility for maintenance and machine performance, improving employee engagement and teamwork within management, engineering, maintenance, and operations.

 There are eight types of pillars TPM. 

Willard R. Fazar was an American economist, Head of the Program Evaluation Branch at Special Projects Office, U.S. Navy, and author. He is known as one of co-inventors, and key-developers of PERT."

References

  1. Technical Performance Measurement Handbook. Fort Belvoir: Defense Systems Management College. 1984. p. 3. Archived from the original on May 23, 2012. Retrieved 20 November 2014.
  2. Waks, Norman (December 1968). "Technical Performance Measurement - A Defense Department View". Defence Industry Bulletin., quoted in "TECHNICAL PERFORMANCE MEASUREMENT HANDBOOK". Defense Systems Management College. July 31, 1984. Retrieved October 19, 2009.