Tembek

Last updated
History
NameTembek
OwnerOverseas LNG S1 Corporation
OperatorNakilat Shipping (Qatar) Limited (NSQL)
Port of registryFlag of the Marshall Islands.svg Marshall Islands
Builder Samsung Heavy Industries Co. Ltd. (Korea), Koje Shipyard
Yard number1605
Laid down2006-05-15
Launched2006-09-10
Completed2007-11-19
Identification
General characteristics
Type LNG tanker
Tonnage
  • 136,410  GT
  • 40,924  NT
  • 106,896  DWT
Lengthoverall 315.17 m (1,034 ft 0 in)
Draught12 m (39 ft 4 in)
Depth27 m (88 ft 7 in)
Speed20.4 kn (37.8 km/h; 23.5 mph)
Capacity216,200 m3 (7,640,000 cu ft) storage (LNG)

Tembek a Q-Flex ship [1] is the first liquefied natural gas (LNG) carrier to berth at Milford Haven [2] at the South Hook LNG terminal.

Technical dates

The auxiliary boilers EB150120 and MB0106DS08 were designed and manufactured by Kangrim. The emergency diesel generator power unit (KTA38-D(M)) was produced by Cummins Inc.

The five main generator engines (7L32/40) were of MAN Diesel SE manufacture.

The two main propulsion engines are diesel (6S70ME-C) and were supplied by MAN B&W.

The two propellers are mono-block and were supplied by MMG (Mecklenburger Metallguss).

Speed recorded (Max / Average) 20.4 / 18.4 knots

References

  1. Fineren, Daniel (2009-03-17). "UPDATE 1-First LNG tanker to dock at UK's South Hook Friday". reuters.com. Retrieved 2009-03-18.
  2. "First LNG shipment expected on Friday". Western Telegraph. 2009-03-16. Retrieved 2009-03-17.